A23 Pricing Sheet.xlsx
XLSX spreadsheet 53 KB Posted
- Attached to
- Janitorial Services
- Solicitation number
- HQ003421R0031
- Issued by
-
DOD Washington Headquarters Service
About this file
This price proposal summary sheet outlines the pricing for a multi-year janitorial services contract at the Pentagon and various ancillary facilities. The solicitation calls for daily cleaning and policing of over 4 million square feet of office space, restrooms, corridors, entrances and other areas. It also includes quarterly carpet cleaning and shampooing, snow and ice removal, interior and exterior window cleaning, hard surface polishing, and emergency response services. Pricing is provided for the base year and four one-year options by location and space type. Additional event services and a hard floor protector system are also priced. The solicitation was issued by the DOD Washington Headquarters Services for janitorial services under number HQ003421R0031.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CBA addendum A Redacted.pdf | ||
| A23 Pricing Sheet 4 Nov 2021.xlsx | XLSX spreadsheet | |
| 21R0031 Amendment 6.pdf | ||
| HQ003421R0031 Conformed 11042021.pdf | ||
| A23 Pricing Sheet 0900-26oct2021.xlsx | XLSX spreadsheet | |
| CONFORMED21R0031 10262021.pdf | ||
| CBA.pdf | ||
| AMENDMENT 0005 21R0031.pdf | ||
| Conformed 21R0031 10_13_2021.pdf | ||
| Amendment 0004.pdf | ||
| Conformed Copy 21R0031.pdf | ||
| REVISED Attachment - J3 Past Performance Questionnaire.docx | DOCX document | |
| A23 Pricing Sheet 11oct2021.xlsx | XLSX spreadsheet | |
| Amendment 0003.pdf | ||
| REVISED - J4 Past Performance Data Sheet.docx | DOCX document | |
| amendment 2.pdf | ||
| Amendment 0001.pdf | ||
| A23 Attachment - J4 Past Performance Data Sheet.docx | DOCX document | |
| A23 Services WD-2015-4281 Revision 18.pdf | ||
| A23 Attachment J1.pdf | ||
| A23 Attachment - J3 Past Performance Questionnaire.docx | DOCX document | |
| A23 Attachment J2.pdf | ||
| HQ003421R0031.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| HQ003421R0031 Janitorial Services | ||||||
| Price Proposal Summary | ||||||
| CLIN | Description | Base | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 |
| CLIN 0001 | Pentagon | |||||
| CLIN 0002 | Walk-Off Mats | |||||
| CLIN 0003 | Carpeted Shampoo | |||||
| CLIN 0004 | Snow & Ice Removal - Treatments | |||||
| CLIN 0005 | Interior / Exterior Window Cleaning | |||||
| CLIN 0006 | Reservation Hard Surfaces Policing | |||||
| CLIN 0007 | Metro Entrance Facility | |||||
| CLIN 0008 | Special Events | |||||
| CLIN 0009 | Emergency Response Services | |||||
| CLIN 0010 | 3M Terrazzo Hard Floor Protector System | |||||
| Total | ||||||
| Grand Total |
Base Breakdown
| Base Period | |||||||
| PENTAGON | Space Type Count | Estimated Daily Sq. Ft. | Deductible Sq. Ft. | Unit | Daily Prices | Monthly Prices | Annual Prices |
| Specific Space Type | |||||||
| SST | STC | EDSF | DSF | UNIT | DP | MP | AP |
| CLIN 0001 - Pentagon (PNT) | |||||||
| Restrooms | 38 | 18,853 | 496 | sq ft | |||
| Janitor Closets | 30 | 1,844 | 61 | sq ft | |||
| Corridors | 101 | 217,287 | 2,151 | sq ft | |||
| Entrances/Lobbies | 10 | 5,637 | 564 | sq ft | |||
| Ramps | 4 | 11,023 | 2,756 | sq ft | |||
| Escalators | 11 | 3,361 | 306 | sq ft | |||
| Customer Service Centers | 5 | 13,502 | 2,700 | sq ft | |||
| Senior Executive Offices | 19 | 24,621 | 1,296 | sq ft | |||
| Senior Executive Offices – TS* | 16 | 15,929 | 996 | sq ft | |||
| Executive Offices | 26 | 36,292 | 1,396 | sq ft | |||
| Executive Offices – TS* | 6 | 10,588 | 1,765 | sq ft | |||
| General Offices | 192 | 419,699 | 2,186 | sq ft | |||
| General Offices – TS* | 56 | 105,356 | 1,881 | sq ft | |||
| Conference/Class/Training Rooms | 5 | 4,228 | 846 | sq ft | |||
| Conference/Class/Training Rooms - TS* | 18 | 8,295 | 461 | sq ft | |||
| Structurally Changed Spaces - TS* | 3 | 499 | 166 | sq ft | |||
| Communication/ADP – TS* | 3 | 538 | 1,012 | sq ft | |||
| CLIN 0001 - Remote Delivery Facility (RDF) | |||||||
| Corridors | 5 | 29,201 | 5,840 | sq ft | |||
| Rest Rooms | 4 | 2,425 | 606 | sq ft | |||
| General Office | 25 | 47,067 | 1,883 | sq ft | |||
| Locker Rooms | 2 | 1,372 | 686 | sq ft | |||
| Loading Dock (Trash) | 1 | 2,810 | 2,810 | sq ft | |||
