Amendment_00003_Fire_Alarm_System_Clarification.doc

DOC document 27 KB Posted

Attached to
SEISMIC UPGRADES AND RENOVATION OF BLDG 576 AT USCG BASE KODIAK
Solicitation number
HSCG87-14-B-PJT691
Issued by

About this file

IFB AMENDMENT 00003 / Fire Alarm System Clarification

View the file

Other files

File Type Posted
SF_1409_BID_EXTRACT_2.pdf PDF
Amendment_4_Clarifications_Answers.docx DOCX document
Amendment_00004.pdf PDF
Amendment_00003.pdf PDF
02357_Geotechnical_Report.pdf PDF
576__ARCHIVE_DRAWINGS.zip ZIP file
ammendment_2_doc.doc DOC document
Amendment_00002.pdf PDF
AMENDMENT_0001_PJT691_BLDG_576.pdf PDF
576Final_hzmat_report_part_6_of_9.pdf PDF
576Final_hzmat_report_part_3_of_9.pdf PDF
576Final_hzmat_report_part_8__of_9.pdf PDF
SOP-ExemptSolidWasteLandfill-28Oct2010.pdf PDF
20140416_Rev_2__BASE_KODIAK_STANDARD__CONSTRUCTION_SPEC_MASTER.pdf PDF
Contractors_UEG-withChartsandForms-2003.pdf PDF
DAVIS_BACON.pdf PDF
576Final_hzmat_report__part_1_of_9.pdf PDF
USCG_Bldg_576_Hazmat_Analysis.pdf PDF
5250935_USCG_Kodiak_Bldg_576_Final_Specifications.pdf PDF
HSCG87-14-B-PJT691_IFB_BLDG_576.pdf PDF
576Final_hzmat_report_part_5_of_9.pdf PDF
5250935_USCG_Kodiak_Bldg_576_Bid_Set_signed_part_1_of_2.pdf PDF
Hazmat_data_SKMBT_42113050111040.pdf PDF
576Final_hzmat_report_part_9_of_9.pdf PDF
JOTFOC_576.pdf PDF
576Final_hzmat_report_part_7_of_9.pdf PDF
5250935_USCG_Kodiak_Bldg_576_Bid_Set_signed_part_2_of_2.pdf PDF
576Final_hzmat_report_part_4_of_9.pdf PDF
BR549_Kodiak_Siding_Manual_FINAL_130704.pdf PDF
576_tower_stuff.zip ZIP file
576Final_hzmat_report__part_2_of_9.pdf PDF
USCGESDJan2014.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q: Regarding the fire alarm system (28 31 74) and the clean agent suppression system (22 21 00) installation:

The building fire alarm detection system and the clean agent suppression system detection and releasing functions can be handled by a single control panel with the appropriate capabilities. The King Fisher KFRTI (IRAC) is not listed for releasing service and does not have the capability to perform such functions. The existing King Fisher transmitter could be reused (as it is currently being utilized) to transmit the alarm and utility signals to the MILPOL, Base Firehouse, and CHP for reporting purposes. The current transmitter offers up to eight discrete reporting zones. This solution would comply with the applicable NFPA codes for these systems, meet the operational requirements of this facility, as well as the intent of the specifications.

Would the existing King-Fisher transmitter be considered an acceptable means of fire alarm, clean agent activation, and utility signal transmission versus the specified King-Fisher IRAC control panel?

A: Please provide the new IRAC panel and other features/equipment as specified. Reuse of the existing King-Fisher panel, and/or addressable systems is NOT intended. The clean agent releasing equipment shall be listed for that function, and may be new or reused Halon equipment if it meets all requirements of the specifications.

File details come from the government source that posted it. Updated .