NDGPS RFP - Atth I - PWS Enclosure 4 - PM Summary.pdf

PDF 307 KB Posted

Attached to
Nationwide Differential Global Positioning System Engineering and Logistics Support (NDGPS) Federal contract opportunity
Solicitation number
HSCG44-12-R-P13005
Issued by
Department of Homeland Security US Coast Guard

About this file

NDGPS RFP - Atth I - PWS Enclosure 4 - PM Summary

View the file

Other files for this federal contract opportunity

Other files attached to Nationwide Differential Global Positioning System Engineering and Logistics Support (NDGPS), newest first.
File Type Posted
SF30-A00003.pdf PDF
HSCG44-12-R-P13005_Amendment_A00003_Continuation.doc DOC document
2_-_NDGPS_RFP_-_Atth_II_A_and_II_B_DGPS__Pricing_Sheet_ _Summary_(Amended)(A2).xlsx XLSX spreadsheet
1_-_sf30-A00002.pdf PDF
3_-_NDGPS_RFP_-_Atth_IV LABOR_CATEGORIES_2-6-12_A2.pdf PDF
6 - NDGPS RFP - Atth IV - LABOR CATEGORIES —
3 - NDGPS RFP - Atth - VII Subcontracting Plan Format.docx DOCX document
1 - sf30-A00001.pdf PDF
5 - NDGPS RFP - Atth V- Past Performance Questionnaire --18 May 2012 —
2 - NDGPS RFP - Atth - VI - LIST OF TECHNICAL QUESTIONS.pdf PDF
8 - NDGPS RFP - IX - USCG NAV CEN - 3 YEARS Casualty Data.pdf PDF
9 - NDGPS RFP - Atth I - PWS Enclosure 4 - PM Summary a2.pdf PDF
4 - NDGPS RFP - Atth —
7- NDGPS RFP - Atth II A and II B DGPS Pricing Sheet Summary —
NDGPS RFP - Atth I - PWS Enclosure 5 - Special Site Requirements.pdf PDF
NDGPS RFP - Atth V - Past Performance Questionnaire.pdf PDF
NDGPS RFP - Atth I - PWS Enclosure 2 - Maintenance Support Guide for NDGPS Sites.pdf PDF
NDGPS RFP HSCG44-12-R-P13005.pdf PDF
NDGPS RFP - Atth I - PWS Enclosure 3 - Maintenance Procedures Manual.pdf PDF
NDGPS RFP - Atth IV - LABOR CATEGORIES.pdf PDF
NDGPS RFP - Atth I - PWS.pdf PDF
NDGPS RFP - Atth IIA - Contractor Pricing Sheet.pdf PDF
NDGPS RFP - Atth I - PWS Encolsure 6 - Government Furnished Equipment.pdf PDF
NDGPS RFP - Atth IIB - Contractor Pricing Summary Sheet.pdf PDF
NDGPS RFP - Atth I - PWS Enclosure 1 - NDGPS Site List.pdf PDF
NDGPS RFP - Atth III - Wage Determination.pdf PDF
NDGPS RFP - Atth I - PWS Enclosure 5 - Special Site Requirements.doc.pdf PDF
NDGPS RFP - Atth I - PWS —
NDGPS RFP - Atth I - PWS Enclosure 2- Maintenance Support Guide.pdf PDF
NDGPS RFP - Atth I - PWS Enclosure 4 - PM Summary.doc.pdf PDF
NDGPS RFP - Atth I - PWS Enclosure 3 - Maintenance Procedures Manual.pdf PDF
NDGPS RFP - Atth I - PWS Enclosure 1- DGPS Site List.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

As part of the Coast Guards Logistics Transformation Modernization

Program the preventative maintenance program will be moving to an electronic documentation system. The Coast Guard Asset Logistics

Management Information System (ALMIS) will be used to track all maintenance. Under ALMIS will be the Electronic Asset Log (EAL) that maintenance units will access to generate Maintenance Procedure

Cards (MPC). These cards will be used to guide the technicians in performing the required equipment maintenance.

Until this new system is fully implements, the following pages will be used as the guidelines for all DGPS related maintenance.

ENCLOSURE 4

PREVENTATIVE MAINTENANCE

SUMMARY

Periodicity Codes: Q = Quarterly; T = Tri-annual; S = Semi-annual; A = Annual ; O = Other

1 of 7 ENCLOSURE 4

PREVENTATIVE MAINTENANCE SUMMARY

GCF-W-1216-DGPS (Ref: MPC 42315/AHAA 02)

MAINTENANCE REQUIREMENT T S A O NOTE

1 Clean and Inspect REFSTA Receivers

2 Clean and Inspect ITMON Receivers

3 Inspect Electrical and RF connections

4 Inspect and clean interior of equipment cabinet

5 Inspect and Clean rack blower

6 Clean Filter

7 Check operation and connections on DSU

8 Inspect wiring and connections on relay and distribution panel

9 Inspect and Test UPS

10 Inspect / Repair ground connections

11 Clean and Inspect MSK, ITMON and

REFSTA antennas

12 Check for loose joints and mounting HW

13 Weatherproof connectors

14 Inspect / Replace cable clamps

2 of 7 ENCLOSURE 4

CDWP-SC1000-DGPS-USCG

1 Clean and Inspect SC1000 Transmitter 1

2 Check SC1000 operating parameters 2

3 Perform SC1000 Transmitter alignment 3 cabinet

5 Test remote sensors 4

6 Inspect / Test load center and battery charger

7 Service / Replace defective components in load center

8 Clean and Inspect Batteries 6

9 Clean / Inspect ATU 7

10 Operate / Test ATU 7

11 Perform RSIM drawer alignment 8

12 Inspect and Test transmission line to ATU

13 Inspect / Adjust spark gaps

Notes: 1. MPC 42315/AUAA

2. MPC 42315/AUAB

3. MPC 42315/AUAF

4. MPC 42315/AUAC

5. MPC 42315/AUAD

6. MPC 31311/ADAA

7. MPC 42315/AUAE

8. MPC 42315/AUAG

3 of 7 ENCLOSURE 4

RCA-MSK-5SS TRANSMITTER

1 Clean and Inspect MSK-5SS Transmitter

2 Check / Record operating parameters

3 Perform Transmitter Alignment cabinet and air filters

5 Test remote sensors

6 Test Transmitter under generator load

7 Clean / Inspect ATU

8 Operate / Test ATU

9 Perform RSIM interface alignment

10 Inspect and Test transmission line to ATU

11 Inspect / Adjust spark gaps

12 Inspect for signs of arcing, corrosion or deterioration.

13 Complete test and alignments outlined in the NDGPS Maintenance procedures

Manual

Notes: 1. Final maintenance procedures will be developed by the maintenance contractor based on reliability considerations. Procedures may be added or deleted as performance and conditions dictate.

4 of 7 ENCLOSURE 4

(1SG38), VECTOR D DGPS TRANSMITTER

1 Clean and Inspect Vector Transmitter

2 Check / Record operating parameters

3 Perform Transmitter Alignment cabinet and air filters

5 Test remote sensors

6 Test Transmitter under generator load

7 Clean / Inspect ATU

8 Operate / Test ATU

9 Inspect and Test transmission line to ATU

10 Inspect / Adjust spark gaps

11 Inspect for signs of arcing, corrosion or deterioration

12 Complete test and alignments outlined in the NDGPS Maintenance procedures

Manual

5 of 7 ENCLOSURE 4

290’ TRANSMITTING TOWER

1 Visual Inspection of tower, guys, TLEs, insulators, and anchors

2 Check vertical alignment

3 Check tension of guy wires

4 Inspect and clean base insulator 1

5 Check antenna ground resistance

6 Inspect / Test obstruction lighting system

7 Inspect / Replace flash head assembly 2

8 Inspect ground connections 1

9 Remove weeds / grass from around tower base and coupler area; treat with weed killer

10 Comprehensive tower inspection 2

11 Check RF connections and transmission line. Clean and tighten all connections

12 Inspect ground radial system

Notes: 1. MPC 44111/010

2. Comprehensive tower inspection and light replacement required every three years

6 of 7 ENCLOSURE 4

BUPG

1 Conduct visual inspection of shelter

2 Inspect for fuel leaks or spills

3 Inspect and clean air intake filters

4 Check /Test coolant, battery and oil heaters

5 Check temperature sensor settings

6 Check ATS

7. Inspect as test timer assemblies

8 Inspect and Test the prime mover

9. Test alarm sensors

10. Change oil, oil filters and fuel filters

11. Clean and tighten electrical connections

12. Analyze oil samples

13. Check and fill all fluid levels

14. Check generator operation under load

15. Test generator start with simulated power failure

16 Clean and oil motor in compartment heater

17 Collect and analyze fuel samples (each tank)

18 Check Fuel Levels in both tanks

19 Maintain fuel levels at 80-90% (DF-2)

20 Treat fuel with appropriate conditioners

21 Inspect and Test batteries and charger

22 Inspect / Tighten/ Replace belts and hoses

23 Inspect and clean floor drain (if applicable)

24 Remove and dispose of any oil / fuel in overflow pan

25 Check and record generator run time meter

26 Inspect all meters, gauges, and indicator lamps

27 Inspect and Test ventilation, heaters and alarms

7 of 7 ENCLOSURE 4

FACILITIES / GROUNDS

1 Mow / cut grass at site 1

2 Trim along fences and around fixed structures

3 Treat / weed in gravel areas

4 Inspect for site damage and vandalism

5 Inspect shelters for corrosion and leaks

6 Replace lamps, bulbs, lights

7 Test / Service HVAC units

8 Inspect fences, gates, and barb wire

9 Replace / repair damaged fence sections

10 Inspect site for rodent and pest infiltration

11 Inspect / service locks

12 Inspect and replace safety equipment

13 Inspect GSOS equipment

14 Weatherproof GSOS external connections

15 Snow removal

16 Inspect / maintain access road and gravel areas

17 Inspect site for exposed ground radials

18 Inspect power and telephone service entry points for damage and vegetation

19 Inspect REFSTA masts and foundations

20 Inspect / Repair Ice Shields

21 Inspect / trim trees blocking REF STA antennas and along power lines

Notes: 1. Grass cutting requirements will vary from site to site. General requirement is to maintain grass height at less than 12 inches for operational sites.

2. Anticipate biennial grading of access road for proper drainage.

File details come from the government source that posted it. Updated .