Amendment0002(12RP45003).pdf

PDF 412 KB Posted

Attached to
CGC CYPRESS (WLB 210) FY2012 DRYDOCKING AND REPAIRS
Solicitation number
HSCG85-12-R-P45003
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
Amendment0010(12RP45003).pdf PDF
Amendment0009(12RP45003).pdf PDF
Amendment0008(12RP45003).pdf PDF
Amendment0007(12RP45003).pdf PDF
Amendment0006(12RP45003).pdf PDF
225B-WLB_506_3.zip ZIP file
225B-WLB_635-1.zip ZIP file
225B-WLB_506_5.zip ZIP file
225B-WLB_505_3.zip ZIP file
Amendment0005(12RP45003).pdf PDF
225B-WLB_506_1.zip ZIP file
Amendment0004(12RP45003).pdf PDF
Amendment0003(12RP45003).pdf PDF
Amendment0001(12RP45003).pdf PDF
Solicitation(SchedA-M)(12RP45003).doc DOC document
AttJ.2ElectronicSectionB(12RP45003).xls XLS spreadsheet
AttJ.3Clarification_Form(12RP45003).doc DOC document
AttJ.1CypressFY12DD_Rprs.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0002 21 OCT 11 21-12-852P45003

6. ISSUED BY CODE HSCG85 7. ADMINISTERED BY (If other than Item 6) CODE

COMMANDER

SURFACE FORCES LOGISTICS CENTER C&P2

1301 CLAY ST. STE 807N

OAKLAND, CA 94612-5217

8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.

HSCG85-12-R-P45003

9B. DATE (SEE ITEM 11)

19 OCT 11

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

√ A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)

SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority).

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

CGC CYPRESS (WLB 210) FY12 DRYDOCK & REPAIRS

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

)PREVIOUS EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.2

HSCG85-12-R-P45003 Amendment 0002

1. Response(s) to Request(s) for Clarification 0001-0006 is/are provided as Attachment A.

2. Offerors are reminded of the early submission requirements of the drydock information detailed in solicitation section L.9.2

11/10/11 4 p.m. Pacific time

3. There is no change to the proposal closing date, which remains as follows:

11/21/11 11 a.m. Pacific Time Price Proposal & Attachment J.2.

ATTACHMENT A

Date: 10-18-11

Question No. 0001

REQUEST FOR CLARIFICATION

SHIP & HULL No.: CGC CYPRESS (WLB 210) FY12 DRYDOCK REPAIRS

RFP No.: HSCG85-12-R-P45003

SOLICITATION SECTION: PARA NO.

WORK ITEM NO. 21 para. no 3.2

TITLE:

QUESTION:

Please state the size and length of the two wire ropes that are being renewed.

RESPONSE:

As per Section 2 of this Work Item (Coast Guard Technical Publication (TP) 3557, SWBS 568-573, Jan 1997, Maunfacturer’s Instruction Book, Model EB-480-60-40 Appleton Crane, Appendix T) the wire rope parts list is attached.

Date: 10-20-11

Question No. 0002

RFP No.: HSCG85-12-R-P45003

SOLICITATION SECTION: PARA NO.

WORK ITEM NO.

36 para. no 4.1 & 37 para. no 4.1

TITLE:

Tanks (MP fuel service) & Tanks (overflow/storage)

Can the contractor store the fuel and reinstall the fuel later on.

Negative. The Contractor shall replenish the fuel with new, clean fuel as per the Naval Engineering Manual (NEM), COMDTINST M9000.6F

Question No. 0003

RFP No.: HSCG85-12-R-P45003

SOLICITATION SECTION: PARA NO.

WORK ITEM NO. 44 para. no 3.11.1

TITLE: Propulsion shafting remove/reinstall

Para. 3.11.1 states the Coast Guard will arrange for fuel oil to be delivered by a barge. Who is paying for the fuel in this item ? Work item 36 and 37 states that the shipyard is to provide the replacement fuel. Please clarify the three (3) work items as to the fuel replacement.

Work Item #44 is incorrect as this is inconsistent with Work Items 36 & 37.

At paragraph 3.11.1, at second bullet, delete:

“Coast Guard will arrange for fuel oil delivery by a barge”

And replace with:

“the Contractor shall arrange for fuel onload and replenishment.”

Question No. 0004

RFP No.: HSCG85-12-R-P45003

SOLICITATION SECTION: PARA NO.

WORK ITEM NO. 52 para. no 3.3.1

TITLE:

Para. 1.2 states no GFM provided. Para. 3.3.1 states the rope guard will be Government provided.

Please clarify work item to reflect who is to provide the new rope guard.

The government already possesses the new rope guard. The contractor is NOT required to provide the new rope guard.

Question No. 0005

RFP No.: HSCG85-12-R-P45003

SOLICITATION SECTION: PARA NO.

WORK ITEM NO.

56 para no 1.1 and 1.2,

3.5.1 , 3.5.2 & 3.9, 3.12

TITLE: Bow and Stern Thrusters

Paragraph 1 states work to be done to the bow and stern thruster. Paragraph 1.2 GFM looks to support only (1) thruster propeller shaft. Paragraph 3.5.1 specifies to renew a propeller shaft……which one gets renewed….bow or stern ? Paragraph 3.5.2 states to inspect and repair by clad welding. What gets clad welded ? How much….dia. and length ? Or do we inspect and submit a CFR and the clad welding is done on a change order ? Paragraph 3.9 states to install a contractor furnished shaft seal. Is this seal GFM under paragraph 1.2 ? Is the pinion gear seal mentioned in paragraph 3.12 GFM ?

Please clarify.

The quantities in paragraph 1.2 “Government-furnished property” should be doubled to support both bow and stern thruster. Both thrusters are getting their thruster shafts renewed.

Inspect and repairs “by clad welding and other method” apply to both thruster tunnels. The clad welding repairs would be taking place on the thruster tunnels. Estimate 6-7 sq ft of repairs. The repairs will be done as part of this work item, NOT as a change request. If additional repairs beyond 6-7 sq ft are needed, then a change request must be submitted and authorized by the Contracting Officer.

The shaft seals are provided as GFP, but the end caps and o-rings shall be contractor furnished using tech rep assistance/guidance.

No, the pinion gear seal is not included in para. 1.2 GFP.

Question No. 0006

RFP No.: HSCG85-12-R-P45003

SOLICITATION SECTION: PARA NO.

WORK ITEM NO.

57 para no. 3.2-#3, #4 & #7

TITLE: Buoy Crane Inspect & repair

Paragraph 3.2 #3 states to renew wear pucks, pads, shims and fasteners. Are these items covered in the GFM labeled “Slide pad/shim kit” ? Does #4 under paragraph 3.2 come with new bushings and a new pin ? Items # 7 seem to be duplicated in work item # 22. Is this correct ? If so please delete this requirement from work item # 57 or state “ it is being done in work item # 22”.

As per Section 2 of Work Item 56, Coast Guard Technical Publication (TP) 3557, Section 573-C, Jul 2005, Manufacturer's Instruction Book-SWBS Group 568-573, Buoy Crane – Model EB-480-60-40 (225B-Class), see attached Appleton Marine kit list for the contents of the Slide Pad/Shim Kit, P/N YMD-8956. The contractor is responsible for supplying any parts needed that are not in the kit.

The cylinder, as per para 1.2 GFP, is provided by the government, the pins and bushings shall be provided by the Contractor.

Work Item 57, para. 3.2, tasks #7 & #8 can be deleted, as full (interior and exterior) preservation of the Buoy Crane is taking place in Work Item 22.