7- NDGPS RFP - Atth II A and II B DGPS Pricing Sheet Summary
53 KB Posted
- Attached to
- Nationwide Differential Global Positioning System Engineering and Logistics Support (NDGPS) Federal contract opportunity
- Solicitation number
- HSCG44-12-R-P13005
About this file
RFP - HSCG44-12-R-P13005 Amendment A00001 Attachment IIA and IIB revised (Excel)
Text of this file
Contract Year 1
| Labor Category (Off-site) | Contract Year 1 Estimated Max Labor Hours | Fully Burdened Hourly Labor Rate | TOTAL with Fully Burdened Labor Rates | |||
| Program Manager, ST | 1664 | $ - 0 | $0.00 | |||
| Technical Manager, ST | 2080 | $ - 0 | $0.00 | |||
| Electronics Technician, Maintenance II, ST | 2080 | $ - 0 | $0.00 | |||
| Electronics Technician, Maintenance III, ST | 20840 | $ - 0 | $0.00 | |||
| Engineering Technician IV, ST | 2080 | $ - 0 | $0.00 | |||
| Engineering Technician VI, ST | 2080 | $ - 0 | $0.00 | |||
| Drafter IV, ST | 832 | $ - 0 | $0.00 | |||
| Logistics Technician, ST | 2496 | $ - 0 | $0.00 | |||
| Administrative Assistant, ST | 3120 | $ - 0 | $0.00 | |||
| General Maintenance Worker, ST | 3120 | $ - 0 | $0.00 | |||
| Field Support Administrator - ST | 2920 | $ - 0 | $0.00 | |||
| Total Estimated Hours/Labor | 43,312 | $0.00 | ||||
| Travel & Materials Category | Quantity | Unit of Issue | Contract Year 1 Estimated NTE Amount | G&A Rate % (No Fee or Profit) | Total with G&A | |
| Material | 1 | Lot | $ 1,185,000.00 | 0% | $1,185,000.00 | |
| Travel | 1 | Lot | $ 787,000.00 | 0% | $787,000.00 | |
| ODCs - (Other) | 1 | Lot | $ 1,316,000.00 | 0% | $1,316,000.00 | |
| Price | Extended Price | |||||
| ODC - (Minimum Warehouse Need: 7,000 - 9,000 Sq Ft) | 7000 | SQFT | $ - 0 | $ - 0 | 0% | $0.00 |
| Total Estimated Material, Travel & Other Direct Costs | $3,288,000.00 |
| Est NTE Total for Labor PLUS Material, Travel & ODC's | CY-1 Estimated ODC's Travel & Materials | CY-1 Estimated NTE Fully Burdened Labor | NTE Grand Total For Contract Year 1 |
| Grand Total | $3,288,000.00 | $0.00 | $ 3,288,000.00 |
USCG NDGPS
HSCG44-12-R-P13005
&P of &N Contractor Pricing Sheet Contract Year 1 Attachment II-A
Contract Year 2
| Labor Category (Off-site) | Contract Year 2 Estimated Max Labor Hours | Fully Burdened Hourly Labor Rate | TOTAL with Fully Burdened Labor Rates | |||
| Program Manager, ST | 1664 | $ - 0 | $0.00 | |||
| Technical Manager, ST | 2080 | $ - 0 | $0.00 | |||
| Electronics Technician, Maintenance II, ST | 2080 | $ - 0 | $0.00 | |||
| Electronics Technician, Maintenance III, ST | 20840 | $ - 0 | $0.00 | |||
| Engineering Technician IV, ST | 2080 | $ - 0 | $0.00 | |||
| Engineering Technician VI, ST | 2080 | $ - 0 | $0.00 | |||
| Drafter IV, ST | 832 | $ - 0 | $0.00 | |||
| Logistics Technician, ST | 2496 | $ - 0 | $0.00 | |||
| Administrative Assistant, ST | 3120 | $ - 0 | $0.00 | |||
| General Maintenance Worker, ST | 3120 | $ - 0 | $0.00 | |||
