NEXT GENERATION AEGIS MISSILE
CONCEPT DEFINITION AND PROGRAM
PLANNING (CDPP)
CONTRACT DATA REQUIREMENTS LIST (CDRL)
HQ0147-10-R-0027
Revision 1
22 October 2010
CONTRACT DATA REQUIREMENTS LIST (CDRL)
TABLE OF CONTENTS
1.0 INTRODUCTION
2.0 INSTRUCTIONS FOR INTERPRETING DD FORM 1423
AND RELATED INFORMATION, AND FOR PREPARATION
AND DELIVERY OF DATA
2.1 GENERAL
2.2 Interpretation of the CDRL, DD Form 1423
2.2.1 Block 7 DD 250 Requirements 3
2.2.2 Block 8 Approval Code
2.2.3 Block 9 Distribution Statement 3
2.2.4 Block 10 Frequency
2.2.5 Block 11 As Of Date 5
2.2.6 Block 12/13 Date of First & Subsequent Submissions
2.2.7 Block 14 Distribution
2.2.8 Block 16 Remarks
2.2.9 Distribution Control
2.2.10 Special Markings
2.3 Digital Delivery of Data
3.0 EXHIBITS
A. Exhibit A CDPP Contract Effort B. Exhibit B Recommended Program Table 11 C. CDRLs 12-45
4.0 One-Time Data Item Descriptions 46-55
1.0 INTRODUCTION
This document provides data submission information to contractors for the basic contract and/or options to be accomplished. Within this document will be found:
• Instructions
• Contract Data Requirements Lists (CDRLs) with CDRL Index.
• One-Time Data Item Descriptions (DIDs) for non standard DIDs
• Data Item Descriptions have not been included in this document. Standard DIDs will be furnished upon request. Once a contract begins, changes to this document will be made in the same manner as for any other section of the contract.
2.0 INSTRUCTIONS FOR INTERPRETING DD FORM 1423 AND RELATED
INFORMATION AND FOR PREPARATION AND DELIVERY OF DATA
2.1 GENERAL
The CDRL, DD Form 1423-1 shall be used as the main contractual document which lists the data/information items that are formally deliverable to the Government under the contract to which the CDRL applies. Exceptions may be noted in the Contract Schedule and/or the Contract General Provisions, either of which may require submission of other data. Each CDRL item has an assigned a data item number (e.g. A001), a DID identifier and a data item title, and in some cases a subtitle. Additionally, the CDRL provides other information such as: frequency of submission of deliverable item, as-of-date, dates or times of first and subsequent submissions, distribution; and, approvals.
Data Item Descriptions, tailored as necessary, provide detailed instructions for preparation of data which is listed on the CDRL. The DIDs are identified by title and assigned data item alpha-numeric codes: e.g., DI-F-6010. In those instances in which a DID has been generated to fit a particular requirement, and the standard DID does not exist or does not supply the appropriate information, it is assigned a unique identifier code (e.g., OT-MRT-20081).
The contractor shall develop a CDRL sequence-to-Performance Work Statement (PWS) index as part of the their proposal This cross reference list will show all the applicable CDRL sequence numbers in the left hand column and, in the right column, indicate where each CDRL sequence numbered item applies in the contract
This CDRL package, as presented in Section 3, is broken into two specific Exhibits for clarification. Exhibit “A” CDRLs are applicable to deliverables associated with the execution of the CDPP contract itself. Exhibit “B” CDRLs are applicable to deliverables associated with recommended developmental program. As an example, there are separate and distinct requirements for the A002 Contract Work Breakdown Structure, which refers to execution of the CDPP, and the B012 Work Breakdown Instruction, which refers to the recommended developmental program.
2.2 INTERPRETATION OF THE CDRL, DD FORM 1423
This data requirements document utilizes the DD 1423-1 version. The blocks are essentially self-explanatory and are delineated on the DD Form 1423-1. Additionally, instructions, definitions and codes shown on the DD Form 1423 are contained in DFAR 253.303 AR 700-
51. Further instructions and guidance are provided for Blocks 7, 8, 9, 10, 11, 12, 13, 14, and 16 in the following sections.
2.2.1 Block 7. DD 250 Req – Electronic notification will be used when transmitting the reports or data listed in the CDRL when Block 7 is coded “EN.” This electronic notification fulfills the contractual delivery requirements normally provided by a Letter of Transmittal. The electronic notification via e-mail will be addressed to the requiring office shown in CDRL Block 6 and Block 14a copy addressees. The electronic notification will reference the CDRL sequence number(s) of the report or data and advise that the report or data required by the CDRL has been sent to the electronic data warehouse. For data requirements which have an "A" code in CDRL Block 8, the electronic notification will contain a request for formal approval from the Government and the reports or data sent to the electronic data warehouse will be labeled “Draft” in its filename. Upon receipt of Government approval of the CDRL report or data, an electronic distribution shall be made to the Block 6 and Block 14a addressees advising an “Approved” report or data has been sent to the electronic data warehouse with the file name including “Approved.” For Block 7 codes other than EN, the acceptance will be by DD 250 action as defined in DOD 5010.12-M, and DFAR Supplement Appendix F
2.2.2 Block 8. APP Code A - When "A" is placed in Block 8, Government approval of the submitted data is required; distribution of the approved data will be deferred pending receipt of approval and/or comments to the submitted draft. The Government’s and contractor's responsibilities for timely processing of such submitted data is identified in Block 16 by the expression "APPROVAL: GXX/CYY" (numbers are inserted in place of XX and YY which represent numbers of calendar days). For example “APPROVAL: G04/C03” is interpreted as follows: "Government response (approval/disapproval/comments/technical direction) will be provided within 4 calendar days of receipt of the data from the contractor;
the contractor will update or revise the data (reflecting the Government's comments) and resubmit within 3 calendar days of receipt of the Government's response. When an "N/A" appears in Block 8, draft data are not required before submittal of final data.
