A23 Pricing Sheet 11oct2021.xlsx
XLSX spreadsheet 56 KB Posted
- Attached to
- Janitorial Services
- Solicitation number
- HQ003421R0031
- Issued by
-
DOD Washington Headquarters Service
About this file
This document contains a price proposal summary sheet for a janitorial services solicitation from the Department of Defense Washington Headquarters Service. The solicitation seeks pricing for cleaning and maintenance services at various Pentagon facilities over a one year base period and four one-year option periods. Services include daily cleaning of restrooms, corridors, offices and other occupied spaces totaling over 2.1 million square feet; quarterly shampooing of walk-off mats and carpet as needed; snow and ice removal at entrances 12 times per year; annual interior and exterior window cleaning; daily policing of hard surface areas; and event support such as portable latrines and floor stripping/waxing. Pricing is provided by line item and space type with unit rates for daily, monthly and annual costs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CBA addendum A Redacted.pdf | ||
| A23 Pricing Sheet 4 Nov 2021.xlsx | XLSX spreadsheet | |
| 21R0031 Amendment 6.pdf | ||
| HQ003421R0031 Conformed 11042021.pdf | ||
| A23 Pricing Sheet 0900-26oct2021.xlsx | XLSX spreadsheet | |
| CONFORMED21R0031 10262021.pdf | ||
| CBA.pdf | ||
| AMENDMENT 0005 21R0031.pdf | ||
| Conformed 21R0031 10_13_2021.pdf | ||
| Amendment 0004.pdf | ||
| Conformed Copy 21R0031.pdf | ||
| REVISED Attachment - J3 Past Performance Questionnaire.docx | DOCX document | |
| Amendment 0003.pdf | ||
| REVISED - J4 Past Performance Data Sheet.docx | DOCX document | |
| amendment 2.pdf | ||
| Amendment 0001.pdf | ||
| A23 Attachment - J4 Past Performance Data Sheet.docx | DOCX document | |
| A23 Services WD-2015-4281 Revision 18.pdf | ||
| A23 Pricing Sheet.xlsx | XLSX spreadsheet | |
| A23 Attachment J1.pdf | ||
| A23 Attachment - J3 Past Performance Questionnaire.docx | DOCX document | |
| A23 Attachment J2.pdf | ||
| HQ003421R0031.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| HQ003421R0031 Janitorial Services | ||||||
| Price Proposal Summary | ||||||
| CLIN | Description | Base | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 |
| CLIN 0001 | Pentagon | |||||
| CLIN 0002 | Walk-Off Mats | |||||
| CLIN 0003 | Carpeted Shampoo | |||||
| CLIN 0004 | Snow & Ice Removal - Treatments | |||||
| CLIN 0005 | Interior / Exterior Window Cleaning | |||||
| CLIN 0006 | Reservation Hard Surfaces Policing | |||||
| CLIN 0007 | Metro Entrance Facility | |||||
| CLIN 0008 | Special Events | |||||
| CLIN 0009 | Emergency Response Services | |||||
| CLIN 0010 | 3M Terrazzo Hard Floor Protector System | |||||
| Total | ||||||
| Grand Total |
Base Breakdown
| Base Period | |||||||
| PENTAGON | Space Type Count | Estimated Daily Sq. Ft. | Deductible Sq. Ft. | Unit | Daily Prices | Monthly Prices | Annual Prices |
| Specific Space Type | |||||||
| SST | STC | EDSF | DSF | UNIT | DP | MP | AP |
| CLIN 0001 - Pentagon (PNT) | |||||||
| Restrooms | 38 | 18,853 | 496 | sq ft | |||
| Janitor Closets | 30 | 1,844 | 61 | sq ft | |||
| Corridors | 101 | 217,287 | 2,151 | sq ft | |||
| Entrances/Lobbies | 10 | 5,637 | 564 | sq ft | |||
| Ramps | 4 | 11,740 | 2,935 | sq ft | |||
| Escalators | 11 | 3,361 | 306 | sq ft | |||
| Customer Service Centers | 5 | 13,502 | 2,700 | sq ft | |||
| Senior Executive Offices | 19 | 24,621 | 1,296 | sq ft | |||
| Senior Executive Offices – TS* | 16 | 15,929 | 996 | sq ft | |||
| Executive Offices | 26 | 36,292 | 1,396 | sq ft | |||
| Executive Offices – TS* | 6 | 10,588 | 1,765 | sq ft | |||
| General Offices | 192 | 419,699 | 2,186 | sq ft | |||
| General Offices – TS* | 56 | 105,356 | 1,881 | sq ft | |||
| Conference/Class/Training Rooms | 5 | 4,228 | 846 | sq ft | |||
| Conference/Class/Training Rooms - TS* | 18 | 8,295 | 461 | sq ft | |||
| Structurally Changed Spaces - TS* | 3 | 499 | 166 | sq ft | |||
| Communication/ADP – TS* | 3 | 538 | 1,012 | sq ft | |||
| CLIN 0001 - Remote Delivery Facility (RDF) | |||||||
| Corridors | 5 | 29,201 | 5,840 | sq ft | |||
| Rest Rooms | 4 | 2,425 | 606 | sq ft | |||
| General Office | 25 | 47,067 | 1,883 | sq ft | |||
| Locker Rooms | 2 | 1,372 | 686 | sq ft | |||
| Loading Dock (Trash) | 1 | 2,810 | 2,810 | sq ft | |||