| Field Support Administrator - ST | 2920 | $ - 0 | $0.00 | |||
| Total Estimated Hours/Labor | 43,312 | $0.00 | ||||
| Travel & Materials Category | Quantity | Unit of Issue | Contract Year 1 Estimated NTE Amount | G&A Rate % (No Fee or Profit) | Total with G&A | |
| Material | 1 | Lot | $ 1,185,000.00 | 0% | $1,185,000.00 | |
| Travel | 1 | Lot | $ 787,000.00 | 0% | $787,000.00 | |
| ODCs - (Other) | 1 | Lot | $ 1,316,000.00 | 0% | $1,316,000.00 | |
| Price | Extended Price | |||||
| ODC - (Minimum Warehouse Need: 7,000 - 9,000 Sq Ft) | 7000 | SQFT | $ - 0 | $ - 0 | 0% | $0.00 |
| Total Estimated Material, Travel & Other Direct Costs | $3,288,000.00 |
| Est NTE Total for Labor PLUS Material, Travel & ODC's | CY-2 Estimated ODC's Travel & Materials | CY-2 Estimated NTE Fully Burdened Labor | NTE Grand Total For Contract Year 2 |
| Grand Total | $3,288,000.00 | $0.00 | $3,288,000.00 |
HSCG44-12-R-P13005
&P of &N Contractor Pricing Sheet Contract Year 2
Contract Year 3
| Labor Category (Off-site) | Contract Year 3 Estimated Max Labor Hours | Fully Burdened Hourly Labor Rate | TOTAL with Fully Burdened Labor Rates | |||
| Program Manager, ST | 1664 | $ - 0 | $0.00 | |||
| Technical Manager, ST | 2080 | $ - 0 | $0.00 | |||
| Electronics Technician, Maintenance II, ST | 2080 | $ - 0 | $0.00 | |||
| Electronics Technician, Maintenance III, ST | 20840 | $ - 0 | $0.00 | |||
| Engineering Technician IV, ST | 2080 | $ - 0 | $0.00 | |||
| Engineering Technician VI, ST | 2080 | $ - 0 | $0.00 | |||
| Drafter IV, ST | 832 | $ - 0 | $0.00 | |||
| Logistics Technician, ST | 2496 | $ - 0 | $0.00 | |||
| Administrative Assistant, ST | 3120 | $ - 0 | $0.00 | |||
| General Maintenance Worker, ST | 3120 | $ - 0 | $0.00 | |||
| Field Support Administrator - ST | 2920 | $ - 0 | $0.00 | |||
| Total Estimated Hours/Labor | 43,312 | $0.00 | ||||
| Travel & Materials Category | Quantity | Unit of Issue | Contract Year 1 Estimated NTE Amount | G&A Rate % (No Fee or Profit) | Total with G&A | |
| Material | 1 | Lot | $ 1,185,000.00 | 0% | $1,185,000.00 | |
| Travel | 1 | Lot | $ 787,000.00 | 0% | $787,000.00 | |
| ODCs - (Other) | 1 | Lot | $ 1,316,000.00 | 0% | $1,316,000.00 | |
| Price | Extended Price | |||||
| ODC - (Minimum Warehouse Need: 7,000 - 9,000 Sq Ft) | 7000 | SQFT | $ - 0 | $ - 0 | 0% | $0.00 |
| Total Estimated Material, Travel & Other Direct Costs | $3,288,000.00 |
| Est NTE Total for Labor PLUS Material, Travel & ODC's | CY-3 Estimated ODC's Travel & Materials | CY-3 Estimated NTE Fully Burdened Labor | NTE Grand Total For Contract Year 3 |
| Grand Total | $3,288,000.00 | $0.00 | $3,288,000.00 |
&P of &N Contractor Pricing Sheet Contract Year 3
Contract Year 4
| Labor Category (Off-site) | Contract Year 4 Estimated Max Labor Hours | Fully Burdened Hourly Labor Rate | TOTAL with Fully Burdened Labor Rates | |||