2.2.3 Block 9. Distribution Statement – Distribution code “D” applies to all CDRL deliverables, which restricts dissemination to DOD and DOD contractors only.
2.2.4 Block 10. Frequency - The frequency of data submittal. Entries in this Block are explained in Table 1, “Data Submittal Frequency Codes”. If the data are of a recurring type, it is to be submitted at the end of the reporting period established in this Block unless otherwise indicated in Block 16 or Block 13.
TABLE 1. BLOCK 10 DATA SUBMITTAL FREQUENCY CODES
CODE FREQUENCY
ANNLY Annually
ASGEN* As generated
ASREQ* As required
BI-MO Every two months
BI-WE Every two weeks
CP/RQ Change pages as required
DAILY Daily
DFDEL Deferred delivery (See DFARS 252.227-7026)
MTHLY Monthly
ONE/P One Preliminary
ONE/R One time with revisions
OTIME One time (Does not include draft submissions)
QTRLY Quarterly
R/ASR* Revisions as required
SEMIA Every six months
WEEKLY Weekly
XTIME* Multiple separate submittals (2TIME, 3TIME, etc.)
(Does not include draft submissions). Requirement is fully described in Block 16. Used in lieu of other codes where such are inadequate to define requirement, or used in addition to other codes requiring amplification in Block 16.
*SEE BLOCK 16* Specific instructions will be found in Block 16 for this item.
2.2.5 Block 11. As of Date – This is the date for cutting off collection of the data. If the data are to be submitted multiple times, a numeral will be entered in this block to indicate the number of calendar days prior to the end of the reporting period, which was established in Block 10, that data collection will be cut off. For example “15” would place the “as of” date for the data at 15 days before the end of the month, quarter, or year, depending on the frequency established in Block 10; a “0” would place the “as of” date at the end of each month, quarter, etc. If the data are submitted only once, the “as of” date will be as follows: year/month/day (e.g., “10/03/01”).
2.2.6 Blocks 12 and 13. Date of First Submission – This is the due date for initial data submission. This is normally date the data are delivered electronically and is entered as year/month/day (e.g., “10/03/01”) or keyed to a specific event or milestone, using a code from Table 2, “Data Submission Codes”.
NOTE: No classified dates are cited in the CDRL.
TABLE 2. BLOCK 12 and 13 DATA SUBMISSION CODES
CODE FREQUENCY
ASGEN As generated
ASREQ* As required
DFDEL* Deferred delivery
XMAC** Months after contract award
XDAC** Days after contract award
XDACM** Days after contract modification
XDADO** Days after delivery order
XDARP** Days after reporting period
XDARC** Days after receipt of comments
XDATC** Days after test completion
XDPTT** Days prior to test
NLT No later than
EOC End of contract
EOM End of month
EOQ End of quarter
*SEE BLOCK 16 Specific instructions will be found in Block 16 for this item.
** The “X” is assigned a value indicating the number of time units; e.g., 2MAC is 2 Months after contract award.
2.2.7 Block 14. Distribution Addressee Code List - This section specifies the physical mailing addresses (if required) and electronic notification addresses for the Block 14.a addressee codes listed on the CDRLs.
DTIC Email: Notification address to be supplied at time of award Mailing Address:
Defense Technical Information Center Cameron Station Alexandria, VA 22314
DCMA Email: Notification address to be supplied at time of award Mailing Address:
DCMA Office for Contractors Facility Address to be supplied at time of award
MDA/DVM Email: Notification address to be supplied at time of award Mailing Address:
Missile Defense Agency Next Generation Aegis Missile - Program Manager
ATTN: MDA/DVM
Ms. Kari Anderson Bldg. 5222, Martin Road Redstone Arsenal, AL 35898
MDA/DACV Email: Notification address to be supplied at time of award Mailing Address:
Missile Defense Agency Next Generation Aegis Missile – Contracting Officer
ATTN: MDA/DACV
NGAM Contracting Officer Bldg. 5222, Martin Road Redstone Arsenal, AL 35898
MDA/DVM/PM&I
Missile Defense Agency Next Generation Aegis Missile - Program Management and Integration
(Email notification address to be supplied at time of award)
ATTN: MDA/DVM/PM&I
Bldg. 5222, Martin Road Redstone Arsenal, AL 35898
2.2.8 Block 16. "Remarks" - This block is used to modify the DID preparation instructions. Block 16 also provides a place for specific instructions relating to:
report frequency, as of date, time of first submission, and time of subsequent submissions.
2.2.9 Distribution Control – Modifications to the distribution of any contract report in any stage of development or completion is prohibited without the approval of the Contracting Officer.
2.2.10 Special Markings
Disclaimer Statement - A conspicuous disclaimer statement shall be contained on the cover of all reports as follows:
"The views, opinions, and/or findings contained in this report are those of the author(s) and should not be construed as an official Missile Defense Agency position, policy, or decision unless so designated by other documentation."
