576Final_hzmat_report__part_1_of_9.pdf

PDF 287 KB Posted

Attached to
SEISMIC UPGRADES AND RENOVATION OF BLDG 576 AT USCG BASE KODIAK
Solicitation number
HSCG87-14-B-PJT691
Issued by

About this file

BLDG 576 Hazmat Report 1

View the file

Other files

File Type Posted
SF_1409_BID_EXTRACT_2.pdf PDF
Amendment_4_Clarifications_Answers.docx DOCX document
Amendment_00004.pdf PDF
Amendment_00003_Fire_Alarm_System_Clarification.doc DOC document
Amendment_00003.pdf PDF
02357_Geotechnical_Report.pdf PDF
576__ARCHIVE_DRAWINGS.zip ZIP file
ammendment_2_doc.doc DOC document
Amendment_00002.pdf PDF
AMENDMENT_0001_PJT691_BLDG_576.pdf PDF
576Final_hzmat_report_part_6_of_9.pdf PDF
576Final_hzmat_report_part_3_of_9.pdf PDF
576Final_hzmat_report_part_8__of_9.pdf PDF
SOP-ExemptSolidWasteLandfill-28Oct2010.pdf PDF
20140416_Rev_2__BASE_KODIAK_STANDARD__CONSTRUCTION_SPEC_MASTER.pdf PDF
Contractors_UEG-withChartsandForms-2003.pdf PDF
DAVIS_BACON.pdf PDF
USCG_Bldg_576_Hazmat_Analysis.pdf PDF
5250935_USCG_Kodiak_Bldg_576_Final_Specifications.pdf PDF
HSCG87-14-B-PJT691_IFB_BLDG_576.pdf PDF
576Final_hzmat_report_part_5_of_9.pdf PDF
5250935_USCG_Kodiak_Bldg_576_Bid_Set_signed_part_1_of_2.pdf PDF
Hazmat_data_SKMBT_42113050111040.pdf PDF
576Final_hzmat_report_part_9_of_9.pdf PDF
JOTFOC_576.pdf PDF
576Final_hzmat_report_part_7_of_9.pdf PDF
5250935_USCG_Kodiak_Bldg_576_Bid_Set_signed_part_2_of_2.pdf PDF
576Final_hzmat_report_part_4_of_9.pdf PDF
BR549_Kodiak_Siding_Manual_FINAL_130704.pdf PDF
576_tower_stuff.zip ZIP file
576Final_hzmat_report__part_2_of_9.pdf PDF
USCGESDJan2014.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building 576 Report Located on

Aviation Hill Contract # DTCG50-02-D-643J55

Table of Contents

1.0 Executive Summary

2.0 Asbestos Overview

3.0 Lead-based Paint (LBP) Overview

4.0 Methods and Limitations

5.0 Building 576 Exterior Results

5.1 Asbestos Results

Table 1 Building 576 Exterior Asbestos Samples Table 1 Building 576 (cont.) Exterior Asbestos Samples

5.2 Lead Results

6.0 Building 576 Interior Results

6.1 Asbestos Results

Table 2 Building 576 Interior Asbestos Samples

6.2 Lead Results

Figures 1 & 2 Asbestos and Lead Sample Locations

7.0 Recommendations

Appendix A: Laboratory / XRF Results Appendix B: Certifications Appendix C: Chain of Custody Appendix D: Regulatory Matrix

ACRONYMS

ACM Asbestos Containing Material

AHERA Asbestos Hazard Emergency Response Act

ASHARA Asbestos School Hazard Abatement Reauthorization Act

CFR Code of Federal Regulations

EPA Environmental Protection Agency

GWB Gypsum Wallboard

HUD Housing and Urban Development

LBP Lead Based Paint

LBPPPA Lead Based Paint Poisoning Prevention Act

NVLAP National Voluntary Laboratory Accreditation Program

OSHA Occupational Safety and Health Administration

TCLP Toxicity Characteristic Leaching Procedure

TSCA Toxicity Substance Control Act

USCG United States Coast Guard

XRF X-Ray Florescence

1.0 Executive Summary

Environmental Health Services Inc. was contracted to conduct a Hazardous Materials Survey of the Lorsta Office (Building 576) located on Aviation Hill near the United States Coast Guard (USCG) station in Kodiak, Alaska. The survey efforts focused on identifying the existence and quantity of asbestos containing gypsum wall board (GWB) and joint compound in Room 205 and exterior asbestos and Lead-Based Paint (LBP) containing materials. The information obtained will be used to guide the future renovations, general operations, and maintenance of this facility.

Based on current findings for the Lorsta Office (Building 576), asbestos is present at concentrations greater than 1% in the roofing system and at one exterior location where black sealant was used to seal building crevasses. Seven exterior building locations were confirmed to contain LBP greater than 1 mg/cm2.

