576Final_hzmat_report_part_8__of_9.pdf

PDF 6 MB Posted

Attached to
SEISMIC UPGRADES AND RENOVATION OF BLDG 576 AT USCG BASE KODIAK
Solicitation number
HSCG87-14-B-PJT691
Issued by

About this file

BLDG 576 Hazmat Report 8

View the file

Other files

File Type Posted
SF_1409_BID_EXTRACT_2.pdf PDF
Amendment_4_Clarifications_Answers.docx DOCX document
Amendment_00004.pdf PDF
Amendment_00003_Fire_Alarm_System_Clarification.doc DOC document
Amendment_00003.pdf PDF
02357_Geotechnical_Report.pdf PDF
576__ARCHIVE_DRAWINGS.zip ZIP file
ammendment_2_doc.doc DOC document
Amendment_00002.pdf PDF
AMENDMENT_0001_PJT691_BLDG_576.pdf PDF
576Final_hzmat_report_part_6_of_9.pdf PDF
576Final_hzmat_report_part_3_of_9.pdf PDF
SOP-ExemptSolidWasteLandfill-28Oct2010.pdf PDF
20140416_Rev_2__BASE_KODIAK_STANDARD__CONSTRUCTION_SPEC_MASTER.pdf PDF
Contractors_UEG-withChartsandForms-2003.pdf PDF
DAVIS_BACON.pdf PDF
576Final_hzmat_report__part_1_of_9.pdf PDF
USCG_Bldg_576_Hazmat_Analysis.pdf PDF
5250935_USCG_Kodiak_Bldg_576_Final_Specifications.pdf PDF
HSCG87-14-B-PJT691_IFB_BLDG_576.pdf PDF
576Final_hzmat_report_part_5_of_9.pdf PDF
5250935_USCG_Kodiak_Bldg_576_Bid_Set_signed_part_1_of_2.pdf PDF
Hazmat_data_SKMBT_42113050111040.pdf PDF
576Final_hzmat_report_part_9_of_9.pdf PDF
JOTFOC_576.pdf PDF
576Final_hzmat_report_part_7_of_9.pdf PDF
5250935_USCG_Kodiak_Bldg_576_Bid_Set_signed_part_2_of_2.pdf PDF
576Final_hzmat_report_part_4_of_9.pdf PDF
BR549_Kodiak_Siding_Manual_FINAL_130704.pdf PDF
576_tower_stuff.zip ZIP file
576Final_hzmat_report__part_2_of_9.pdf PDF
USCGESDJan2014.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Serial #XL309-U3815NR4345

PAINT

Header:

Site:

Date: 2/3/2003 10:28:36 Ranges (NEG<INC<POS): Device PCS

XLNo Side Substrate Location ConditionColor Result Pbc Pbc Error

207 CALIBRATION POS 1.04 0.09

208 CALIBRATION POS 1.04 0.06

209 CALIBRATION POS 1.05 0.1

210 East Sheetrock 2nd Floor Room Wall 5ft Good White NEG 0.02 0.09 211 East Sheetrock 2nd Floor Room Wall 1ft Good White NEG 0 0.07

212 CALIBRATION POS 1.13 0.11

213 CALIBRATION POS 1.09 0.06

214 CALIBRATION POS 1.11 0.08

Building No. 576 Internal Lead Paint Inspection USCG Kodiak Building 576 Aviation Hill

Serial #XL309-U3815NR4345

PAINT

Header:

Site:

