Attch 16 Draft QASP.doc

DOC document 98 KB Posted

Attached to
ice Information Technology Field Operations (ITFO)
Solicitation number
HSCETC-11-R-00002
Issued by

About this file

ATTACH 16 DRAFT QASP

View the file

Other files

File Type Posted
Amendment 3.pdf PDF
Attch 10 IDIQ Pricing Table(REV1).xls XLS spreadsheet
Amendment 2.pdf PDF
Attch 11 Consent_Ltr.doc DOC document
Attch 18 - Hardware List.xlsx XLSX spreadsheet
Appendix A ITFO_Map.pdf PDF
Amendment 1.pdf PDF
Attch 19 ITFO Q A.doc DOC document
Attch 4 Labor Cat desc(REV 1) .doc DOC document
Attch 15 PPQ —
Addendum 52.212-2 Eval —
Index —
SOW_Final —
Attch 1 Spec Ktrt Req(REV1).doc DOC document
ADDENDUM 52 212-1 —
Attch 17 ITFO SOP QuickRef Guide.pdf PDF
Attch 14TO 1Req Prop REV 1.doc DOC document
Attch 9 ODC Appr Sample.doc DOC document
Attch 8 Travel Auth .docx DOCX document
Attch 7 Ktr eval report.docx DOCX document
Attch 14 TO 1 Proposal Req.doc DOC document
Attch 6 DD 254.pdf PDF
Attch 4 Labor Cat descriptions .doc DOC document
Attch 3 ITFO Branch Org Doc.pdf PDF
Attch 7 Ktr eval report.docm DOCM document
Attch 1 Spec Ktrt Req .doc DOC document
Appendix D Ticket Top.docx DOCX document
Attch 12 Subcontracting Plan Format.doc DOC document
Appendix C Ticket Counts by Area.docx DOCX document
Attch 5 Monthly TO Status Rept.doc DOC document
Attch 10 IDIQ Pricing Table.xls XLS spreadsheet
SOW Final.doc DOC document
Attch 9 ODC Appr Sample.docm DOCM document
SF1449.pdf PDF
Addendum 52.212-1.doc DOC document
Appendix B ITFO User Count.docx DOCX document
Attch 11 Consent_Ltr.docm DOCM document
Attch 13 Task Order 1 Price Format.xls XLS spreadsheet
Appendix F Acronym List.docx DOCX document
Appendix A Map.docx DOCX document
Attch 8 Travel Auth .docm DOCM document
Attach Index.doc DOC document
Attch 2 Provisions Clauses.doc DOC document
Addendum 52.212-2 Eval .doc DOC document
Attch 15 Past Perf Questionnaire.rtf RTF text file
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 16

Quality Assurance Surveillance Plan (QASP) For the

Information Technology Field Operations (ITFO) Information Technology (IT) Support Services Contract Note: This is a draft QASP and the Government reserves the right to revise or change the QASP as determined by the Government to ensure quality service and deliverables over the course of the IDIQ contracts and/or task orders.

1.

Introduction

1.1 This Quality Assurance Surveillance Plan (QASP) is a Government-developed and applied document whose purpose is to facilitate the use of systematic quality assurance methods. The intent is to ensure that the Contractor performs in accordance with performance metrics presented and the Government receives the quality of services/deliverables called for in the task order(s).

1.2 To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between the Quality Control Plan (QCP) and the QASP. The Contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth in task order(s). The Contractor develops and submits its QCP for Government approval in compliance with the overall IDIQ and task order(s) services/deliverables. Once accepted, the Contractor uses the QCP to guide and to rigorously document the implementation of the required management and quality control actions to achieve the specified results. The QASP provides Government surveillance oversight of the Contractor’s quality control efforts to assure that they are timely, effective and delivering the results specified.

2. Roles and Responsibilities of Government Officials

2.1 The following Government officials shall oversee and coordinate surveillance activities to assess contractor performance. Their roles and responsibilities are described as follows:

2.1.1 Contracting Officer. The Contracting Officer (CO) has overall responsibility for overseeing the contractor’s performance and is responsible for the day to day monitoring of the contractor’s performance in the areas of task order compliance, contract administration, cost control, and property control. The CO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

2.1.2 Performance Incentive Fee Determining Official (PIFDO). If a task order is issued where an Incentive Fee is incorporated, the CO will act as the PIFDO and will review the Contractor’s attained performance, review the final recommendations from the COTR and make the appropriate performance incentive fee recommendation. The CO may call upon the expertise of other Government individuals as required.

2.1.3 Contracting Officer’s Technical Representative (COTR). The COTR is responsible for overall administration of the IDIQ and task order(s) and assures proper Government surveillance of the Contractor’s performance. The COTR will perform centralized monitoring and surveillance of performance. The COTR will maintain a complete quality assurance file and will be responsible for submitting an assessment, receiving and facilitating distribution of invoice payments and status reporting to the Program Manager (PM) and CO on a monthly basis.

