Picture_for_Questions_ _Answers_4.doc

DOC document 2 MB Posted

Attached to
Dry-dock Repair for Coast Guard Cutter BAYBERRY
Solicitation number
HSCG85-16-Q-P45458
Issued by

About this file

Picture for BAYBERRY Questions Answers 4.

View the file

Other files

File Type Posted
Pictures_1_ _2_Relating_to_Work_Item_50.doc DOC document
Picture_3_of_3_Relating_to_Work_Item_50.doc DOC document
BAYBERRY _Amendment_02.pdf PDF
BAYBERRY_Question_ _Answer_5.doc DOC document
BAYBERRY_Questions_ _Answers_4.doc DOC document
BAYBERRY_Questions_ _Answers_3.doc DOC document
BAYBERRY_Questions_ _Answers_2.doc DOC document
BAYBERRY_Questions_ _Answers.doc DOC document
BAYBERRY _Amendment_01.pdf PDF
BAYBERRY _Attachment_2_Specification.pdf PDF
BAYBERRY_RFQ_HSCG85-16-Q-P45458.doc DOC document
BAYBERRY _Specification.doc DOC document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The area’s marked in yellow represent the deteriorated steel that needs to be replaced. The yellow lines run parallel to the deteriorated steel.

The red arrows show the interferences on the aft side of the forepeak tk bulkhead. All are bolted down and can be removed and temporarily supported while repairs are being conducted inside the forepeak tk.

File details come from the government source that posted it. Updated .