Date: 2/3/2003 10:28:36 Ranges (NEG<INC<POS): Device PCS

XLNo Side Substrate Location Condition Color Result Pbc Pbc Error

160 East Concrete 2nd Column Poor Beige NEG 0 0.05 161 East Metal Window Trim Poor Blue NEG 0 0.07 162 East Metal Window Poor Blue NEG 0 0.04 163 East Concrete Wall Poor Beige NEG 0.01 0.08 164 North Metal Walkway Posts Poor White NEG 0.04 0.05 165 North Wood Entrance Awning Poor Grey NEG 0 0.05 166 North Metal Entrance Door Poor Blue NEG 0 0.06 167 North Tin Drain Spout Poor Grey NEG 0.09 0.13 168 West Concrete Wall Poor Beige NEG 0 0.07 169 West Concrete Wall Poor Beige NEG 0.01 0.1 170 West Metal Door Good Blue NEG 0 0.07 171 West Metal Fan Cover Poor White NEG 0 0.02 172 West Metal Air Conditioner Poor Green NEG 0.01 0.09 173 West Metal Pipe to AC Poor White NEG 0.26 0.52 174 West Metal Fuel Tank Poor White NEG 0.01 0.11 175 West Metal Pipe to Fuel Tank Poor Yellow NEG 0.03 0.19 176 West Metal Ladder to Roof Poor Beige POS 1.51 0.35 177 West Metal Vent By Ladder Poor Beige POS 5.1 1.79 178 West Metal Vent By Ladder Poor Beige POS 6.98 1.14 179 West Metal Large Upper Vent Hood Poor Beige NEG 0 0.01 180 South Metal Brace for Exhaust Pipe Poor Black NEG 0 0.01 181 South Metal Fire Valve Good Red NEG 0.69 0.08 182 South Metal Double Doors Good Blue NEG 0 0.09 183 South Metal Large Conduit Poor White NEG 0.07 0.32 184 South Wood Loading Dock Poor Red NEG 0 0.01 185 South Metal Edge of Loading Dock Poor Yellow POS 6.68 1.39 186 South Metal Hand Railing Good Yellow NEG 0 0.06 187 South Metal Metal Treds on Stairs Poor Yellow NEG 0 0.04

USCG Kodiak Building 576 Aviation Hill 576 External Lead-based Paint Inspection

188 South Metal Loading Dock Decking Poor Yellow POS 1.69 0.42 189 South Metal Loading Dock Handrailing Poor Yellow NEG 0 0.06

190 CALIBRATION POS 1.04 0.05

191 CALIBRATION POS 1.01 0.07

192 CALIBRATION POS 1.01 0.08

193 ... NA

194 CALIBRATION POS 1.03 0.1

195 CALIBRATION POS 0.96 0.06

196 CALIBRATION POS 0.99 0.05

197 South Metal Roof Ladder 2nd Level Poor Pink/Beige NEG 0.68 0.13 198 East Metal Radar Stand Poor Red NEG 0.68 0.13 199 East Metal Radar Ladder Stand Poor Red POS 1.32 0.18 200 West Lead Lead Phlange Ring On Radar Poor Silver POS 71.88 3.43 201 West Metal Pipes Under Radar Stand Poor Red NEG 0.41 0.15 202 West Metal Siren Stand Poor Pink POS 7.32 1.38 203 West Contrete Concrete Wall Poor Beige NEG 0 0.05 204 South Metal Ladder 1st Level Going Up Poor Beige NEG 0.11 0.13 205 South Metal Ladder Top 1st Level Poor Beige POS 1.08 0.13 206 South Contrete Wall Under Window Poor Beige NEG 0 0.05

207 CALIBRATION POS 1.04 0.09

208 CALIBRATION POS 1.04 0.06

209 CALIBRATION POS 1.05 0.1

Shutter Calibration

Appendix B: Certifications

Appendix C: Chain of Custody

1.0Executive Summary
2.0Asbestos Overview
3.0Lead-based Paint (LBP) Overview
4.0Methods and Limitations
5.0Building 576 Exterior Results
5.1Asbestos Results
Table 1 Building 576Exterior Asbestos Samples
Table 1 Building 576 (cont.)Exterior Asbestos Samples

5.2Lead Results

6.0Building 576 Interior Results
6.1Asbestos Results
Table 2 Building 576Interior Asbestos Samples

6.2Lead Results

Figures 1 & 2 Asbestos and Lead Sample Locations
7.0Recommendations
Appendix A: Laboratory / XRF Results
Appendix B:Certifications
Appendix C:Chain of Custody
Appendix D:Regulatory Matrix

File details come from the government source that posted it. Updated .