| Loading Dock (Dock Master) | 1 | 17,851 | 17,851 | sq ft | |||
| Conference Rooms | 2 | 631 | 316 | sq ft | |||
| SAIC Warehouse | 2 | 11,992 | 5,996 | sq ft | |||
| CLIN 0001 - Pentagon Incinerator Plant (PIP) | |||||||
| General Office Space | 2 | 600 | 300 | sq ft | |||
| Restroom/Locker Rooms | 2 | 900 | 450 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 500 | 250 | sq ft | |||
| Stairwells | 1 | 345 | 345 | sq ft | |||
| CLIN 0001 - Heating & Refrigeration Plant (HRP) | |||||||
| General Office Space | 10 | 7,578 | 758 | sq ft | |||
| Restroom/Locker Rooms | 6 | 900 | 150 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 6,022 | 3,011 | sq ft | |||
| Stairwells | 7 | 1,650 | 236 | sq ft | |||
| Elevator | 2 | 253 | 127 | sq ft | |||
| CLIN 0001 - Pentagon Emergency Response Center (PERC) | |||||||
| General Office Space | 8 | 11,288 | 1,411 | sq ft | |||
| Restrooms/Locker Rooms | 10 | 2,062 | 206 | sq ft | |||
| Corridor, Lobbies, Entrances | 8 | 3,836 | 480 | sq ft | |||
| Conference/Training Rooms | 2 | 1,590 | 795 | sq ft | |||
| Laboratories | 2 | 2,528 | 1,264 | sq ft | |||
| Stairs | 4 | 886 | 222 | sq ft | |||
| Elevator | 2 | 160 | 80 | sq ft | |||
| Structurally Changed Spaces (ERT Motors) | 4 | 7,347 | 1,837 | sq ft | |||
| CLIN 0001 - PFPA K9 Building & Guard Posts | |||||||
| Corridors/Circulation/Lobby | 2 | 1,925 | 963 | sq ft | |||
| Rest Rooms | 2 | 128 | 64 | sq ft | |||
| General Office | 5 | 1,090 | 218 | sq ft | |||
| Locker Room | 1 | 270 | 270 | sq ft | |||
| Kennel Room | 3 | 445 | 148 | sq ft | |||
| PFPA Guard Posts | 28 | 3,850 | 138 | sq ft | |||
| CLIN 0001 - Pentagon Ancillary Support Facility (PASF) | |||||||
| General Office | 25 | 12,120 | 485 | sq ft | |||
| Rest Rooms | 3 | 475 | 158 | sq ft | |||
| CLIN 0001 - Trailers | |||||||
| Heliport Control Tower | 1 | 110 | 110 | sq ft | |||
| Firehouse Trailer 1 | 1 | 320 | 320 | sq ft | |||
| Firehouse Trailer 2 | 1 | 670 | 670 | sq ft | |||
| General Dynamics Modular Office Space | 35 | ERROR:#REF! | ERROR:#REF! | sq ft | |||
| General Dynamics Modular Office Entrances | 4 | 75 | 19 | sq ft | |||
| PFPA CBRN Trailer | 1 | 1,190 | 1,190 | sq ft | |||
| Restrooms | 7 | 1,465 | 209 | sq ft | |||
| Sub-Total = |
| **CLIN 0002 - Walk-Off Mats 4x per Period** | |||||
| Walk-Off Mats (Shampooed Quarterly) | 4 | 7,850 | 95 | sq ft | |
| Sub-Total = |
| **CLIN 0003 - Carpeted Shampoo** | |||||
| Carpet Shampoo (Work will be ordered as needed) | N/A | 600,000 | N/A | sq ft | |
| Sub-Total = |
| **CLIN 0004 - Snow & Ice Removal 12 Treatments** | |||||
| Snow & Ice Treatment - Exterior Entrances | 15 | 15 | 1 | each | |
| Sub-Total = |
| **CLIN 0005 - Interior / Exterior Window Cleaning 1x / Spring** | |||||
| PNT Windows - Interior | 365 | 365 | 1 | each | |
| PNT Windows - Exterior | 7,720 | 7,720 | 1 | each | |
| Metro Awnings | 10 | 10 | 1 | each | |
| General Dynamics Modular Space ** | 20 | 20 | 1 | each | |
| Metro Bus Stops ** | 16 | 16 | 1 | each | |
| CDC ** | 112 | 112 | 1 | each | |
| Heating & Refrigeration Plant ** | 17 | 17 | 1 | each | |
| Pentagon Emergency Response Center ** | 190 | 190 | 1 | each | |
| Addition Square Feet of Glass | 5,000 | 5,000 | 1 | each | |
| ** Note: Includes Interior & Exterior Glass ** | Sub-Total = |
| **CLIN 0005A - Exterior Center Court Yard Window Cleaning 1x / Fall** | |||||
| Center Court Yard Windows - Exterior "Only" | 425 | 425 | 1 | each | |
| ** Note: Includes Exterior Glass Only ** | Sub-Total = |
| **CLIN 0006 - Daily Reservation Hard Surfaces Policing** | |||||
| Reservation Hard Surfaces & CCY | 251 | 4,456,890 | 17,757 | sq ft | |
| (Labor & Equipment Only) | Sub-Total = |
| **CLIN 0007 - Metro Entrance Facility (MEF)** | |||||
| Corridors/Circulation | 7 | 16,159 | 2,655 | sq ft | |
| Escalators | 4 | 1,100 | 275 | sq ft | |
| General Office | 10 | 3,564 | 809 | sq ft | |
| Rest Room | 3 | 790 | 314 | sq ft | |
| Locker Room | 1 | 1,150 | 1,150 | sq ft | |
| Elevators | 2 | 60 | 30 | sq ft | |
| Sub-Total = |
| **CLIN 0008 - Special Events** | ||||
| AWG Shop Floor Strip & Wax (WHS) Events | 4 | 10,900 | sq ft | |
| Portable Latrines | 50 | ea | ||
| Rolling Thunder | 1 | ea | ||
| July 4th | 1 | ea | ||
| 9/11 Commemoration | 1 | ea | ||
| Army 10 Miler | 1 | ea | ||