| Loading Dock (Dock Master) | 1 | 17,851 | 17,851 | sq ft | |||
| Conference Rooms | 2 | 631 | 316 | sq ft | |||
| SAIC Warehouse | 2 | 11,992 | 5,996 | sq ft | |||
| CLIN 0001 - Pentagon Incinerator Plant (PIP) | |||||||
| General Office Space | 2 | 600 | 300 | sq ft | |||
| Restroom/Locker Rooms | 2 | 900 | 450 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 500 | 250 | sq ft | |||
| Stairwells | 1 | 345 | 345 | sq ft | |||
| CLIN 0001 - Heating & Refrigeration Plant (HRP) | |||||||
| General Office Space | 10 | 7,578 | 758 | sq ft | |||
| Restroom/Locker Rooms | 6 | 900 | 150 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 6,022 | 3,011 | sq ft | |||
| Stairwells | 7 | 1,650 | 236 | sq ft | |||
| Elevator | 2 | 253 | 127 | sq ft | |||
| CLIN 0001 - Pentagon Emergency Response Center (PERC) | |||||||
| General Office Space | 8 | 11,288 | 1,411 | sq ft | |||
| Restrooms/Locker Rooms | 10 | 2,062 | 206 | sq ft | |||
| Corridor, Lobbies, Entrances | 8 | 3,836 | 480 | sq ft | |||
| Conference/Training Rooms | 2 | 1,590 | 795 | sq ft | |||
| Laboratories | 2 | 2,528 | 1,264 | sq ft | |||
| Stairs | 4 | 886 | 222 | sq ft | |||
| Elevator | 2 | 160 | 80 | sq ft | |||
| Structurally Changed Spaces (ERT Motors) | 4 | 7,347 | 1,837 | sq ft | |||
| CLIN 0001 - PFPA K9 Building & Guard Posts | |||||||
| Corridors/Circulation/Lobby | 2 | 1,925 | 963 | sq ft | |||
| Rest Rooms | 2 | 128 | 64 | sq ft | |||
| General Office | 5 | 1,090 | 218 | sq ft | |||
| Locker Room | 1 | 270 | 270 | sq ft | |||
| Kennel Room | 3 | 445 | 148 | sq ft | |||
| PFPA Guard Posts | 28 | 3,850 | 138 | sq ft | |||
| CLIN 0001 - Pentagon Ancillary Support Facility (PASF) | |||||||
| General Office | 25 | 12,120 | 485 | sq ft | |||
| Rest Rooms | 3 | 475 | 158 | sq ft | |||
| CLIN 0001 - Trailers | |||||||
| Heliport Control Tower | 1 | 110 | 110 | sq ft | |||
| Firehouse Trailer 1 | 1 | 320 | 320 | sq ft | |||
| Firehouse Trailer 2 | 1 | 670 | 670 | sq ft | |||
| General Dynamics Modular Office Space | 35 | ERROR:#REF! | ERROR:#REF! | sq ft | |||
| General Dynamics Modular Office Entrances | 4 | 75 | 19 | sq ft | |||
| PFPA CBRN Trailer | 1 | 1,190 | 1,190 | sq ft | |||
| Restrooms | 7 | 1,465 | 209 | sq ft | |||
| Sub-Total = |
| **CLIN 0002 - Walk-Off Mats 4x per Period** | |||||
| Walk-Off Mats (Shampooed Quarterly) | 4 | 7,850 | 95 | sq ft | |
| Sub-Total = |
| **CLIN 0003 - Carpeted Shampoo** | |||||
| Carpet Shampoo (Work will be ordered as needed) | N/A | 600,000 | N/A | sq ft | |
| Sub-Total = |
| **CLIN 0004 - Snow & Ice Removal 12 Treatments** | |||||
| Snow & Ice Treatment - Exterior Entrances | 15 | 15 | 1 | each | |
| Sub-Total = |
| **CLIN 0005 - Interior / Exterior Window Cleaning 1x / Spring** | |||||
| PNT Windows - Interior | 365 | 365 | 1 | each | |
| PNT Windows - Exterior | 7,720 | 7,720 | 1 | each | |
| Metro Awnings | 10 | 10 | 1 | each | |
| General Dynamics Modular Space ** | 20 | 20 | 1 | each | |
| Metro Bus Stops ** | 16 | 16 | 1 | each | |
| CDC ** | 112 | 112 | 1 | each | |
| Heating & Refrigeration Plant ** | 17 | 17 | 1 | each | |
| Pentagon Emergency Response Center ** | 190 | 190 | 1 | each | |
| Addition Square Feet of Glass | 5,000 | 5,000 | 1 | each | |
| ** Note: Includes Interior & Exterior Glass ** | Sub-Total = |
| **CLIN 0005A - Exterior Center Court Yard Window Cleaning 1x / Fall** | |||||
| Center Court Yard Windows - Exterior "Only" | 425 | 425 | 1 | each | |
| ** Note: Includes Exterior Glass Only ** | Sub-Total = |
| **CLIN 0006 - Daily Reservation Hard Surfaces Policing** | |||||
| Reservation Hard Surfaces & CCY | 251 | 4,456,890 | 17,757 | sq ft | |
| (Labor & Equipment Only) | Sub-Total = |
| **CLIN 0007 - Metro Entrance Facility (MEF)** | |||||
| Corridors/Circulation | 7 | 16,159 | 2,655 | sq ft | |
| Escalators | 4 | 1,100 | 275 | sq ft | |
| General Office | 10 | 3,564 | 809 | sq ft | |
| Rest Room | 3 | 790 | 314 | sq ft | |
| Locker Room | 1 | 1,150 | 1,150 | sq ft | |
| Elevators | 2 | 60 | 30 | sq ft | |
| Sub-Total = |
| **CLIN 0008 - Special Events** | ||||
| AWG Shop Floor Strip & Wax (WHS) Events | 4 | 10,900 | sq ft | |
| Portable Latrines | 50 | ea | ||
| Rolling Thunder | 1 | ea | ||
| July 4th | 1 | ea | ||
| 9/11 Commemoration | 1 | ea | ||
| Army 10 Miler | 1 | ea | ||
| Marine Corps Marathon (MCM) | 1 | ea | ||
