R200_B2B_Gateway_Questionnaire.pdf
PDF 436 KB Posted
- Attached to
- TRICARE Overseas Program (TOP) 2021 Solicitation - HT940219R0001 Federal contract opportunity
- Solicitation number
- HT9402-19-R-0001
- Issued by
- Defense Health Agency
About this file
This document package includes a Business-to-Business Gateway Questionnaire template and information on a related TRICARE Overseas Program federal contract opportunity.
The Questionnaire template is to be used by commercial partners to provide various technical details to the Defense Health Agency regarding proposed Business-to-Business connections to Military Health System networks. It requests information such as software and hardware requirements, network diagrams, point of contact information, and approval signatures.
The federal contract opportunity is a Request for Proposal for the TRICARE Overseas Program 2021 contract. The anticipated period of performance is a 1-year base period for transition plus seven 1-year option periods, for a potential total of 8 years and 6 months. Proposals are due by October 31, 2019. The contract will provide a range of administrative health care support services for TRICARE-eligible beneficiaries residing outside the 50 United States, including developing provider networks, claims processing, call center support, and medical management. The Defense Health Agency is the contracting agency.
R200 B2B Gateway Questionnaire
View the file
Other files for this federal contract opportunity
Show all 50
TRICARE Overseas Program (TOP) 2021 Solicitation - HT940219R0001 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(1 Data Item) Form Approved OMB No. 0704-0188
HT9402-19-R-0001
(Data Acquisition Document No.)
O
Contract Award
09 09
DEFENSE HEALTH AGENCY
BUSINESS 2 BUSINESS (B2B) GATEWAY QUESTIONNAIRE
PHASE II – [INSERT VENDOR NAME AND MTFS IF LISTED]
January 31, 2018 Version 10.3
B2B Implementation Plan v10.3 January 2018
CHANGE / REVISION RECORD
This record is maintained throughout the life of the document; each published update is recorded. A Change Package (re-issue of changed pages only) carries change bars in the page margins to identify differences from the preceding issue. Due to the scope of change that necessitates a Revision (re-issue of entire document); a Revision does not carry change bars.
DOCUMENT VERSION
NUMBER
REVISION SUMMARY DATE
Version 5.0 Updated to reflect transition from DISA to DHA
12/14/15
Version 6.0 Updated to reflect AnyConnect option 4/4/16
Version 7.0 Updated to reflect Citrix option 11/9/16
Version 8.0 Updated contact list to reflect current personnel
12/2/16
Version 9.0 Updated the TOC. Updated General Information Page. Updated the DHA staff information. Updated the Implementation Checklist. Removed the
DD Form 2875 attachment and screenshot and added a Web link to access the form. Added an appendix to gather data for software and hardware requirements. Revised the B2B Requirements appendix. Added a signature line for program office’s ISSM.
8/8/17
Version 10.0 Update DoD POC information. Replace “Netscreen” with “Cisco ISR” under
Network Boundary Information. Update Network Address table and Notes below table. Update Appendix I. Add Appendix
K and update following Appendices’ letters.
10/26/17
Version 10.2 “eMASS #” section added in General Information table. Update B2B Mailbox email address in DoD POC table. Last Mile Information table of Appendix E updated. Appendix J &K edited.
1/23/18
Version 10.3 Updated Appendix F: Phase I/Existing Connection chart. Clarified Example row on Phase II Chart
1/31/18
TABLE OF CONTENTS
INTRODUCTION
DHA POLICY FOR COMMUNICATIONS
Commercial Partner POC Information
IMPLEMENTATION CHECKLIST
APPENDIX A: SOFTWARE AND SETTINGS/HARDWARE REQUIREMENTS
APPENDIX B: SUBMISSION OF THE SYSTEM AUTHORIZATION ACCESS REQUEST (SAAR)
FORM 2875
APPENDIX C: USER PERFORMANCE REQUIREMENTS
User System Requirements
APPENDIX D: SYSTEM PERFORMANCE REQUIREMENTS
System (Third Party Partner) to System (MHS) Requirements
APPENDIX E: VPN IMPLEMENTATION FORM
Last Mile Information – WAN Access Network Boundary Information (not required for Citrix) Firewall Specifics/Proxy Servers (not required for Citrix)
APPENDIX F: DHA B2B CONNECTIVITY REQUIREMENTS SUBMISSION
APPENDIX G: “AS IS” DIAGRAM (NOT REQUIRED FOR CITRIX)
APPENDIX H: LAST MILE DIAGRAM (NOT REQUIRED FOR CITRIX)
APPENDIX I: DEVICE PACKAGE SLIP (NOT REQUIRED FOR CITRIX)
APPENDIX J: ISSM APPROVAL (FOR ALL NEW CONNECTIONS)
APPENDIX K: SITE ISSM APPROVAL
APPENDIX L: PROGRAM MANAGER APPROVAL
APPENDIX M: SECURITY APPROVAL
APPENDIX N: PROJECT MANAGER APPROVAL (FOR NEW CONNECTIONS ONLY)
Introduction Defense Health Agency (DHA) oversees the Military Health System (MHS) Infrastructure and Operations (I&O). DHA is chartered to design, provision, and deploy a standards based, common telecommunications infrastructure throughout the MHS.