| Marine Corps Marathon (MCM) | 1 | ea | ||
| Presidential Inauguration | 1 | ea | ||
| Unscheduled Special Event | 1 | ea | ||
| Sub-Total = |
| **CLIN 1009 - Emergency Response Services** | |||||
| Emergency Response Services (Events) | 4 | ea | |||
| Sub-Total = | |||||
| **CLIN 0010 - 3M Terrazzo Hard Floor Protector System** | |||||
| 3M Terrazzo Hard Floor Protector System | 101 | 221,123 | 2,189 | sq ft | |
| (Labor & Supplies Only) | Sub-Total = | ||||
| G-TOTAL = |
Option 1 B
| Option Period 1 | |||||||
| PENTAGON | Space Type Count | Estimated Daily Sq. Ft. | Deductible Sq. Ft. | Unit | Daily Prices | Monthly Prices | Annual Prices |
| Specific Space Type | |||||||
| SST | STC | EDSF | DSF | UNIT | DP | MP | AP |
| CLIN 0001 - Pentagon (PNT) | |||||||
| Restrooms | 38 | 18,853 | 496 | sq ft | |||
| Janitor Closets | 30 | 1,844 | 61 | sq ft | |||
| Corridors | 101 | 217,287 | 2,151 | sq ft | |||
| Entrances/Lobbies | 10 | 5,637 | 564 | sq ft | |||
| Ramps | 4 | 11,023 | 2,756 | sq ft | |||
| Escalators | 11 | 3,361 | 306 | sq ft | |||
| Customer Service Centers | 5 | 13,502 | 2,700 | sq ft | |||
| Senior Executive Offices | 19 | 24,621 | 1,296 | sq ft | |||
| Senior Executive Offices – TS* | 16 | 15,929 | 996 | sq ft | |||
| Executive Offices | 26 | 36,292 | 1,396 | sq ft | |||
| Executive Offices – TS* | 6 | 10,588 | 1,765 | sq ft | |||
| General Offices | 192 | 419,699 | 2,186 | sq ft | |||
| General Offices – TS* | 56 | 105,356 | 1,881 | sq ft | |||
| Conference/Class/Training Rooms | 5 | 4,228 | 846 | sq ft | |||
| Conference/Class/Training Rooms - TS* | 18 | 8,295 | 461 | sq ft | |||
| Structurally Changed Spaces - TS* | 3 | 499 | 166 | sq ft | |||
| Communication/ADP – TS* | 3 | 538 | 1,012 | sq ft | |||
| CLIN 0001 - Remote Delivery Facility (RDF) | |||||||
| Corridors | 5 | 29,201 | 5,840 | sq ft | |||
| Rest Rooms | 4 | 2,425 | 606 | sq ft | |||
| General Office | 25 | 47,067 | 1,883 | sq ft | |||
| Locker Rooms | 2 | 1,372 | 686 | sq ft | |||
| Loading Dock (Trash) | 1 | 2,810 | 2,810 | sq ft | |||
| Loading Dock (Dock Master) | 1 | 17,851 | 17,851 | sq ft | |||
| Conference Rooms | 2 | 631 | 316 | sq ft | |||
| SAIC Warehouse | 2 | 11,992 | 5,996 | sq ft | |||
| CLIN 0001 - Pentagon Incinerator Plant (PIP) | |||||||
| General Office Space | 2 | 600 | 300 | sq ft | |||
| Restroom/Locker Rooms | 2 | 900 | 450 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 500 | 250 | sq ft | |||
| Stairwells | 1 | 345 | 345 | sq ft | |||
| CLIN 0001 - Heating & Refrigeration Plant (HRP) | |||||||
| General Office Space | 10 | 7,578 | 758 | sq ft | |||
| Restroom/Locker Rooms | 6 | 900 | 150 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 6,022 | 3,011 | sq ft | |||
| Stairwells | 7 | 1,650 | 236 | sq ft | |||
| Elevator | 2 | 253 | 127 | sq ft | |||
| CLIN 0001 - Pentagon Emergency Response Center (PERC) | |||||||
| General Office Space | 8 | 11,288 | 1,411 | sq ft | |||
| Restrooms/Locker Rooms | 10 | 2,062 | 206 | sq ft | |||
| Corridor, Lobbies, Entrances | 8 | 3,836 | 480 | sq ft | |||
| Conference/Training Rooms | 2 | 1,590 | 795 | sq ft | |||
| Laboratories | 2 | 2,528 | 1,264 | sq ft | |||
| Stairs | 4 | 886 | 222 | sq ft | |||
| Elevator | 2 | 160 | 80 | sq ft | |||
| Structurally Changed Spaces (ERT Motors) | 4 | 7,347 | 1,837 | sq ft | |||
| CLIN 0001 - PFPA K9 Building & Guard Posts | |||||||
| Corridors/Circulation/Lobby | 2 | 1,925 | 963 | sq ft | |||
| Rest Rooms | 2 | 128 | 64 | sq ft | |||
| General Office | 5 | 1,090 | 218 | sq ft | |||
| Locker Room | 1 | 270 | 270 | sq ft | |||
| Kennel Room | 3 | 445 | 148 | sq ft | |||
| PFPA Guard Posts | 28 | 3,850 | 138 | sq ft | |||
| CLIN 0001 - Pentagon Ancillary Support Facility (PASF) | |||||||
| General Office | 25 | 12,120 | 485 | sq ft | |||
| Rest Rooms | 3 | 475 | 158 | sq ft | |||
| CLIN 0001 - Trailers | |||||||
| Heliport Control Tower | 1 | 110 | 110 | sq ft | |||
| Firehouse Trailer 1 | 1 | 320 | 320 | sq ft | |||
| Firehouse Trailer 2 | 1 | 670 | 670 | sq ft | |||
| General Dynamics Modular Office Space | 35 | ERROR:#REF! | ERROR:#REF! | sq ft | |||
| General Dynamics Modular Office Entrances | 4 | 75 | 19 | sq ft | |||
| PFPA CBRN Trailer | 1 | 1,190 | 1,190 | sq ft | |||
| Restrooms | 7 | 1,465 | 209 | sq ft | |||
| Sub-Total = |
| **CLIN 0002 - Walk-Off Mats 4x per Period** | |||||