| Program Manager, ST | 1664 | $ - 0 | $0.00 | |||
| Technical Manager, ST | 2080 | $ - 0 | $0.00 | |||
| Electronics Technician, Maintenance II, ST | 2080 | $ - 0 | $0.00 | |||
| Electronics Technician, Maintenance III, ST | 20840 | $ - 0 | $0.00 | |||
| Engineering Technician IV, ST | 2080 | $ - 0 | $0.00 | |||
| Engineering Technician VI, ST | 2080 | $ - 0 | $0.00 | |||
| Drafter IV, ST | 832 | $ - 0 | $0.00 | |||
| Logistics Technician, ST | 2496 | $ - 0 | $0.00 | |||
| Administrative Assistant, ST | 3120 | $ - 0 | $0.00 | |||
| General Maintenance Worker, ST | 3120 | $ - 0 | $0.00 | |||
| Field Support Administrator - ST | 2920 | $ - 0 | $0.00 | |||
| Total Estimated Hours/Labor | 43,312 | $0.00 | ||||
| Travel & Materials Category | Quantity | Unit of Issue | Contract Year 1 Estimated NTE Amount | G&A Rate % (No Fee or Profit) | Total with G&A | |
| Material | 1 | Lot | $ 1,185,000.00 | 0% | $1,185,000.00 | |
| Travel | 1 | Lot | $ 787,000.00 | 0% | $787,000.00 | |
| ODCs - (Other) | 1 | Lot | $ 1,316,000.00 | 0% | $1,316,000.00 | |
| Price | Extended Price | |||||
| ODC - (Minimum Warehouse Need: 7,000 - 9,000 Sq Ft) | 7000 | SQFT | $ - 0 | $ - 0 | 10% | $0.00 |
| Total Estimated Material, Travel & Other Direct Costs | $3,288,000.00 |
| Est NTE Total for Labor PLUS Material, Travel & ODC's | CY-4 Estimated ODC's Travel & Materials | CY-4 Estimated NTE Fully Burdened Labor | NTE Grand Total For Contract Year 4 |
| Grand Total | $3,288,000.00 | $0.00 | $3,288,000.00 |
&P of &N Contractor Pricing Sheet Contract Year 4
Contract Year 5
| Labor Category (Off-site) | Contract Year 5 Estimated Max Labor Hours | Fully Burdened Hourly Labor Rate | TOTAL with Fully Burdened Labor Rates | |||
| Program Manager, ST | 1664 | $ - 0 | $0.00 | |||
| Technical Manager, ST | 2080 | $ - 0 | $0.00 | |||
| Electronics Technician, Maintenance II, ST | 2080 | $ - 0 | $0.00 | |||
| Electronics Technician, Maintenance III, ST | 20840 | $ - 0 | $0.00 | |||
| Engineering Technician IV, ST | 2080 | $ - 0 | $0.00 | |||
| Engineering Technician VI, ST | 2080 | $ - 0 | $0.00 | |||
| Drafter IV, ST | 832 | $ - 0 | $0.00 | |||
| Logistics Technician, ST | 2496 | $ - 0 | $0.00 | |||
| Administrative Assistant, ST | 3120 | $ - 0 | $0.00 | |||
| General Maintenance Worker, ST | 3120 | $ - 0 | $0.00 | |||
| Field Support Administrator - ST | 2920 | $ - 0 | $0.00 | |||
| Total Estimated Hours/Labor | 43,312 | $0.00 | ||||
| Travel & Materials Category | Quantity | Unit of Issue | Contract Year 1 Estimated NTE Amount | G&A Rate % (No Fee or Profit) | Total with G&A | |
| Material | 1 | Lot | $ 1,185,000.00 | 0% | $1,185,000.00 | |
| Travel | 1 | Lot | $ 787,000.00 | 0% | $787,000.00 | |
| ODCs - (Other) | 1 | Lot | $ 1,316,000.00 | 0% | $1,316,000.00 | |
| Price | Extended Price | |||||
| ODC - (Minimum Warehouse Need: 7,000 - 9,000 Sq Ft) | 7000 | SQFT | $ - 0 | $ - 0 | 0% | $0.00 |