2.1.4 Alternate Contracting Officer’s Technical Representative (ACOTR). The ACOTR acts in the absence of or in cooperation with the COTR.

2.1.5 Technical Task Monitors (TTMs) are responsible for monitoring, assessing, recording and reporting the Contractor’s performance on a regional or field Office level as applicable. The TTMs will have primary responsibility for completion and submitting Quality Assurance monitoring forms to the CO and COTR that will be used to document the evaluation of the contractor’s performance.

2.1.6 PM. The PM is responsible for facilitating and coordinating periodic program/project reviews.

3. Performance Standards Contractor Performance Rating (Attachment A) and Performance Requirements (Attachment B) identify the performance standards that define performance rating and acceptable performance levels that will be monitored. In addition, Attachment B provides a measurement methodology or the requirements and a description of the type/frequency of monitoring that may be selected. The Government uses these standards to determine contractor performance and will compare contractor performance to the acceptable performance levels. The COTR, as defined in the appointment letter, with the support of TTM(s) is principally responsible for quality assurance surveillance. TTM(s) responsibilities are outlined in Paragraph 2.1.5.

4. Monthly Performance Assessment

4.1 A determination of the contractor’s overall performance will be on a monthly basis, and will be used (along with other factors in FAR 17.2) to support the determination to exercise any options provided for in the task order(s) and/or IDIQ contract.

4.2 The COTR will initiate the monthly performance evaluation through the TTM(s) and PM utilizing a report developed by the Government and provided to the Contractor. The COTR, with the input of the TTM(s) will be responsible for completion and submission of the evaluation to the CO and PM.

4.3 The Government will score each document and/or deliverable received as Excellent, Acceptable or Unacceptable based on completeness, feasibility, understandability, accuracy, and practicality. Unacceptable ratings will require the Contractor to revise each document and/or deliverable at no additional cost to the Government.

5. Key Deliverables to be Reviewed At a minimum, the deliverables set forth in the deliverables table of the IDIQ SOW will be revised and evaluated by the COTR. The COTR shall immediately notify the PM and CO as appropriate, if concerns or problems are identified with the performance/deliverable.

The COTR/TTMs will, in addition to providing documentation to the CO, maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, surveillance checklists, and any actions related to the Government’s performance. All such records will be retained for the life of the task order and forwarded to the CO upon IDIQ and task order completion.

6. Methods of Surveillance

The COTR, with the assistance from the ACOTR/TTMs and CO, will be responsible for monitoring the contractor’s performance in meeting performance standards. Any or all of the surveillance methods listed below may be used in the administration of this QASP:

Periodic Inspection: This method uses a comprehensive evaluation of selected outputs such as periodic reports.

100% Inspection: The Government may use 100% inspection on deliverables such as reports or for a service/task(s) where performance is critical and/or has fallen significantly below the acceptable quality level. This method may be used if/as determined by the Government to be appropriate.

Random Inspection: This method randomly selects tasks, outputs, performance location or deliverables for review and evaluation. The generated information is reviewed and the results recorded in the file.

Customer Feedback: This method uses available electronic distribution (e.g. Email), personal contact, telephone contact and other collection tools to document customer satisfaction.

7. Surveillance Documentation

7.1 The Contractor’s Performance Rating (Attachment A) will be used to document the monitoring of the contractor’s performance. Performance evaluations will encompass those elements provided for in the performance requirements summary. The performance rating document will be submitted by the COTR to the CO and PM monthly. Specific performance issues will be immediately brought to the attention of the CO and PM when identified.

7.2 Acceptable Performance

The Government will document positive performance and may use any report as part of the supporting documentation for the annual evaluation.

7.3 Unacceptable Performance

7.3.1 The COTR/TTM will inform the Contractor’s PM and/or onsite representative when performance/deliverables are unacceptable and why, and request the representative’s initials and date on the surveillance form. By initialing and dating the form, the contractor’s on-site representative acknowledges notification of the unacceptable performance/deliverable. The representative is not necessarily agreeing that the performance is unacceptable. If the contractor wants to dispute or discuss the results of the evaluation, the COTR/TTM will refer them to the CO to resolve the issue.

7.3.2 COTR/TTM will refer them to the CO to resolve the issue.

8.4 The COTR/TTMs will, in addition to providing documentation to the CO, maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, surveillance checklists, and any actions related to the Government’s performance. All such records will be retained for the life of the task order and forwarded to the CO upon IDIQ and task order completion.

Contractor Performance Rating Attachment A

Rating Guidelines

This attachment provides rating guidelines to assist in the evaluation of the performance/deliverables. The following acts as guidance in making Excellent, Acceptable or Unacceptable evaluation(s).