| Walk-Off Mats (Shampooed Quarterly) | 4 | 7,850 | 95 | sq ft | |
| Sub-Total = |
| **CLIN 0003 - Carpeted Shampoo** | |||||
| Carpet Shampoo (Work will be ordered as needed) | N/A | 600,000 | N/A | sq ft | |
| Sub-Total = |
| **CLIN 0004 - Snow & Ice Removal 12 Treatments** | |||||
| Snow & Ice Treatment - Exterior Entrances | 15 | 15 | 1 | each | |
| Sub-Total = |
| **CLIN 0005 - Interior / Exterior Window Cleaning 1x / Spring** | |||||
| PNT Windows - Interior | 365 | 365 | 1 | each | |
| PNT Windows - Exterior | 7,720 | 7,720 | 1 | each | |
| Metro Awnings | 10 | 10 | 1 | each | |
| General Dynamics Modular Space ** | 20 | 20 | 1 | each | |
| Metro Bus Stops ** | 16 | 16 | 1 | each | |
| CDC ** | 112 | 112 | 1 | each | |
| Heating & Refrigeration Plant ** | 17 | 17 | 1 | each | |
| Pentagon Emergency Response Center ** | 190 | 190 | 1 | each | |
| Addition Square Feet of Glass | 5,000 | 5,000 | 1 | each | |
| ** Note: Includes Interior & Exterior Glass ** | Sub-Total = |
| **CLIN 0005A - Exterior Center Court Yard Window Cleaning 1x / Fall** | |||||
| Center Court Yard Windows - Exterior "Only" | 425 | 425 | 1 | each | |
| ** Note: Includes Exterior Glass Only ** | Sub-Total = |
| **CLIN 0006 - Daily Reservation Hard Surfaces Policing** | |||||
| Reservation Hard Surfaces & CCY | 251 | 4,456,890 | 17,757 | sq ft | |
| (Labor & Equipment Only) | Sub-Total = |
| **CLIN 0007 - Metro Entrance Facility (MEF)** | |||||
| Corridors/Circulation | 7 | 16,159 | 2,655 | sq ft | |
| Escalators | 4 | 1,100 | 275 | sq ft | |
| General Office | 10 | 3,564 | 809 | sq ft | |
| Rest Room | 3 | 790 | 314 | sq ft | |
| Locker Room | 1 | 1,150 | 1,150 | sq ft | |
| Elevators | 2 | 60 | 30 | sq ft | |
| Sub-Total = |
| **CLIN 0008 - Special Events** | ||||
| AWG Shop Floor Strip & Wax (WHS) Events | 4 | 10,900 | sq ft | |
| Portable Latrines | 50 | ea | ||
| Rolling Thunder | 1 | ea | ||
| July 4th | 1 | ea | ||
| 9/11 Commemoration | 1 | ea | ||
| Army 10 Miler | 1 | ea | ||
| Marine Corps Marathon (MCM) | 1 | ea | ||
| Presidential Inauguration | 1 | ea | ||
| Unscheduled Special Event | 1 | ea | ||
| Sub-Total = |
| **CLIN 1009 - Emergency Response Services** | |||||
| Emergency Response Services (Events) | 4 | ea | |||
| Sub-Total = | |||||
| **CLIN 1010 - 3M Terrazzo Hard Floor Protector System** | |||||
| 3M Terrazzo Hard Floor Protector System | 101 | 221,123 | 2,189 | sq ft | |
| (Labor & Supplies Only) | Sub-Total = | ||||
| G-TOTAL = |
Option 2 B
| Option Period 2 | |||||||
| PENTAGON | Space Type Count | Estimated Daily Sq. Ft. | Deductible Sq. Ft. | Unit | Daily Prices | Monthly Prices | Annual Prices |
| Specific Space Type | |||||||
| SST | STC | EDSF | DSF | UNIT | DP | MP | AP |
| CLIN 0001 - Pentagon (PNT) | |||||||
| Restrooms | 38 | 18,853 | 496 | sq ft | |||
| Janitor Closets | 30 | 1,844 | 61 | sq ft | |||
| Corridors | 101 | 217,287 | 2,151 | sq ft | |||
| Entrances/Lobbies | 10 | 5,637 | 564 | sq ft | |||
| Ramps | 4 | 11,023 | 2,756 | sq ft | |||
| Escalators | 11 | 3,361 | 306 | sq ft | |||
| Customer Service Centers | 5 | 13,502 | 2,700 | sq ft | |||
| Senior Executive Offices | 19 | 24,621 | 1,296 | sq ft | |||
| Senior Executive Offices – TS* | 16 | 15,929 | 996 | sq ft | |||
| Executive Offices | 26 | 36,292 | 1,396 | sq ft | |||
| Executive Offices – TS* | 6 | 10,588 | 1,765 | sq ft | |||
| General Offices | 192 | 419,699 | 2,186 | sq ft | |||
| General Offices – TS* | 56 | 105,356 | 1,881 | sq ft | |||
| Conference/Class/Training Rooms | 5 | 4,228 | 846 | sq ft | |||
| Conference/Class/Training Rooms - TS* | 18 | 8,295 | 461 | sq ft | |||
| Structurally Changed Spaces - TS* | 3 | 499 | 166 | sq ft | |||
| Communication/ADP – TS* | 3 | 538 | 1,012 | sq ft | |||
| CLIN 0001 - Remote Delivery Facility (RDF) | |||||||
| Corridors | 5 | 29,201 | 5,840 | sq ft | |||
| Rest Rooms | 4 | 2,425 | 606 | sq ft | |||
| General Office | 25 | 47,067 | 1,883 | sq ft | |||
| Locker Rooms | 2 | 1,372 | 686 | sq ft | |||
| Loading Dock (Trash) | 1 | 2,810 | 2,810 | sq ft | |||
| Loading Dock (Dock Master) | 1 | 17,851 | 17,851 | sq ft | |||
| Conference Rooms | 2 | 631 | 316 | sq ft | |||
| SAIC Warehouse | 2 | 11,992 | 5,996 | sq ft | |||
| CLIN 0001 - Pentagon Incinerator Plant (PIP) | |||||||
| General Office Space | 2 | 600 | 300 | sq ft | |||