| Total Estimated Material, Travel & Other Direct Costs | $3,288,000.00 |
| Est NTE Total for Labor PLUS Material, Travel & ODC's | CY-5 Estimated ODC's Travel & Materials | CY-5 Estimated NTE Fully Burdened Labor | NTE Grand Total For Contract Year 5 |
| Grand Total | $3,288,000.00 | $0.00 | $3,288,000.00 |
&P of &N Contractor Pricing Sheet Contract Year 5
Contract Year 6
| Labor Category (Off-site) | Contract Year 6 Estimated Max Labor Hours | Fully Burdened Hourly Labor Rate | TOTAL with Fully Burdened Labor Rates | |||
| Program Manager, ST | 1664 | $ - 0 | $0.00 | |||
| Technical Manager, ST | 2080 | $ - 0 | $0.00 | |||
| Electronics Technician, Maintenance II, ST | 2080 | $ - 0 | $0.00 | |||
| Electronics Technician, Maintenance III, ST | 20840 | $ - 0 | $0.00 | |||
| Engineering Technician IV, ST | 2080 | $ - 0 | $0.00 | |||
| Engineering Technician VI, ST | 2080 | $ - 0 | $0.00 | |||
| Drafter IV, ST | 832 | $ - 0 | $0.00 | |||
| Logistics Technician, ST | 2496 | $ - 0 | $0.00 | |||
| Administrative Assistant, ST | 3120 | $ - 0 | $0.00 | |||
| General Maintenance Worker, ST | 3120 | $ - 0 | $0.00 | |||
| Field Support Administrator - ST | 2920 | $ - 0 | $0.00 | |||
| Total Estimated Hours/Labor | 43,312 | $0.00 | ||||
| Travel & Materials Category | Quantity | Unit of Issue | Contract Year 1 Estimated NTE Amount | G&A Rate % (No Fee or Profit) | Total with G&A | |
| Material | 1 | Lot | $ 1,185,000.00 | 0% | $1,185,000.00 | |
| Travel | 1 | Lot | $ 787,000.00 | 0% | $787,000.00 | |
| ODCs - (Other) | 1 | Lot | $ 1,316,000.00 | 0% | $1,316,000.00 | |
| Price | Extended Price | |||||
| ODC - (Minimum Warehouse Need: 7,000 - 9,000 Sq Ft) | 7000 | SQFT | $ - 0 | $ - 0 | 0% | $0.00 |
| Total Estimated Material, Travel & Other Direct Costs | $3,288,000.00 |
| Est NTE Total for Labor PLUS Material, Travel & ODC's | CY-6 Estimated ODC's Travel & Materials | CY-6 Estimated NTE Fully Burdened Labor | NTE Grand Total For Contract Year 6 |
| Grand Total | $3,288,000.00 | $0.00 | $3,288,000.00 |
HSCG44-12-R-P13005
Contractor Pricing Sheet Contract Year 6
Contract Year 7
| Labor Category (Off-site) | Contract Year 7 Estimated Max Labor Hours | Fully Burdened Hourly Labor Rate | TOTAL with Fully Burdened Labor Rates | |||
| Program Manager, ST | 1664 | $ - 0 | $0.00 | |||
| Technical Manager, ST | 2080 | $ - 0 | $0.00 | |||
| Electronics Technician, Maintenance II, ST | 2080 | $ - 0 | $0.00 | |||
| Electronics Technician, Maintenance III, ST | 20840 | $ - 0 | $0.00 | |||
| Engineering Technician IV, ST | 2080 | $ - 0 | $0.00 | |||
| Engineering Technician VI, ST | 2080 | $ - 0 | $0.00 | |||
| Drafter IV, ST | 832 | $ - 0 | $0.00 | |||
| Logistics Technician, ST | 2496 | $ - 0 | $0.00 | |||
| Administrative Assistant, ST | 3120 | $ - 0 | $0.00 | |||
| General Maintenance Worker, ST | 3120 | $ - 0 | $0.00 | |||