Distribution Statement – All material will be marked “Reproduction requires approval of originator or higher DOD Authority. Further dissemination only as directed by MDA/DVM or higher DOD Authority. Request for this document must be referred to: (to be supplied at contract award).”
Warning – All material will be marked “This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751 et seq
For Official Use Only. – All material will be marked “For Official Use Only”
.) or Executive Order 12470. Violation of these export laws is subject to severe criminal penalties." "Destruction Notice - All material will be marked as follows: For classified documents, “Follow the procedures in DOD 5200.22M, Industrial Security Manual, Section II-19 or DOD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, “Destroy by any methods that will prevent disclosure of contents or reconstruction of the document." “Pre-Decisional Material
- All material will be marked “Pre-Decisional, Exemption (b) (5).”
2.3 Digital Delivery of Data and Electronic Data Warehouse
The contractor shall establish and maintain throughout the duration of this contract a secure password-protected, web-based data warehouse for the electronic delivery of all unclassified data delivered under this contract. A list of authorized personnel for access to the data warehouse will be provided by the Government. Upon electronic delivery of data to the data warehouse, the contractor shall notify by electronic notification in lieu of transmittal letter, all CDRL Block 6 and 14 addresses of such delivery.
SECTION 3.0
CONTRACT DATA REQUIREMENTS
INDEX LIST
Exhibit A – CDPP Contract Effort DATA ITEM NO. TITLE OF DATA ITEM DID or Reference Document
A001 Management Plan DI-MGMT-80004A
A002 Contract Work Breakdown Structure (WBS) and Dictionary DI-MGMT-81334C
A003 Integrated Master Schedule – Key Events N/A A004 Cost Performance Report (EVMS Included) DI-MGMT-81466A A005 Contract Funds Status Report DI-MGMT-81468 A006 Monthly Status Report DI-MGMT-80368A A007 Agenda DI-ADMN-81249A A008 Report Record of Meetings and Minutes DI-ADMN-81505 A009 Presentation Material DI-ADMN-81373 A010 Contract Summary Report DI-ADMN-80447A
A011 MAP and PMAP Requirements Applicability Matrix DI-MISC-80711A
A012 Performance Report on Small Business Utilization DI-MGMT-81642
A013 Test Plan DI-NDTI-80566A A014 Test Report - Quick Look DI-MISC-80652 A015 Test Report - Final DI-MISC-80652
A016 Scientific and Technical Reports - Performance Analysis Predictions DI-MISC-80711A
A017 Analysis Modeling and Simulation Plan DI-IPSC-81427A
Exhibit B – Recommended Program
B001 Concept Technical Parameters for Analysis Interceptor Data Template & Data
Requirements NGAM
B002
Operational Concept Definition - Concept Functional and Physical Architecture / Allocations DI-IPSC-81430A
B003 Risk Management Plan DI-MGMT-81808 B004 Critical Program Technologies DI-RELI-80685
B005 System/Subsystem Specification - Draft Missile System Specification DI-IPSC-81431A
B006 Performance Models and Simulations DI-MSSM-81751
B007 MAP and PMAP Requirements Applicability Matrix DI-MISC-80711A
B008
Failure and Summary Analysis Report - Failure Modes, Effects and Criticality Analysis (FMECA) Report DI-RELI-80687
B009 Draft Concept Cost Analysis Requirements Description CARD MDA Handbook V.6
B010
IMS and IMP - Development and Production Integrated Master Schedule and Integrated Master Plan
DI-MGMT-81650
B011 WBS - Development and Production Work Breakdown Structure with Dictionary DI-MGMT-81334C
B012 Product Development, Production, and Operating & Support Cost Estimates DI-FNCL-80166C
B013 Integrated Logistics Support DI-ILSS-80095
SECTION 4.0
One-Time (OT) Data Item Descriptions
Section 4.0 Data Reference Data Items
B001 Concept Technical Parameters for Analysis Interceptor Data Template
B001 Concept Technical Parameters for Analysis Data Requirements NGAM
B008
Failure and Summary Analysis Report - Failure Modes, Effects and Criticality Analysis (FMECA) Report DI-RELI-80687
B009 Draft Concept Cost Analysis Requirements Description GFI List
DATA ITEM DESCRIPTION Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including t he time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503.
1. TITLE
Interceptor Data Template
2. IDENTIFICATION NUMBER
XX-XXX-XXXXX
3. DESCRIPTION/PURPOSE
4. APPROVAL DATE
(YYMMDD)
5. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE
7. APPLICATION/INTERRELATIONSHIP
7. Th is DID provides a list of the data items required to support the configuration of Contractor interceptor designs in the Government Simulation tool.
8. APPROVAL LIMITATION
9a. APPLICABLE FORMS
9b. AMSC NUMBER
10. PREPARATION INSTRUCTIONS
Metric Data
Baseline Predicted Nominal Mass Estimated Mass with MGA Applied
Component (kg) MGA (%) (kg)
Missile 10.0 11.5 Payload 10.0 11.5 KV Weight w/ Cover 10.0 15.00% 11.5
Sensor Optics Cover Guidance Electronics (IMU + avionics) Battery(s) Wiring Harness DACS Inert DACS fuel Data link, TM, ant
Structure/Misc hardware
Misc Hardware
Ballast
Guidance Unit 0.0 0.0 Mount Plate 15% Cover KV relay with MGA Applied
Component (kg) MGA (%) (kg)
Misc Hardware
Separation Assy
Nosecone 0.0 0.0 Nosecone Assy (deployed) 15%
Nosecone shroud
Nosecone deployment system
Aft shroud Assy
Aft shroud
Misc Hardware
Deployment System
Third Stage 0.0 0.0 3rd Stage Burn out Mass 15%
Rocket Motor Assy 0.0 0.0
Rocket Motor Inerts 0.0 0.0
Case + Internal Insulation
Cable Raceway(s)
Igniter + ISD
Nozzle Assy TVC Components (battery+brackets + cabling
External Insulation
Misc motor hardware (o-rings, nut plates ..)
