Picture_3_of_3_Relating_to_Work_Item_50.doc
DOC document 225 KB Posted
- Attached to
- Dry-dock Repair for Coast Guard Cutter BAYBERRY
- Solicitation number
- HSCG85-16-Q-P45458
About this file
Picture 3 of 3 Relating to Work Item 50
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pictures_1_ _2_Relating_to_Work_Item_50.doc | DOC document | |
| BAYBERRY _Amendment_02.pdf | ||
| BAYBERRY_Question_ _Answer_5.doc | DOC document | |
| Picture_for_Questions_ _Answers_4.doc | DOC document | |
| BAYBERRY_Questions_ _Answers_4.doc | DOC document | |
| BAYBERRY_Questions_ _Answers_3.doc | DOC document | |
| BAYBERRY_Questions_ _Answers_2.doc | DOC document | |
| BAYBERRY_Questions_ _Answers.doc | DOC document | |
| BAYBERRY _Amendment_01.pdf | ||
| BAYBERRY _Attachment_2_Specification.pdf | ||
| BAYBERRY_RFQ_HSCG85-16-Q-P45458.doc | DOC document | |
| BAYBERRY _Specification.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BAYBERRY RFQ HSCG85-16-Q-P45458, Picture 3 of 3 Relating to Work Item 50 The repairs required by Work Item 50 were not accessible. Below is picture 3 of 3 of the area to be repaired.
Top line shows the location of the hole in frame 13, Bottom line shows the location of the hole in the keel
The view is looking down from the buoy deck, with the sewage tank removed.
File details come from the government source that posted it. Updated .