| Field Support Administrator - ST | 2920 | $ - 0 | $0.00 | |||
| Total Estimated Hours/Labor | 43,312 | $0.00 | ||||
| Travel & Materials Category | Quantity | Unit of Issue | Contract Year 1 Estimated NTE Amount | G&A Rate % (No Fee or Profit) | Total with G&A | |
| Material | 1 | Lot | $ 1,185,000.00 | 0% | $1,185,000.00 | |
| Travel | 1 | Lot | $ 787,000.00 | 0% | $787,000.00 | |
| ODCs - (Other) | 1 | Lot | $ 1,316,000.00 | 0% | $1,316,000.00 | |
| Price | Extended Price | |||||
| ODC - (Minimum Warehouse Need: 7,000 - 9,000 Sq Ft) | 7000 | SQFT | $ - 0 | $ - 0 | 0% | $0.00 |
| Total Estimated Material, Travel & Other Direct Costs | $3,288,000.00 |
| Est NTE Total for Labor PLUS Material, Travel & ODC's | CY-7 Estimated ODC's Travel & Materials | CY-7 Estimated NTE Fully Burdened Labor | NTE Grand Total For Contract Year 7 |
| Grand Total | $3,288,000.00 | $0.00 | $3,288,000.00 |
HSCG44-12-R-P13005
Contractor Pricing Sheet Contract Year 7
Contract Year 8
| Labor Category (Off-site) | Contract Year 8 Estimated Max Labor Hours | Fully Burdened Hourly Labor Rate | TOTAL with Fully Burdened Labor Rates | |||
| Program Manager, ST | 1664 | $ - 0 | $0.00 | |||
| Technical Manager, ST | 2080 | $ - 0 | $0.00 | |||
| Electronics Technician, Maintenance II, ST | 2080 | $ - 0 | $0.00 | |||
| Electronics Technician, Maintenance III, ST | 20840 | $ - 0 | $0.00 | |||
| Engineering Technician IV, ST | 2080 | $ - 0 | $0.00 | |||
| Engineering Technician VI, ST | 2080 | $ - 0 | $0.00 | |||
| Drafter IV, ST | 832 | $ - 0 | $0.00 | |||
| Logistics Technician, ST | 2496 | $ - 0 | $0.00 | |||
| Administrative Assistant, ST | 3120 | $ - 0 | $0.00 | |||
| General Maintenance Worker, ST | 3120 | $ - 0 | $0.00 | |||
| Field Support Administrator - ST | 2920 | $ - 0 | $0.00 | |||
| Total Estimated Hours/Labor | 43,312 | $0.00 | ||||
| Travel & Materials Category | Quantity | Unit of Issue | Contract Year 1 Estimated NTE Amount | G&A Rate % (No Fee or Profit) | Total with G&A | |
| Material | 1 | Lot | $ 1,185,000.00 | 0% | $1,185,000.00 | |
| Travel | 1 | Lot | $ 787,000.00 | 0% | $787,000.00 | |
| ODCs - (Other) | 1 | Lot | $ 1,316,000.00 | 0% | $1,316,000.00 | |
| Price | Extended Price | |||||
| ODC - (Minimum Warehouse Need: 7,000 - 9,000 Sq Ft) | 7000 | SQFT | $ - 0 | $ - 0 | 0% | $0.00 |
| Total Estimated Material, Travel & Other Direct Costs | $3,288,000.00 |
| Est NTE Total for Labor PLUS Material, Travel & ODC's | CY-8 Estimated ODC's Travel & Materials | CY-8 Estimated NTE Fully Burdened Labor | NTE Grand Total For Contract Year 8 |
| Grand Total | $3,288,000.00 | $0.00 | $3,288,000.00 |
HSCG44-12-R-P13005
Contractor Pricing Sheet Contract Year 8
SECTION B CLIN STRUCTURE
| Eight Year Ordering Period. Labor, material/ODC and Travel: |
| Please Note: The following CLIN structure is for evaluation of price proposals only. |