Nozzle Shroud
ACS
Aero Surfaces
Harnesses
Stage Separation Assy (3rd Stage to Payload)
Misc stage hardware
Total Expelled Weight 0.0 0.0
Propellant
Expelled Insulation
Second Stage 0.0 0.0 2nd Stage Burn out Mass 15%
Rocket Motor Assy 0.0 0.0
Rocket Motor Inerts 0.0 0.0
Case + Internal Insulation
Cable Raceway(s) with MGA Applied
Component (kg) MGA (%) (kg)
External Insulation
Misc motor hardware (o-rings, nut plates ..)
Nozzle Shroud
ACS
Aero Surfaces
Harnesses
Stage Separation Assy (2nd Stage to 3rd Stage)
Stage Separation Assy (1st Stage to 2nd Stage)
Misc stage hardware
Total Expelled Weight 0.0 0.0
Propellant Mass
Expelled Insulation
First Stage 0.0 0.0 1st Stage Burn out Mass 15%
Rocket Motor Assy 0.0 0.0
Rocket Motor Inerts 0.0 0.0
Case + Internal Insulation
Cable Raceway(s)
Igniter + ISD
Nozzle Assy TVC Components (battery+brackets + cabling
External Insulation
Misc motor hardware (o-rings, nut plates ..)
Nozzle Shroud
ACS
Aero Surfaces
Harnesses
Stage Separation Assy (1st Stage to 2nd Stage)
Canister Restraint Hardware
Misc stage hardware
Total Expelled Weight 0.0 0.0
Propellant
Expelled Insulation
11. DISTRIBUTION STATEMENT
DATA ITEM DESCRIPTION Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including t he time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503.
1. TITLE
Interceptor Data Requirements NGAM
2. IDENTIFICATION NUMBER
XX-XXX-XXXXX
3. DESCRIPTION/PURPOSE
4. APPROVAL DATE
(YYMMDD)
5. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE
7. APPLICATION/INTERRELATIONSHIP
7. Th is DID provides a list of the data items required to support the configuration of Contractor interceptor designs in the Government Simulation tool.
8. APPROVAL LIMITATION
9a. APPLICABLE FORMS
9b. AMSC NUMBER
10. PREPARATION INSTRUCTIONS
Overview
Parameters units/formats
All parameters in SI units
Angles in degrees
Definition of random variab les
Uniform: minimum and maximum values
Gaussian: mean and 3-sigma values
All positions/orientations defined with respect to Body Reference Frame (BRF)
X-axis along centerline and out the nose with Y-Z axis defined fo r a right handed system – origin to be defined by contractor
Table Formats – see Appendix
Propulsion
For each stage,
• Motor wet & dry mass (include expendable inerts)
• Expendable propellant mass
• Nozzle exit area
• Nozzle location(s) in BRF
• Nozzle alignment uncertainty
• Motor Type
– Solid
• Complete “Ballistics Data” tab in “Interceptor Data Template” spreadsheet
• Minimum/maximum burn time across operating temperature range
• Total Impulse uncertainty
– Liquid
• Nominal thrust level
• Thrust bias and repeatability uncertainties
• Specific impulse
• Control System Type
– Thrust Vector Control
• Nozzle 2nd order response characteristics
• Nozzle deflection and deflection rate limits
– Reaction Control System
• Nozzle locations in BRF
• Thrust level(s)
• Propellant mass
• Specific impulse
For each aerodynamic configuration, Aerodynamics:
• Aero reference area
• Aero reference length
• Moment reference point location in BRF
• Force/moment coefficient tables
– For axi-symmetric airframe, 2-d imensional tables as a function of Mach and Total angle-of-attack
– For non-axi-symmetric airframe, 3-dimensional tables required – independent variables may be:
• Mach, Total angle-of-attack, Aerodynamic Roll Angle – f(M, aT, f)
• Mach, Pitch angle-of-attack, Yaw angle-of-attack – f(M, a, b)
– CA (axial force coefficient) – Power on and Power off tables – includes all drag terms except skin frict ion
– CN (normal force coefficient)
– CY (side force coefficient) – not required for axi-symmetric airframe
– Cl (rolling moment coefficient)
– Cm (pitching moment coefficient)
– Cn (yawing moment coefficient) – not required fo r axi-symmetric airframe
– For configurations that include aerodynamic control surfaces
• Definition of fin configuration
• Incremental aero tables
– Define increments to each aero coefficient for deflect ion of each fin
– 4-dimensional tables – f(M, aT, f, di) or f(M, a, b, di)
• Additional tables
– CSF (skin friction coefficient) – 2-dimensional table – function of Mach and Altitude
– Cmq, Cnr, Clp, etc. (rate damping coefficients) – 1-d imensional table – function of Mach
• Uncertainty of each coefficient
• Complete “Physical Descript ion” tab in “Interceptor Data Template” spreadsheet
• Complete “Mass Props Details” tab in “Interceptor Data Template” spreadsheet, defining component masses and mass growth allowances
Mass Properties:
• Provide vehicle mass properties table for each configuration, defining center-of-grav ity vector and inertia tensor as a function of interceptor mass
– Configurat ions
• 1st Stage Burn
• 2nd Stage Burn
• 3rd Stage Burn with Nosecone
• 3rd Stage Burn without Nosecone
• KV
– Table format – 10 co lumn format
• Column 1 – Total vehicle mass – row 1 = burnout mass, row N = ignit ion mass - kg
• Columns 2-4 – Center-of-grav ity position in BRF (x,y,z) – meters
• Columns 5-7 – Moment of inert ia (Ixx, Iyy, Izz) – kg-m2
• Columns 8-10 – Product of inert ia (Ixy , Ixz, Iyz) – kg-m2
IMU / Navigation:
Location in BRF
Provide characteristics of each IMU (Guidance Sect ion and/or KV)
Gyro response characteristics
- Natural frequency, damping ratio, dynamic range
Gyro Error model
- Bias, scale factor, non-orthogonality, random walk, etc.