| Presidential Inauguration | 1 | ea | ||
| Unscheduled Special Event | 1 | ea | ||
| Sub-Total = |
| **CLIN 1009 - Emergency Response Services** | |||||
| Emergency Response Services (Events) | 4 | ea | |||
| Sub-Total = | |||||
| **CLIN 0010 - 3M Terrazzo Hard Floor Protector System** | |||||
| 3M Terrazzo Hard Floor Protector System | 101 | 221,123 | 2,189 | sq ft | |
| (Labor & Equipment Only) | Sub-Total = | ||||
| G-TOTAL = |
Option 1 B
| Option Period 1 | |||||||
| PENTAGON | Space Type Count | Estimated Daily Sq. Ft. | Deductible Sq. Ft. | Unit | Daily Prices | Monthly Prices | Annual Prices |
| Specific Space Type | |||||||
| SST | STC | EDSF | DSF | UNIT | DP | MP | AP |
| CLIN 0001 - Pentagon (PNT) | |||||||
| Restrooms | 38 | 18,853 | 496 | sq ft | |||
| Janitor Closets | 30 | 1,844 | 61 | sq ft | |||
| Corridors | 101 | 217,287 | 2,151 | sq ft | |||
| Entrances/Lobbies | 10 | 5,637 | 564 | sq ft | |||
| Ramps | 4 | 11,023 | 2,756 | sq ft | |||
| Escalators | 11 | 3,361 | 306 | sq ft | |||
| Customer Service Centers | 5 | 13,502 | 2,700 | sq ft | |||
| Senior Executive Offices | 19 | 24,621 | 1,296 | sq ft | |||
| Senior Executive Offices – TS* | 16 | 15,929 | 996 | sq ft | |||
| Executive Offices | 26 | 36,292 | 1,396 | sq ft | |||
| Executive Offices – TS* | 6 | 10,588 | 1,765 | sq ft | |||
| General Offices | 192 | 419,699 | 2,186 | sq ft | |||
| General Offices – TS* | 56 | 105,356 | 1,881 | sq ft | |||
| Conference/Class/Training Rooms | 5 | 4,228 | 846 | sq ft | |||
| Conference/Class/Training Rooms - TS* | 18 | 8,295 | 461 | sq ft | |||
| Structurally Changed Spaces - TS* | 3 | 499 | 166 | sq ft | |||
| Communication/ADP – TS* | 3 | 538 | 1,012 | sq ft | |||
| CLIN 0001 - Remote Delivery Facility (RDF) | |||||||
| Corridors | 5 | 29,201 | 5,840 | sq ft | |||
| Rest Rooms | 4 | 2,425 | 606 | sq ft | |||
| General Office | 25 | 47,067 | 1,883 | sq ft | |||
| Locker Rooms | 2 | 1,372 | 686 | sq ft | |||
| Loading Dock (Trash) | 1 | 2,810 | 2,810 | sq ft | |||
| Loading Dock (Dock Master) | 1 | 17,851 | 17,851 | sq ft | |||
| Conference Rooms | 2 | 631 | 316 | sq ft | |||
| SAIC Warehouse | 2 | 11,992 | 5,996 | sq ft | |||
| CLIN 0001 - Pentagon Incinerator Plant (PIP) | |||||||
| General Office Space | 2 | 600 | 300 | sq ft | |||
| Restroom/Locker Rooms | 2 | 900 | 450 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 500 | 250 | sq ft | |||
| Stairwells | 1 | 345 | 345 | sq ft | |||
| CLIN 0001 - Heating & Refrigeration Plant (HRP) | |||||||
| General Office Space | 10 | 7,578 | 758 | sq ft | |||
| Restroom/Locker Rooms | 6 | 900 | 150 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 6,022 | 3,011 | sq ft | |||
| Stairwells | 7 | 1,650 | 236 | sq ft | |||
| Elevator | 2 | 253 | 127 | sq ft | |||
| CLIN 0001 - Pentagon Emergency Response Center (PERC) | |||||||
| General Office Space | 8 | 11,288 | 1,411 | sq ft | |||
| Restrooms/Locker Rooms | 10 | 2,062 | 206 | sq ft | |||
| Corridor, Lobbies, Entrances | 8 | 3,836 | 480 | sq ft | |||
| Conference/Training Rooms | 2 | 1,590 | 795 | sq ft | |||
| Laboratories | 2 | 2,528 | 1,264 | sq ft | |||
| Stairs | 4 | 886 | 222 | sq ft | |||
| Elevator | 2 | 160 | 80 | sq ft | |||
| Structurally Changed Spaces (ERT Motors) | 4 | 7,347 | 1,837 | sq ft | |||
| CLIN 0001 - PFPA K9 Building & Guard Posts | |||||||
| Corridors/Circulation/Lobby | 2 | 1,925 | 963 | sq ft | |||
| Rest Rooms | 2 | 128 | 64 | sq ft | |||
| General Office | 5 | 1,090 | 218 | sq ft | |||
| Locker Room | 1 | 270 | 270 | sq ft | |||
| Kennel Room | 3 | 445 | 148 | sq ft | |||
| PFPA Guard Posts | 28 | 3,850 | 138 | sq ft | |||
| CLIN 0001 - Pentagon Ancillary Support Facility (PASF) | |||||||
| General Office | 25 | 12,120 | 485 | sq ft | |||
| Rest Rooms | 3 | 475 | 158 | sq ft | |||
| CLIN 0001 - Trailers | |||||||
| Heliport Control Tower | 1 | 110 | 110 | sq ft | |||
| Firehouse Trailer 1 | 1 | 320 | 320 | sq ft | |||
| Firehouse Trailer 2 | 1 | 670 | 670 | sq ft | |||
| General Dynamics Modular Office Space | 35 | ERROR:#REF! | ERROR:#REF! | sq ft | |||
| General Dynamics Modular Office Entrances | 4 | 75 | 19 | sq ft | |||
| PFPA CBRN Trailer | 1 | 1,190 | 1,190 | sq ft | |||
| Restrooms | 7 | 1,465 | 209 | sq ft | |||
| Sub-Total = |
| **CLIN 0002 - Walk-Off Mats 4x per Period** | |||||