This information paper identifies the required parameters for Commercial Business Partners to connect to an MHS Military Treatment Facility (MTF) or other Department of Defense (DoD) .mil network using a Virtual Private Network (VPN). This information sheet is intended do the following:
• Adhere to the DoD Guidelines for third party vendors
• Adhere to the policies of connectivity and device management of the third party vendor
• Meet the functional and technical requirements as designed for a given project
In prioritizing security and confidentiality of DoD system resources and networks, the gateway approach is the standard for all non-DoD resources to connect, communicate, and manage systems within the DoD. In the gateway solution, the third party affiliate will terminate at a DMZ and then be re-directed to its destination. This is the recommended long-term solution to ensure data and system resource security and confidentiality.
The following criterion depicts a Gateway solution:
• There is a single reference point for the third party affiliate to the DoD thus eliminating any back doors to the DoD
• Third party affiliate VPN device procurement resource must be identified
• Third party affiliate VPN device model must be in the product line of the DHA – MHS
Standard
• The DHA VPN team maintains Configuration Management and support of the VPN device located at the Third Party Affiliate’s DMZ
• MHS traffic can be more effectively managed
• Adheres to the DoD initiative to move away from third party affiliates connecting directly to a MTF This document is to serve as a template to identify the requirements of the sponsoring organization and the third party partner to DHA. Below will be detailed information that when completed will be used for:
• Establishing necessary requirements
• Configuring the MHS B2B Gateway
• Configuring the VPN device
DHA Policy for Communications The TRICARE Systems Manual (TSM 7950.1-M) discusses the requirements necessary for Managed Care Contractors to interface with the Department of Defense (DoD):
General Information
Project Information Request Type � New Connection(s) � Changes/Updates to
Existing Connection(s) � Decommission
Connection(s)
Connection Type:
For legacy Juniper connections select “Changes/Updates..”
and/or “Decommission..”
� Server to Server Allows continuous connectivity between the partner-and DHA-hosted servers. The commercial partner (vendor) will be required to procure and install a DHA-configured and tested Cisco VPN router (Cisco ISR) on its premise at all appropriate locations. The device (which will be remotely managed by DHA) will provide a controlled entry/exit point and an encrypted pathway for all communications between the commercial partner and its DHA-hosted system(s). System-to-system communications are defined as automated processes between two systems that require always-on connectivity.
� Client to Server Allows the commercial partner system administrators to manage and monitor those systems for which they are responsible. Client-to-server communications are defined as any administrative function that requires administrative input (Remote Desktop, Dameware, SSH, etc).This will be an on-demand solution and will require the administrator to establish a connection for each use through a DHA provided Virtual Desktop Infrastructure (VDI) using CAC authentication.
eMASS # (DHA ID for the system with which the vendor is communicating.)
Project Name (Vendor Name to MHS Name) Program Office Description: What is this for?