- Accelerometer response characteristics
- Natural frequency, damping ratio, dynamic range
Accelerometer Error model
- Bias, scale factor, non-orthogonality, random walk, etc.
Description of GPS aid ing
KV:
• Propellant Mass
DACS
• For each nozzle,
– Location and orientation in BRF
– Alignment error
– For liquid DACS,
• Force level, specific impulse, minimum on-time, on/off delay, response characteristics, repeatability
– For solid DACS,
• Description of throttling (o r sustain/divert pulse) functionality and relat ionship of thrust level and specific impulse to throttle level (or sustain/divert thrust)
• Turn down ratio
• Valve response characteristics
• Field-of-v iew
Seeker
• IFOV
• NEI
• Update interval
• Measurement noise
• Processing delay
Separation Dynamic
• Description of separation mechanism, tip-off rates, and separation DV s
• Description of flyout/engagement constraints, i.e., min stage separation altitudes, maximum staging dynamic pressure and angle-of-attack, maximum lateral/axial g-loads, dynamic pressure for nosecone separation, min imum p lanned intercept altitude, minimum planned endgame time, etc.
Boost Flyout Model:
• General description of guidance modes, i.e., hold vertical (launch-xx seconds), pitchover (xx-xx seconds), etc.
• Autopilot block d iagram/algorithm with gain schedules of sufficient detail to replicate in government model
• Flyout fan to support verificat ion of government model
– To include nominal time histories of ground range, altitude, velocity, flight path angle, pitch angle, angle-of-attack, mass, delivered thrust, body rates, body-frame acceleration vector (no gravity), CG location (body coordinates)
• Timing/update interval of flight algorithms
Midcourse and Endgame Model:
• Description of Midcourse and Endgame Sequencing/Events
• Description of track filter, guidance, and autopilot algorithms – to include
– Guidance modes & criteria for sequencing
• Guidance commands in response to midcourse IFTUs
• Endgame guidance
• Criteria for terminal aimpoint shift
– Description and block d iagram of DACS throttling/firing logic
• Timing/update interval of flight algorithms
11. DISTRIBUTION STATEMENT
| NGAM CDPP CDRL 10-19 10 TC Top Third.pdf |
| 1.0 INTRODUCTION |
| This document provides data submission information to contractors for the basic contract and/or options to be accomplished. Within this document will be found: |
| Instructions |
| Contract Data Requirements Lists (CDRLs) with CDRL Index. |
| One-Time Data Item Descriptions (DIDs) for non standard DIDs |
| Data Item Descriptions have not been included in this document. Standard DIDs will be furnished upon request. Once a contract begins, changes to this document will be made in the same manner as for any other section of the contract. |
| 2.0 INSTRUCTIONS FOR INTERPRETING DD FORM 1423 AND RELATED INFORMATION AND FOR PREPARATION AND DELIVERY OF DATA |
| 2.1 GENERAL |
| The CDRL, DD Form 1423-1 shall be used as the main contractual document which lists the data/information items that are formally deliverable to the Government under the contract to which the CDRL applies. Exceptions may be noted in the Contract Schedule and/or the Contract General Provisions, either of which may require submission of other data. Each CDRL item has an assigned a data item number (e.g. A001), a DID identifier and a data item title, and in some cases a subtitle. Additionally, the CDRL provides other information such as: frequency of submission of deliverable item, as-of-date, dates or times of first and subsequent submissions, distribution; and, approvals. |
| Data Item Descriptions, tailored as necessary, provide detailed instructions for preparation of data which is listed on the CDRL. The DIDs are identified by title and assigned data item alpha-numeric codes: e.g., DI-F-6010. In those instances in which a DID has been generated to fit a particular requirement, and the standard DID does not exist or does not supply the appropriate information, it is assigned a unique identifier code (e.g., OT-MRT-20081). |
| The contractor shall develop a CDRL sequence-to-Performance Work Statement (PWS) index as part of the their proposal This cross reference list will show all the applicable CDRL sequence numbers in the left hand column and, in the right column, indicate where each CDRL sequence numbered item applies in the contract |
| This CDRL package, as presented in Section 3, is broken into two specific Exhibits for clarification. Exhibit “A” CDRLs are applicable to deliverables associated with the execution of the CDPP contract itself. Exhibit “B” CDRLs are applicable to deliverables associated with recommended developmental program. As an example, there are separate and distinct requirements for the A002 Contract Work Breakdown Structure, which refers to execution of the CDPP, and the B012 Work Breakdown Instruction, which refers to the recommended developmental program. |
| 2.2 INTERPRETATION OF THE CDRL, DD FORM 1423 |
| This data requirements document utilizes the DD 1423-1 version. The blocks are essentially self-explanatory and are delineated on the DD Form 1423-1. Additionally, instructions, definitions and codes shown on the DD Form 1423 are contained in DFAR 253.303 AR 700-51. Further instructions and guidance are provided for Blocks 7, 8, 9, 10, 11, 12, 13, 14, and 16 in the following sections. |