The Contract Line Item Number (CLIN) structure shall consist of four CLINs per year for an 8 year period of performance. Offerors shall use Attachment II-A, Pricing Table, to provide pricing for the CLINs provided below:
| CLIN | PoP | Description | QTY | AMOUNT |
| Unit of Issue |
| 00001 | Year One | Labor IAW Delivery/Task Orders | 1 JB | $0.00 |
| 00002 | Year One | Material - Hardware/Equipment | 1 LT | $1,185,000.00 |
| 00003 | Year One | NTE Travel | 1 LT | $787,000.00 |
| 00004 | Year One | ODC | 1 LT | $1,316,000.00 |
| 10001 | Year Two | Labor IAW Delivery/Task Orders | 1 JB | $0.00 |
| 10002 | Year Two | Material - Hardware/Equipment | 1 LT | $1,185,000.00 |
| 10003 | Year Two | NTE Travel | 1 LT | $787,000.00 |
| 10004 | Year Two | ODC | 1 LT | $1,316,000.00 |
| 20001 | Year Three | Labor IAW Delivery/Task Orders | 1 JB | $0.00 |
| 20002 | Year Three | Material - Hardware/Equipment | 1 LT | $1,185,000.00 |
| 20003 | Year Three | NTE Travel | 1 LT | $787,000.00 |
| 20004 | Year Three | ODC | 1 LT | $1,316,000.00 |
| 30001 | Year Four | Labor IAW Delivery/Task Orders | 1 JB | $0.00 |
| 30002 | Year Four | Material - Hardware/Equipment | 1 LT | $1,185,000.00 |
| 30003 | Year Four | NTE Travel | 1 LT | $787,000.00 |
| 30004 | Year Four | ODC | 1 LT | $1,316,000.00 |
| 40001 | Year Five | Labor IAW Delivery/Task Orders | 1 JB | $0.00 |
| 40002 | Year Five | Material - Hardware/Equipment | 1 LT | $1,185,000.00 |
| 40003 | Year Five | NTE Travel | 1 LT | $787,000.00 |
| 40004 | Year Five | ODC | 1 LT | $1,316,000.00 |
| 50001 | Year Six | Labor IAW Delivery/Task Orders | 1 JB | $0.00 |
| 50002 | Year Six | Material - Hardware/Equipment | 1 LT | $1,185,000.00 |
| 50003 | Year Six | NTE Travel | 1 LT | $787,000.00 |
| 50004 | Year Six | ODC | 1 LT | $1,316,000.00 |
| 60001 | Year Seven | Labor IAW Delivery/Task Orders | 1 JB | $0.00 |
| 60002 | Year Seven | Material - Hardware/Equipment | 1 LT | $1,185,000.00 |
| 60003 | Year Seven | NTE Travel | 1 LT | $787,000.00 |
| 60004 | Year Seven | ODC | 1 LT | $1,316,000.00 |
| 70001 | Year Eight | Labor IAW Delivery/Task Orders | 1 JB | $0.00 |
| 70002 | Year Eight | Material - Hardware/Equipment | 1 LT | $1,185,000.00 |
| 70003 | Year Eight | NTE Travel | 1 LT | $787,000.00 |
| 70004 | Year Eight | ODC | 1 LT | $1,316,000.00 |
GRAND TOTAL [8 YEAR PERIOD OF PERFORMANCE] $26,304,000.00
| 80001 | 6 Month | Labor IAW Delivery/Task Orders | 1 JB | $0.00 |
| 80002 | 6 Month | Material - Hardware/Equipment | 1 LT | $592,500.00 |
| 80003 | 6 Month | NTE Travel | 1 LT | $393,500.00 |
| 80004 | 6 Month | ODC | 1 LT | $658,000.00 |
GRAND TOTAL [8 YEAR PERIOD OF PERFORMANCE with Option to Extend Services for 6 Months] $27,948,000.00
| * Note: The government may order any combination of labor, materials, ODC, and NTE travel from the above CLINS based on results of individual task order requirements. All Delivery/Task Orders shall be issued on a Firm-Fixed Price basis or Time and Material basis depending on scope of Task Order. |