| Restroom/Locker Rooms | 2 | 900 | 450 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 500 | 250 | sq ft | |||
| Stairwells | 1 | 345 | 345 | sq ft | |||
| CLIN 0001 - Heating & Refrigeration Plant (HRP) | |||||||
| General Office Space | 10 | 7,578 | 758 | sq ft | |||
| Restroom/Locker Rooms | 6 | 900 | 150 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 6,022 | 3,011 | sq ft | |||
| Stairwells | 7 | 1,650 | 236 | sq ft | |||
| Elevator | 2 | 253 | 127 | sq ft | |||
| CLIN 0001 - Pentagon Emergency Response Center (PERC) | |||||||
| General Office Space | 8 | 11,288 | 1,411 | sq ft | |||
| Restrooms/Locker Rooms | 10 | 2,062 | 206 | sq ft | |||
| Corridor, Lobbies, Entrances | 8 | 3,836 | 480 | sq ft | |||
| Conference/Training Rooms | 2 | 1,590 | 795 | sq ft | |||
| Laboratories | 2 | 2,528 | 1,264 | sq ft | |||
| Stairs | 4 | 886 | 222 | sq ft | |||
| Elevator | 2 | 160 | 80 | sq ft | |||
| Structurally Changed Spaces (ERT Motors) | 4 | 7,347 | 1,837 | sq ft | |||
| CLIN 0001 - PFPA K9 Building & Guard Posts | |||||||
| Corridors/Circulation/Lobby | 2 | 1,925 | 963 | sq ft | |||
| Rest Rooms | 2 | 128 | 64 | sq ft | |||
| General Office | 5 | 1,090 | 218 | sq ft | |||
| Locker Room | 1 | 270 | 270 | sq ft | |||
| Kennel Room | 3 | 445 | 148 | sq ft | |||
| PFPA Guard Posts | 28 | 3,850 | 138 | sq ft | |||
| CLIN 0001 - Pentagon Ancillary Support Facility (PASF) | |||||||
| General Office | 25 | 12,120 | 485 | sq ft | |||
| Rest Rooms | 3 | 475 | 158 | sq ft | |||
| CLIN 0001 - Trailers | |||||||
| Heliport Control Tower | 1 | 110 | 110 | sq ft | |||
| Firehouse Trailer 1 | 1 | 320 | 320 | sq ft | |||
| Firehouse Trailer 2 | 1 | 670 | 670 | sq ft | |||
| General Dynamics Modular Office Space | 35 | ERROR:#REF! | ERROR:#REF! | sq ft | |||
| General Dynamics Modular Office Entrances | 4 | 75 | 19 | sq ft | |||
| PFPA CBRN Trailer | 1 | 1,190 | 1,190 | sq ft | |||
| Restrooms | 7 | 1,465 | 209 | sq ft | |||
| Sub-Total = |
| **CLIN 0002 - Walk-Off Mats 4x per Period** | |||||
| Walk-Off Mats (Shampooed Quarterly) | 4 | 7,850 | 95 | sq ft | |
| Sub-Total = |
| **CLIN 0003 - Carpeted Shampoo** | |||||
| Carpet Shampoo (Work will be ordered as needed) | N/A | 600,000 | N/A | sq ft | |
| Sub-Total = |
| **CLIN 0004 - Snow & Ice Removal 12 Treatments** | |||||
| Snow & Ice Treatment - Exterior Entrances | 15 | 15 | 1 | each | |
| Sub-Total = |
| **CLIN 0005 - Interior / Exterior Window Cleaning 1x / Spring** | |||||
| PNT Windows - Interior | 365 | 365 | 1 | each | |
| PNT Windows - Exterior | 7,720 | 7,720 | 1 | each | |
| Metro Awnings | 10 | 10 | 1 | each | |
| General Dynamics Modular Space ** | 20 | 20 | 1 | each | |
| Metro Bus Stops ** | 16 | 16 | 1 | each | |
| CDC ** | 112 | 112 | 1 | each | |
| Heating & Refrigeration Plant ** | 17 | 17 | 1 | each | |
| Pentagon Emergency Response Center ** | 190 | 190 | 1 | each | |
| Addition Square Feet of Glass | 5,000 | 5,000 | 1 | each | |
| ** Note: Includes Interior & Exterior Glass ** | Sub-Total = |
| **CLIN 0005A - Exterior Center Court Yard Window Cleaning 1x / Fall** | |||||
| Center Court Yard Windows - Exterior "Only" | 425 | 425 | 1 | each | |
| ** Note: Includes Exterior Glass Only ** | Sub-Total = |
| **CLIN 0006 - Daily Reservation Hard Surfaces Policing** | |||||
| Reservation Hard Surfaces & CCY | 251 | 4,456,890 | 17,757 | sq ft | |
| (Labor & Equipment Only) | Sub-Total = |
| **CLIN 0007 - Metro Entrance Facility (MEF)** | |||||
| Corridors/Circulation | 7 | 16,159 | 2,655 | sq ft | |
| Escalators | 4 | 1,100 | 275 | sq ft | |
| General Office | 10 | 3,564 | 809 | sq ft | |
| Rest Room | 3 | 790 | 314 | sq ft | |
| Locker Room | 1 | 1,150 | 1,150 | sq ft | |
| Elevators | 2 | 60 | 30 | sq ft | |
| Sub-Total = |
| **CLIN 0008 - Special Events** | ||||
| AWG Shop Floor Strip & Wax (WHS) Events | 4 | 10,900 | sq ft | |
| Portable Latrines | 50 | ea | ||
| Rolling Thunder | 1 | ea | ||
| July 4th | 1 | ea | ||
| 9/11 Commemoration | 1 | ea | ||
| Army 10 Miler | 1 | ea | ||
| Marine Corps Marathon (MCM) | 1 | ea | ||
| Presidential Inauguration | 1 | ea | ||
| Unscheduled Special Event | 1 | ea | ||
| Sub-Total = |
| **CLIN 1009 - Emergency Response Services** | |||||
| Emergency Response Services (Events) | 4 | ea | |||
| Sub-Total = | |||||