| Walk-Off Mats (Shampooed Quarterly) | 4 | 7,850 | 95 | sq ft | |
| Sub-Total = |
| **CLIN 0003 - Carpeted Shampoo** | |||||
| Carpet Shampoo (Work will be ordered as needed) | N/A | 600,000 | N/A | sq ft | |
| Sub-Total = |
| **CLIN 0004 - Snow & Ice Removal 12 Treatments** | |||||
| Snow & Ice Treatment - Exterior Entrances | 15 | 15 | 1 | each | |
| Sub-Total = |
| **CLIN 0005 - Interior / Exterior Window Cleaning 1x / Spring** | |||||
| PNT Windows - Interior | 365 | 365 | 1 | each | |
| PNT Windows - Exterior | 7,720 | 7,720 | 1 | each | |
| Metro Awnings | 10 | 10 | 1 | each | |
| General Dynamics Modular Space ** | 20 | 20 | 1 | each | |
| Metro Bus Stops ** | 16 | 16 | 1 | each | |
| CDC ** | 112 | 112 | 1 | each | |
| Heating & Refrigeration Plant ** | 17 | 17 | 1 | each | |
| Pentagon Emergency Response Center ** | 190 | 190 | 1 | each | |
| Addition Square Feet of Glass | 5,000 | 5,000 | 1 | each | |
| ** Note: Includes Interior & Exterior Glass ** | Sub-Total = |
| **CLIN 0005A - Exterior Center Court Yard Window Cleaning 1x / Fall** | |||||
| Center Court Yard Windows - Exterior "Only" | 425 | 425 | 1 | each | |
| ** Note: Includes Exterior Glass Only ** | Sub-Total = |
| **CLIN 0006 - Daily Reservation Hard Surfaces Policing** | |||||
| Reservation Hard Surfaces & CCY | 251 | 4,456,890 | 17,757 | sq ft | |
| (Labor & Equipment Only) | Sub-Total = |
| **CLIN 0007 - Metro Entrance Facility (MEF)** | |||||
| Corridors/Circulation | 7 | 16,159 | 2,655 | sq ft | |
| Escalators | 4 | 1,100 | 275 | sq ft | |
| General Office | 10 | 3,564 | 809 | sq ft | |
| Rest Room | 3 | 790 | 314 | sq ft | |
| Locker Room | 1 | 1,150 | 1,150 | sq ft | |
| Elevators | 2 | 60 | 30 | sq ft | |
| Sub-Total = |
| **CLIN 0008 - Special Events** | ||||
| AWG Shop Floor Strip & Wax (WHS) Events | 4 | 10,900 | sq ft | |
| Portable Latrines | 50 | ea | ||
| Rolling Thunder | 1 | ea | ||
| July 4th | 1 | ea | ||
| 9/11 Commemoration | 1 | ea | ||
| Army 10 Miler | 1 | ea | ||
| Marine Corps Marathon (MCM) | 1 | ea | ||
| Presidential Inauguration | 1 | ea | ||
| Unscheduled Special Event | 1 | ea | ||
| Sub-Total = |
| **CLIN 1009 - Emergency Response Services** | |||||
| Emergency Response Services (Events) | 4 | ea | |||
| Sub-Total = | |||||
| **CLIN 0010 - 3M Terrazzo Hard Floor Protector System** | |||||
| 3M Terrazzo Hard Floor Protector System | 101 | 221,123 | 2,189 | sq ft | |
| (Labor & Equipment Only) | Sub-Total = | ||||
| G-TOTAL = |
Option 2 B
| Option Period 2 | |||||||
| PENTAGON | Space Type Count | Estimated Daily Sq. Ft. | Deductible Sq. Ft. | Unit | Daily Prices | Monthly Prices | Annual Prices |
| Specific Space Type | |||||||
| SST | STC | EDSF | DSF | UNIT | DP | MP | AP |
| CLIN 0001 - Pentagon (PNT) | |||||||
| Restrooms | 38 | 18,853 | 496 | sq ft | |||
| Janitor Closets | 30 | 1,844 | 61 | sq ft | |||
| Corridors | 101 | 217,287 | 2,151 | sq ft | |||
| Entrances/Lobbies | 10 | 5,637 | 564 | sq ft | |||
| Ramps | 4 | 11,023 | 2,756 | sq ft | |||
| Escalators | 11 | 3,361 | 306 | sq ft | |||
| Customer Service Centers | 5 | 13,502 | 2,700 | sq ft | |||
| Senior Executive Offices | 19 | 24,621 | 1,296 | sq ft | |||
| Senior Executive Offices – TS* | 16 | 15,929 | 996 | sq ft | |||
| Executive Offices | 26 | 36,292 | 1,396 | sq ft | |||
| Executive Offices – TS* | 6 | 10,588 | 1,765 | sq ft | |||
| General Offices | 192 | 419,699 | 2,186 | sq ft | |||
| General Offices – TS* | 56 | 105,356 | 1,881 | sq ft | |||
| Conference/Class/Training Rooms | 5 | 4,228 | 846 | sq ft | |||
| Conference/Class/Training Rooms - TS* | 18 | 8,295 | 461 | sq ft | |||
| Structurally Changed Spaces - TS* | 3 | 499 | 166 | sq ft | |||
| Communication/ADP – TS* | 3 | 538 | 1,012 | sq ft | |||
| CLIN 0001 - Remote Delivery Facility (RDF) | |||||||
| Corridors | 5 | 29,201 | 5,840 | sq ft | |||
| Rest Rooms | 4 | 2,425 | 606 | sq ft | |||
| General Office | 25 | 47,067 | 1,883 | sq ft | |||
| Locker Rooms | 2 | 1,372 | 686 | sq ft | |||
| Loading Dock (Trash) | 1 | 2,810 | 2,810 | sq ft | |||
| Loading Dock (Dock Master) | 1 | 17,851 | 17,851 | sq ft | |||
| Conference Rooms | 2 | 631 | 316 | sq ft | |||
| SAIC Warehouse | 2 | 11,992 | 5,996 | sq ft | |||
| CLIN 0001 - Pentagon Incinerator Plant (PIP) | |||||||
| General Office Space | 2 | 600 | 300 | sq ft | |||
| Restroom/Locker Rooms | 2 | 900 | 450 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 500 | 250 | sq ft | |||
| Stairwells | 1 | 345 | 345 | sq ft | |||
| CLIN 0001 - Heating & Refrigeration Plant (HRP) | |||||||
| General Office Space | 10 | 7,578 | 758 | sq ft | |||
| Restroom/Locker Rooms | 6 | 900 | 150 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 6,022 | 3,011 | sq ft | |||
| Stairwells | 7 | 1,650 | 236 | sq ft | |||
| Elevator | 2 | 253 | 127 | sq ft | |||
| CLIN 0001 - Pentagon Emergency Response Center (PERC) | |||||||
| General Office Space | 8 | 11,288 | 1,411 | sq ft | |||
| Restrooms/Locker Rooms | 10 | 2,062 | 206 | sq ft | |||
| Corridor, Lobbies, Entrances | 8 | 3,836 | 480 | sq ft | |||
| Conference/Training Rooms | 2 | 1,590 | 795 | sq ft | |||
| Laboratories | 2 | 2,528 | 1,264 | sq ft | |||
| Stairs | 4 | 886 | 222 | sq ft | |||
| Elevator | 2 | 160 | 80 | sq ft | |||
| Structurally Changed Spaces (ERT Motors) | 4 | 7,347 | 1,837 | sq ft | |||
| CLIN 0001 - PFPA K9 Building & Guard Posts | |||||||
| Corridors/Circulation/Lobby | 2 | 1,925 | 963 | sq ft | |||
| Rest Rooms | 2 | 128 | 64 | sq ft | |||
| General Office | 5 | 1,090 | 218 | sq ft | |||
| Locker Room | 1 | 270 | 270 | sq ft | |||
| Kennel Room | 3 | 445 | 148 | sq ft | |||
| PFPA Guard Posts | 28 | 3,850 | 138 | sq ft | |||
| CLIN 0001 - Pentagon Ancillary Support Facility (PASF) | |||||||
| General Office | 25 | 12,120 | 485 | sq ft | |||
| Rest Rooms | 3 | 475 | 158 | sq ft | |||
| CLIN 0001 - Trailers | |||||||
| Heliport Control Tower | 1 | 110 | 110 | sq ft | |||
| Firehouse Trailer 1 | 1 | 320 | 320 | sq ft | |||
| Firehouse Trailer 2 | 1 | 670 | 670 | sq ft | |||
| General Dynamics Modular Office Space | 35 | ERROR:#REF! | ERROR:#REF! | sq ft | |||
| General Dynamics Modular Office Entrances | 4 | 75 | 19 | sq ft | |||
| PFPA CBRN Trailer | 1 | 1,190 | 1,190 | sq ft | |||
| Restrooms | 7 | 1,465 | 209 | sq ft | |||
| Sub-Total = |
| **CLIN 0002 - Walk-Off Mats 4x per Period** | |||||
| Walk-Off Mats (Shampooed Quarterly) | 4 | 7,850 | 95 | sq ft | |
| Sub-Total = |
| **CLIN 0003 - Carpeted Shampoo** | |||||
| Carpet Shampoo (Work will be ordered as needed) | N/A | 600,000 | N/A | sq ft | |
| Sub-Total = |
| **CLIN 0004 - Snow & Ice Removal 12 Treatments** | |||||
| Snow & Ice Treatment - Exterior Entrances | 15 | 15 | 1 | each | |
| Sub-Total = |
| **CLIN 0005 - Interior / Exterior Window Cleaning 1x / Spring** | |||||
| PNT Windows - Interior | 365 | 365 | 1 | each | |
| PNT Windows - Exterior | 7,720 | 7,720 | 1 | each | |
| Metro Awnings | 10 | 10 | 1 | each | |
| General Dynamics Modular Space ** | 20 | 20 | 1 | each | |
| Metro Bus Stops ** | 16 | 16 | 1 | each | |
| CDC ** | 112 | 112 | 1 | each | |
| Heating & Refrigeration Plant ** | 17 | 17 | 1 | each | |
| Pentagon Emergency Response Center ** | 190 | 190 | 1 | each | |
| Addition Square Feet of Glass | 5,000 | 5,000 | 1 | each | |
| ** Note: Includes Interior & Exterior Glass ** | Sub-Total = |
| **CLIN 0005A - Exterior Center Court Yard Window Cleaning 1x / Fall** | |||||
| Center Court Yard Windows - Exterior "Only" | 425 | 425 | 1 | each | |
| ** Note: Includes Exterior Glass Only ** | Sub-Total = |
| **CLIN 0006 - Daily Reservation Hard Surfaces Policing** | |||||
| Reservation Hard Surfaces & CCY | 251 | 4,456,890 | 17,757 | sq ft | |
| (Labor & Equipment Only) | Sub-Total = |
| **CLIN 0007 - Metro Entrance Facility (MEF)** | |||||
| Corridors/Circulation | 7 | 16,159 | 2,655 | sq ft | |
| Escalators | 4 | 1,100 | 275 | sq ft | |
| General Office | 10 | 3,564 | 809 | sq ft | |
| Rest Room | 3 | 790 | 314 | sq ft | |
| Locker Room | 1 | 1,150 | 1,150 | sq ft | |
| Elevators | 2 | 60 | 30 | sq ft | |
| Sub-Total = |
| **CLIN 0008 - Special Events** | ||||
| AWG Shop Floor Strip & Wax (WHS) Events | 4 | 10,900 | sq ft | |
| Portable Latrines | 50 | ea | ||
| Rolling Thunder | 1 | ea | ||
| July 4th | 1 | ea | ||
| 9/11 Commemoration | 1 | ea | ||
| Army 10 Miler | 1 | ea | ||
| Marine Corps Marathon (MCM) | 1 | ea | ||
| Presidential Inauguration | 1 | ea | ||
| Unscheduled Special Event | 1 | ea | ||
| Sub-Total = |
| **CLIN 1009 - Emergency Response Services** | |||||
| Emergency Response Services (Events) | 4 | ea | |||
| Sub-Total = | |||||
| **CLIN 0010 - 3M Terrazzo Hard Floor Protector System** | |||||
| 3M Terrazzo Hard Floor Protector System | 101 | 221,123 | 2,189 | sq ft | |
| (Labor & Equipment Only) | Sub-Total = | ||||
| G-TOTAL = |
Option 3 B
| Option Period Period 3 | |||||||
| PENTAGON | Space Type Count | Estimated Daily Sq. Ft. | Deductible Sq. Ft. | Unit | Daily Prices | Monthly Prices | Annual Prices |
| Specific Space Type | |||||||
| SST | STC | EDSF | DSF | UNIT | DP | MP | AP |
| CLIN 0001 - Pentagon (PNT) | |||||||
| Restrooms | 38 | 18,853 | 496 | sq ft | |||
| Janitor Closets | 30 | 1,844 | 61 | sq ft | |||
| Corridors | 101 | 217,287 | 2,151 | sq ft | |||
| Entrances/Lobbies | 10 | 5,637 | 564 | sq ft | |||
| Ramps | 4 | 11,023 | 2,756 | sq ft | |||
| Escalators | 11 | 3,361 | 306 | sq ft | |||
| Customer Service Centers | 5 | 13,502 | 2,700 | sq ft | |||
| Senior Executive Offices | 19 | 24,621 | 1,296 | sq ft | |||
| Senior Executive Offices – TS* | 16 | 15,929 | 996 | sq ft | |||
| Executive Offices | 26 | 36,292 | 1,396 | sq ft | |||
| Executive Offices – TS* | 6 | 10,588 | 1,765 | sq ft | |||
| General Offices | 192 | 419,699 | 2,186 | sq ft | |||
| General Offices – TS* | 56 | 105,356 | 1,881 | sq ft | |||
| Conference/Class/Training Rooms | 5 | 4,228 | 846 | sq ft | |||
| Conference/Class/Training Rooms - TS* | 18 | 8,295 | 461 | sq ft | |||
| Structurally Changed Spaces - TS* | 3 | 499 | 166 | sq ft | |||
| Communication/ADP – TS* | 3 | 538 | 1,012 | sq ft | |||
| CLIN 0001 - Remote Delivery Facility (RDF) | |||||||
| Corridors | 5 | 29,201 | 5,840 | sq ft | |||
| Rest Rooms | 4 | 2,425 | 606 | sq ft | |||
| General Office | 25 | 47,067 | 1,883 | sq ft | |||
| Locker Rooms | 2 | 1,372 | 686 | sq ft | |||
| Loading Dock (Trash) | 1 | 2,810 | 2,810 | sq ft | |||
| Loading Dock (Dock Master) | 1 | 17,851 | 17,851 | sq ft | |||
| Conference Rooms | 2 | 631 | 316 | sq ft | |||
| SAIC Warehouse | 2 | 11,992 | 5,996 | sq ft | |||
| CLIN 0001 - Pentagon Incinerator Plant (PIP) | |||||||
| General Office Space | 2 | 600 | 300 | sq ft | |||
| Restroom/Locker Rooms | 2 | 900 | 450 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 500 | 250 | sq ft | |||
| Stairwells | 1 | 345 | 345 | sq ft | |||
| CLIN 0001 - Heating & Refrigeration Plant (HRP) | |||||||
| General Office Space | 10 | 7,578 | 758 | sq ft | |||
| Restroom/Locker Rooms | 6 | 900 | 150 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 6,022 | 3,011 | sq ft | |||
| Stairwells | 7 | 1,650 | 236 | sq ft | |||
| Elevator | 2 | 253 | 127 | sq ft | |||
| CLIN 0001 - Pentagon Emergency Response Center (PERC) | |||||||
| General Office Space | 8 | 11,288 | 1,411 | sq ft | |||
| Restrooms/Locker Rooms | 10 | 2,062 | 206 | sq ft | |||
| Corridor, Lobbies, Entrances | 8 | 3,836 | 480 | sq ft | |||
| Conference/Training Rooms | 2 | 1,590 | 795 | sq ft | |||
| Laboratories | 2 | 2,528 | 1,264 | sq ft | |||
| Stairs | 4 | 886 | 222 | sq ft | |||
| Elevator | 2 | 160 | 80 | sq ft | |||
| Structurally Changed Spaces (ERT Motors) | 4 | 7,347 | 1,837 | sq ft | |||
| CLIN 0001 - PFPA K9 Building & Guard Posts | |||||||
| Corridors/Circulation/Lobby | 2 | 1,925 | 963 | sq ft | |||
| Rest Rooms | 2 | 128 | 64 | sq ft | |||
| General Office | 5 | 1,090 | 218 | sq ft | |||
| Locker Room | 1 | 270 | 270 | sq ft | |||
| Kennel Room | 3 | 445 | 148 | sq ft | |||
| PFPA Guard Posts | 28 | 3,850 | 138 | sq ft | |||
| CLIN 0001 - Pentagon Ancillary Support Facility (PASF) | |||||||
| General Office | 25 | 12,120 | 485 | sq ft | |||
| Rest Rooms | 3 | 475 | 158 | sq ft | |||
| CLIN 0001 - Trailers | |||||||
| Heliport Control Tower | 1 | 110 | 110 | sq ft | |||
| Firehouse Trailer 1 | 1 | 320 | 320 | sq ft | |||
| Firehouse Trailer 2 | 1 | 670 | 670 | sq ft | |||
| General Dynamics Modular Office Space | 35 | ERROR:#REF! | ERROR:#REF! | sq ft | |||
| General Dynamics Modular Office Entrances | 4 | 75 | 19 | sq ft | |||
| PFPA CBRN Trailer | 1 | 1,190 | 1,190 | sq ft | |||
| Restrooms | 7 | 1,465 | 209 | sq ft | |||
| Sub-Total = |
| **CLIN 0002 - Walk-Off Mats 4x per Period** | |||||
| Walk-Off Mats (Shampooed Quarterly) | 4 | 7,850 | 95 | sq ft | |
| Sub-Total = |
| **CLIN 0003 - Carpeted Shampoo** | |||||
| Carpet Shampoo (Work will be ordered as needed) | N/A | 600,000 | N/A | sq ft | |
| Sub-Total = |
| **CLIN 0004 - Snow & Ice Removal 12 Treatments** | |||||
| Snow & Ice Treatment - Exterior Entrances | 15 | 15 | 1 | each | |
| Sub-Total = |
| **CLIN 0005 - Interior / Exterior Window Cleaning 1x / Spring** | |||||
| PNT Windows - Interior | 365 | 365 | 1 | each | |
| PNT Windows - Exterior | 7,720 | 7,720 | 1 | each | |
| Metro Awnings | 10 | 10 | 1 | each | |
| General Dynamics Modular Space ** | 20 | 20 | 1 | each | |
| Metro Bus Stops ** | 16 | 16 | 1 | each | |
| CDC ** | 112 | 112 | 1 | each | |
| Heating & Refrigeration Plant ** | 17 | 17 | 1 | each | |
| Pentagon Emergency Response Center ** | 190 | 190 | 1 | each | |
| Addition Square Feet of Glass | 5,000 | 5,000 | 1 | each | |
| ** Note: Includes Interior & Exterior Glass ** | Sub-Total = |
| **CLIN 0005A - Exterior Center Court Yard Window Cleaning 1x / Fall** | |||||
| Center Court Yard Windows - Exterior "Only" | 425 | 425 | 1 | each | |
| ** Note: Includes Exterior Glass Only ** | Sub-Total = |
| **CLIN 0006 - Daily Reservation Hard Surfaces Policing** | |||||
| Reservation Hard Surfaces & CCY | 251 | 4,456,890 | 17,757 | sq ft | |
| (Labor & Equipment Only) | Sub-Total = |
| **CLIN 0007 - Metro Entrance Facility (MEF)** | |||||
| Corridors/Circulation | 7 | 16,159 | 2,655 | sq ft | |
| Escalators | 4 | 1,100 | 275 | sq ft | |
| General Office | 10 | 3,564 | 809 | sq ft | |
| Rest Room | 3 | 790 | 314 | sq ft | |
| Locker Room | 1 | 1,150 | 1,150 | sq ft | |
| Elevators | 2 | 60 | 30 | sq ft | |
| Sub-Total = |
| **CLIN 0008 - Special Events** | ||||
| AWG Shop Floor Strip & Wax (WHS) Events | 4 | 10,900 | sq ft | |
| Portable Latrines | 50 | ea | ||
| Rolling Thunder | 1 | ea | ||
| July 4th | 1 | ea | ||
| 9/11 Commemoration | 1 | ea | ||
| Army 10 Miler | 1 | ea | ||
| Marine Corps Marathon (MCM) | 1 | ea | ||
| Presidential Inauguration | 1 | ea | ||
| Unscheduled Special Event | 1 | ea | ||
| Sub-Total = |
| **CLIN 1009 - Emergency Response Services** | |||||
| Emergency Response Services (Events) | 4 | ea | |||
| Sub-Total = | |||||
| **CLIN 0010 - 3M Terrazzo Hard Floor Protector System** | |||||
| 3M Terrazzo Hard Floor Protector System | 101 | 221,123 | 2,189 | sq ft | |
| (Labor & Equipment Only) | Sub-Total = | ||||
| G-TOTAL = |
Option 4 B
| Option Period Period 4 | |||||||
| PENTAGON | Space Type Count | Estimated Daily Sq. Ft. | Deductible Sq. Ft. | Unit | Daily Prices | Monthly Prices | Annual Prices |
| Specific Space Type | |||||||
| SST | STC | EDSF | DSF | UNIT | DP | MP | AP |
| CLIN 0001 - Pentagon (PNT) | |||||||
| Restrooms | 38 | 18,853 | 496 | sq ft | |||
| Janitor Closets | 30 | 1,844 | 61 | sq ft | |||
| Corridors | 101 | 217,287 | 2,151 | sq ft | |||
| Entrances/Lobbies | 10 | 5,637 | 564 | sq ft | |||
| Ramps | 4 | 11,023 | 2,756 | sq ft | |||
| Escalators | 11 | 3,361 | 306 | sq ft | |||
| Customer Service Centers | 5 | 13,502 | 2,700 | sq ft | |||
| Senior Executive Offices | 19 | 24,621 | 1,296 | sq ft | |||
| Senior Executive Offices – TS* | 16 | 15,929 | 996 | sq ft | |||
| Executive Offices | 26 | 36,292 | 1,396 | sq ft | |||
| Executive Offices – TS* | 6 | 10,588 | 1,765 | sq ft | |||
| General Offices | 192 | 419,699 | 2,186 | sq ft | |||
| General Offices – TS* | 56 | 105,356 | 1,881 | sq ft | |||
| Conference/Class/Training Rooms | 5 | 4,228 | 846 | sq ft | |||
| Conference/Class/Training Rooms - TS* | 18 | 8,295 | 461 | sq ft | |||
| Structurally Changed Spaces - TS* | 3 | 499 | 166 | sq ft | |||
| Communication/ADP – TS* | 3 | 538 | 1,012 | sq ft | |||
| CLIN 0001 - Remote Delivery Facility (RDF) | |||||||
| Corridors | 5 | 29,201 | 5,840 | sq ft | |||
| Rest Rooms | 4 | 2,425 | 606 | sq ft | |||
| General Office | 25 | 47,067 | 1,883 | sq ft | |||
| Locker Rooms | 2 | 1,372 | 686 | sq ft | |||
| Loading Dock (Trash) | 1 | 2,810 | 2,810 | sq ft | |||
| Loading Dock (Dock Master) | 1 | 17,851 | 17,851 | sq ft | |||
| Conference Rooms | 2 | 631 | 316 | sq ft | |||
| SAIC Warehouse | 2 | 11,992 | 5,996 | sq ft | |||
| CLIN 0001 - Pentagon Incinerator Plant (PIP) | |||||||
| General Office Space | 2 | 600 | 300 | sq ft | |||
| Restroom/Locker Rooms | 2 | 900 | 450 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 500 | 250 | sq ft | |||
| Stairwells | 1 | 345 | 345 | sq ft | |||
| CLIN 0001 - Heating & Refrigeration Plant (HRP) | |||||||
| General Office Space | 10 | 7,578 | 758 | sq ft | |||
| Restroom/Locker Rooms | 6 | 900 | 150 | sq ft | |||
| Corridors, Lobbies, Entrances | 2 | 6,022 | 3,011 | sq ft | |||
| Stairwells | 7 | 1,650 | 236 | sq ft | |||
| Elevator | 2 | 253 | 127 | sq ft | |||
| CLIN 0001 - Pentagon Emergency Response Center (PERC) | |||||||
| General Office Space | 8 | 11,288 | 1,411 | sq ft | |||
| Restrooms/Locker Rooms | 10 | 2,062 | 206 | sq ft | |||
| Corridor, Lobbies, Entrances | 8 | 3,836 | 480 | sq ft | |||
| Conference/Training Rooms | 2 | 1,590 | 795 | sq ft | |||
| Laboratories | 2 | 2,528 | 1,264 | sq ft | |||
| Stairs | 4 | 886 | 222 | sq ft | |||
| Elevator | 2 | 160 | 80 | sq ft | |||
| Structurally Changed Spaces (ERT Motors) | 4 | 7,347 | 1,837 | sq ft | |||
| CLIN 0001 - PFPA K9 Building & Guard Posts | |||||||
| Corridors/Circulation/Lobby | 2 | 1,925 | 963 | sq ft | |||
| Rest Rooms | 2 | 128 | 64 | sq ft | |||
| General Office | 5 | 1,090 | 218 | sq ft | |||
| Locker Room | 1 | 270 | 270 | sq ft | |||
| Kennel Room | 3 | 445 | 148 | sq ft | |||
| PFPA Guard Posts | 28 | 3,850 | 138 | sq ft | |||
| CLIN 0001 - Pentagon Ancillary Support Facility (PASF) | |||||||
| General Office | 25 | 12,120 | 485 | sq ft | |||
| Rest Rooms | 3 | 475 | 158 | sq ft | |||
| CLIN 0001 - Trailers | |||||||
| Heliport Control Tower | 1 | 110 | 110 | sq ft | |||
| Firehouse Trailer 1 | 1 | 320 | 320 | sq ft | |||
| Firehouse Trailer 2 | 1 | 670 | 670 | sq ft | |||
| General Dynamics Modular Office Space | 35 | ERROR:#REF! | ERROR:#REF! | sq ft | |||
| General Dynamics Modular Office Entrances | 4 | 75 | 19 | sq ft | |||
| PFPA CBRN Trailer | 1 | 1,190 | 1,190 | sq ft | |||
| Restrooms | 7 | 1,465 | 209 | sq ft | |||
| Sub-Total = |
| **CLIN 0002 - Walk-Off Mats 4x per Period** | |||||
| Walk-Off Mats (Shampooed Quarterly) | 4 | 7,850 | 95 | sq ft | |
| Sub-Total = |
| **CLIN 0003 - Carpeted Shampoo** | |||||
| Carpet Shampoo (Work will be ordered as needed) | N/A | 600,000 | N/A | sq ft | |
| Sub-Total = |
| **CLIN 0004 - Snow & Ice Removal 12 Treatments** | |||||
| Snow & Ice Treatment - Exterior Entrances | 15 | 15 | 1 | each | |
| Sub-Total = |
| **CLIN 0005 - Interior / Exterior Window Cleaning 1x / Spring** | |||||
| PNT Windows - Interior | 365 | 365 | 1 | each | |
| PNT Windows - Exterior | 7,720 | 7,720 | 1 | each | |
| Metro Awnings | 10 | 10 | 1 | each | |
| General Dynamics Modular Space ** | 20 | 20 | 1 | each | |
| Metro Bus Stops ** | 16 | 16 | 1 | each | |
| CDC ** | 112 | 112 | 1 | each | |
| Heating & Refrigeration Plant ** | 17 | 17 | 1 | each | |
| Pentagon Emergency Response Center ** | 190 | 190 | 1 | each | |
| Addition Square Feet of Glass | 5,000 | 5,000 | 1 | each | |
| ** Note: Includes Interior & Exterior Glass ** | Sub-Total = |
| **CLIN 0005A - Exterior Center Court Yard Window Cleaning 1x / Fall** | |||||
| Center Court Yard Windows - Exterior "Only" | 425 | 425 | 1 | each | |
| ** Note: Includes Exterior Glass Only ** | Sub-Total = |
| **CLIN 0006 - Daily Reservation Hard Surfaces Policing** | |||||
| Reservation Hard Surfaces & CCY | 251 | 4,456,890 | 17,757 | sq ft | |
| (Labor & Equipment Only) | Sub-Total = |
| **CLIN 0007 - Metro Entrance Facility (MEF)** | |||||
| Corridors/Circulation | 7 | 16,159 | 2,655 | sq ft | |
| Escalators | 4 | 1,100 | 275 | sq ft | |
| General Office | 10 | 3,564 | 809 | sq ft | |
| Rest Room | 3 | 790 | 314 | sq ft | |
| Locker Room | 1 | 1,150 | 1,150 | sq ft | |
| Elevators | 2 | 60 | 30 | sq ft | |
| Sub-Total = |
| **CLIN 0008 - Special Events** | ||||
| AWG Shop Floor Strip & Wax (WHS) Events | 4 | 10,900 | sq ft | |
| Portable Latrines | 50 | ea | ||
| Rolling Thunder | 1 | ea | ||
| July 4th | 1 | ea | ||
| 9/11 Commemoration | 1 | ea | ||
| Army 10 Miler | 1 | ea | ||
| Marine Corps Marathon (MCM) | 1 | ea | ||
| Presidential Inauguration | 1 | ea | ||
| Unscheduled Special Event | 1 | ea | ||
| Sub-Total = |
| **CLIN 1009 - Emergency Response Services** | |||||
| Emergency Response Services (Events) | 4 | ea | |||
| Sub-Total = | |||||
| **CLIN 0010 - 3M Terrazzo Hard Floor Protector System** | |||||
| 3M Terrazzo Hard Floor Protector System | 101 | 221,123 | 2,189 | sq ft | |
| (Labor & Equipment Only) | Sub-Total = | ||||
| G-TOTAL = |
File details come from the government source that posted it. Updated .