Requested Date:
Critical Date:
DoD POC Information
Please complete the following:
DoD Organization Name Phone E-Mail Government POC Sponsoring the B2B Gateway Connection Contracting Officer/COR
ISSM
DHA B2B ISSM Mr. Eric Wildermuth (703) 681-1145 Eric.R.Wildermuth.civ@mail.mil
DHA B2B Project Manager
Mr. Orlando Januario Jr. (210) 295-3599 orlandojr.januario.civ@mail.mil
DHA B2B Project Manager
Mr. Gary Waltman (703) 681-6754 Gary.P.Waltman.civ@mail.mil
DHA B2B PM
Support
Ms. Asha Jones (571) 765-6136 asha.z.jones2.ctr@mail.mil
DHA B2B Phase 2 Support
Mr. Ronald Yoon (516) 509-0022 ronald.i.yoon.ctr@mail.mil
DHA Engineer DHA Other
(SPAWAR)
Remote Systems Management rsm@nsoc.health.mil
DHA Global Service Center
DHA Global Service Center Personnel
(800)-600-9332 dhagsc@mail.mil
DHA B2B Mailbox DHA B2B Team dha.ncr.ops-sustain.list.b2b-phase2@mail.mil
.MIL Gov.
.MIL PM Support
.MIL Firewall Engineer .MIL System Administrator
Commercial Partner POC Information
Please complete the following:
Organization Name Phone E-Mail
PM
Application /System Engineer Network Administrator Security Manager Network Manager
Organization Name Phone E-Mail Procedures Help Desk Contact Information After-Hours Support Contact Information
Organization Address:
Physical Device Location (not required for Citrix): {NOTE: Be sure to include the full address, building, room, and rack where the MHS VPN node will be deployed}
Implementation Checklist
Please check the following:
Question Yes No Date
Complete
1. Has the software requirements for C2S connection been provided by vendor? (Appendix A)
2. Is Form 2875 completed? (See PDF file “DHAGSC_B2B_C2S (v.1.1 20171212)” sent with questionnaire)
3. Internet addresses are publicly routable for all B2B applications?
(Clients need a unique address for authentication tracking.)
4. Is user performance requirement information completed?
(Appendix C)
5. Is system performance requirement information completed?
(Appendix D)
6. Has the VPN Implementation Form been completed? (Appendix E)
7. Has Connectivity Requirements Sheet been submitted? (Appendix F)
8. Has “As Is” Network Diagram been provided? (Appendix G - Attachment)
9. Has VPN Last Mile Diagram (Appendix H) been discussed and concurred by both sides?
10. Is VPN device procured? (Appendix A, S2S connections only)
11. Has the VPN device been configured and STIGed by DHA?
(Please send VPN device to the contact and address below for configuration:
Shaun Pillé KSH Solutions, Inc.
5965 Core Road, Suite 624 North Charleston, SC 29406)
12. Has VPN Installation been scheduled?
Appendix A: Software and Settings/Hardware Requirements
For Client to Server Connections:
We need to better understand the administrative tasks to be performed by the commercial partner to determine software and setting requirements. Please answer the following questions:
Question Response
1. What is the highest number of simultaneous users you expect to have active connections at peak usage?
2. List the full name of all applications that you expect to use in management of your servers and/or remote assets. Please include any Proprietary software.
3. For each application, please list all dependencies required for full functionality, including:
a) Active X settings;
b) Specific browsers required (Chrome, Firefox, etc.);
c) Browser settings required;
d) SSL/CA Certificate installations
For Server to Server Connections:
The commercial partner will be required to purchase one of the following Cisco device(s) for their location(s):
• ISR C891f
• ISR 4331
• ISR 4451
• CSR 1000V
Less than 5Mb Between 5Mb-30Mb Between 30Mb-300Mb Virtual ISR
Also, please make certain to provide (on Appendix F) 2 public IP addresses for each device to be installed.
Note: The Cisco pubs indicate higher bandwidth capabilities for models noted above; however, the Cisco figures are under ideal conditions (UDP, low overhead, etc.). These considerations were evaluated by the DHA engineers and factored in the configurations and other overhead/loading factors (noted above). If you opt to select the next lower/smaller model, then there is a potential risk of overloading the device, which will require the procurement of a replacement with the next higher model.