| **CLIN 0010 - 3M Terrazzo Hard Floor Protector System** | |||||
| 3M Terrazzo Hard Floor Protector System | 101 | 221,123 | 2,189 | sq ft | |
| (Labor & Supplies Only) | Sub-Total = | ||||
| G-TOTAL = |
Option 3 B
| Option Period Period 3 | |||||||
| PENTAGON | Space Type Count | Estimated Daily Sq. Ft. | Deductible Sq. Ft. | Unit | Daily Prices | Monthly Prices | Annual Prices |
| Specific Space Type | |||||||
| SST | STC | EDSF | DSF | UNIT | DP | MP | AP |
| CLIN 0001 - Pentagon (PNT) | |||||||
| Restrooms | 38 | 18,853 | 496 | sq ft | |||
| Janitor Closets | 30 | 1,844 | 61 | sq ft | |||
| Corridors | 101 | 217,287 | 2,151 | sq ft | |||
| Entrances/Lobbies | 10 | 5,637 | 564 | sq ft | |||
| Ramps | 4 | 11,023 | 2,756 | sq ft | |||
| Escalators | 11 | 3,361 | 306 | sq ft | |||
| Customer Service Centers | 5 | 13,502 | 2,700 | sq ft | |||
| Senior Executive Offices | 19 | 24,621 | 1,296 | sq ft | |||
| Senior Executive Offices – TS* | 16 | 15,929 | 996 | sq ft | |||
| Executive Offices | 26 | 36,292 | 1,396 | sq ft | |||
| Executive Offices – TS* | 6 | 10,588 | 1,765 | sq ft | |||
| General Offices | 192 | 419,699 | 2,186 | sq ft | |||
| General Offices – TS* | 56 | 105,356 | 1,881 | sq ft | |||
| Conference/Class/Training Rooms | 5 | 4,228 | 846 | sq ft | |||
| Conference/Class/Training Rooms - TS* | 18 | 8,295 | 461 | sq ft | |||
| Structurally Changed Spaces - TS* | 3 | 499 | 166 | sq ft | |||
| Communication/ADP – TS* | 3 | 538 | 1,012 | sq ft | |||
| CLIN 0001 - Remote Delivery Facility (RDF) | |||||||
| Corridors | 5 | 29,201 | 5,840 | sq ft | |||
| Rest Rooms | 4 | 2,425 | 606 | sq ft | |||
| General Office | 25 | 47,067 | 1,883 | sq ft | |||
| Locker Rooms | 2 | 1,372 | 686 | sq ft | |||
| Loading Dock (Trash) | 1 | 2,810 | 2,810 | sq ft | |||
| Loading Dock (Dock Master) | 1 | 17,851 | 17,851 | sq ft | |||
| Conference Rooms | 2 | 631 | 316 | sq ft | |||
| SAIC Warehouse | 2 | 11,992 | 5,996 | sq ft | |||
| CLIN 0001 - Pentagon Incinerator Plant (PIP) | |||||||
| General Office Space | 2 | 600 | 300 | sq ft | |||
| Restroom/Locker Rooms | 2 | 900 | 450 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 500 | 250 | sq ft | |||
| Stairwells | 1 | 345 | 345 | sq ft | |||
| CLIN 0001 - Heating & Refrigeration Plant (HRP) | |||||||
| General Office Space | 10 | 7,578 | 758 | sq ft | |||
| Restroom/Locker Rooms | 6 | 900 | 150 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 6,022 | 3,011 | sq ft | |||
| Stairwells | 7 | 1,650 | 236 | sq ft | |||
| Elevator | 2 | 253 | 127 | sq ft | |||
| CLIN 0001 - Pentagon Emergency Response Center (PERC) | |||||||
| General Office Space | 8 | 11,288 | 1,411 | sq ft | |||
| Restrooms/Locker Rooms | 10 | 2,062 | 206 | sq ft | |||
| Corridor, Lobbies, Entrances | 8 | 3,836 | 480 | sq ft | |||
| Conference/Training Rooms | 2 | 1,590 | 795 | sq ft | |||
| Laboratories | 2 | 2,528 | 1,264 | sq ft | |||
| Stairs | 4 | 886 | 222 | sq ft | |||
| Elevator | 2 | 160 | 80 | sq ft | |||
| Structurally Changed Spaces (ERT Motors) | 4 | 7,347 | 1,837 | sq ft | |||
| CLIN 0001 - PFPA K9 Building & Guard Posts | |||||||
| Corridors/Circulation/Lobby | 2 | 1,925 | 963 | sq ft | |||
| Rest Rooms | 2 | 128 | 64 | sq ft | |||
| General Office | 5 | 1,090 | 218 | sq ft | |||
| Locker Room | 1 | 270 | 270 | sq ft | |||
| Kennel Room | 3 | 445 | 148 | sq ft | |||
| PFPA Guard Posts | 28 | 3,850 | 138 | sq ft | |||
| CLIN 0001 - Pentagon Ancillary Support Facility (PASF) | |||||||
| General Office | 25 | 12,120 | 485 | sq ft | |||
| Rest Rooms | 3 | 475 | 158 | sq ft | |||
| CLIN 0001 - Trailers | |||||||
| Heliport Control Tower | 1 | 110 | 110 | sq ft | |||
| Firehouse Trailer 1 | 1 | 320 | 320 | sq ft | |||
| Firehouse Trailer 2 | 1 | 670 | 670 | sq ft | |||
| General Dynamics Modular Office Space | 35 | ERROR:#REF! | ERROR:#REF! | sq ft | |||
| General Dynamics Modular Office Entrances | 4 | 75 | 19 | sq ft | |||
| PFPA CBRN Trailer | 1 | 1,190 | 1,190 | sq ft | |||
| Restrooms | 7 | 1,465 | 209 | sq ft | |||
| Sub-Total = |
| **CLIN 0002 - Walk-Off Mats 4x per Period** | |||||
| Walk-Off Mats (Shampooed Quarterly) | 4 | 7,850 | 95 | sq ft | |
| Sub-Total = |
| **CLIN 0003 - Carpeted Shampoo** | |||||
| Carpet Shampoo (Work will be ordered as needed) | N/A | 600,000 | N/A | sq ft | |
| Sub-Total = |
