J171 Every 10 Year PM - Fuel Oil Tank - Internal Inspection.pdf
PDF 47 KB Posted
- Solicitation number
- HQ003420R0087
- Issued by
-
DOD Washington Headquarters Service
About this file
This document contains a job plan and safety requirements for conducting internal inspections of an aboveground fuel oil storage tank located at the Pentagon Heating and Refrigeration Plant in accordance with API Standard 653 every ten years. The job plan outlines the notification process, safety requirements, inspection procedures including visual, ultrasonic, and liquid penetrant testing of the tank bottom, shell and roof to assess minimum thickness and corrosion rates. It also specifies procedures for settlement evaluations, water washing and cleaning of the tank interior, mechanical cleaning equipment inspections, and contact ultrasonic thickness measurements of the tank bottom. Upon completion of the inspection and testing, the contractor must provide all required documentation and obtain quality assurance sign off from the plant shift supervisor before demobilizing.
The related federal contract opportunity is a solicitation issued by the DOD Washington Headquarters Service to provide preventative maintenance, predictive maintenance, corrective maintenance, service calls, and inspections for the equipment and systems at the Pentagon Heating and Refrigeration Plant, including the aboveground fuel oil storage tanks. The contractor will be responsible for quality work performance and partnering with the customer to continuously improve programs and services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HQ003420R0087-0003.pdf | ||
| HQ003420R0087-0001.pdf | ||
| HQ003420R0087-0002.pdf | ||
| Combined Questions and Answers Template.pdf | ||
| Master Site Visit Roster.pdf | ||
| 9. Sewage System.zip | ZIP file | |
| Wage Determination.pdf | ||
| 2. Chilled Water System.zip | ZIP file | |
| J4 Past Performance Data Sheet.docx | DOCX document | |
| 5. Distributed Controls System (DCS).zip | ZIP file | |
| 3. Compressed Air System.zip | ZIP file | |
| 10. Auxiliary Systems and Facilities.zip | ZIP file | |
| HQ0034-20-R-0087 RFP FINAL.pdf | ||
| 1. Boiler System.zip | ZIP file | |
| J5 Non-Disclosure Agreement.docx | DOCX document | |
| 6. Feedwater System.zip | ZIP file | |
| J3 Past Performance Questionnaire.docx | DOCX document | |
| 4. Condenser Water System.zip | ZIP file | |
| J0 Key Personnel Qualifications.docx | DOCX document | |
| 7. Fuel Oil System.zip | ZIP file | |
| J1 Questions and Answers Template.xlsx | XLSX spreadsheet | |
| Equipment Nameplate Data.zip | ZIP file | |
| 8. Heating, Ventilation, and Air Condtioning (HVAC) System.zip | ZIP file | |
| J2 Pricing Template.xlsx | XLSX spreadsheet |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Every 10 Year PM - Fuel Oil Tank - Internal Inspection
Job Plan JPTNA025
1. Notify Government PHRP shift supervisor and receive approval each day before.
2. Follow all SAFETY REQUIREMENTS
3. “SAFETY”-SEE THE ATTACHMENT SAFETY REQUIREMENTS DOCUMENT(S)
4. (Recommended) Perform API 653Tank Inspections to include the following:
API 653 Internal Inspections
Required Every 10 years
• Depending on the initial assessment of the tank, internal inspections may be required more frequently.
• API 653 internal inspections are conducted by a certified inspector
• Internal inspection assesses the internal and external condition of the above ground tank and determine its suitability for continued service.
• Depending on the initial inspection findings, an external inspection may be required more frequently.
• External inspections are conducted by a certified API 653 inspector to assess the condition of the above ground tank and determine its suitability for continued service.
• This inspection does require entry into the tank’s interior. Tank cannot remain in service.
a. General Tank Information: Review tank description information including:
• Tank Specifications
• Tank Construction
• Release Detection Methods
• Spill Control
b. Tank Bottom, Tank Shell, and Tank Roof Inspections: API 653 allows different types of inspection to examine the aboveground tank’s components including:
• Visual
• Ultrasonic (spot)
• Ultrasonic (Scan)
• Liquid Penetrant
• Penetrating Oil
• Magnetic Particle
• Radiography
• Magnetic Flux Scan
• Vacuum Box
• Tracer Gas
c. Bottom, Shell and Roof: The structure of the tank is inspected to API 653 standards taking into account:
• Minimum Remaining Thickness
• Minimum Required Thickness
• Maximum Corrosion Rate
d. Settlement Evaluations: Examine whether the tank is tilting or settling in the ground improperly. These factors are also assessed under API 653:
• Out of plane
• Rigid Body Tilting
• Uniform
• Dish Type
• Edge Settlement
• Localized Dispersions
5. Water wash and clean inside tank
6. Sweep and vacuum interiorof tank
7. Conduct MFE Inspection
8. Conduct Contact UT
9. Mearsure Bottom Settling
10. Provided Government with all reporting docuemnts from testing and inspections document reports of preformed task.
11. **STOP** Contact PHRP Shift Supervisor for QA Inspection
12. QA Sign and Date stating all contractor work has been accomplished satisfactory according to this Job Plan
| API 653 Internal Inspections |
| Required Every 10 years |