AttJ.1CypressFY12DD_Rprs.pdf
PDF 2 MB Posted
- Solicitation number
- HSCG85-12-R-P45003
About this file
Attachment J.1 Specification
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0010(12RP45003).pdf | ||
| Amendment0009(12RP45003).pdf | ||
| Amendment0008(12RP45003).pdf | ||
| Amendment0007(12RP45003).pdf | ||
| Amendment0006(12RP45003).pdf | ||
| 225B-WLB_506_3.zip | ZIP file | |
| 225B-WLB_635-1.zip | ZIP file | |
| 225B-WLB_506_5.zip | ZIP file | |
| 225B-WLB_505_3.zip | ZIP file | |
| Amendment0005(12RP45003).pdf | ||
| 225B-WLB_506_1.zip | ZIP file | |
| Amendment0004(12RP45003).pdf | ||
| Amendment0003(12RP45003).pdf | ||
| Amendment0002(12RP45003).pdf | ||
| Amendment0001(12RP45003).pdf | ||
| Solicitation(SchedA-M)(12RP45003).doc | DOC document | |
| AttJ.2ElectronicSectionB(12RP45003).xls | XLS spreadsheet | |
| AttJ.3Clarification_Form(12RP45003).doc | DOC document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC CYPRESS (WLB 210)
225 FOOT "B CLASS" SEAGOING BUOY TENDER
SPECIFICATION FOR DRYDOCK REPAIRS
Developed By: LT David B. Komar
IBCT – PDM – APM2
(Rev-1, 07 September 2011)
USCGC CYPRESS (WLB-225B) DRYDOCK AVAILABILITY 2012
ii (Rev-1)
TABLE OF CONTENTS
Revisions Record ....................................................................................................................................... iv Consolidated List of References ................................................................................................................. v Consolidated List of Government-furnished Property ................................................................................ x Consolidated List of Critical Inspection Items ......................................................................................... xii Principal Characteristics .......................................................................................................................... xiii General Requirements WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing WORK ITEM 2: Hull Plating, U/W Body, Inspect WORK ITEM 3: Appendages (U/W), Leak Test WORK ITEM 4: Appendages (U/W) - Internal, Preserve WORK ITEM 5: Voids (Non-Accessible), Leak Test WORK ITEM 6: Chain Lockers, Inspect WORK ITEM 7: Voids (Non-Accessible), Preserve Internal Surfaces WORK ITEM 8: Propulsion Shaft Bearings (External), Check Clearances WORK ITEM 9: Controllable Pitch Propellers, Clean and Inspect WORK ITEM 10: Fathometer Transducer, General Maintenance WORK ITEM 11: Duplex Strainers (All Sizes), Overhaul WORK ITEM 12: Rudder Stock Bearings, Check Clearances WORK ITEM 13: Thruster Units (General), Overhaul WORK ITEM 14: Commissary Hoist, Service and Inspect WORK ITEM 15: Pad Eyes, Inspect and Test WORK ITEM 16: Crossdeck Winches, Overhaul WORK ITEM 17: Mechanical Chain Stoppers, Overhaul WORK ITEM 18: Anchor Windlass, Level 2 Inspect and Repair WORK ITEM 19: Anchor Chain(s) and Ground Tackle, Inspect and Repair WORK ITEM 20: Warping Capstan, Level 2 Inspect and Repair WORK ITEM 21: Buoy and Cargo Handling Crane Wire Rope, Renew WORK ITEM 22: Buoy Crane, Preserve WORK ITEM 23: Tanks (Ballast), Preserve “100%” WORK ITEM 24: Chain Locker, Preserve Partial WORK ITEM 25: U/W Body, Preserve “100%” WORK ITEM 26: U/W Body, Preserve “Partial – Condition A” WORK ITEM 27: U/W Body, Preserve “Partial – Condition B” WORK ITEM 28: U/W Body, Preserve “Partial – Condition C” WORK ITEM 29: Cathodic Protection / Zincs, Renew WORK ITEM 30: Impressed Current Cathodic Protection System, Inspect and Maintain WORK ITEM 31: Drydocking WORK ITEM 32: Temporary Services, Provide WORK ITEM 33: Sea Trial Performance, Provide Support WORK ITEM 34: Chain Lockers, Clean WORK ITEM 35: Tanks (Dirty Oil and Waste), Clean iii (Rev-1)
WORK ITEM 36: Tanks (MP Fuel Service), Clean WORK ITEM 37: Tanks (MP Fuel Stowage and Overflow), Clean WORK ITEM 38: Fwd Scan Sonar Transducer, General Maintenance WORK ITEM 39: Sea Bay, Inspect WORK ITEM 40: Sea Bay, Preserve 100% WORK ITEM 41: Towing Bitts, Chocks, and Fairleads, Inspect and Test WORK ITEM 42: Chain Locker, Preserve 100% WORK ITEM 43: Impressed Current Cathodic Protection System Dielectric Shield (Capastic Fairing), Renew WORK ITEM 44: Propulsion Shafting Remove, Inspect, and Reinstall WORK ITEM 45: Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renewal WORK ITEM 46: Propulsion Tail Shaft Sleeve, Skim Cut WORK ITEM 47: Propulsion Shaft Bearing, Stave Renewal WORK ITEM 48: Controllable Pitch Propeller Hub, Remove and Reinstall WORK ITEM 49: Stern Tube Interior Surfaces, Preserve 100% WORK ITEM 50: Controllable Pitch Propeller, System Maintenance WORK ITEM 51: Controllable Pitch Propeller, Hub General Maintenance WORK ITEM 52: Propulsion Shaft Rope Guard, Renewal WORK ITEM 53: Single Point Davit, Level 2 Inspect and Repair WORK ITEM 54: Miscellaneous Tanks Vent and Overflow Piping, Renew WORK ITEM 55: Main Mast, Preserve 100% WORK ITEM 56: Bow and Stern Thruster Units, Shaft Renew & Tunnel Repair WORK ITEM 57: Buoy Crane, Inspect and Repair WORK ITEM 58: Tank Vent Cofferdams, Preserve WORK ITEM 59: Hydraulic Inhaul Winch, Repair WORK ITEM 60: RO Unit Foundation, Renew WORK ITEM 61: Auxiliary Sea Water System Valves, Overhaul or Renew WORK ITEM 62: Supply Ventilation Systems, Overhaul WORK ITEM 63: Rudder, Inspect, Repair and Preserve iv (Rev-1)
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
v (Rev-1)
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free or charge. Other Government documents may be accessed – free of charge – as follows:
• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::
www.gpoaccess.gov
The Government is aware of the following internet web links where contractors may procure commercial specifications:
• American Welding Society (AWS): http://www.awspubs.com/index.php
• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
• NFPA: http://www.nfpa.org
• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 225 WLB 184-001, Rev B, CRP-V850 Transducer Adaptor Ring Coast Guard Drawing 225 WLB 256-001, Rev P , Seawater Cooling System Diagram Coast Guard Drawing 225 WLB 573-011, Rev -, ATON Tie Downs Coast Guard Drawing 225 WLB 581-001, Rev E, Anchor Handling System Arrangement Coast Guard Drawing 225 WLB 601-001, Rev M; General Arrangement Inboard & Outboard Profiles Coast Guard Drawing 225 WLB 801-020, Rev B, Tank CAPACITY - 95% Curves Coast Guard Drawing 225B WLB 114-001, Rev C, Shell Appendages Coast Guard Drawing 225B WLB 114-002, Rev -, Flow Accelerating Fin Coast Guard Drawing 225B WLB 541-007, Rev D; Incinerator Fuel Oil Service Tank Coast Guard Drawing 225B WLB 568-001, Rev A, Bow Thruster A & D Coast Guard Drawing 225B WLB 568-002, Rev A, Stern Thruster A & D Coast Guard Drawing 225B WLB 573-001, Rev E, Buoy Handling System Arrangement Coast Guard Drawing 225B WLB 801-006, Rev D, Docking Drawing Coast Guard Drawing 225B WLB 111-001, Rev A, Shell Expansion Coast Guard Drawing 225B WLB 114-001, Rev C; Shell Appendages Coast Guard Drawing 225B WLB 170-1, Rev F; MAST A & D Coast Guard Drawing 225B WLB 243-001, Rev C, Propulsion Shafting Arrangement Coast Guard Drawing 225B WLB 243-002, Rev E, Stern Tube and Bearings A&D Coast Guard Drawing 225B WLB 256-1, Rev M, Seawater System Cooling Diagram Coast Guard Drawing 225B WLB 256-4, Rev F, SW Cooling System FR 66 Aft Block 940, 950 & 970 Coast Guard Drawing 225B WLB 424-001, Rev C, Acoustic Navigation System Block & Isometric Coast Guard Drawing 225B WLB 505-1, Rev D, General Requirements for Piping Systems Coast Guard Drawing 225B WLB 508-1, Rev A, Thermal Insulation for Mchry, Equipment and Piping vi (Rev-1)
Coast Guard Drawing 225B WLB 541-001, Rev G; Fuel Oil System Diagram Coast Guard Drawing 225B WLB 549-001, Rev A, Onboard Lubrication Requirements Coast Guard Drawing 225B WLB 556-001, Rev F, Hydraulic System Diagram Coast Guard Drawing 225B WLB 562-002, Rev C; Rudder Structural A & D Coast Guard Drawing 225B WLB 573-002, Rev -, Weight Handling System Arrangement Coast Guard Drawing 225B WLB 573-011, Rev -, ATON Tie Downs Coast Guard Drawing 225B WLB 581-001, Rev C, Anchor Handling System Arrangement Coast Guard Drawing 225B WLB 582-001, Rev -, Mooring and Towing A & D Coast Guard Drawing 225B WLB 601-001, Rev F, General Arrangement Inboard & Outboard Profiles Coast Guard Drawing 225B WLB 601-002, Rev -; Booklet Of General Plans Coast Guard Drawing 225B WLB 601-002, Rev H, Booklet of General Drawings Coast Guard Drawing 225B WLB 633-001, Rev B, Cathodic Protection System Arrangement, Block Diagram, Wiring Deck Plan, and Elementary Diagrams Coast Guard Drawing 225B WLB 633-002, Rev A; Cathodic protection passive Coast Guard Drawing 225B WLB 801-005, Rev A Tank CAPACITY - 95% Curves Coast Guard Drawing 225B WLB 801-006, Rev D, Docking Drawing Coast Guard Drawing 225B-WLB 233-1, Rev C, Propulsion Train Installation Drawing Coast Guard Drawing 225B-WLB 243-1, Rev C, Propulsion Shafting Arrangement Coast Guard Drawing 225B-WLB 243-2, Rev E; Stern Tube and Bearing A & D Coast Guard Drawing 225B-WLB 556-8, Rev C, CPP Hydraulic System Diagram Coast Guard Drawing 225B-WLB 562-2, Rev C, Rudder Structural a & D Coast Guard Drawing 225B-WLB 611-1, Rev D, Lifting Pads - Main and Aux Machinery Room Coast Guard Drawing 225B-WLB 561-003, Rev A; STEERING GEAR ARRANGEMENT Coast Guard Drawing 225B-WLB 562-001, Rev B; STEERING COMPONENTS A/D Coast Guard Drawing 225B-WLB 562-002, Rev C; RUDDER - STRUCT A & D Coast Guard Drawing 225B-WLB 801-6, Rev C; Docking Drawing Coast Guard Drawing 225B-WLB-506-006, Rev D, OVFL, AE & ST SYS A/D FR66 Aft, Block 940, 950 Coast Guard Drawing 225B-WLB-506-007, Rev D, OVFL, AE & ST SYS A/D MN DK & Above Block 960A, 970 Coast Guard Drawing 225-WLB 244-203, Rev -, Stern Tube Split Dovetail Carrier Casting Coast Guard Drawing 225-WLB 611-4, Rev J; Lifting Pads Outside Machinery Spaces Coast Guard Drawing FL 1204-3, Rev A; Welded Padeyes & Links Coast Guard Drawing FL 2605-031, Rev D, Mechanical Chain Stopper, 1-7/8" Buoy Cha in Coast Guard Drawing FL 2605-034, Rev C, Mechanical Chain Stopper Repair Kit: 1-7/8", 1-5/8" & 1-1/4" Coast Guard Yard Drawing 225B-WLB_512_1, K, HVAC DIAGRAM Coast Guard Yard Drawing 225B-WLB_512_13, A, GALLEY SUPPLY SYSTEM VENTILATION
MODIFICATIONS B01 LEVEL FR 57-61 (STBD)
Coast Guard Yard Drawing 225B-WLB_512_2, F, VENTILATION SCHEDULE Coast Guard Yard Drawing 225B-WLB_512_9, D, HVAC A & D FR 57 THRU FR 75 MN DK & LVL 1
HULL BLOCK 960A
NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, (Series), Coatings and Colors Manual Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Colors Manual Coast Guard Commandant Instruction (COMDTINST) M10360.3, (Series), Coatings and Colors Manual Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual Coast Guard Technical Publication (TP) 3498, Section A, Feb 2008, Buoy Chain Winch vii (Rev-1)
Coast Guard Technical Publication (TP) 3523, APR 2002, SWBS 241-A, Reduction Gear - Model 96DHCMG-Cp Coast Guard Technical Publication (TP) 3524, 07-JAN-97, Manufacturer's Instruction Book-SWBS Group(s) 243-262 Coast Guard Technical Publication (TP) 3524, Jan 1997, Manufacturer's Instruction Book-SWBS Group(s) 243-262 Coast Guard Technical Publication (TP) 3550, 21-MAY-96, Manufacturer's Instruction Book-SWBS Group(s)(s) 521-531 Coast Guard Technical Publication (TP) 3554, MAY 1996, Manufacturer's Instruction Book, SWBS 556 Coast Guard Technical Publication (TP) 3556, Jun 2009, Manufacturer’s Instruction Book - SWBS Group(s) 568, Bow and Stern Thruster Units Coast Guard Technical Publication (TP) 3556, Jun 2009, Manufacturer’s Instruction Book-SWBS Group(s) 568, Bow and Stern Thruster – Model 125/3 STAY/FP Coast Guard Technical Publication (TP) 3557, Section 573-C, Jul 2005, Manufacturer's Instruction Book- SWBS Group 568-573, Buoy Crane – Model EB-480-60-40 (225B-Class) Coast Guard Technical Publication (TP) 3557, SWBS 568-573, Jan 1997, Manufacturer’s Instruction Book, Model EB-480-60-40 Appleton Crane Coast Guard Technical Publication (TP) 3558, Apr 2008, Manufacturer’s Instruction Book-SWBS Group(s) 573, Section A, Cross Deck Winch – Model BMD-390 Coast Guard Technical Publication (TP) 3558, Apr 2008, Manufacturer’s Instruction Book-SWBS Group(s) 573, Section B, Cross Deck Winch – Model BMD-471 Coast Guard Technical Publication (TP) 3559, SWBS 581B, Jan 1997, Anchor Windlass, P/S - Model BMD- Coast Guard Technical Publication (TP) 3559, Section 582B, Apr 2009, Aft Capstan, 21” - Model BMD-475 Coast Guard Technical Publication (TP) 3562, Aug 1998, Section a, Manufacturer's Instruction Book SWBS Groups 583-589, RHIB Handling Davit P/S - Model RAD30-15.5 Coast Guard Technical Publication (TP) 3574, Mar 2009, Volume 1 of 1, SWBS Group 633-638, 225 FT Juniper Class Seagoing Buoy Tender Coast Guard Technical Publication (TP) 3630, Section 573-A, Mar 2008, Manufacturer's Instruction Book- SWBS Group 573, Buoy Crane Coast Guard Technical Publication (TP) E-424-006, Version WLB97-1, Wesmar 3060-08/M-8/AC Forward Scan Sonar COMDTINST M10360.3 (series), Coatings and Colors Manual COMDTINST M10360.3, Coatings and Colors Manual, Revision C Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, Jan 2009; General Requirements Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, Jan 2009, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0000 (Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), Jan 2009, Shipboard Electrical, Cable Removal, Relocation, Splice, Repair and Installation Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), Jan 2009, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), Jan 2009, Auxiliary viii (Rev-1)
Machinery Systems Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), Jan 2009, Clean Shipboard Ventilation Systems Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), Jan 2009, Drydocking Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), Jan 2009, Provide Temporary Services Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), Jan 2009, Temporary Hull Accesses Surface Forces Logistics Command (SFLC) Naval Engineering Directive (NED) 5735-01, Inspection and Test Procedure For Buoy Chain Winch Model CW-1 Onboard WLM 551-564 and WLB 201-215, May 2010
OTHER REFERENCES
American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2006, Recommended Practice for Nondestructive Testing Personnel Qualification and Certification American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End ASTM International (ASTM) D 4138, 2007, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel ASTM International (ASTM) D5363, 2008, Standard Specification for Anaerobic Single Component Adhesives (An) ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component Adhesives (An) ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Antiseize, Zinc Dust- Petrolatum Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting Commercial Item Descriptions (CID) A-A-59323, Rev A; Cloths, Cleaning, Low-Lint Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections Federal Specification (Fed Spec) RR-C-271, Nov 1995, Chain and Attachments, Welded and Weldless Grid Cover on Port Thruster Tube. Grid Cover on Starboard Thruster Tube 3.2 Protective measures -hydraulic system . The Contractor shall maintain existing hydraulic system cleanliness; take all necessary precautions to prevent the introduction of contaminants into the hydraulic system. Whenever disconnecting or removing components from the hydraulic system, completely seal all openings to the rest of the system, immediately, using either caps (for externally threaded connection points), bolt-on blanks, or taped-on discs/covers (durable plastic or sheet-metal no less than 1/16-inch thick).
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves ix (Rev-1)
MIL PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418) MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning MIL-C-24633, Apr 1998, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded MIL-DTL-23549, Feb 2007, Grease, General Purpose MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application MIL-PRF-24647, Jun 2006, Paint System, Anticorrosive and Antifouling, Ship Hull MIL-S-22473 , Rev E(8); Sealing, Locking, and Retaining Compounds: (Single Component), 11/18/1993 MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant Naval Sea Systems Command (NAVSEA) S9243-AW-TRS-011, Surface Ships Main Propulsion Shafting Refurbishment Procedures, Volume I, Part 1 Naval Sea Systems Command (NAVSEA) S9243-AW-TRS-012, Surface Ships Main Propulsion Shafting Examination, Test and Repair Action Record, Volume 1, Part 2 Naval Sea Systems Command (NAVSEA) T9074-AS-GIB-010/271, Apr 1997, Requirements for Nondestructive Testing Methods NAVSEA Dwg 803-2145807, Propulsion Shafting & Components ODOM Echotrac DF3200 MKII, Rev 2, Technical Manual Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 1999, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning The Society for Protective Coatings (SSPC), June 1996, Paint Application Specification No. 2 (PA-2), Measurement of Dry Coating Thickness with Magnetic Gages The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2004, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2004, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2007, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 7/NACE No.4, 2007, Brush-Off Blast Cleaning The Society for Protective Coatings (SSPC)/NACE Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2004, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning The Society for Protective Coatings SSPC-SP 10/NACE No.2, Jan 2007; Near-White Blast Cleaning The Society for Protective Coatings SSPC-SP 10/NACE No.2, Rev -; Near-White Blast Cleaning The Society for Protective Coatings SSPC-SP 11, Nov 2004; Power Tool Cleaning to Bare Metal x (Rev-1)
Consolidated List of Government-furnished Property The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
11 N Stern Seal Strainer
Model: ST053020BF11TS Mfr: Hayward 1 ea.
17 N Overhaul Kit (for Para. 3.2 Task #2)
NSN: 2030-01-485-7215 2 ea. 1,000.00
17 N Pin Repair Kit (for Para. 3.2, Task #2)
NSN: 2030-01-485-7209 2 ea. 593.00
31 Y *Transducer Cover Plate N/A 4 ea. 50.00 44 Y **Propeller shaft NSN: 2010-01-399-5912 1 ea. 165,000 45 N 225' WLB Major
Overhaul Kit 01-520-5284 1 ea. 35,249.00
45 N **225' WLB Seat (Split) John Crane (Wartsila), H72579-01-7
1 ea. 12,500.00
45 Y Seal Compression Tool Onboard Tool 1 ea. 200.00 50 N Stat-O-Seal Washers NSN: 5310-01-212-5987
PN: 0-4-3-5
12 ea. 55.61
50 N O-Ring, Hub Flange Bolt Cover
NSN: 5331-00-983-9878
PN: 0-2-2-5
12 ea. 50.00
51 N **Blade Bolts NSN: 5306-01-410-6893 4 ea. 1,854.12 51 N Blade Bolt O-rings NSN: 5330-01-408-7251
(0-3-2-11) 48 ea. 2.25
51 N Blade Seal NSN: 5330-01-409-1058 (0-4-4-22)
4 ea. 55.00
51 Y *Lifting Device, Propeller Blade
NSN: 2020-01-F02-6825 1 ea. 100.00
53 Y Winch Assembly PN: YMD-8072 1 ea.
53 N Swing Brake Seal Kit NSN: 90-016-2141 2 ea.
53 N Swing Brake Disc &
Bearing Kit NSN: 90-016-2131 2 ea.
53 N Counterbalance Valve PN: YMD-3763 1 ea.
53 N Shuttle Valve PN: YMD-1288 1 ea.
56 Y Seal 5330-01-495-3435 5 ea.
56 N Bearing, Roller, Tapered 3110-01-495-3354 1 ea.
56 N Bearing, Roller, Tapered 3110-01-495-3344 1.ea.
56 N Bearing, Roller, Tapered 3110-01-495-3334 1 ea.
56 N Bearing, Roller, Tapered 3110-01-495-3465 1 ea.
56 Y Propeller Shaft D125FM43311 1 ea.
57 Y Extension/telescope
Hydraulic cylinder PN: YMD-8261 1 ea.
57 N Hinge Bushings PN: MMD-2875 2 ea.
xi (Rev-1)
57 N Thrust washers PN: MMD-1363 4 ea.
57 N Slide Pad/shim kit PN: YMD-8956 1 Kit 57 N Emergency Release
Manifold
PN: YMD-6895 1
Assembly Available on board
59 Y Roller bearing Unit NSN:3130-01-504-4363 2 ea. 4,012.00 59 N Winch Shaft Assembly PN: 573-06-00005 1 ea.
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xii (Rev-1)
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph
3.2.6.5 (Inspection report particulars)):
Work Item Title 1 Hull Plating (Side Scan), Ultrasonic Testing 3 Appendages (U/W), Leak Test 5 Voids (Non-Accessible), Leak Test 8 Propulsion Shaft Bearings (External), Check Clearances 9 Controllable Pitch Propellers, Clean and Inspect 12 Rudder Stock Bearings, Check Clearances 16 Crossdeck Winches, Overhaul 17 Mechanical Chain Stoppers, Overhaul 18 Anchor Windlass, Level 2 Inspect and Repair 19 Anchor Chain(s) and Ground Tackle, Inspect and Repair 20 Warping Capstan, Level 2 Inspect and Repair 39 Sea Bay, Inspect 44 Propulsion Shafting Remove, Inspect, and Reinstall 45 Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renewal 50 Controllable Pitch Propeller, System Maintenance 51 Controllable Pitch Propeller, Hub General Maintenance 53 Single Point Davit, Level 2 Inspect and Repair 57 Buoy Crane, Inspect and Repair 59 Hydraulic Inhaul Winch, Repair 61 Auxiliary Sea Water System Valves, Overhaul or Renew 63 Rudder, Inspect, Repair and Preserve xiii (Rev-1)
PC_225B_WLB_1109
Principal Characteristics
225' WLB (B-CLASS)
PHYSICAL CHARACTERISTICS
Length Overall 225' 0" Length between Perpendiculars 206' 0" Maximum Beam 46' Designed Draft 13' 0" Full Load Displacement 2000 long tons Light Ship Displacement 1523 long tons Minimum Operating Displacement 1800 long tons Mast Height (Above 12' Waterline) 67' 5"
Anchor Two 4000 lb standard Navy stockless anchors, 8 shots each, port and starboard, 1-3/8 die lock chain
HULL CHARACTERISTICS
Bilge Keels (Port & Starboard) Frames 42-79 Frame Spacing
FR 0 to 12 21" FR 12 to 30 22"
FR 30 to 102 24"
MACHINERY CHARACTERISTICS
Main Propulsion Diesel Reduction Diesel Engines Two Caterpillar 3608, TA, 3100 BHP each @ 900 RPM Number of Propellers 1 Number of Blades 4 Diameter 10' Pitch Controllable
RPM 254
Ship's Service Diesel Generators Two Caterpillar 3508 TA, 450 kW Emergency Diesel Generator One Caterpillar 3406 DITA, 280 kW Shore Tie Two 450 VAC, two 400 Amp, 3-wire Shaft Bearing, Forward Cooper Bearing 01-BCP-1400-EX-TL Shaft Bearing, Aft Water Lubricated Cutless Bearing
TANK CAPACITIES
Diesel Oil 76,498 gal Fresh Water Capacity 8056 gal Hydraulic Oil Capacity 2785 gal Lube Oil Storage 764 gal Grey Water Tank 2700 gal Sewage Holding Tank 1700 gal xiv (Rev-1)
1 (Rev-1)
00000_PWB_0211_FLT
REC_0000_FLT_ Commercial Project @ Contractor’ Facility (0211)
General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. REFERENCES
COAST GUARD DRAWINGS
None.
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and
Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
OTHER REFERENCES
ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface
Profile of Blast Cleaned Steel Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety
Administration, Department Of Transportation MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel
Surfaces Prepared by Dry Abrasive Blast Cleaning
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
2 (Rev-1)
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.4 HW disposal. The Contractor is considered as the generator of all contract-generated hazardous wastes and shall use its facility’s EPA generator ID number for management, transportation, and disposal of said hazardous wastes. Ensure the following:
3.4.1 Contractor’s hazardous waste handlers shall comply with applicable requirements of 40 CFR 262.
3.4.2 All contract generated hazardous wastes shall be packaged in 49 CFR-compliant containers.
3.4.3 The designated wastes shall be disposed of at a state or Federally-approved and permitted HW TSDF.
3.4.4 Name of destination TSDF shall be submitted to the KO at the Arrival Conference.
3.5 Pre-surface preparation test coupon. In order to ensure production of required surface profile, the Contractor shall accomplish the following tasks, whenever abrasive-blasting is required in a work item that is deemed a ”critical-coated’ surface:
3.5.1 Coupon material and test set-up particulars.
3.5.1.1 Conduct a performance test on all abrasive blasting operations on a Contractor- provided test coupon, prior to starting abrasive blasting operations on the vessel. Ensure the following:
• The coupon shall be a new metal plate, of the same metal type and material properties as the vessel area to be blasted - steel or aluminum plate, as applicable, and shall have no existing anchor profile - other than the surface irregularities from the manufacturing process.
• The test coupon shall be flat, with nothing welded to the side used for the anchor profile test, no thinner than a 1/8-inch plate and measuring no smaller than 1-foot by 1-foot.
• For steel substrates, the coupon shall have the mill scale intact, and be in a Rust Grade "A" condition, in accordance with SSPC-VIS 1.
• The test coupon shall be affixed so as to not permit excessive movement during the performance test, but shall not be affixed to the vessel.
3.5.1.2 Ensure that the abrasive-blasting operation for the test coupon is conducted with the identical setup and parameters that will be used blasting the designated vessel surfaces – including, but not limited to:
• The abrasive media type and media size selected to achieve the anchor profile range, as specified in the applicable work items.
• Nozzle size and type (straight bore, high velocity nozzle, angle nozzle...).
• Delivery rate and pressure settings.
3 (Rev-1)
3.5.1.3 Blast a one-square foot area on one side of the test coupon to the abrasive surface preparation standard specified in the work item, and perform an anchor profile test of the blasted surface in accordance with ASTM D4417, Method B or C. Notify the COTR in advance of the abrasive blasting operation test, to permit the witnessing of the test by the COTR. Submit a CFR documenting the results of the abrasive blasting operation test. The CFR shall include at a minimum, the following:
• Area of the vessel for which the verified setup will be used to abrasive blast.