| **CLIN 0004 - Snow & Ice Removal 12 Treatments** | |||||
| Snow & Ice Treatment - Exterior Entrances | 15 | 15 | 1 | each | |
| Sub-Total = |
| **CLIN 0005 - Interior / Exterior Window Cleaning 1x / Spring** | |||||
| PNT Windows - Interior | 365 | 365 | 1 | each | |
| PNT Windows - Exterior | 7,720 | 7,720 | 1 | each | |
| Metro Awnings | 10 | 10 | 1 | each | |
| General Dynamics Modular Space ** | 20 | 20 | 1 | each | |
| Metro Bus Stops ** | 16 | 16 | 1 | each | |
| CDC ** | 112 | 112 | 1 | each | |
| Heating & Refrigeration Plant ** | 17 | 17 | 1 | each | |
| Pentagon Emergency Response Center ** | 190 | 190 | 1 | each | |
| Addition Square Feet of Glass | 5,000 | 5,000 | 1 | each | |
| ** Note: Includes Interior & Exterior Glass ** | Sub-Total = |
| **CLIN 0005A - Exterior Center Court Yard Window Cleaning 1x / Fall** | |||||
| Center Court Yard Windows - Exterior "Only" | 425 | 425 | 1 | each | |
| ** Note: Includes Exterior Glass Only ** | Sub-Total = |
| **CLIN 0006 - Daily Reservation Hard Surfaces Policing** | |||||
| Reservation Hard Surfaces & CCY | 251 | 4,456,890 | 17,757 | sq ft | |
| (Labor & Equipment Only) | Sub-Total = |
| **CLIN 0007 - Metro Entrance Facility (MEF)** | |||||
| Corridors/Circulation | 7 | 16,159 | 2,655 | sq ft | |
| Escalators | 4 | 1,100 | 275 | sq ft | |
| General Office | 10 | 3,564 | 809 | sq ft | |
| Rest Room | 3 | 790 | 314 | sq ft | |
| Locker Room | 1 | 1,150 | 1,150 | sq ft | |
| Elevators | 2 | 60 | 30 | sq ft | |
| Sub-Total = |
| **CLIN 0008 - Special Events** | ||||
| AWG Shop Floor Strip & Wax (WHS) Events | 4 | 10,900 | sq ft | |
| Portable Latrines | 50 | ea | ||
| Rolling Thunder | 1 | ea | ||
| July 4th | 1 | ea | ||
| 9/11 Commemoration | 1 | ea | ||
| Army 10 Miler | 1 | ea | ||
| Marine Corps Marathon (MCM) | 1 | ea | ||
| Presidential Inauguration | 1 | ea | ||
| Unscheduled Special Event | 1 | ea | ||
| Sub-Total = |
| **CLIN 1009 - Emergency Response Services** | |||||
| Emergency Response Services (Events) | 4 | ea | |||
| Sub-Total = | |||||
| **CLIN 0010 - 3M Terrazzo Hard Floor Protector System** | |||||
| 3M Terrazzo Hard Floor Protector System | 101 | 221,123 | 2,189 | sq ft | |
| (Labor & Supplies Only) | Sub-Total = | ||||
| G-TOTAL = |
Option 4 B
| Option Period Period 4 | |||||||
| PENTAGON | Space Type Count | Estimated Daily Sq. Ft. | Deductible Sq. Ft. | Unit | Daily Prices | Monthly Prices | Annual Prices |
| Specific Space Type | |||||||
| SST | STC | EDSF | DSF | UNIT | DP | MP | AP |
| CLIN 0001 - Pentagon (PNT) | |||||||
| Restrooms | 38 | 18,853 | 496 | sq ft | |||
| Janitor Closets | 30 | 1,844 | 61 | sq ft | |||
| Corridors | 101 | 217,287 | 2,151 | sq ft | |||
| Entrances/Lobbies | 10 | 5,637 | 564 | sq ft | |||
| Ramps | 4 | 11,023 | 2,756 | sq ft | |||
| Escalators | 11 | 3,361 | 306 | sq ft | |||
| Customer Service Centers | 5 | 13,502 | 2,700 | sq ft | |||
| Senior Executive Offices | 19 | 24,621 | 1,296 | sq ft | |||
| Senior Executive Offices – TS* | 16 | 15,929 | 996 | sq ft | |||
| Executive Offices | 26 | 36,292 | 1,396 | sq ft | |||
| Executive Offices – TS* | 6 | 10,588 | 1,765 | sq ft | |||
| General Offices | 192 | 419,699 | 2,186 | sq ft | |||
| General Offices – TS* | 56 | 105,356 | 1,881 | sq ft | |||
| Conference/Class/Training Rooms | 5 | 4,228 | 846 | sq ft | |||
| Conference/Class/Training Rooms - TS* | 18 | 8,295 | 461 | sq ft | |||
| Structurally Changed Spaces - TS* | 3 | 499 | 166 | sq ft | |||
| Communication/ADP – TS* | 3 | 538 | 1,012 | sq ft | |||
| CLIN 0001 - Remote Delivery Facility (RDF) | |||||||
| Corridors | 5 | 29,201 | 5,840 | sq ft | |||
| Rest Rooms | 4 | 2,425 | 606 | sq ft | |||
| General Office | 25 | 47,067 | 1,883 | sq ft | |||
| Locker Rooms | 2 | 1,372 | 686 | sq ft | |||
| Loading Dock (Trash) | 1 | 2,810 | 2,810 | sq ft | |||
| Loading Dock (Dock Master) | 1 | 17,851 | 17,851 | sq ft | |||
| Conference Rooms | 2 | 631 | 316 | sq ft | |||
| SAIC Warehouse | 2 | 11,992 | 5,996 | sq ft | |||
| CLIN 0001 - Pentagon Incinerator Plant (PIP) | |||||||
| General Office Space | 2 | 600 | 300 | sq ft | |||
| Restroom/Locker Rooms | 2 | 900 | 450 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 500 | 250 | sq ft | |||
| Stairwells | 1 | 345 | 345 | sq ft | |||
| CLIN 0001 - Heating & Refrigeration Plant (HRP) | |||||||
| General Office Space | 10 | 7,578 | 758 | sq ft | |||
| Restroom/Locker Rooms | 6 | 900 | 150 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 6,022 | 3,011 | sq ft | |||
| Stairwells | 7 | 1,650 | 236 | sq ft | |||
| Elevator | 2 | 253 | 127 | sq ft | |||
| CLIN 0001 - Pentagon Emergency Response Center (PERC) | |||||||
| General Office Space | 8 | 11,288 | 1,411 | sq ft | |||
| Restrooms/Locker Rooms | 10 | 2,062 | 206 | sq ft | |||
| Corridor, Lobbies, Entrances | 8 | 3,836 | 480 | sq ft | |||
| Conference/Training Rooms | 2 | 1,590 | 795 | sq ft | |||
| Laboratories | 2 | 2,528 | 1,264 | sq ft | |||
| Stairs | 4 | 886 | 222 | sq ft | |||
| Elevator | 2 | 160 | 80 | sq ft | |||
| Structurally Changed Spaces (ERT Motors) | 4 | 7,347 | 1,837 | sq ft | |||
| CLIN 0001 - PFPA K9 Building & Guard Posts | |||||||
| Corridors/Circulation/Lobby | 2 | 1,925 | 963 | sq ft | |||
| Rest Rooms | 2 | 128 | 64 | sq ft | |||
| General Office | 5 | 1,090 | 218 | sq ft | |||
| Locker Room | 1 | 270 | 270 | sq ft | |||
| Kennel Room | 3 | 445 | 148 | sq ft | |||
| PFPA Guard Posts | 28 | 3,850 | 138 | sq ft | |||
| CLIN 0001 - Pentagon Ancillary Support Facility (PASF) | |||||||
| General Office | 25 | 12,120 | 485 | sq ft | |||
| Rest Rooms | 3 | 475 | 158 | sq ft | |||
| CLIN 0001 - Trailers | |||||||
| Heliport Control Tower | 1 | 110 | 110 | sq ft | |||
| Firehouse Trailer 1 | 1 | 320 | 320 | sq ft | |||
| Firehouse Trailer 2 | 1 | 670 | 670 | sq ft | |||
| General Dynamics Modular Office Space | 35 | ERROR:#REF! | ERROR:#REF! | sq ft | |||
| General Dynamics Modular Office Entrances | 4 | 75 | 19 | sq ft | |||
| PFPA CBRN Trailer | 1 | 1,190 | 1,190 | sq ft | |||
| Restrooms | 7 | 1,465 | 209 | sq ft | |||
| Sub-Total = |
| **CLIN 0002 - Walk-Off Mats 4x per Period** | |||||
| Walk-Off Mats (Shampooed Quarterly) | 4 | 7,850 | 95 | sq ft | |
| Sub-Total = |
| **CLIN 0003 - Carpeted Shampoo** | |||||
| Carpet Shampoo (Work will be ordered as needed) | N/A | 600,000 | N/A | sq ft | |
| Sub-Total = |
| **CLIN 0004 - Snow & Ice Removal 12 Treatments** | |||||
| Snow & Ice Treatment - Exterior Entrances | 15 | 15 | 1 | each | |
| Sub-Total = |
| **CLIN 0005 - Interior / Exterior Window Cleaning 1x / Spring** | |||||
| PNT Windows - Interior | 365 | 365 | 1 | each | |
| PNT Windows - Exterior | 7,720 | 7,720 | 1 | each | |
| Metro Awnings | 10 | 10 | 1 | each | |
| General Dynamics Modular Space ** | 20 | 20 | 1 | each | |
| Metro Bus Stops ** | 16 | 16 | 1 | each | |
| CDC ** | 112 | 112 | 1 | each | |
| Heating & Refrigeration Plant ** | 17 | 17 | 1 | each | |
| Pentagon Emergency Response Center ** | 190 | 190 | 1 | each | |
| Addition Square Feet of Glass | 5,000 | 5,000 | 1 | each | |
| ** Note: Includes Interior & Exterior Glass ** | Sub-Total = |
| **CLIN 0005A - Exterior Center Court Yard Window Cleaning 1x / Fall** | |||||
| Center Court Yard Windows - Exterior "Only" | 425 | 425 | 1 | each | |
| ** Note: Includes Exterior Glass Only ** | Sub-Total = |
| **CLIN 0006 - Daily Reservation Hard Surfaces Policing** | |||||
| Reservation Hard Surfaces & CCY | 251 | 4,456,890 | 17,757 | sq ft | |
| (Labor & Equipment Only) | Sub-Total = |
| **CLIN 0007 - Metro Entrance Facility (MEF)** | |||||
| Corridors/Circulation | 7 | 16,159 | 2,655 | sq ft | |
| Escalators | 4 | 1,100 | 275 | sq ft | |
| General Office | 10 | 3,564 | 809 | sq ft | |
| Rest Room | 3 | 790 | 314 | sq ft | |
| Locker Room | 1 | 1,150 | 1,150 | sq ft | |
| Elevators | 2 | 60 | 30 | sq ft | |
| Sub-Total = |
| **CLIN 0008 - Special Events** | ||||
| AWG Shop Floor Strip & Wax (WHS) Events | 4 | 10,900 | sq ft | |
| Portable Latrines | 50 | ea | ||
| Rolling Thunder | 1 | ea | ||
| July 4th | 1 | ea | ||
| 9/11 Commemoration | 1 | ea | ||
| Army 10 Miler | 1 | ea | ||
| Marine Corps Marathon (MCM) | 1 | ea | ||
| Presidential Inauguration | 1 | ea | ||
| Unscheduled Special Event | 1 | ea | ||
| Sub-Total = |
| **CLIN 1009 - Emergency Response Services** | |||||
| Emergency Response Services (Events) | 4 | ea | |||
| Sub-Total = | |||||
| **CLIN 0010 - 3M Terrazzo Hard Floor Protector System** | |||||
| 3M Terrazzo Hard Floor Protector System | 101 | 221,123 | 2,189 | sq ft | |
| (Labor & Supplies Only) | Sub-Total = | ||||
| G-TOTAL = |
File details come from the government source that posted it. Updated .