2.0 Asbestos Overview

Asbestos is a naturally occurring mineral. Asbestos is divided into two mineral groups- Serpentine and Amphibole. The division between the two types of asbestos is based upon the crystalline structure. Serpentines have sheet or layered structure where amphiboles have a chain-like structure. As the only member of the serpentine group, Chrysotile is the most common type of asbestos found in buildings. Also known as “white asbestos”, Chrysotile makes up approximately 90%-95% of all asbestos contained in buildings in the United States.

Asbestos is often referred to as “friable” or “non-friable” for classification purposes. Friable asbestos is defined as “crumbled or reduced to powder by hand pressure”. Asbestos which is friable or has become friable has a greater likelihood of releasing asbestos fibers into the air.

The Asbestos Hazard Emergency Response Act (AHERA) was promulgated in 1986. AHERA mandated that the Environmental Protection Agency (EPA) to develop regulations for addressing asbestos in schools. The mandatory AHERA inspector requirement was implemented for any person who performs inspections for Asbestos Containing Material (ACM) on public and commercial buildings; however it failed to include residential apartments or detached single family homes. The Asbestos School Hazard Abatement Reauthorization Act (ASHARA), enacted in 1990 and implemented in 1994, governs the training that asbestos workers, inspectors, supervisors, and plan management writers, and abatement designers must receive to become accredited by the state. AHERA instituted the training requirement for any person who inspects for ACM following a recommendation by ASHARA.

Asbestos in buildings does not mean an endangerment to workers or occupants unless the condition of the asbestos is damaged or will become damaged due to human or environmental influences. The Occupational Safety and Health Administration (OSHA) regulates workers exposure to ACM during asbestos removal and stipulate use of trained asbestos workers and engineering controls for mitigating exposure. A regulatory matrix applicable to the hazardous materials identified in this report is provided in Appendix D.

3.0 Lead-based Paint (LBP) Overview

Lead is a heavy, soft, easily worked, bluish metal that is mined out the earth.

Lead has been used for many different applications throughout the centuries. It has been used in pipes, lining for storage vessels, glazing in pottery, added to paint, roofing, electrical conduits and combined with other metals.

Lead was added to paint up until the 1950’s for three main reasons: pigment, added durability and corrosion control, and as a drying agent. The use of LBP declined due to the introduction of latex and titanium oxide paints. In 1971 Congress made the Lead-based Paint Poisoning Prevention Act (LBPPPA) which gave a limit to the amount of lead paint could contain. Later, Congress passed legislation to reduce lead-based paint hazards called the Residential Lead Hazard Reduction Act (Title X). The Housing and Urban Development (HUD) agency next created the Guidelines for the Evaluation and Control of Lead-based Paint Hazards in Housing based on the requirements set forth in Section 402 of Title X. The development of Title X was largely to support reduction of LBP hazards in housing, especially target housing where a potential for childhood lead poisoning exists. The Title X Guidelines use a Federal limit for lead in paint as 1.0 mg/cm² or more than 0.5% by weight.

Section 402 of the Toxic Substance Control Act (TSCA) details the requirements and certifications needed to conduct lead-based paint inspections, risk assessments, designers, supervisors, and abatement workers. The Occupational Safety and Health Administration (OSHA) also regulates workers exposure to lead during disturbance activities as defined in the 29 CFR 1926.62. A regulatory matrix applicable to the hazardous materials identified in this report is provided in Appendix D.

4.0 Methods and Limitations

The asbestos survey was conducted pursuant to the requirements of the Asbestos Hazard Emergency Response Act (AHERA), as specified in 40 CFR 763. The visual inspections, evaluations, and sample collection was conducted by Randall Neel, AHERA building inspector certification number 3508-02-C19-02. Asbestos bulk sample analysis was performed by EMSL Laboratories, a certified National Voluntary Laboratory Accreditation Program (NVLAP) laboratory.

All lead-based paint testing was performed on site using a Niton XRF 300. The primary lead inspector was Alan Caldwell (EPA Lead Risk Assessor #AK-09-122005- 047).

1.0Executive Summary
2.0Asbestos Overview
3.0Lead-based Paint (LBP) Overview
4.0Methods and Limitations
5.0Building 576 Exterior Results
5.1Asbestos Results
Table 1 Building 576Exterior Asbestos Samples
Table 1 Building 576 (cont.)Exterior Asbestos Samples

5.2Lead Results

6.0Building 576 Interior Results
6.1Asbestos Results
Table 2 Building 576Interior Asbestos Samples

6.2Lead Results

Figures 1 & 2 Asbestos and Lead Sample Locations
7.0Recommendations
Appendix A: Laboratory / XRF Results
Appendix B:Certifications
Appendix C:Chain of Custody
Appendix D:Regulatory Matrix

File details come from the government source that posted it. Updated .