J171 Every 10 Year PM - Fuel Oil Tank - Internal Inspection.pdf

PDF 47 KB Posted

Attached to
Pentagon Heating and Refrigeration Plant Operations and Maintenance
Solicitation number
HQ003420R0087
Issued by

About this file

This document contains a job plan and safety requirements for conducting internal inspections of an aboveground fuel oil storage tank located at the Pentagon Heating and Refrigeration Plant in accordance with API Standard 653 every ten years. The job plan outlines the notification process, safety requirements, inspection procedures including visual, ultrasonic, and liquid penetrant testing of the tank bottom, shell and roof to assess minimum thickness and corrosion rates. It also specifies procedures for settlement evaluations, water washing and cleaning of the tank interior, mechanical cleaning equipment inspections, and contact ultrasonic thickness measurements of the tank bottom. Upon completion of the inspection and testing, the contractor must provide all required documentation and obtain quality assurance sign off from the plant shift supervisor before demobilizing.

The related federal contract opportunity is a solicitation issued by the DOD Washington Headquarters Service to provide preventative maintenance, predictive maintenance, corrective maintenance, service calls, and inspections for the equipment and systems at the Pentagon Heating and Refrigeration Plant, including the aboveground fuel oil storage tanks. The contractor will be responsible for quality work performance and partnering with the customer to continuously improve programs and services.

View the file

Other files

File Type Posted
HQ003420R0087-0003.pdf PDF
HQ003420R0087-0001.pdf PDF
HQ003420R0087-0002.pdf PDF
Combined Questions and Answers Template.pdf PDF
Master Site Visit Roster.pdf PDF
9. Sewage System.zip ZIP file
Wage Determination.pdf PDF
2. Chilled Water System.zip ZIP file
J4 Past Performance Data Sheet.docx DOCX document
5. Distributed Controls System (DCS).zip ZIP file
3. Compressed Air System.zip ZIP file
10. Auxiliary Systems and Facilities.zip ZIP file
HQ0034-20-R-0087 RFP FINAL.pdf PDF
1. Boiler System.zip ZIP file
J5 Non-Disclosure Agreement.docx DOCX document
6. Feedwater System.zip ZIP file
J3 Past Performance Questionnaire.docx DOCX document
4. Condenser Water System.zip ZIP file
J0 Key Personnel Qualifications.docx DOCX document
7. Fuel Oil System.zip ZIP file
J1 Questions and Answers Template.xlsx XLSX spreadsheet
Equipment Nameplate Data.zip ZIP file
8. Heating, Ventilation, and Air Condtioning (HVAC) System.zip ZIP file
J2 Pricing Template.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Every 10 Year PM - Fuel Oil Tank - Internal Inspection

Job Plan JPTNA025

1. Notify Government PHRP shift supervisor and receive approval each day before.

2. Follow all SAFETY REQUIREMENTS

3. “SAFETY”-SEE THE ATTACHMENT SAFETY REQUIREMENTS DOCUMENT(S)

4. (Recommended) Perform API 653Tank Inspections to include the following:

API 653 Internal Inspections

Required Every 10 years

• Depending on the initial assessment of the tank, internal inspections may be required more frequently.

• API 653 internal inspections are conducted by a certified inspector

• Internal inspection assesses the internal and external condition of the above ground tank and determine its suitability for continued service.

• Depending on the initial inspection findings, an external inspection may be required more frequently.

• External inspections are conducted by a certified API 653 inspector to assess the condition of the above ground tank and determine its suitability for continued service.

• This inspection does require entry into the tank’s interior. Tank cannot remain in service.

a. General Tank Information: Review tank description information including:

• Tank Specifications

• Tank Construction

• Release Detection Methods

• Spill Control

b. Tank Bottom, Tank Shell, and Tank Roof Inspections: API 653 allows different types of inspection to examine the aboveground tank’s components including:

• Visual

• Ultrasonic (spot)

• Ultrasonic (Scan)

• Liquid Penetrant

• Penetrating Oil

• Magnetic Particle

• Radiography

• Magnetic Flux Scan

• Vacuum Box

• Tracer Gas

c. Bottom, Shell and Roof: The structure of the tank is inspected to API 653 standards taking into account:

• Minimum Remaining Thickness

• Minimum Required Thickness

• Maximum Corrosion Rate

d. Settlement Evaluations: Examine whether the tank is tilting or settling in the ground improperly. These factors are also assessed under API 653:

• Out of plane

• Rigid Body Tilting

• Uniform

• Dish Type

• Edge Settlement

• Localized Dispersions

5. Water wash and clean inside tank

6. Sweep and vacuum interiorof tank

7. Conduct MFE Inspection

8. Conduct Contact UT

9. Mearsure Bottom Settling

10. Provided Government with all reporting docuemnts from testing and inspections document reports of preformed task.

11. **STOP** Contact PHRP Shift Supervisor for QA Inspection

12. QA Sign and Date stating all contractor work has been accomplished satisfactory according to this Job Plan

API 653 Internal Inspections
Required Every 10 years