EXCELLENT

ACCEPTABLE

UNACCEPTABLE

Timeliness of Performance

Timeliness of Performance

Timeliness of Performance

There were no delays

Delays did not impact achievement of contract requirements

Delays compromised the achievement of contract requirements despite use of internal resources

Delays required minor internal resources to ensure achievement of contract requirements

Delays required major internal resources to ensure achievement of contract requirements

Quality

Quality

Quality

There were no quality related problems

Nonconformance did not impact of contract requirements

Nonconformance compromised the achievement of contract requirements, despite use of internal resources

Nonconformance required minor internal resources to ensure achievement of contract requirements

Nonconformance required major internal resources to ensure achievement of contract requirements

Cost Control

Cost Control

Cost Control

Contractor gave detailed indication of controls/limits on costs

Contractor gave adequate indication of control limits on cost

Contractor gave no indication of controls/limits on cost

Contractor rarely gave indication of controls/limits on costs

Business Conduct

Business Conduct

Business Conduct

Response to inquiries, technical/service/ Administrative issues were effective and responsive

Response to inquiries, technical/service administrative issues were usually effective and responsive

Response to inquiries, technical/service administrative issues were not effective and responsive

Response to inquiries, technical/service/administrative issues were marginally effective and responsive

Customer satisfaction

Customer satisfaction

Customer Satisfaction

Contractor was always perceived by end users as cooperative, responsive and effective

Contractor was usually perceived by end users as cooperative, responsive and effective

Customer was rarely perceived by end user as cooperative, responsive and effective

Attachment B

Performance Requirements

Performance Requirement Summary

Performance Requirement
Task Order Reference
Performance Measure
Performance Standard
Acceptable Quality Level (AQL)
Surveillance Method
Personnel Response and Cooperation
To be identified at the time task order is issued. This may also include references to contract
Key personnel

responsive, and cooperative

Prompt and courteous service and critical support to the user community is maintained at acceptable levels at all times
All REMEDY tickets shall be responded to within 3 business hours of receipt 97% of the time is considered Excellent, 89%-96% is Acceptable, less than 89% is Unacceptable
100% Inspection
Timely Resolution
To be identified at the time task order is issued. This may also include references to contract
REMEDY tickets resolved timely
Provide timely resolution for all problems identified during service calls for all support
All REMEDY tickets for Tier Two Issues which are resolved within two business days are considered Excellent. Problems resolved within seven business days are acceptable and unresolved issues greater than one week are considered unacceptable.*
Random Inspection

Performance Requirement Summary

Performance Requirement
Task Order Reference
Performance Measure
Performance Standard
Acceptable Quality Level (AQL)
Surveillance Method
Contractor Management Responsiveness
To be identified at the time task order is issued. This may also include references to contract
TTM/COTR queries responded to timely
Provide timely responses to queries by TTM/COTR
TTM/COTR queries whether by phone or e-mail will be answered within 3 hours.

100% is considered Excellent

95%-100% is deemed acceptable

Less than 95% will require a written report to the TTM explaining the delay in response.

100% Inspection

Status Report
To be identified at the time task order is issued. This may also include references to contract
Technical Accuracy, Clarity, and Completeness
The report accurately addresses:

• All services provided and all events and deliverables completed during the reporting period.

• All on-going activities/tasks for the upcoming reporting period.

• All problem areas and actions planned or recommended solutions for alleviating the problem.

Status report Identifies 98% of the on-going activities/tasks Report approved as submitted, resubmissions not required.

100% Inspection

Performance Requirement Summary

Performance Requirement
Task Order Reference
Performance Measure
Performance Standard
Acceptable Quality Level (AQL)
Surveillance Method
Customer Satisfaction
To be identified at the time task order is issued. This may also include references to contract
Response to customers are handled with courtesy and professionalism
Less than 3 customer complaints per month
100% of all areas receiving services are without customer complaints for the reporting period
Customer Feedback
Process Compliance
To be identified at the time task order is issued. This may also include references to contract
Ensure compliance of Government developed processes
Processes followed with no

impact to overall cost and schedule resulting from non-compliance

Processes are followed 98% of the time
100% Inspection
Professional and Ethical Conduct
To be identified at the time task order is issued. This may also include references to contract
Meetings, interaction and

correspondences with stakeholders

Zero letters of reprimand, grievances, or formal complaints AND one or more unsolicited letters of commendation 100% Inspection

*NON-RATED PERFORMANCE:

The Government at its' sole discretion may allow an exception from these outlined performance factors on a case by case basis due to unforeseen and/or interrelated circumstances that are beyond the control of the parties to this agreement. These exceptions may include one-time events or unique requirements. The PM will submit a written request for consideration to the COTR documenting the reasons for this performance exception and will receive written approval/authorization from the CO.

Once the contributing factor to the exception has been accomplished Contractor performance will again be subject to the performance factors. Performance of exceptions will be subjectively evaluated by the TTM and COTR.

File details come from the government source that posted it. Updated .