Appendix B: Submission of the System Authorization Access Request (SAAR) Form 2875
The DD 2875 form and instructions are attached in a separate PDF document named “DHAGSC_B2B_C2S_(v1.1 20171212)”
Appendix C: User Performance Requirements
Project Name Program Office Project POC
User System Requirements
Subject Matter Metric Commercial User to MHS System
Number of Users * Number of Existing User Accounts* Number of New User Accounts Needed* Peak Operational Time Operational Time Frame (Per Day) Operational Time Frame (Per Week) Operational Time Frame (Per Year) Number of concurrent sessions per user Number of concurrent users * Average file/data size per user Average number of transactions per day/ per user Expected % growth per year Other Other Other Other Other
MHS User to Third Party System Number of Users Peak Operational Time Operational Time Frame (Per Day) Operational Time Frame (Per Week) Operational Time Frame (Per Year) Number of concurrent sessions per user Number of concurrent users Average file/data size per user Average number of transactions per day/ per user Expected % growth per year
* Note: Each user should be coming from a unique IP address
Appendix D: System Performance Requirements
Project Name Program Office Project POC
System (Third Party Partner) to System (MHS) Requirements
Subject Matter Metric Expected screen refresh time Expected response time Expected % availability uptime Meantime between failure Meantime to repair Sustained throughput requirement Max packet loss acceptable Max latency Expected bandwidth between systems Peak bandwidth requirements Other Other Other Other Other
Appendix E: VPN Implementation Form
Project Name Program Office Project POC
Last Mile Information – WAN Access
Please check the following for the .MIL side of the connection:
Question Answer
1. Who is your Internet Service Provider? (Please Specify)
2. Assessment and Authorization
a. What type of certification does the Gov. Sponsor require?
DIACAP/RMF, Certificate of Networthiness (CON), Platform IT (PIT), DODI8582.01
b. What is the current status of required certification and date of your expected date of certification?
c. Has documentation been provided to the B2B team as evidence of the A&A process? (ATO memo, 8582 evidence, CON memo, or PIT memo)
Please check the following for the .COM side of the connection:
Question Answer
1. Who is your Internet Service Provider? (Please Specify)
2. Assessment and Authorization
a. What type of certification does the Gov. Sponsor require?
DIACAP/RMF, Certificate of Networthiness (CON), Platform IT (PIT), DODI8582.01
b. What is the current status of required certification and date of your expected date of certification?
c. Has documentation been provided to the B2B team as evidence of the A&A process? (ATO memo, 8582 evidence, CON memo, or PIT memo)
Network Boundary Information (not required for Citrix)
1. What are the Interfaces of the Border Router?
Interface IP Address Subnet Mask Default Gateway
2. What are the External and DMZ Interfaces of the Firewall?
Interface IP Address Subnet Mask Default Gateway
3. What is the Network Space between the Firewall and Border Router where the Cisco ISR will be installed?
NOTES:
a. Ensure the Network between the Firewall and the Border Router has sufficient address space to support splitting the network.
b. Ensure the Bit Boundaries are valid and are NOT CROSSED when splitting into smaller subnets.
IP Network/ Mask Subnet Mask
4. What are the new Network Addresses for the Cisco ISR device?
External Interface Subnet Mask Default Gateway
Primary ISR Secondary ISR
RLOC IP Subnet Mask Default Gateway Primary ISR 255.255.255.255 NA Secondary ISR 255.255.255.255 NA
Internal Interface Subnet Mask Default Gateway Primary ISR Secondary ISR Floating
Note 1: For HA setup, each device would require a unique External, Internal and RLOC IP address.
One additional floating Internal IP is required for VRRP failover.
Note 2: All IP addresses for the ISR need to be publically routable. Private address space using a NAT is not permitted.
Note 3: RLOC IP addresses should be /32 addresses and not a part of the subnet used by the External or Internal interfaces.
Firewall Specifics/Proxy Servers (not required for Citrix)
Please check the following:
Question Yes No
1. Is this site using Network Address Translation (NAT) Static (1 to 1)?
B2 B
Im pl em en ta tio n Pl an v
.3
Ja nu ar y
Ap pe nd ix
F : D
H A
B2 B
Co nn ec tiv ity R eq ui re m en ts
S ub m iss io n
Ve nd or
N am e Pr og ra m ffi ce Pr oj ec t P O
C
Pl ea se re ad fa ilu re to d o so w ill d el ay th e pr oc es sin g of th is re qu es t.
If yo u ar e su bm itt in g a
Ph as e
II
co nn ec tio n pl ea se c om pl et e th e ch ar t b el ow ti tle d Ph as e
II
En vi ro nm en t T yp e.
F or P ha se
I /E xi st in g
Co nn ec tio ns s ki p do w n an d co m pl et e th e ne xt c ha rt ti tle d
Ph as e I o r E xi st in g En vi ro nm en t T yp e.
Ph as e
II
En vi ro nm en t T yp e
(P le as e su bm it B2
BQ
fo r e ac h en vi ro nm en t.
ne en vi ro nm en t p er B
2B Q
Te st
Pr od uc tio n
AP
PL
IC
AT
IO
N
N
AM
E
DE
SC
RI
PT
IO
IP
PR
TO
CO
L
SE
RV
IC
E
LO
W
PO
RT
HI
GH
PO
RT
VE
ND
O R
SE
RV
ER
AM
E
VE
N
DO
R
SE
VE
N
DO
R
SE
AT
DH
A
SE
AM
E
DH
A
SE
DH
A
SE
AT
DH
A
SI
TE
LO
CA
TI
O
N
CO
NN
EC
TI
O N
SO
U
RC
E
*Example*
Eg
BD
M
S
Eg . B lo od
Do no r
M an ag em en t
Se rv er
Eg . T
CP
Eg
SF
TP
Eg
Co
Va ul t
Se rv er X.
X.
X.
X Pr ov id ed
By
SO
C
RS
M
In sig ht
Se rv er X.
X.
X.
X
Pr ov id e d By
SO
C
RS
M
N M
C Sa n Di eg o
.C O
M
*Example*
B2 B
Im pl em en ta tio n Pl an v
.3
Ja nu ar y
Ph as e I o r E xi st in g En vi ro nm en t T yp e (P le as e su bm it
B2
BQ
fo r e ac h en vi ro nm en t.
ne en vi ro nm en t p er
B 2B
Q
Te st
Pr od uc tio n
Appendix G: “As Is” Diagram (not required for Citrix)
Appendix H: Last Mile Diagram (not required for Citrix)
Server Network
Network Address __.__.__.__ Subnet Mask __.__.__.__
Lan Switch
Inside Interface IP __.__.__.__ Cisco ISR
External IP __.__.__.__ Subnet Mask __.__.__.__
RLOC IP __.__.__.__/32
Internal IP __.__.__.__ Subnet Mask __.__.__.__External Interface
IP __.__.__.__
Internet
Appendix I: Device Package Slip (not required for Citrix)
INCLUDE THIS DOCUMENT INSIDE THE CISCO ISR SHIPPING PACKAGE
Name of Project
Point of Contact (POC)
Name of Company ATTN: POC Name
ADDRESS
Contact Number
Device Serial Number
Device Model
Shipping Tracking Number
NOTE:
After shipment, please send a copy of this appendix to DHA PM Support.
Appendix J: ISSM Approval (For all new connections)
Information System Security Manager B2B Implementation Approval
[ ] As the ISSM for the DHA B2B C2S, I have reviewed the appropriate documentation and provide the approval to proceed as planned.
[ ] As the ISSM for the DHA B2B S2S, I have reviewed the appropriate documentation and provide the approval to proceed as planned.
TYPED NAME
SIGNATURE DATE
Appendix K: Site ISSM Approval (For all connections; i.e. add/remove/modify)
Information Assurance Manager B2B Implementation Approval
As the Site ISSM for [appropriate program office or installation], I have reviewed the appropriate documentation and provide the approval to proceed as planned.
TYPED NAME
PROGRAM OFFICE
Appendix L: Program Manager Approval (For all connections; i.e. add/remove/modify) May sign in lieu of multiple site ISSM connections sic Appendix K
Program Manager B2B Implementation Approval
As the Government Sponsor for [appropriate program office or installation], I have reviewed the appropriate documentation and vendor certification. I provide the approval to proceed as planned.
Appendix M: Security Approval (For all connections; i.e. add/remove/modify)
Commercial Partner Security Manager B2B Implementation Approval
As the Security Manager of the [MHS .com partner], I have reviewed the appropriate documentation and provide the approval to proceed as planned.
Appendix N: Project Manager Approval (For all connections; i.e. add/remove/modify)
Defense Health Agency B2B Gateway Project Manager B2B Implementation Approval
As the Business-to-Business Gateway Project Manager for DHA, I have reviewed the appropriate documentation and provide the approval to proceed as planned.
File details come from the government source that posted it. Updated .