Director's Brief from Industry Day 29 Jul 2010

View the file

Other files

File Type Posted
FINAL NGAM Q A —
FINAL RFP HQ0147-10-R-0027 - 0002 —
Amendment 02 NGAM GFI Rev 1 —
Amendment 02 NGAM RFP Section L Rev 2 —
Amendment 02 NGAM CDRL Rev 1 —
FINAL RFP HQ0147-10-R-0027 - 0002 —
Amendment 02 NGAM RFP Section M Rev 2 —
FINAL NGAM Q A —
NGAM Pre-Proposal Conf Attendees —
SAMPLE Performance Standards Chart —
NGAM Pre-Proposal Conference 13 Oct 10 Brief.pdf PDF
Amendment 01 NGAM RFP Section M Rev 01 —
RFP HQ0147-10-R-0027 - 0001 —
Amendment 01 NGAM RFP Section L Rev 01 —
Cost Format A.xls XLS spreadsheet
FINAL NGAM Industry Q A on Draft RFP —
NGAM RFP OCI Analysis_Disclosure Form - Attachment 8.docx DOCX document
Pre-Proposal Conference Registration_Form Attachment 1.docx DOCX document
VAR_Instructions Attch 2.pdf PDF
MDA OCI Memo 51.pdf PDF
NGAM RFP Section M FINAL 092710.pdf PDF
NGAM RFP CDRL FINAL 092710.pdf PDF
NGAM RFP Acronym and Definition List FINAL 092710.pdf PDF
NGAM RFP SOO FINAL 092710.pdf PDF
NGAM RFP Section L FINAL 092710.pdf PDF
NGAM RFP PCO Letter FINAL 092810.pdf PDF
NGAM RFP HQ0147-10-R-0027 FINAL 092810.pdf PDF
NGAM DRAFT SOO Prime Concept Exploration Contract V100902 —
NGAM DRAFT CDRL LIST 10-09-02 —
NGAM DRAFT Acronym List V100902 —
FINAL NGAM Industry Day Q A Set 1 —
Organizational Conflicts of Interest.pdf PDF
NGAM DRAFT GFI List V100902 —
NGAM DRFP - Section M V100902 —
DRAFT RFP HQ0147-10-R-0027 - 009022010 _FBO_.pdf PDF
NGAM DRAFT Section L V100902 —
PCO Letter second DRFP docs 9.2.10.pdf PDF
NGAM Industry Day 29 Jul 10 Brief.pdf PDF
Comment Matrix - NGAM - Section L.docx DOCX document
PCO Letter dated 24 Aug 2010 .pdf PDF
NGAM DRAFT Section L - HQ0147-10-R-0027.pdf PDF
DRAFT RFP HQ0147-10-R-0027 —
Comment Matrix - Next Generation Aegis Missile.docx DOCX document
NGAM DRFP - Section M 10 07 26.1.pdf PDF
PCO Cover Letter - Executive Summary.pdf PDF
SOO Prime Concept Exploration Contract V100726 Final.1.pdf PDF
VAR - Instructions.pdf PDF
Final Registration Form.docx DOCX document
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Missile Defense Overview Next Generation Aegis Missile

Industry Day

LTG Patrick J. O’Reilly, USA Director

Missile Defense Agency

29 JUL 10

ncr-113213 / 072810

Distribution Statement A:

Approved for public release;

distribution is unlimited

Approved for Public Release

10-MDA-5650 (26 JUL 10)

2ncr-113213 / 072810Approved for Public Release

Early Intercept Strategy A lti tu de

Time After Lift-Off

Interceptor Launch

Threat Launch

Boost Tracking Limited Tracking Fire-control Tracking Interceptor Flyout Hit Assessment Intercept

Benefits of Early Intercept

1. Large Raid Handling

2. Shoot-Look-Shoot

3. Hedge Against Maneuvering

Threats

4. Constrained Countermeasure

Deployments

3ncr-113213 / 072810Approved for Public Release

Phased Adaptive Approach

Expanded capability against potential ICBM threat

Phase 1 (2011) Phase 2 (2015) Phase 3 (2018) Phase 4 (2020) Deploy existing / maturing systems against SRBM/MRBM threat

Aegis BMD 3.6.1 with SM-3 IA

AN/TPY-2 (FBM)

C2BMC AOC

Ramstein

Enhanced systems against SRBM/MRBM threat

Aegis BMD 4.0.1/5.0 with SM-3 IB

Aegis Ashore 5.0 with SM-3 IB

(one site)

C2BMC Updates

Improved area coverage against MRBM/IRBM threat

Aegis BMD 5.1 with SM-3 IIA

Aegis Ashore 5.1 with SM-3 IB/IIA

(two sites) Aegis Ashore 5.1 with Next Generation

Aegis Missile (two sites)