• The selected abrasive media type and size.
• The nozzle size and type.
• The delivery rate and pressure.
• The test coupon starting properties (material type and surface conditions).
• The resultant anchor profile readings from the test (a minimum of 3 locations, separated by a minimum of
2 inches shall be recorded).
NOTES
1. A performance test of the abrasive blasting operations on a test coupon and measuring the resultant anchor profile prior to performing the abrasive blasting operation on the cutter is required. The test coupon will be used to evaluate the anchor profile produced by the equipment setup and selected abrasive media.
2. The reverse side of the test coupon may be used for the subsequent test, provided that the conditions in paragraph 3.5.1 (Coupon material and test set-up particulars) are met.
3. Ultra high pressure water jetting does not create an anchor profile and is exempt from the anchor profile test coupon check.
3.5.1.4 Repeat the abrasive blasting operation test in the following instances:
• The equipment setup, that was evaluated during the test coupon abrasive blasting performance test in paragraph 3.5.1 (Coupon material and test set-up particulars), has changed.
• The resultant anchor profile readings observed on the vessel are outside the specified anchor profile range.
• Media is changed from MIL-A-22262 to CID A-A-59316 or vice versa.
• The supplier of the abrasive blasting media changes, regardless if the new source for the media has the same specifications.
• When Directed by the COTR.
CAUTION!
Ensure that blast media from the performance test does not strike the vessel during the test.
3.6 Interim changes to SFLC Std Spec 0000. The Contractor shall be aware of the fact that the requirements of paragraph 3.3.2.1.1 (Water depth) have been revised to read as follows:
“3.3.2.1.1 Water depth. Ensure that water depth is sufficient at the pier to allow the vessel's lowest underwater appendage to clear the bottom by at least two feet at:
• Ordinary low water mark on non-tidal rivers.
• At all tide conditions predicted during the availability for tidal rivers and other navigable waterways (Bay, Lake, etc.).”
4 (Rev-1)
4. NOTES
4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/directives/cim.asp
4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-1)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
Vessel Name Hull # Work Item # Work Item Title
Location of Work (incl. frame #’s) Area (sqft)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down
(maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).
Verify surface anchor profile using ASTM D4417-Methods B or C against COMDTINST M10360.3. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max.
threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Name of QP-1/NACE Inspector Signature Cert. # Date / Time
6 (Rev-1)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE &
TIME
ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION
(Frame &
Deck, relation to equipment, etc.)
TEMPERATURE % REL.
HUMID-
ITY DEW PT. SURFACE AMBIENT ΔT
| DP - Surface |
7 (Rev-1)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
Location of Work (Frame References) Area (sqft)
SURFACE PREPARATION
METHOD
PROFILE ACHIEVED (mils) Min Max Mean
SSPC-SP-10/NACE No. 2 SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________ Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
8 (Rev-1)
9 (Rev-1)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
SURFACE PREPARATION
METHOD
PROFILE ACHIEVED (mils) Min Max Mean
SSPC-SP-10/NACE No. 2 SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________ Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading: _____ mils _____ mils _____ mils mils mils mils mils mils mils mils mils mils mils mils
Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):
_____ mils _____ mils _____ mils mils
10 (Rev-1)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15
DATE TEST LOCATIONS CONDUCTIVITY
(microsiemens/cm)
11 (Rev-1)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
Coating Mfg Product Name Batch # Induction Time
Coating System Sequence (Primer/Touchup/3rd Coat, etc.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2
SPOT 1 2 3 4 5 AVERAGE
VALUE
*BASE METAL
READING (BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Application Method (Airless, Conventional Spray, Rolled) Average DFT
12 (Rev-1)
11000_Side Scan_0411_FLT REC_11000_Side_Scan_FLT_225B WLB- ALL (1209)
WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform thickness measurements of underwater (u/w) hull plating by ultrasonic side scan method.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 225B WLB 111-1, Rev A; Shell Expansion Coast Guard Drawing 225B-WLB 801-6, Rev C; Docking Drawing
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General
Requirements
OTHER REFERENCES
American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2006, Recommended Practice for
Nondestructive Testing Personnel Qualification and Certification
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
• 3.3 (Side Scan Reports).
3.1.2 Technical Representative.
Not applicable.
3.1.3 Protective measures.
Not applicable.
13 (Rev-1)
3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):
• Docking blocks.
3.1.5 Work coordination and preparation. The Contractor shall plan all specified vessel work detailed in this specification package to ensure the side scan survey does not necessitate a work stoppage. Abide by the following guidance, to facilitate the ultrasonic survey:
• Ensure that all u/w body surface preparation and primer coat application tasks are completed within ten days of lifting the vessel.
• Prior to side-scan survey, inspect interior and bilge plating for the presence of bubbles of rusted metal;
break up and remove all rust bubbles with a small hand tool, to facilitate accurate survey results.
• Provide a continuous supply of fresh water and 110 VAC electrical power, and scaffolding or other suitable means of access to the u/w body surfaces.
• After completion of the hull survey, and authorized hull repairs, resume/complete u/w body preservation process by applying the second coat of the anti-corrosive coating system, and all anti-fouling paint coats.
CAUTION!
The Contractor shall pay close attention to manufacturer’s recommended practices in regards to overcoating windows and surface cleanliness prior to resuming u/w body coating application.
3.2 Side scan requirements and procedures. The Contractor shall use drawings listed in Section 2 herein as guidance during the performance of the tasks specified below:
3.2.1 Testing company and personnel. Provide the services of a qualified ultrasonic testing company, with suitable side scan equipment, to conduct a “Scanning Crawler Automated Test” of the vessel’s u/w hull plating for the presence of metal corrosion and deterioration. Ensure the following:
• All scanning shall be completed by a certified automated scanner with a proven history and certificate of qualifications.
• An ASNT Level II Analyst shall be on site during the entire scanning process, to complete all readings and review all scanning data.
3.2.2 Coast Guard notification. Allow ten calendar days for the survey team to complete its required tasks.
3.2.2.1 Provide a daily update to the COTR on all areas inspected and potential issues or schedule changes.
3.2.2.2 Notify the COTR at least 3 days prior to completion for an onsite review of readings and repair areas.
3.2.3 Scanning parameters. Use the following parameters during the course of this inspection:
• Scanning resolution shall be set to (.5x .5).
• Plates where scan data indicating wastage greater than or equal to 25% nominal plate thickness shall be highlighted in “RED” and designated “repair areas”.
• Plates where scan data indicating wastage greater than or equal to 15% to 24% of nominal plate thickness shall be highlighted in “YELLOW”.
• Plates where scan data indicating wastage greater than or equal to 10% to 14% of nominal plate thickness shall be highlighted in DARK GREEN.
14 (Rev-1)
• Hand held UT readings shall be taken to verify bad metal areas found with the side scan equipment. All readings shall be provided to the COTR and the lowest reading marked on the hull at the bad metal location.
• Areas that are accessible but cannot be scanned by scanning equipment shall be hand-scanned. Any repair areas found during the hand scan shall be marked on the ships hull and their approximate positions recorded on the plate drawings and report summary.
NOTES
1. Any scanning parameter or scope of work changes must be approved by the KO.
2. The echo to echo transducer is not authorized due to inconsistent readings and technical difficulties.
3. There shall be no deviation from the color scheme specified above!
3.2.4 Inspection exclusions. Ensure that the side scan inspection area includes the Port, Starboard, and Transom exterior shell plate below the water line, but shall exclude the following:
• Areas under and within 6-inches of blocks and side blocks (areas that are accessible 6 inches from blocks and side blocks must be hand scanned.)
• Areas up to 6-inches around any obstacle on the hull including sea suctions, discharges, rudderposts, knuckle, bow stem, stabilizer tubes, and stern tubes, as applicable.
• Any areas blocked by immovable scaffolding or shipyard activity.
3.3 Side scan reports. The Contractor shall submit to the COTR a CIR (Critical Inspection Report) in accordance with paragraph 3.1.1 after the side scan inspection is completed. A copy of all repair areas shall be summarized and clearly marked on the hull with white or yellow marking paint and submitted to the COTR prior to departing the job site. Submit two hard copies of the report with two CD’s containing the electronic (raw) data. Ensure that the reports shall include:
• Inspection overview.
• Data sheets for each plate with designated repair areas outlined in blue.
• Mosaic of scanned data overlaid on Coast Guard Drawing 225B WLB 111-1.
3.3.1 Photos. Provide digital photos of all designated repair areas.
3.3.2 Electronic files. CD’s shall contain a complete copy of the report, interactive data files, and digital pictures. All electronic files shall be compatible with standard USCG workstation operating software. Electronic files format shall be such that the CG has the capability to change the percent of wastage (format conditioning) per plate. Electronic files shall be capable of being opened using MS Word, Ms Excel, or PDF software. Digital pictures shall be recorded in JPEG format.
This section is not applicable to this work item.
15 (Rev-1)
11000_UWHIB_0310_FLT
REC_11000_UWHIB_FLT_225B WLB (210 CGC CYPRESS) (0510)
WORK ITEM 2: Hull Plating, U/W Body, Inspect
1.1 Intent. This work item describes the requirements for the Contractor to inspect/survey the vessel’s U/W hull plating, including U/W appendages and coating system.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 225B WLB 111-001, Rev A; Shell Expansion Coast Guard Drawing…
This is the start of the file's text. The full file is on GovTribe.