| *Note: The Not-To-Exceed Cost Reimbursable Travel estimate for the Eight year ordering period under this ID/IQ is estimated at $6,296,000.00. The annual NTE Travel estimate of $787,000 is included for evaluation purposes only. Other than detailed in Section B.1. above, Offerors shall not propose travel costs. |
| *Note: TBN refers to Be Negotiated by the Government. |
| *Note: Other than detailed in Section B.1. above, Offerors shall not propose material/ODC. |
| *Note: Warehouse square footage rates shall be provided on Attachment II-A to be utilized as the rate the Government will pay on any task order requiring ware house space. |
* NOTE: Under the Option to Extend Services at FAR Clause 52.217-8 request contractor to address in its price proposal the rates for the possible 6 month extension beyond the end of the eight years.
USCG NDGPS, HSCG44-12-R-P13005
Page &P of &N Attachment II-B
OPTION TO EXTEND
| Labor Category (Off-site) | 6 Month Option Estimated Max Labor Hours | Fully Burdened Hourly Labor Rate | TOTAL with Fully Burdened Labor Rates | |||
| Program Manager, ST | 832 | $ - 0 | $0.00 | |||
| Technical Manager, ST | 1040 | $ - 0 | $0.00 | |||
| Electronics Technician, Maintenance II, ST | 1040 | $ - 0 | $0.00 | |||
| Electronics Technician, Maintenance III, ST | 10420 | $ - 0 | $0.00 | |||
| Engineering Technician IV, ST | 1040 | $ - 0 | $0.00 | |||
| Engineering Technician VI, ST | 1040 | $ - 0 | $0.00 | |||
| Drafter IV, ST | 416 | $ - 0 | $0.00 | |||
| Logistics Technician, ST | 1248 | $ - 0 | $0.00 | |||
| Administrative Assistant, ST | 1560 | $ - 0 | $0.00 | |||
| General Maintenance Worker, ST | 1560 | $ - 0 | $0.00 | |||
| Field Support Administrator - ST | 1460 | $ - 0 | $0.00 | |||
| Total Estimated Hours/Labor | 21,656 | $0.00 | ||||
| Travel & Materials Category | Quantity | Unit of Issue | Contract Year 1 Estimated NTE Amount | G&A Rate % (No Fee or Profit) | Total with G&A | |
| Material | 1 | Lot | $ 592,500.00 | 0% | $592,500.00 | |
| Travel | 1 | Lot | $ 393,500.00 | 0% | $393,500.00 | |
| ODCs - (Other) | 1 | Lot | $ 658,000.00 | 0% | $658,000.00 | |
| Price | Extended Price | |||||
| ODC - (Minimum Warehouse Need: 7,000 - 9,000 Sq Ft) | 7000 | SQFT | $ - 0 | $ - 0 | 0% | $0.00 |
| Total Estimated Material, Travel & Other Direct Costs | $1,644,000.00 |
| Est NTE Total for Labor PLUS Material, Travel & ODC's | 6 Month Option ODC's Travel & Materials | 6 Month Option Estimated NTE Fully Burdened Labor | NTE Grand Total For Contract 6 Month Option |
| Grand Total | $1,644,000.00 | $0.00 | $1,644,000.00 |
HSCG44-12-R-P13005
Page 1 of 1 Contractor Pricing Sheet Option to Extend Services Attachment IIA
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .