Pictures_1_ _2_Relating_to_Work_Item_50.doc

DOC document 142 KB Posted

Attached to
Dry-dock Repair for Coast Guard Cutter BAYBERRY
Solicitation number
HSCG85-16-Q-P45458
Issued by

View the file

Other files

File Type Posted
Picture_3_of_3_Relating_to_Work_Item_50.doc DOC document
BAYBERRY _Amendment_02.pdf PDF
BAYBERRY_Question_ _Answer_5.doc DOC document
Picture_for_Questions_ _Answers_4.doc DOC document
BAYBERRY_Questions_ _Answers_4.doc DOC document
BAYBERRY_Questions_ _Answers_3.doc DOC document
BAYBERRY_Questions_ _Answers_2.doc DOC document
BAYBERRY_Questions_ _Answers.doc DOC document
BAYBERRY _Amendment_01.pdf PDF
BAYBERRY _Attachment_2_Specification.pdf PDF
BAYBERRY_RFQ_HSCG85-16-Q-P45458.doc DOC document
BAYBERRY _Specification.doc DOC document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BAYBERRY RFQ HSCG85-16-Q-P45458, Pictures 1 & 2 Relating to Work Item 50 The repairs required by Work Item 50 were not accessible. Below are pictures 1 & 2 of the areas to be repaired.

Hole in fuel tank at frame 13

Hole in the Keel at frame 13

CHT Tank. CHT piping. Fire Main Piping

The hole in the Keel is slightly distorted by the photo. All of the arrows around the holes are just showing heavy corrosion and fatigue in the metal.

File details come from the government source that posted it. Updated .