USCGESDJan2014.pdf

PDF 12 KB Posted

Attached to
SEISMIC UPGRADES AND RENOVATION OF BLDG 576 AT USCG BASE KODIAK
Solicitation number
HSCG87-14-B-PJT691
Issued by

About this file

USCG ESD

View the file

Other files

File Type Posted
SF_1409_BID_EXTRACT_2.pdf PDF
Amendment_4_Clarifications_Answers.docx DOCX document
Amendment_00004.pdf PDF
Amendment_00003_Fire_Alarm_System_Clarification.doc DOC document
Amendment_00003.pdf PDF
02357_Geotechnical_Report.pdf PDF
576__ARCHIVE_DRAWINGS.zip ZIP file
ammendment_2_doc.doc DOC document
Amendment_00002.pdf PDF
AMENDMENT_0001_PJT691_BLDG_576.pdf PDF
576Final_hzmat_report_part_6_of_9.pdf PDF
576Final_hzmat_report_part_3_of_9.pdf PDF
576Final_hzmat_report_part_8__of_9.pdf PDF
SOP-ExemptSolidWasteLandfill-28Oct2010.pdf PDF
20140416_Rev_2__BASE_KODIAK_STANDARD__CONSTRUCTION_SPEC_MASTER.pdf PDF
Contractors_UEG-withChartsandForms-2003.pdf PDF
DAVIS_BACON.pdf PDF
576Final_hzmat_report__part_1_of_9.pdf PDF
USCG_Bldg_576_Hazmat_Analysis.pdf PDF
5250935_USCG_Kodiak_Bldg_576_Final_Specifications.pdf PDF
HSCG87-14-B-PJT691_IFB_BLDG_576.pdf PDF
576Final_hzmat_report_part_5_of_9.pdf PDF
5250935_USCG_Kodiak_Bldg_576_Bid_Set_signed_part_1_of_2.pdf PDF
Hazmat_data_SKMBT_42113050111040.pdf PDF
576Final_hzmat_report_part_9_of_9.pdf PDF
JOTFOC_576.pdf PDF
576Final_hzmat_report_part_7_of_9.pdf PDF
5250935_USCG_Kodiak_Bldg_576_Bid_Set_signed_part_2_of_2.pdf PDF
576Final_hzmat_report_part_4_of_9.pdf PDF
BR549_Kodiak_Siding_Manual_FINAL_130704.pdf PDF
576_tower_stuff.zip ZIP file
576Final_hzmat_report__part_2_of_9.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment: USCG Bldg 576 Seismic Upgrade RF Information

March 2014

This is an extract from a report received as a result of:

A STATE OF ALASKA DEPT. OF HEALTH AND SOCIAL SERVICES

Radiological Health Program Representative performed Radiation surveys

– January 23 and 24, 2014.

Testing was performed at the Electronic Support Detachment building, (ESD) on U.S.

Coast Guard property in Kodiak.

A survey of second floor hallways, meeting rooms, and stairwells at each end using instrumentation to detect ionizing radiation, microwave and RF frequency. Testing was also conducted inside each of three locked rooms and on the first floor inside the building. Outside testing was conducted around the antenna tower. During the testing period all operations of the facility were normal. Portions of the first level of the building near each entrance end were also tested. The testing was conducted using two RF/microwave meters and one ionizing radiation meter simultaneously. The RF/microwave meters were positioned at right angles due to directionality of the sensors.

Test results found no instance of abnormal or unsafe levels of ionizing radiation, microwave, or RF signals.

Repeat testing was performed the following day, Friday, January 24, 2014 with systems fully activated to determine if higher level operation will produce significant radiation sufficient to cause adverse health effects.

In summary, there were no findings of ionizing radiation, EMF, or radiofrequency emissions at any of the ESD locations tested in either the “cold” state or while transmitting.

Test instruments used included:

TriField 100 XE which has a broadband detection accuracy of +/- 30% for 60 Hz electric fields, and ½ to 2X reading for radio/microwave signals.

The ionizing radiation instrument was an SEI Inspector EXP with mylar window, S/N 20739 with a lower level of detection at 1 microR/hr.

End of Report Extract