BAYBERRY_Questions_ _Answers_3.doc
DOC document 24 KB Posted
- Attached to
- Dry-dock Repair for Coast Guard Cutter BAYBERRY
- Solicitation number
- HSCG85-16-Q-P45458
About this file
Questions Answers Round 3 January 15 2016
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pictures_1_ _2_Relating_to_Work_Item_50.doc | DOC document | |
| Picture_3_of_3_Relating_to_Work_Item_50.doc | DOC document | |
| BAYBERRY _Amendment_02.pdf | ||
| BAYBERRY_Question_ _Answer_5.doc | DOC document | |
| Picture_for_Questions_ _Answers_4.doc | DOC document | |
| BAYBERRY_Questions_ _Answers_4.doc | DOC document | |
| BAYBERRY_Questions_ _Answers_2.doc | DOC document | |
| BAYBERRY_Questions_ _Answers.doc | DOC document | |
| BAYBERRY _Amendment_01.pdf | ||
| BAYBERRY _Attachment_2_Specification.pdf | ||
| BAYBERRY_RFQ_HSCG85-16-Q-P45458.doc | DOC document | |
| BAYBERRY _Specification.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BAYBERRY RFQ HSCG85-16-Q-P45458, Questions & Answers, Round 3
20) Question: Work Item 53, Stern Tubes and Strut Barrels, Renew, paragraph 3.6 and 3.6.1 direct the contractor to “renew the strut and stern tube bearings (4 total) in accordance with Coast Guard Drawing 65BUS 4301-1. Bearing shells shall fit inside housing with a -0.001” to +0.004” fit”.
Drawing 65BUS 4301-1 does show the stern tube and strut bearings pressed into the stern tube and strut housings. It also indicates that in 1999 chock fast and set screws were added to the material list which indicates that the some or all of the bearings should be set in liners which are aligned using the set screws and chock fast in place once aligned. The drawing does not show liners for the bearings.
Does the government want the strut and stern tube bearings machined to fit into the strut and stern tube housings? Or is the contractor to price fabricating bearing liners and chock fasting the liners into the housings and setting the bearings into the liners?
Answer: The strut and stern tube bearings machined to fit into the strut and stern tube housings. Previous use of chock fasting was temporary fix, to maintain bearing fit after stern tube experienced wear.
21) Question: Work Item 25, paragraph 3.6 direct the contractor to “perform designated routine dry docking work, in accordance with SFLC STD SPEC 8634, paragraph 3.4.4 (within twenty four hours after docking)”. The contractor believes that the paragraph number is incorrect as there is no paragraph 3.4.4. Please verify that the correct paragraph number should be 3.5.4.
Answer: Concur with contractor. This is apparently a typo and will be changed to reference 3.5.4 VICE 3.4.4 of SFLC Standard Spec 8634. The Paragraph number should be 3.5.4.
File details come from the government source that posted it. Updated .