| 2.2.1 Block 7. DD 250 Req – Electronic notification will be used when transmitting the reports or data listed in the CDRL when Block 7 is coded “EN.” This electronic notification fulfills the contractual delivery requirements normally provided by a Letter of Transmittal. The electronic notification via e-mail will be addressed to the requiring office shown in CDRL Block 6 and Block 14a copy addressees. The electronic notification will reference the CDRL sequence number(s) of the report or data and advise that the report or data required by the CDRL has been sent to the electronic data warehouse. For data requirements which have an "A" code in CDRL Block 8, the electronic notification will contain a request for formal approval from the Government and the reports or data sent to the electronic data warehouse will be labeled “Draft” in its filename. Upon receipt of Government approval of the CDRL report or data, an electronic distribution shall be made to the Block 6 and Block 14a addressees advising an “Approved” report or data has been sent to the electronic data warehouse with the file name including “Approved.” For Block 7 codes other than EN, the acceptance will be by DD 250 action as defined in DOD 5010.12-M, and DFAR Supplement Appendix F |
| 2.2.2 Block 8. APP Code A - When "A" is placed in Block 8, Government approval of the submitted data is required; distribution of the approved data will be deferred pending receipt of approval and/or comments to the submitted draft. The Government’s and contractor's responsibilities for timely processing of such submitted data is identified in Block 16 by the expression "APPROVAL: GXX/CYY" (numbers are inserted in place of XX and YY which represent numbers of calendar days). For example “APPROVAL: G04/C03” is interpreted as follows: "Government response (approval/disapproval/comments/technical direction) will be provided within 4 calendar days of receipt of the data from the contractor; the contractor will update or revise the data (reflecting the Government's comments) and resubmit within 3 calendar days of receipt of the Government's response. When an "N/A" appears in Block 8, draft data are not required before submittal of final data. |
| 2.2.3 Block 9. Distribution Statement – Distribution code “D” applies to all CDRL deliverables, which restricts dissemination to DOD and DOD contractors only. |
| 2.2.4 Block 10. Frequency - The frequency of data submittal. Entries in this Block are explained in Table 1, “Data Submittal Frequency Codes”. If the data are of a recurring type, it is to be submitted at the end of the reporting period established in this Block unless otherwise indicated in Block 16 or Block 13. |
| TABLE 1. BLOCK 10 DATA SUBMITTAL FREQUENCY CODES |
| CODE |
| FREQUENCY |
| ANNLY |
| Annually |
| ASGEN* |
| As generated |
| ASREQ* |
| As required |
| BI-MO |
| Every two months |
| BI-WE |
| Every two weeks |
| CP/RQ |
| Change pages as required |
| DAILY |
| Daily |
| DFDEL |
| Deferred delivery (See DFARS 252.227-7026) |
| MTHLY |
| Monthly |
| ONE/P |
| One Preliminary |
| ONE/R |
| One time with revisions |
| OTIME |
| One time (Does not include draft submissions) |
| QTRLY |
| Quarterly |
| R/ASR* |
| Revisions as required |
| SEMIA |
| Every six months |
| WEEKLY |
| Weekly |
| XTIME* |
| Multiple separate submittals (2TIME, 3TIME, etc.)(Does not include draft submissions). Requirement is fully described in Block 16. Used in lieu of other codes where such are inadequate to define requirement, or used in addition to other codes requiring amplification in Block 16. |
| *SEE BLOCK 16* |
| Specific instructions will be found in Block 16 for this item. |
| 2.2.5 Block 11. As of Date – This is the date for cutting off collection of the data. If the data are to be submitted multiple times, a numeral will be entered in this block to indicate the number of calendar days prior to the end of the reporting period, which was established in Block 10, that data collection will be cut off. For example “15” would place the “as of” date for the data at 15 days before the end of the month, quarter, or year, depending on the frequency established in Block 10; a “0” would place the “as of” date at the end of each month, quarter, etc. If the data are submitted only once, the “as of” date will be as follows: year/month/day (e.g., “10/03/01”). |
| 2.2.6 Blocks 12 and 13. Date of First Submission – This is the due date for initial data submission. This is normally date the data are delivered electronically and is entered as year/month/day (e.g., “10/03/01”) or keyed to a specific event or milestone, using a code from Table 2, “Data Submission Codes”. |
| NOTE: No classified dates are cited in the CDRL. |
| TABLE 2. BLOCK 12 and 13 DATA SUBMISSION CODES |
| CODE |
| FREQUENCY |
| ASGEN |
| As generated |
| ASREQ* |
| As required |
| DFDEL* |
| Deferred delivery |
| XMAC** |
| Months after contract award |
| XDAC** |
| Days after contract award |
| XDACM** |
| Days after contract modification |
| XDADO** |
| Days after delivery order |
| XDARP** |
| Days after reporting period |
| XDARC** |
| Days after receipt of comments |
| XDATC** |
| Days after test completion |
| XDPTT** |
| Days prior to test |
| NLT |
| No later than |
| EOC |
| End of contract |
| EOM |
| End of month |
| EOQ |
| End of quarter |
| *SEE BLOCK 16 |
| Specific instructions will be found in Block 16 for this item. |
| ** The “X” is assigned a value indicating the number of time units; e.g., 2MAC is 2 Months after contract award. |
| 2.2.7 Block 14. Distribution Addressee Code List - This section specifies the physical mailing addresses (if required) and electronic notification addresses for the Block 14.a addressee codes listed on the CDRLs. |
| 2.2.9 Distribution Control – Modifications to the distribution of any contract report in any stage of development or completion is prohibited without the approval of the Contracting Officer. |
| For Official Use Only. – All material will be marked “For Official Use Only” |
| 2.3 Digital Delivery of Data and Electronic Data Warehouse |
| The contractor shall establish and maintain throughout the duration of this contract a secure password-protected, web-based data warehouse for the electronic delivery of all unclassified data delivered under this contract. A list of authorized personnel for access to the data warehouse will be provided by the Government. Upon electronic delivery of data to the data warehouse, the contractor shall notify by electronic notification in lieu of transmittal letter, all CDRL Block 6 and 14 addresses of such delivery. |
| SECTION 3.0 |
| CDRL Set Amedn 02 1 of 2 |
| CDRL Set Amend 02 2 of 2 |
| NGAM CDPP CDRL 10-19 10 TC Bottom Section |
| 1.0 INTRODUCTION |
| This document provides data submission information to contractors for the basic contract and/or options to be accomplished. Within this document will be found: |
| Instructions |
| Contract Data Requirements Lists (CDRLs) with CDRL Index. |
| One-Time Data Item Descriptions (DIDs) for non standard DIDs |
| Data Item Descriptions have not been included in this document. Standard DIDs will be furnished upon request. Once a contract begins, changes to this document will be made in the same manner as for any other section of the contract. |
| 2.0 INSTRUCTIONS FOR INTERPRETING DD FORM 1423 AND RELATED INFORMATION AND FOR PREPARATION AND DELIVERY OF DATA |
| 2.1 GENERAL |
| The CDRL, DD Form 1423-1 shall be used as the main contractual document which lists the data/information items that are formally deliverable to the Government under the contract to which the CDRL applies. Exceptions may be noted in the Contract Schedule and/or the Contract General Provisions, either of which may require submission of other data. Each CDRL item has an assigned a data item number (e.g. A001), a DID identifier and a data item title, and in some cases a subtitle. Additionally, the CDRL provides other information such as: frequency of submission of deliverable item, as-of-date, dates or times of first and subsequent submissions, distribution; and, approvals. |
| Data Item Descriptions, tailored as necessary, provide detailed instructions for preparation of data which is listed on the CDRL. The DIDs are identified by title and assigned data item alpha-numeric codes: e.g., DI-F-6010. In those instances in which a DID has been generated to fit a particular requirement, and the standard DID does not exist or does not supply the appropriate information, it is assigned a unique identifier code (e.g., OT-MRT-20081). |
| The contractor shall develop a CDRL sequence-to-Performance Work Statement (PWS) index as part of the their proposal This cross reference list will show all the applicable CDRL sequence numbers in the left hand column and, in the right column, indicate where each CDRL sequence numbered item applies in the contract |
| This CDRL package, as presented in Section 3, is broken into two specific Exhibits for clarification. Exhibit “A” CDRLs are applicable to deliverables associated with the execution of the CDPP contract itself. Exhibit “B” CDRLs are applicable to deliverables associated with recommended developmental program. As an example, there are separate and distinct requirements for the A002 Contract Work Breakdown Structure, which refers to execution of the CDPP, and the B012 Work Breakdown Instruction, which refers to the recommended developmental program. |
| 2.2 INTERPRETATION OF THE CDRL, DD FORM 1423 |
| This data requirements document utilizes the DD 1423-1 version. The blocks are essentially self-explanatory and are delineated on the DD Form 1423-1. Additionally, instructions, definitions and codes shown on the DD Form 1423 are contained in DFAR 253.303 AR 700-51. Further instructions and guidance are provided for Blocks 7, 8, 9, 10, 11, 12, 13, 14, and 16 in the following sections. |
| 2.2.1 Block 7. DD 250 Req – Electronic notification will be used when transmitting the reports or data listed in the CDRL when Block 7 is coded “EN.” This electronic notification fulfills the contractual delivery requirements normally provided by a Letter of Transmittal. The electronic notification via e-mail will be addressed to the requiring office shown in CDRL Block 6 and Block 14a copy addressees. The electronic notification will reference the CDRL sequence number(s) of the report or data and advise that the report or data required by the CDRL has been sent to the electronic data warehouse. For data requirements which have an "A" code in CDRL Block 8, the electronic notification will contain a request for formal approval from the Government and the reports or data sent to the electronic data warehouse will be labeled “Draft” in its filename. Upon receipt of Government approval of the CDRL report or data, an electronic distribution shall be made to the Block 6 and Block 14a addressees advising an “Approved” report or data has been sent to the electronic data warehouse with the file name including “Approved.” For Block 7 codes other than EN, the acceptance will be by DD 250 action as defined in DOD 5010.12-M, and DFAR Supplement Appendix F |
| 2.2.2 Block 8. APP Code A - When "A" is placed in Block 8, Government approval of the submitted data is required; distribution of the approved data will be deferred pending receipt of approval and/or comments to the submitted draft. The Government’s and contractor's responsibilities for timely processing of such submitted data is identified in Block 16 by the expression "APPROVAL: GXX/CYY" (numbers are inserted in place of XX and YY which represent numbers of calendar days). For example “APPROVAL: G04/C03” is interpreted as follows: "Government response (approval/disapproval/comments/technical direction) will be provided within 4 calendar days of receipt of the data from the contractor; the contractor will update or revise the data (reflecting the Government's comments) and resubmit within 3 calendar days of receipt of the Government's response. When an "N/A" appears in Block 8, draft data are not required before submittal of final data. |
| 2.2.3 Block 9. Distribution Statement – Distribution code “D” applies to all CDRL deliverables, which restricts dissemination to DOD and DOD contractors only. |
| 2.2.4 Block 10. Frequency - The frequency of data submittal. Entries in this Block are explained in Table 1, “Data Submittal Frequency Codes”. If the data are of a recurring type, it is to be submitted at the end of the reporting period established in this Block unless otherwise indicated in Block 16 or Block 13. |
| TABLE 1. BLOCK 10 DATA SUBMITTAL FREQUENCY CODES |
| CODE |
| FREQUENCY |
| ANNLY |
| Annually |
| ASGEN* |
| As generated |
| ASREQ* |
| As required |
| BI-MO |
| Every two months |
| BI-WE |
| Every two weeks |
| CP/RQ |
| Change pages as required |
| DAILY |
| Daily |
| DFDEL |
| Deferred delivery (See DFARS 252.227-7026) |
| MTHLY |
| Monthly |
| ONE/P |
| One Preliminary |
| ONE/R |
| One time with revisions |
| OTIME |
| One time (Does not include draft submissions) |
| QTRLY |
| Quarterly |
| R/ASR* |
| Revisions as required |
| SEMIA |
| Every six months |
| WEEKLY |
| Weekly |
| XTIME* |
| Multiple separate submittals (2TIME, 3TIME, etc.)(Does not include draft submissions). Requirement is fully described in Block 16. Used in lieu of other codes where such are inadequate to define requirement, or used in addition to other codes requiring amplification in Block 16. |
| *SEE BLOCK 16* |
| Specific instructions will be found in Block 16 for this item. |
| 2.2.5 Block 11. As of Date – This is the date for cutting off collection of the data. If the data are to be submitted multiple times, a numeral will be entered in this block to indicate the number of calendar days prior to the end of the reporting period, which was established in Block 10, that data collection will be cut off. For example “15” would place the “as of” date for the data at 15 days before the end of the month, quarter, or year, depending on the frequency established in Block 10; a “0” would place the “as of” date at the end of each month, quarter, etc. If the data are submitted only once, the “as of” date will be as follows: year/month/day (e.g., “10/03/01”). |
| 2.2.6 Blocks 12 and 13. Date of First Submission – This is the due date for initial data submission. This is normally date the data are delivered electronically and is entered as year/month/day (e.g., “10/03/01”) or keyed to a specific event or milestone, using a code from Table 2, “Data Submission Codes”. |
| NOTE: No classified dates are cited in the CDRL. |
| TABLE 2. BLOCK 12 and 13 DATA SUBMISSION CODES |
| CODE |
| FREQUENCY |
| ASGEN |
| As generated |
| ASREQ* |
| As required |
| DFDEL* |
| Deferred delivery |
| XMAC** |
| Months after contract award |
| XDAC** |
| Days after contract award |
| XDACM** |
| Days after contract modification |
| XDADO** |
| Days after delivery order |
| XDARP** |
| Days after reporting period |
| XDARC** |
| Days after receipt of comments |
| XDATC** |
| Days after test completion |
| XDPTT** |
| Days prior to test |
| NLT |
| No later than |
| EOC |
| End of contract |
| EOM |
| End of month |
| EOQ |
| End of quarter |
| *SEE BLOCK 16 |
| Specific instructions will be found in Block 16 for this item. |
| ** The “X” is assigned a value indicating the number of time units; e.g., 2MAC is 2 Months after contract award. |
| 2.2.7 Block 14. Distribution Addressee Code List - This section specifies the physical mailing addresses (if required) and electronic notification addresses for the Block 14.a addressee codes listed on the CDRLs. |
| 2.2.9 Distribution Control – Modifications to the distribution of any contract report in any stage of development or completion is prohibited without the approval of the Contracting Officer. |
| For Official Use Only. – All material will be marked “For Official Use Only” |
| 2.3 Digital Delivery of Data and Electronic Data Warehouse |
| The contractor shall establish and maintain throughout the duration of this contract a secure password-protected, web-based data warehouse for the electronic delivery of all unclassified data delivered under this contract. A list of authorized personnel for access to the data warehouse will be provided by the Government. Upon electronic delivery of data to the data warehouse, the contractor shall notify by electronic notification in lieu of transmittal letter, all CDRL Block 6 and 14 addresses of such delivery. |
| SECTION 3.0 |
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .