A23 Pricing Sheet 0900-26oct2021.xlsx
XLSX spreadsheet 57 KB Posted
- Attached to
- Janitorial Services
- Solicitation number
- HQ003421R0031
- Issued by
-
DOD Washington Headquarters Service
About this file
This document contains a pricing sheet and details for a solicitation seeking janitorial services at the Pentagon. The solicitation, number HQ003421R0031, is seeking to provide high quality, proactive, and responsive custodial services for the Pentagon and includes pricing for base and option years, as well as additional COVID-19 cleaning services. The pricing sheet provides unit rates for cleaning different facility space types at the Pentagon like restrooms, corridors, offices, and conference rooms. Additional line items include walk-off mat cleaning, carpet shampooing, snow and ice removal, window cleaning, hard surface policing, and event support. The solicitation is issued by the DOD Washington Headquarters Service and seeks these janitorial services for the Pentagon reservation including buildings like the Pentagon, Metro Entrance Facility, and Trailers. Pricing is provided for the base year and four option years.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CBA addendum A Redacted.pdf | ||
| A23 Pricing Sheet 4 Nov 2021.xlsx | XLSX spreadsheet | |
| 21R0031 Amendment 6.pdf | ||
| HQ003421R0031 Conformed 11042021.pdf | ||
| CONFORMED21R0031 10262021.pdf | ||
| CBA.pdf | ||
| AMENDMENT 0005 21R0031.pdf | ||
| Conformed 21R0031 10_13_2021.pdf | ||
| Amendment 0004.pdf | ||
| Conformed Copy 21R0031.pdf | ||
| REVISED Attachment - J3 Past Performance Questionnaire.docx | DOCX document | |
| A23 Pricing Sheet 11oct2021.xlsx | XLSX spreadsheet | |
| Amendment 0003.pdf | ||
| REVISED - J4 Past Performance Data Sheet.docx | DOCX document | |
| amendment 2.pdf | ||
| Amendment 0001.pdf | ||
| A23 Attachment - J4 Past Performance Data Sheet.docx | DOCX document | |
| A23 Services WD-2015-4281 Revision 18.pdf | ||
| A23 Pricing Sheet.xlsx | XLSX spreadsheet | |
| A23 Attachment J1.pdf | ||
| A23 Attachment - J3 Past Performance Questionnaire.docx | DOCX document | |
| A23 Attachment J2.pdf | ||
| HQ003421R0031.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| HQ003421R0031 Janitorial Services | ||||||
| Price Proposal Summary | ||||||
| CLIN | Description | Base | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 |
| CLIN 0001 | Pentagon | |||||
| CLIN 0002 | Walk-Off Mats | |||||
| CLIN 0003 | Carpeted Shampoo | |||||
| CLIN 0004 | Snow & Ice Removal - Treatments | |||||
| CLIN 0005 | Interior / Exterior Window Cleaning | |||||
| CLIN 0006 | Reservation Hard Surfaces Policing | |||||
| CLIN 0007 | Metro Entrance Facility | |||||
| CLIN 0008 | Special Events | |||||
| CLIN 0009 | Emergency Response Services | |||||
| CLIN 0010 | 3M Terrazzo Hard Floor Protector System | |||||
| Total | ||||||
| Grand Total |
Base Breakdown
| Base Period | |||||||
| PENTAGON | Space Type Count | Estimated Daily Sq. Ft. | Deductible Sq. Ft. | Unit | Daily Prices | Monthly Prices | Annual Prices |
| Specific Space Type | |||||||
| SST | STC | EDSF | DSF | UNIT | DP | MP | AP |
| CLIN 0001 - Pentagon (PNT) | |||||||
| Restrooms | 38 | 18,853 | 496 | sq ft | |||
| Janitor Closets | 30 | 1,844 | 61 | sq ft | |||
| Corridors (3M Applied) | 101 | 217,287 | 2,151 | sq ft | |||
| Entrances/Lobbies | 10 | 5,637 | 564 | sq ft | |||
| Ramps | 4 | 13,261 | 3,315 | sq ft | |||
| Escalators | 11 | 3,361 | 306 | sq ft | |||
| Customer Service Centers | 5 | 13,502 | 2,700 | sq ft | |||
| Senior Executive Offices | 19 | 24,621 | 1,296 | sq ft | |||
| Senior Executive Offices – TS* | 16 | 15,929 | 996 | sq ft | |||
| Executive Offices | 26 | 36,292 | 1,396 | sq ft | |||
| Executive Offices – TS* | 6 | 10,588 | 1,765 | sq ft | |||
| General Offices | 192 | 419,699 | 2,186 | sq ft | |||
| General Offices – TS* | 56 | 105,356 | 1,881 | sq ft | |||
| Conference/Class/Training Rooms | 5 | 4,228 | 846 | sq ft | |||
| Conference/Class/Training Rooms - TS* | 18 | 8,295 | 461 | sq ft | |||
| Structurally Changed Spaces - TS* | 3 | 499 | 166 | sq ft | |||
| Communication/ADP – TS* | 3 | 538 | 1,012 | sq ft | |||
| CLIN 0001 - Remote Delivery Facility (RDF) | |||||||
| Corridors | 5 | 29,201 | 5,840 | sq ft | |||
| Rest Rooms | 4 | 2,425 | 606 | sq ft | |||
| General Office | 25 | 47,067 | 1,883 | sq ft | |||
| Locker Rooms | 2 | 1,372 | 686 | sq ft | |||
| Loading Dock (Trash) | 1 | 2,810 | 2,810 | sq ft | |||
| Loading Dock (Dock Master) | 1 | 17,851 | 17,851 | sq ft | |||
| Conference Rooms | 2 | 631 | 316 | sq ft | |||
| SAIC Warehouse | 2 | 11,992 | 5,996 | sq ft | |||
| CLIN 0001 - Pentagon Incinerator Plant (PIP) | |||||||
| General Office Space | 2 | 600 | 300 | sq ft | |||
| Restroom/Locker Rooms | 2 | 900 | 450 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 500 | 250 | sq ft | |||
| Stairwells | 1 | 345 | 345 | sq ft | |||
| CLIN 0001 - Heating & Refrigeration Plant (HRP) | |||||||
| General Office Space | 10 | 7,578 | 758 | sq ft | |||
| Restroom/Locker Rooms | 6 | 900 | 150 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 6,022 | 3,011 | sq ft | |||
| Stairwells | 7 | 1,650 | 236 | sq ft | |||
| Elevator | 2 | 253 | 127 | sq ft | |||
| CLIN 0001 - Pentagon Emergency Response Center (PERC) | |||||||
| General Office Space | 8 | 11,288 | 1,411 | sq ft | |||
| Restrooms/Locker Rooms | 10 | 2,062 | 206 | sq ft | |||
| Corridor, Lobbies, Entrances | 8 | 3,836 | 480 | sq ft | |||
| Conference/Training Rooms | 2 | 1,590 | 795 | sq ft | |||
| Laboratories | 2 | 2,528 | 1,264 | sq ft | |||
| Stairs | 4 | 886 | 222 | sq ft | |||
| Elevator | 2 | 160 | 80 | sq ft | |||
| Structurally Changed Spaces (ERT Motors) | 4 | 7,347 | 1,837 | sq ft | |||
| CLIN 0001 - PFPA K9 Building & Guard Posts | |||||||
| Corridors/Circulation/Lobby | 2 | 1,925 | 963 | sq ft | |||
| Rest Rooms | 2 | 128 | 64 | sq ft | |||
| General Office | 5 | 1,090 | 218 | sq ft | |||
| Locker Room | 1 | 270 | 270 | sq ft | |||
| Kennel Room | 3 | 445 | 148 | sq ft | |||
| PFPA Guard Posts | 28 | 3,850 | 138 | sq ft | |||
| CLIN 0001 - Pentagon Ancillary Support Facility (PASF) | |||||||
| General Office | 25 | 12,120 | 485 | sq ft | |||
| Rest Rooms | 3 | 475 | 158 | sq ft | |||
| CLIN 0001 - Trailers | |||||||
| Heliport Control Tower | 1 | 110 | 110 | sq ft | |||
| Firehouse Trailer 1 | 1 | 320 | 320 | sq ft | |||
| Firehouse Trailer 2 | 1 | 670 | 670 | sq ft | |||
| General Dynamics Modular Office Space | 35 | 12,915 | 369 | sq ft | |||
| General Dynamics Modular Office Entrances | 4 | 75 | 19 | sq ft | |||
| PFPA CBRN Trailer | 1 | 1,190 | 1,190 | sq ft | |||
| Restrooms | 7 | 1,465 | 209 | sq ft | |||
| Sub-Total = |
| **CLIN 0002 - Walk-Off Mats 4x per Period** | |||||
| Walk-Off Mats (Shampooed Quarterly) | 4 | 7,850 | 95 | sq ft | |
| Sub-Total = |
| **CLIN 0003 - Carpeted Shampoo** | |||||
| Carpet Shampoo (Work will be ordered as needed) | N/A | 600,000 | N/A | sq ft | |
| Sub-Total = |
| **CLIN 0004 - Snow & Ice Removal 12 Treatments** | |||||
| Snow & Ice Treatment - Exterior Entrances | 15 | 15 | 1 | each | |
| Sub-Total = |
| **CLIN 0005 - Interior / Exterior Window Cleaning 1x / Spring** | |||||
| PNT Windows - Interior | 365 | 365 | 1 | each | |
| PNT Windows - Exterior | 7,720 | 7,720 | 1 | each | |
| Metro Awnings | 10 | 10 | 1 | each | |
| General Dynamics Modular Space ** | 20 | 20 | 1 | each | |
| Metro Bus Stops ** | 16 | 16 | 1 | each | |
| CDC ** | 112 | 112 | 1 | each | |
| Heating & Refrigeration Plant ** | 17 | 17 | 1 | each | |
| Pentagon Emergency Response Center ** | 190 | 190 | 1 | each | |
| Addition Square Feet of Glass | 5,000 | 5,000 | 1 | each | |
| ** Note: Includes Interior & Exterior Glass ** | Sub-Total = |
| **CLIN 0005A - Exterior Center Court Yard Window Cleaning 1x / Fall** | |||||
| Center Court Yard Windows - Exterior "Only" | 425 | 425 | 1 | each | |
| ** Note: Includes Exterior Glass Only ** | Sub-Total = |
| **CLIN 0006 - Daily Reservation Hard Surfaces Policing** | |||||
| Reservation Hard Surfaces & CCY | 251 | 4,456,890 | 17,757 | sq ft | |
| (Labor & Equipment Only) | Sub-Total = |
| **CLIN 0007 - Metro Entrance Facility (MEF)** | |||||
| Corridors/Circulation | 7 | 16,159 | 2,655 | sq ft | |
| Escalators | 4 | 1,100 | 275 | sq ft | |
| General Office | 10 | 3,564 | 809 | sq ft | |
| Rest Room | 3 | 790 | 314 | sq ft | |
| Locker Room | 1 | 1,150 | 1,150 | sq ft | |
| Elevators | 2 | 60 | 30 | sq ft | |
| Sub-Total = |
| **CLIN 0008 - Special Events** | ||||
| AWG Shop Floor Strip & Wax (WHS) Events | 4 | 10,900 | sq ft | |
| Portable Latrines | 50 | ea | ||
| Rolling Thunder | 1 | ea | ||
| July 4th | 1 | ea | ||
| 9/11 Commemoration | 1 | ea | ||
| Army 10 Miler | 1 | ea | ||
| Marine Corps Marathon (MCM) | 1 | ea | ||
| Presidential Inauguration | 1 | ea | ||
| Unscheduled Special Event | 1 | ea | ||
| Sub-Total = |
| **CLIN 0009 - Emergency Response Services** | |||
| Emergency Response Services (Events) | 4 | ea | Sub-Total = |
| **CLIN 0010-COVID19 Enhanced Common Spaces Disinfecting** | |||||
| Enhanced Common Spaces (Not to Exceed) | 1 | N/A | Sub-Total = | $35,000.00 | |
| **CLIN 0011- COVID19 Enhanced Office Spaces Disinfecting** | |||||
| Enhanced Office Spaces (Not to Exceed) | 1 | N/A | Sub-Total = | $35,000.00 | |
| **CLIN 0012 - COVID19 Electrostatic Sanitize** | |||||
| Electrostatic Sanitize (Reservation Wide) (Not to Exceed) | 1 | 100,000 | sq ft | Sub-Total = | $40,000.00 |
| Sub-Total = | |||||
| G-TOTAL = |
Option 1 B
| Option Period 1 | |||||||
| PENTAGON | Space Type Count | Estimated Daily Sq. Ft. | Deductible Sq. Ft. | Unit | Daily Prices | Monthly Prices | Annual Prices |
| Specific Space Type | |||||||
| SST | STC | EDSF | DSF | UNIT | DP | MP | AP |
| CLIN 1001 - Pentagon (PNT) | |||||||
| Restrooms | 38 | 18,853 | 496 | sq ft | |||
| Janitor Closets | 30 | 1,844 | 61 | sq ft | |||
| Corridors (3M Applied) | 101 | 217,287 | 2,151 | sq ft | |||
| Entrances/Lobbies | 10 | 5,637 | 564 | sq ft | |||
| Ramps | 4 | 13,261 | 3,315 | sq ft | |||
| Escalators | 11 | 3,361 | 306 | sq ft | |||
| Customer Service Centers | 5 | 13,502 | 2,700 | sq ft | |||
| Senior Executive Offices | 19 | 24,621 | 1,296 | sq ft | |||
| Senior Executive Offices – TS* | 16 | 15,929 | 996 | sq ft | |||
| Executive Offices | 26 | 36,292 | 1,396 | sq ft | |||
| Executive Offices – TS* | 6 | 10,588 | 1,765 | sq ft | |||
| General Offices | 192 | 419,699 | 2,186 | sq ft | |||
| General Offices – TS* | 56 | 105,356 | 1,881 | sq ft | |||
| Conference/Class/Training Rooms | 5 | 4,228 | 846 | sq ft | |||
| Conference/Class/Training Rooms - TS* | 18 | 8,295 | 461 | sq ft | |||
| Structurally Changed Spaces - TS* | 3 | 499 | 166 | sq ft | |||
| Communication/ADP – TS* | 3 | 538 | 1,012 | sq ft | |||
| CLIN 1001 - Remote Delivery Facility (RDF) | |||||||
| Corridors | 5 | 29,201 | 5,840 | sq ft | |||
| Rest Rooms | 4 | 2,425 | 606 | sq ft | |||
| General Office | 25 | 47,067 | 1,883 | sq ft | |||
| Locker Rooms | 2 | 1,372 | 686 | sq ft | |||
| Loading Dock (Trash) | 1 | 2,810 | 2,810 | sq ft | |||
| Loading Dock (Dock Master) | 1 | 17,851 | 17,851 | sq ft | |||
| Conference Rooms | 2 | 631 | 316 | sq ft | |||
| SAIC Warehouse | 2 | 11,992 | 5,996 | sq ft | |||
| CLIN 1001 - Pentagon Incinerator Plant (PIP) | |||||||
| General Office Space | 2 | 600 | 300 | sq ft | |||
| Restroom/Locker Rooms | 2 | 900 | 450 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 500 | 250 | sq ft | |||
| Stairwells | 1 | 345 | 345 | sq ft | |||
| CLIN 1001 - Heating & Refrigeration Plant (HRP) | |||||||
| General Office Space | 10 | 7,578 | 758 | sq ft | |||
| Restroom/Locker Rooms | 6 | 900 | 150 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 6,022 | 3,011 | sq ft | |||
| Stairwells | 7 | 1,650 | 236 | sq ft | |||
| Elevator | 2 | 253 | 127 | sq ft | |||
| CLIN 1001 - Pentagon Emergency Response Center (PERC) | |||||||
| General Office Space | 8 | 11,288 | 1,411 | sq ft | |||
| Restrooms/Locker Rooms | 10 | 2,062 | 206 | sq ft | |||
| Corridor, Lobbies, Entrances | 8 | 3,836 | 480 | sq ft | |||
| Conference/Training Rooms | 2 | 1,590 | 795 | sq ft | |||
| Laboratories | 2 | 2,528 | 1,264 | sq ft | |||
| Stairs | 4 | 886 | 222 | sq ft | |||
| Elevator | 2 | 160 | 80 | sq ft | |||
| Structurally Changed Spaces (ERT Motors) | 4 | 7,347 | 1,837 | sq ft | |||
| CLIN 1001 - PFPA K9 Building & Guard Posts | |||||||
| Corridors/Circulation/Lobby | 2 | 1,925 | 963 | sq ft | |||
| Rest Rooms | 2 | 128 | 64 | sq ft | |||
| General Office | 5 | 1,090 | 218 | sq ft | |||
| Locker Room | 1 | 270 | 270 | sq ft | |||
| Kennel Room | 3 | 445 | 148 | sq ft | |||
| PFPA Guard Posts | 28 | 3,850 | 138 | sq ft | |||
| CLIN 1001 - Pentagon Ancillary Support Facility (PASF) | |||||||
| General Office | 25 | 12,120 | 485 | sq ft | |||
| Rest Rooms | 3 | 475 | 158 | sq ft | |||
| CLIN 1001 - Trailers | |||||||
| Heliport Control Tower | 1 | 110 | 110 | sq ft | |||
| Firehouse Trailer 1 | 1 | 320 | 320 | sq ft | |||
| Firehouse Trailer 2 | 1 | 670 | 670 | sq ft | |||
| General Dynamics Modular Office Space | 35 | 12,915 | 369 | sq ft | |||
| General Dynamics Modular Office Entrances | 4 | 75 | 19 | sq ft | |||
| PFPA CBRN Trailer | 1 | 1,190 | 1,190 | sq ft | |||
| Restrooms | 7 | 1,465 | 209 | sq ft | |||
| Sub-Total = |
| **CLIN 1002 - Walk-Off Mats 4x per Period** | |||||
| Walk-Off Mats (Shampooed Quarterly) | 4 | 7,850 | 95 | sq ft | |
| Sub-Total = |
| **CLIN 1003 - Carpeted Shampoo** | |||||
| Carpet Shampoo (Work will be ordered as needed) | N/A | 600,000 | N/A | sq ft | |
| Sub-Total = |
| **CLIN 1004 - Snow & Ice Removal 12 Treatments** | |||||
| Snow & Ice Treatment - Exterior Entrances | 15 | 15 | 1 | each | |
| Sub-Total = |
| **CLIN 1005 - Interior / Exterior Window Cleaning 1x / Spring** | |||||
| PNT Windows - Interior | 365 | 365 | 1 | each | |
| PNT Windows - Exterior | 7,720 | 7,720 | 1 | each | |
| Metro Awnings | 10 | 10 | 1 | each | |
| General Dynamics Modular Space ** | 20 | 20 | 1 | each | |
| Metro Bus Stops ** | 16 | 16 | 1 | each | |
| CDC ** | 112 | 112 | 1 | each | |
| Heating & Refrigeration Plant ** | 17 | 17 | 1 | each | |
| Pentagon Emergency Response Center ** | 190 | 190 | 1 | each | |
| Addition Square Feet of Glass | 5,000 | 5,000 | 1 | each | |
| ** Note: Includes Interior & Exterior Glass ** | Sub-Total = |
| **CLIN 1005A - Exterior Center Court Yard Window Cleaning 1x / Fall** | |||||
| Center Court Yard Windows - Exterior "Only" | 425 | 425 | 1 | each | |
| ** Note: Includes Exterior Glass Only ** | Sub-Total = |
| **CLIN 1006 - Daily Reservation Hard Surfaces Policing** | |||||
| Reservation Hard Surfaces & CCY | 251 | 4,456,890 | 17,757 | sq ft | |
| (Labor & Equipment Only) | Sub-Total = |
| **CLIN 1007 - Metro Entrance Facility (MEF)** | |||||
| Corridors/Circulation | 7 | 16,159 | 2,655 | sq ft | |
| Escalators | 4 | 1,100 | 275 | sq ft | |
| General Office | 10 | 3,564 | 809 | sq ft | |
| Rest Room | 3 | 790 | 314 | sq ft | |
| Locker Room | 1 | 1,150 | 1,150 | sq ft | |
| Elevators | 2 | 60 | 30 | sq ft | |
| Sub-Total = |
| **CLIN 1008 - Special Events** | ||||
| AWG Shop Floor Strip & Wax (WHS) Events | 4 | 10,900 | sq ft | |
| Portable Latrines | 50 | ea | ||
| Rolling Thunder | 1 | ea | ||
| July 4th | 1 | ea | ||
| 9/11 Commemoration | 1 | ea | ||
| Army 10 Miler | 1 | ea | ||
| Marine Corps Marathon (MCM) | 1 | ea | ||
| Presidential Inauguration | 1 | ea | ||
| Unscheduled Special Event | 1 | ea | ||
| Sub-Total = |
| **CLIN 1009 - Emergency Response Services** | |||
| Emergency Response Services (Events) | 4 | ea | Sub-Total = |
| **CLIN 1010-COVID19 Enhanced Common Spaces Disinfecting** | |||||
| Enhanced Common Spaces (Not to Exceed) | 1 | N/A | Sub-Total = | $ 35,000.00 | |
| **CLIN 1011- COVID19 Enhanced Office Spaces Disinfecting** | |||||
| Enhanced Office Spaces (Not to Exceed) | 1 | N/A | Sub-Total = | $ 35,000.00 | |
| **CLIN 1012 - COVID19 Electrostatic Sanitize** | |||||
| Electrostatic Sanitize (Reservation Wide) (Not to Exceed) | 1 | 100,000 | sq ft | Sub-Total = | $ 40,000.00 |
| Sub-Total = | |||||
| G-TOTAL = |
Option 2 B
| Option Period 2 | |||||||
| PENTAGON | Space Type Count | Estimated Daily Sq. Ft. | Deductible Sq. Ft. | Unit | Daily Prices | Monthly Prices | Annual Prices |
| Specific Space Type | |||||||
| SST | STC | EDSF | DSF | UNIT | DP | MP | AP |
| CLIN 2001 - Pentagon (PNT) | |||||||
| Restrooms | 38 | 18,853 | 496 | sq ft | |||
| Janitor Closets | 30 | 1,844 | 61 | sq ft | |||
| Corridors (3M Applied) | 101 | 217,287 | 2,151 | sq ft | |||
| Entrances/Lobbies | 10 | 5,637 | 564 | sq ft | |||
| Ramps | 4 | 13,261 | 3,315 | sq ft | |||
| Escalators | 11 | 3,361 | 306 | sq ft | |||
| Customer Service Centers | 5 | 13,502 | 2,700 | sq ft | |||
| Senior Executive Offices | 19 | 24,621 | 1,296 | sq ft | |||
| Senior Executive Offices – TS* | 16 | 15,929 | 996 | sq ft | |||
| Executive Offices | 26 | 36,292 | 1,396 | sq ft | |||
| Executive Offices – TS* | 6 | 10,588 | 1,765 | sq ft | |||
| General Offices | 192 | 419,699 | 2,186 | sq ft | |||
| General Offices – TS* | 56 | 105,356 | 1,881 | sq ft | |||
| Conference/Class/Training Rooms | 5 | 4,228 | 846 | sq ft | |||
| Conference/Class/Training Rooms - TS* | 18 | 8,295 | 461 | sq ft | |||
| Structurally Changed Spaces - TS* | 3 | 499 | 166 | sq ft | |||
| Communication/ADP – TS* | 3 | 538 | 1,012 | sq ft | |||
| CLIN 2001 - Remote Delivery Facility (RDF) | |||||||
| Corridors | 5 | 29,201 | 5,840 | sq ft | |||
| Rest Rooms | 4 | 2,425 | 606 | sq ft | |||
| General Office | 25 | 47,067 | 1,883 | sq ft | |||
| Locker Rooms | 2 | 1,372 | 686 | sq ft | |||
| Loading Dock (Trash) | 1 | 2,810 | 2,810 | sq ft | |||
| Loading Dock (Dock Master) | 1 | 17,851 | 17,851 | sq ft | |||
| Conference Rooms | 2 | 631 | 316 | sq ft | |||
| SAIC Warehouse | 2 | 11,992 | 5,996 | sq ft | |||
| CLIN 2001 - Pentagon Incinerator Plant (PIP) | |||||||
| General Office Space | 2 | 600 | 300 | sq ft | |||
| Restroom/Locker Rooms | 2 | 900 | 450 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 500 | 250 | sq ft | |||
| Stairwells | 1 | 345 | 345 | sq ft | |||
| CLIN 2001 - Heating & Refrigeration Plant (HRP) | |||||||
| General Office Space | 10 | 7,578 | 758 | sq ft | |||
| Restroom/Locker Rooms | 6 | 900 | 150 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 6,022 | 3,011 | sq ft | |||
| Stairwells | 7 | 1,650 | 236 | sq ft | |||
| Elevator | 2 | 253 | 127 | sq ft | |||
| CLIN 2001 - Pentagon Emergency Response Center (PERC) | |||||||
| General Office Space | 8 | 11,288 | 1,411 | sq ft | |||
| Restrooms/Locker Rooms | 10 | 2,062 | 206 | sq ft | |||
| Corridor, Lobbies, Entrances | 8 | 3,836 | 480 | sq ft | |||
| Conference/Training Rooms | 2 | 1,590 | 795 | sq ft | |||
| Laboratories | 2 | 2,528 | 1,264 | sq ft | |||
| Stairs | 4 | 886 | 222 | sq ft | |||
| Elevator | 2 | 160 | 80 | sq ft | |||
| Structurally Changed Spaces (ERT Motors) | 4 | 7,347 | 1,837 | sq ft | |||
| CLIN 2001 - PFPA K9 Building & Guard Posts | |||||||
| Corridors/Circulation/Lobby | 2 | 1,925 | 963 | sq ft | |||
| Rest Rooms | 2 | 128 | 64 | sq ft | |||
| General Office | 5 | 1,090 | 218 | sq ft | |||
| Locker Room | 1 | 270 | 270 | sq ft | |||
| Kennel Room | 3 | 445 | 148 | sq ft | |||
| PFPA Guard Posts | 28 | 3,850 | 138 | sq ft | |||
| CLIN 2001 - Pentagon Ancillary Support Facility (PASF) | |||||||
| General Office | 25 | 12,120 | 485 | sq ft | |||
| Rest Rooms | 3 | 475 | 158 | sq ft | |||
| CLIN 2001 - Trailers | |||||||
| Heliport Control Tower | 1 | 110 | 110 | sq ft | |||
| Firehouse Trailer 1 | 1 | 320 | 320 | sq ft | |||
| Firehouse Trailer 2 | 1 | 670 | 670 | sq ft | |||
| General Dynamics Modular Office Space | 35 | 12,915 | 369 | sq ft | |||
| General Dynamics Modular Office Entrances | 4 | 75 | 19 | sq ft | |||
| PFPA CBRN Trailer | 1 | 1,190 | 1,190 | sq ft | |||
| Restrooms | 7 | 1,465 | 209 | sq ft | |||
| Sub-Total = |
| **CLIN 2002 - Walk-Off Mats 4x per Period** | |||||
| Walk-Off Mats (Shampooed Quarterly) | 4 | 7,850 | 95 | sq ft | |
| Sub-Total = |
| **CLIN 2003 - Carpeted Shampoo** | |||||
| Carpet Shampoo (Work will be ordered as needed) | N/A | 600,000 | N/A | sq ft | |
| Sub-Total = |
| **CLIN 2004 - Snow & Ice Removal 12 Treatments** | |||||
| Snow & Ice Treatment - Exterior Entrances | 15 | 15 | 1 | each | |
| Sub-Total = |
| **CLIN 2005 - Interior / Exterior Window Cleaning 1x / Spring** | |||||
| PNT Windows - Interior | 365 | 365 | 1 | each | |
| PNT Windows - Exterior | 7,720 | 7,720 | 1 | each | |
| Metro Awnings | 10 | 10 | 1 | each | |
| General Dynamics Modular Space ** | 20 | 20 | 1 | each | |
| Metro Bus Stops ** | 16 | 16 | 1 | each | |
| CDC ** | 112 | 112 | 1 | each | |
| Heating & Refrigeration Plant ** | 17 | 17 | 1 | each | |
| Pentagon Emergency Response Center ** | 190 | 190 | 1 | each | |
| Addition Square Feet of Glass | 5,000 | 5,000 | 1 | each | |
| ** Note: Includes Interior & Exterior Glass ** | Sub-Total = |
| **CLIN 2005A - Exterior Center Court Yard Window Cleaning 1x / Fall** | |||||
| Center Court Yard Windows - Exterior "Only" | 425 | 425 | 1 | each | |
| ** Note: Includes Exterior Glass Only ** | Sub-Total = |
| **CLIN 2006 - Daily Reservation Hard Surfaces Policing** | |||||
| Reservation Hard Surfaces & CCY | 251 | 4,456,890 | 17,757 | sq ft | |
| (Labor & Equipment Only) | Sub-Total = |
| **CLIN 2007 - Metro Entrance Facility (MEF)** | |||||
| Corridors/Circulation | 7 | 16,159 | 2,655 | sq ft | |
| Escalators | 4 | 1,100 | 275 | sq ft | |
| General Office | 10 | 3,564 | 809 | sq ft | |
| Rest Room | 3 | 790 | 314 | sq ft | |
| Locker Room | 1 | 1,150 | 1,150 | sq ft | |
| Elevators | 2 | 60 | 30 | sq ft | |
| Sub-Total = |
| **CLIN 2008 - Special Events** | ||||
| AWG Shop Floor Strip & Wax (WHS) Events | 4 | 10,900 | sq ft | |
| Portable Latrines | 50 | ea | ||
| Rolling Thunder | 1 | ea | ||
| July 4th | 1 | ea | ||
| 9/11 Commemoration | 1 | ea | ||
| Army 10 Miler | 1 | ea | ||
| Marine Corps Marathon (MCM) | 1 | ea | ||
| Presidential Inauguration | 1 | ea | ||
| Unscheduled Special Event | 1 | ea | ||
| Sub-Total = |
| **CLIN 2009 - Emergency Response Services** | |||
| Emergency Response Services (Events) | 4 | ea | Sub-Total = |
| **CLIN 2010-COVID19 Enhanced Common Spaces Disinfecting** | |||||
| Enhanced Common Spaces (Not to Exceed) | 1 | N/A | Sub-Total = | $ 35,000.00 | |
| **CLIN 2011- COVID19 Enhanced Office Spaces Disinfecting** | |||||
| Enhanced Office Spaces (Not to Exceed) | 1 | N/A | Sub-Total = | $ 35,000.00 | |
| **CLIN 2012 - COVID19 Electrostatic Sanitize** | |||||
| Electrostatic Sanitize (Reservation Wide) (Not to Exceed) | 1 | 100,000 | sq ft | Sub-Total = | $ 40,000.00 |
| Sub-Total = | |||||
| G-TOTAL = |
Option 3 B
| Option Period Period 3 | |||||||
| PENTAGON | Space Type Count | Estimated Daily Sq. Ft. | Deductible Sq. Ft. | Unit | Daily Prices | Monthly Prices | Annual Prices |
| Specific Space Type | |||||||
| SST | STC | EDSF | DSF | UNIT | DP | MP | AP |
| CLIN 3001 - Pentagon (PNT) | |||||||
| Restrooms | 38 | 18,853 | 496 | sq ft | |||
| Janitor Closets | 30 | 1,844 | 61 | sq ft | |||
| Corridors (3M Applied) | 101 | 217,287 | 2,151 | sq ft | |||
| Entrances/Lobbies | 10 | 5,637 | 564 | sq ft | |||
| Ramps | 4 | 13,261 | 3,315 | sq ft | |||
| Escalators | 11 | 3,361 | 306 | sq ft | |||
| Customer Service Centers | 5 | 13,502 | 2,700 | sq ft | |||
| Senior Executive Offices | 19 | 24,621 | 1,296 | sq ft | |||
| Senior Executive Offices – TS* | 16 | 15,929 | 996 | sq ft | |||
| Executive Offices | 26 | 36,292 | 1,396 | sq ft | |||
| Executive Offices – TS* | 6 | 10,588 | 1,765 | sq ft | |||
| General Offices | 192 | 419,699 | 2,186 | sq ft | |||
| General Offices – TS* | 56 | 105,356 | 1,881 | sq ft | |||
| Conference/Class/Training Rooms | 5 | 4,228 | 846 | sq ft | |||
| Conference/Class/Training Rooms - TS* | 18 | 8,295 | 461 | sq ft | |||
| Structurally Changed Spaces - TS* | 3 | 499 | 166 | sq ft | |||
| Communication/ADP – TS* | 3 | 538 | 1,012 | sq ft | |||
| CLIN 3001 - Remote Delivery Facility (RDF) | |||||||
| Corridors | 5 | 29,201 | 5,840 | sq ft | |||
| Rest Rooms | 4 | 2,425 | 606 | sq ft | |||
| General Office | 25 | 47,067 | 1,883 | sq ft | |||
| Locker Rooms | 2 | 1,372 | 686 | sq ft | |||
| Loading Dock (Trash) | 1 | 2,810 | 2,810 | sq ft | |||
| Loading Dock (Dock Master) | 1 | 17,851 | 17,851 | sq ft | |||
| Conference Rooms | 2 | 631 | 316 | sq ft | |||
| SAIC Warehouse | 2 | 11,992 | 5,996 | sq ft | |||
| CLIN 3001 - Pentagon Incinerator Plant (PIP) | |||||||
| General Office Space | 2 | 600 | 300 | sq ft | |||
| Restroom/Locker Rooms | 2 | 900 | 450 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 500 | 250 | sq ft | |||
| Stairwells | 1 | 345 | 345 | sq ft | |||
| CLIN 3001 - Heating & Refrigeration Plant (HRP) | |||||||
| General Office Space | 10 | 7,578 | 758 | sq ft | |||
| Restroom/Locker Rooms | 6 | 900 | 150 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 6,022 | 3,011 | sq ft | |||
| Stairwells | 7 | 1,650 | 236 | sq ft | |||
| Elevator | 2 | 253 | 127 | sq ft | |||
| CLIN 3001 - Pentagon Emergency Response Center (PERC) | |||||||
| General Office Space | 8 | 11,288 | 1,411 | sq ft | |||
| Restrooms/Locker Rooms | 10 | 2,062 | 206 | sq ft | |||
| Corridor, Lobbies, Entrances | 8 | 3,836 | 480 | sq ft | |||
| Conference/Training Rooms | 2 | 1,590 | 795 | sq ft | |||
| Laboratories | 2 | 2,528 | 1,264 | sq ft | |||
| Stairs | 4 | 886 | 222 | sq ft | |||
| Elevator | 2 | 160 | 80 | sq ft | |||
| Structurally Changed Spaces (ERT Motors) | 4 | 7,347 | 1,837 | sq ft | |||
| CLIN 3001 - PFPA K9 Building & Guard Posts | |||||||
| Corridors/Circulation/Lobby | 2 | 1,925 | 963 | sq ft | |||
| Rest Rooms | 2 | 128 | 64 | sq ft | |||
| General Office | 5 | 1,090 | 218 | sq ft | |||
| Locker Room | 1 | 270 | 270 | sq ft | |||
| Kennel Room | 3 | 445 | 148 | sq ft | |||
| PFPA Guard Posts | 28 | 3,850 | 138 | sq ft | |||
| CLIN 3001 - Pentagon Ancillary Support Facility (PASF) | |||||||
| General Office | 25 | 12,120 | 485 | sq ft | |||
| Rest Rooms | 3 | 475 | 158 | sq ft | |||
| CLIN 3001 - Trailers | |||||||
| Heliport Control Tower | 1 | 110 | 110 | sq ft | |||
| Firehouse Trailer 1 | 1 | 320 | 320 | sq ft | |||
| Firehouse Trailer 2 | 1 | 670 | 670 | sq ft | |||
| General Dynamics Modular Office Space | 35 | 12,915 | 369 | sq ft | |||
| General Dynamics Modular Office Entrances | 4 | 75 | 19 | sq ft | |||
| PFPA CBRN Trailer | 1 | 1,190 | 1,190 | sq ft | |||
| Restrooms | 7 | 1,465 | 209 | sq ft | |||
| Sub-Total = |
| **CLIN 3002 - Walk-Off Mats 4x per Period** | |||||
| Walk-Off Mats (Shampooed Quarterly) | 4 | 7,850 | 95 | sq ft | |
| Sub-Total = |
| **CLIN 3003 - Carpeted Shampoo** | |||||
| Carpet Shampoo (Work will be ordered as needed) | N/A | 600,000 | N/A | sq ft | |
| Sub-Total = |
| **CLIN 3004 - Snow & Ice Removal 12 Treatments** | |||||
| Snow & Ice Treatment - Exterior Entrances | 15 | 15 | 1 | each | |
| Sub-Total = |
| **CLIN 3005 - Interior / Exterior Window Cleaning 1x / Spring** | |||||
| PNT Windows - Interior | 365 | 365 | 1 | each | |
| PNT Windows - Exterior | 7,720 | 7,720 | 1 | each | |
| Metro Awnings | 10 | 10 | 1 | each | |
| General Dynamics Modular Space ** | 20 | 20 | 1 | each | |
| Metro Bus Stops ** | 16 | 16 | 1 | each | |
| CDC ** | 112 | 112 | 1 | each | |
| Heating & Refrigeration Plant ** | 17 | 17 | 1 | each | |
| Pentagon Emergency Response Center ** | 190 | 190 | 1 | each | |
| Addition Square Feet of Glass | 5,000 | 5,000 | 1 | each | |
| ** Note: Includes Interior & Exterior Glass ** | Sub-Total = |
| **CLIN 3005A - Exterior Center Court Yard Window Cleaning 1x / Fall** | |||||
| Center Court Yard Windows - Exterior "Only" | 425 | 425 | 1 | each | |
| ** Note: Includes Exterior Glass Only ** | Sub-Total = |
| **CLIN 3006 - Daily Reservation Hard Surfaces Policing** | |||||
| Reservation Hard Surfaces & CCY | 251 | 4,456,890 | 17,757 | sq ft | |
| (Labor & Equipment Only) | Sub-Total = |
| **CLIN 3007 - Metro Entrance Facility (MEF)** | |||||
| Corridors/Circulation | 7 | 16,159 | 2,655 | sq ft | |
| Escalators | 4 | 1,100 | 275 | sq ft | |
| General Office | 10 | 3,564 | 809 | sq ft | |
| Rest Room | 3 | 790 | 314 | sq ft | |
| Locker Room | 1 | 1,150 | 1,150 | sq ft | |
| Elevators | 2 | 60 | 30 | sq ft | |
| Sub-Total = |
| **CLIN 3008 - Special Events** | ||||
| AWG Shop Floor Strip & Wax (WHS) Events | 4 | 10,900 | sq ft | |
| Portable Latrines | 50 | ea | ||
| Rolling Thunder | 1 | ea | ||
| July 4th | 1 | ea | ||
| 9/11 Commemoration | 1 | ea | ||
| Army 10 Miler | 1 | ea | ||
| Marine Corps Marathon (MCM) | 1 | ea | ||
| Presidential Inauguration | 1 | ea | ||
| Unscheduled Special Event | 1 | ea | ||
| Sub-Total = |
| **CLIN 3009 - Emergency Response Services** | |||
| Emergency Response Services (Events) | 4 | ea | Sub-Total = |
| **CLIN 3010-COVID19 Enhanced Common Spaces Disinfecting** | |||||
| Enhanced Common Spaces (Not to Exceed) | 1 | N/A | Sub-Total = | $ 35,000.00 | |
| **CLIN 3011- COVID19 Enhanced Office Spaces Disinfecting** | |||||
| Enhanced Office Spaces (Not to Exceed) | 1 | N/A | Sub-Total = | $ 35,000.00 | |
| **CLIN 3012 - COVID19 Electrostatic Sanitize** | |||||
| Electrostatic Sanitize (Reservation Wide) (Not to Exceed) | 1 | 100,000 | sq ft | Sub-Total = | $ 40,000.00 |
| Sub-Total = | |||||
| G-TOTAL = |
Option 4 B
| Option Period Period 4 | |||||||
| PENTAGON | Space Type Count | Estimated Daily Sq. Ft. | Deductible Sq. Ft. | Unit | Daily Prices | Monthly Prices | Annual Prices |
| Specific Space Type | |||||||
| SST | STC | EDSF | DSF | UNIT | DP | MP | AP |
| CLIN 4001 - Pentagon (PNT) | |||||||
| Restrooms | 38 | 18,853 | 496 | sq ft | |||
| Janitor Closets | 30 | 1,844 | 61 | sq ft | |||
| Corridors (3M Applied) | 101 | 217,287 | 2,151 | sq ft | |||
| Entrances/Lobbies | 10 | 5,637 | 564 | sq ft | |||
| Ramps | 4 | 13,261 | 3,315 | sq ft | |||
| Escalators | 11 | 3,361 | 306 | sq ft | |||
| Customer Service Centers | 5 | 13,502 | 2,700 | sq ft | |||
| Senior Executive Offices | 19 | 24,621 | 1,296 | sq ft | |||
| Senior Executive Offices – TS* | 16 | 15,929 | 996 | sq ft | |||
| Executive Offices | 26 | 36,292 | 1,396 | sq ft | |||
| Executive Offices – TS* | 6 | 10,588 | 1,765 | sq ft | |||
| General Offices | 192 | 419,699 | 2,186 | sq ft | |||
| General Offices – TS* | 56 | 105,356 | 1,881 | sq ft | |||
| Conference/Class/Training Rooms | 5 | 4,228 | 846 | sq ft | |||
| Conference/Class/Training Rooms - TS* | 18 | 8,295 | 461 | sq ft | |||
| Structurally Changed Spaces - TS* | 3 | 499 | 166 | sq ft | |||
| Communication/ADP – TS* | 3 | 538 | 1,012 | sq ft | |||
| CLIN 4001 - Remote Delivery Facility (RDF) | |||||||
| Corridors | 5 | 29,201 | 5,840 | sq ft | |||
| Rest Rooms | 4 | 2,425 | 606 | sq ft | |||
| General Office | 25 | 47,067 | 1,883 | sq ft | |||
| Locker Rooms | 2 | 1,372 | 686 | sq ft | |||
| Loading Dock (Trash) | 1 | 2,810 | 2,810 | sq ft | |||
| Loading Dock (Dock Master) | 1 | 17,851 | 17,851 | sq ft | |||
| Conference Rooms | 2 | 631 | 316 | sq ft | |||
| SAIC Warehouse | 2 | 11,992 | 5,996 | sq ft | |||
| CLIN 4001 - Pentagon Incinerator Plant (PIP) | |||||||
| General Office Space | 2 | 600 | 300 | sq ft | |||
| Restroom/Locker Rooms | 2 | 900 | 450 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 500 | 250 | sq ft | |||
| Stairwells | 1 | 345 | 345 | sq ft | |||
| CLIN 4001 - Heating & Refrigeration Plant (HRP) | |||||||
| General Office Space | 10 | 7,578 | 758 | sq ft | |||
| Restroom/Locker Rooms | 6 | 900 | 150 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 6,022 | 3,011 | sq ft | |||
| Stairwells | 7 | 1,650 | 236 | sq ft | |||
| Elevator | 2 | 253 | 127 | sq ft | |||
| CLIN 4001 - Pentagon Emergency Response Center (PERC) | |||||||
| General Office Space | 8 | 11,288 | 1,411 | sq ft | |||
| Restrooms/Locker Rooms | 10 | 2,062 | 206 | sq ft | |||
| Corridor, Lobbies, Entrances | 8 | 3,836 | 480 | sq ft | |||
| Conference/Training Rooms | 2 | 1,590 | 795 | sq ft | |||
| Laboratories | 2 | 2,528 | 1,264 | sq ft | |||
| Stairs | 4 | 886 | 222 | sq ft | |||
| Elevator | 2 | 160 | 80 | sq ft | |||
| Structurally Changed Spaces (ERT Motors) | 4 | 7,347 | 1,837 | sq ft | |||
| CLIN 4001 - PFPA K9 Building & Guard Posts | |||||||
| Corridors/Circulation/Lobby | 2 | 1,925 | 963 | sq ft | |||
| Rest Rooms | 2 | 128 | 64 | sq ft | |||
| General Office | 5 | 1,090 | 218 | sq ft | |||
| Locker Room | 1 | 270 | 270 | sq ft | |||
| Kennel Room | 3 | 445 | 148 | sq ft | |||
| PFPA Guard Posts | 28 | 3,850 | 138 | sq ft | |||
| CLIN 4001 - Pentagon Ancillary Support Facility (PASF) | |||||||
| General Office | 25 | 12,120 | 485 | sq ft | |||
| Rest Rooms | 3 | 475 | 158 | sq ft | |||
| CLIN 4001 - Trailers | |||||||
| Heliport Control Tower | 1 | 110 | 110 | sq ft | |||
| Firehouse Trailer 1 | 1 | 320 | 320 | sq ft | |||
| Firehouse Trailer 2 | 1 | 670 | 670 | sq ft | |||
| General Dynamics Modular Office Space | 35 | 12,915 | 369 | sq ft | |||
| General Dynamics Modular Office Entrances | 4 | 75 | 19 | sq ft | |||
| PFPA CBRN Trailer | 1 | 1,190 | 1,190 | sq ft | |||
| Restrooms | 7 | 1,465 | 209 | sq ft | |||
| Sub-Total = |
| **CLIN 4002 - Walk-Off Mats 4x per Period** | |||||
| Walk-Off Mats (Shampooed Quarterly) | 4 | 7,850 | 95 | sq ft | |
| Sub-Total = |
| **CLIN 4003 - Carpeted Shampoo** | |||||
| Carpet Shampoo (Work will be ordered as needed) | N/A | 600,000 | N/A | sq ft | |
| Sub-Total = |
| **CLIN 4004 - Snow & Ice Removal 12 Treatments** | |||||
| Snow & Ice Treatment - Exterior Entrances | 15 | 15 | 1 | each | |
| Sub-Total = |
| **CLIN 4005 - Interior / Exterior Window Cleaning 1x / Spring** | |||||
| PNT Windows - Interior | 365 | 365 | 1 | each | |
| PNT Windows - Exterior | 7,720 | 7,720 | 1 | each | |
| Metro Awnings | 10 | 10 | 1 | each | |
| General Dynamics Modular Space ** | 20 | 20 | 1 | each | |
| Metro Bus Stops ** | 16 | 16 | 1 | each | |
| CDC ** | 112 | 112 | 1 | each | |
| Heating & Refrigeration Plant ** | 17 | 17 | 1 | each | |
| Pentagon Emergency Response Center ** | 190 | 190 | 1 | each | |
| Addition Square Feet of Glass | 5,000 | 5,000 | 1 | each | |
| ** Note: Includes Interior & Exterior Glass ** | Sub-Total = |
| **CLIN 4005A - Exterior Center Court Yard Window Cleaning 1x / Fall** | |||||
| Center Court Yard Windows - Exterior "Only" | 425 | 425 | 1 | each | |
| ** Note: Includes Exterior Glass Only ** | Sub-Total = |
| **CLIN 4006 - Daily Reservation Hard Surfaces Policing** | |||||
| Reservation Hard Surfaces & CCY | 251 | 4,456,890 | 17,757 | sq ft | |
| (Labor & Equipment Only) | Sub-Total = |
| **CLIN 4007 - Metro Entrance Facility (MEF)** | |||||
| Corridors/Circulation | 7 | 16,159 | 2,655 | sq ft | |
| Escalators | 4 | 1,100 | 275 | sq ft | |
| General Office | 10 | 3,564 | 809 | sq ft | |
| Rest Room | 3 | 790 | 314 | sq ft | |
| Locker Room | 1 | 1,150 | 1,150 | sq ft | |
| Elevators | 2 | 60 | 30 | sq ft | |
| Sub-Total = |
| **CLIN 4008 - Special Events** | ||||
| AWG Shop Floor Strip & Wax (WHS) Events | 4 | 10,900 | sq ft | |
| Portable Latrines | 50 | ea | ||
| Rolling Thunder | 1 | ea | ||
| July 4th | 1 | ea | ||
| 9/11 Commemoration | 1 | ea | ||
| Army 10 Miler | 1 | ea | ||
| Marine Corps Marathon (MCM) | 1 | ea | ||
| Presidential Inauguration | 1 | ea | ||
| Unscheduled Special Event | 1 | ea | ||
| Sub-Total = |
| **CLIN 4009 - Emergency Response Services** | |||
| Emergency Response Services (Events) | 4 | ea | Sub-Total = |
| **CLIN 4010-COVID19 Enhanced Common Spaces Disinfecting** | |||||
| Enhanced Common Spaces (Not to Exceed) | 1 | N/A | Sub-Total = | $ 35,000.00 | |
| **CLIN 4011- COVID19 Enhanced Office Spaces Disinfecting** | |||||
| Enhanced Office Spaces (Not toExceed) | 1 | N/A | Sub-Total = | $ 35,000.00 | |
| **CLIN 4012 - COVID19 Electrostatic Sanitize** | |||||
| Electrostatic Sanitize (Reservation Wide) (Not to Exceed) | 1 | 100,000 | sq ft | Sub-Total = | $ 40,000.00 |
| Sub-Total = | |||||
| G-TOTAL = |
File details come from the government source that posted it. Updated .