Enhanced Sensors

Enhanced Sensors

ALTBMD Lower Tier

C2BMC Updates

Enhanced Sensors

ALTBMD Upper Tier

THAAD THAAD

THAAD

4ncr-113213 / 072810Approved for Public Release

Next Generation Aegis Missile

FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21

ProductionTest

Production DecisionConcept Development

And Technology Risk Reduction

Design / Product Development

5ncr-113213 / 072810Approved for Public Release

Missile Capabilities

Phase III

Next Generation Missile

Goals

• Higher velocity to engage longer range threats and achieve earlier intercepts

• Increased divert and energy management for launch-during-boost CONOPS and “first generation” ICBM threats

• Utilizes Aegis fire control and launch systems ‐ Launched from Aegis Ashore ‐ Integrated into Baseline 5.1 with engage-on-remote

MK 41 VLS

Compatible

Phase IV

6ncr-113213 / 072810Approved for Public Release

Next Generation Aegis Missile Acquisition Strategy

• Technology Development Phase in FY11-13

- Three competitive contracts to define missile concepts, support analysis and program plans for product development

– Cost plus fixed fee

– Technical design agent

- Multiple component technology risk reduction contracts to address higher risk components and opportunities for improving performance, reliability, producibility and affordability

• Product Development Phase begins in FY13: limited competition among technology development contractors

7ncr-113213 / 072810Approved for Public Release

Next Generation Aegis Missile Concept Development And Program Planning

Contract Objectives

• Develop the Next Generation Aegis Missile design concepts

• Conduct feasibility assessments and engineering trades

- Bound/optimize interceptor performance based on BMDS off-board engagement support quality

- Optimize interceptor performance based on design and subsystem trades

• Support performance assessments via Modeling and Simulation (M&S) that will be integrated into BMDS level M&S efforts (Digital Simulation Architecture (DSA), Single Stimulation Framework (SSF))

• Assess Risk and Technology Readiness Levels (TRL)

- Interceptor subsystems

- Integration

- Identify mitigation approaches for all medium and higher risks

• Define interface requirements with Aegis Weapons System (AWS) BMD 5.1 computer program and MK 41 VLS

• Develop Program Plan and Cost Estimates (Development, Life Cycle Cost (LCC), and Average Unit Production Cost (AUPC)

Time Phased Deliverables

8ncr-113213 / 072810Approved for Public Release

Next Generation Aegis Missile Systems Engineering Trade Attributes

• Design for reliability and quality, minimize single point failures, no blind assemblies, cables/connectors, in-house supply chain concepts, etc.

• Maximize High Altitude Exo-Atmospheric Nuclear Survivability (HAENS) core standard compliance

• Digital models compliant with MDA Standards and Specifications

• Compare performance and risks of all solid propellant and solid / liquid propellant based designs

• Compatibility with the AWS BMD 5.1 and MK 41 vertical launch system

• Leverage BMDS distributed architecture capability

• Design to cost (Development, LCC, and AUPC)

• Other trades: Multi-Frequency Data Link, discrimination, Guidance, Navigation and Control (GNC), seeker, Inertial Measurement Unit (IMU), battery, Anti-Tamper, Insensitive Munitions, nosecone, hit/kill assessment

9ncr-113213 / 072810Approved for Public Release

Key Contract Deliverables

• Models and simulations compliant with MDA Digital Simulation Architecture and Single Stimulation Framework for performance analysis predictions

• Impacts of BMDS architecture trades on interceptor design

• Performance Trade studies and recommendations for optimized performance

• Integrated Master Schedule for Product Development Phase

• Development, Life Cycle and AUPC cost estimates and identify cost drivers

• Technology Assessment

• Risk Assessment and Risk Mitigation Plan

• Concept Manufacturability Assessment including identifying potential suppliers

10ncr-113213 / 072810Approved for Public Release

MDA Expectations For Next Generation Aegis Missile Concept Development & Program Planning Contracts

• Fielding by 2020 time frame requires a supplier who can develop and deliver a high performing, quality product on schedule and within cost

- Proven capability and capacity to develop and deliver is essential

• The concept development and program planning contracts will shape the planning for the Product Development program

- We want an experienced, proven team to ensure MDA/Industry partner success

Providing Incentives for Greater Efficiency in Industry

• Leveraging real competition

• Using proper contract type for development and procurement

• Using proper contract type for services

• Aligning policy on profit and fee to circumstance

• Sharing the benefits of cash flow

• Targeting non-value-added costs

• Involving small business in defense

• Rewarding excellent suppliers

Approved for Public Release

12ncr-113213 / 072810Approved for Public Release

Slide Number 1
Early Intercept Strategy
Phased Adaptive Approach
Next Generation Aegis Missile
Missile Capabilities
Next Generation Aegis Missile� Acquisition Strategy
Next Generation Aegis Missile�Concept Development And Program Planning Contract Objectives
Next Generation Aegis Missile�Systems Engineering Trade Attributes
Key Contract Deliverables
MDA Expectations For Next Generation Aegis Missile�Concept Development & Program Planning Contracts
Providing Incentives for�Greater Efficiency in Industry