JEDI Cloud RFP Amendment 0001 Summary of Changes
View the file
Other files for this federal contract opportunity
Show all 50
JEDI Cloud RFP has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary of Changes
HQ0034-18-R-0077-0001
August 23, 2018
The following items have been amended in the subject solicitation:
1. Section C4: Contractor Control of Certain Parts of JEDI Cloud; Sub-section 5(b) has been amended for clarity.
2. Section C4: Contractor Control of Certain Parts of JEDI Cloud; Sub-section 5(c) has been amended to refine the requirement.
3. Section C4: Contractor Control of Certain Parts of JEDI Cloud; Sub-section 5(d) has been amended to clarify and refine the requirement.
4. Section H1: Government Data; Sub-section 3 has been revised to include “or workspace” at line 454.
5. Section H1: Government Data; Sub-section 4 has been amended to clarify and refine the requirement.
6. Section H1: Government Data; Sub-section 5 has been amended to clarify and refine the requirement.
7. Section H2: New Services; Sub-section 1 has been amended to include “Subsequent to award” at line 478.
8. Section H6: Limited Release of Contractor Confidential Business Information; Sub-section 2 has been amended to delete “submission of proposal or” on line 601 and
“Offeror or” on line 602.
9. Section H6: Limited Release of Contractor Confidential Business Information; Sub-section 6 has been amended to clarify and refine the requirement.
10. Section L1: General RFP Instructions; Sub-section 9 has been amended to include question submissions requirements regarding Amendment 001.
11. Section L1: General RFP Instructions; Sub-section 11: Proposal Submissions has been amended to clarify the requirements and refine the requirement.
12. Section L2: Written Proposal Organization Instructions; Table L-1, Volume I, TAB A, the word “Master” has been added.
13. Section L2: Written Proposal Organization Instructions; Table L-1, Volume II, TAB B, the word “FedRAMP” has been added to column 3.
14. Section L2: Written Proposal Organization Instructions; Table L-1, Volume VII, the statement “(Not included with initial proposal submission)” has been added to column 2.
15. Section L2: Written Proposal Organization Instructions; Sub-section 6 has been amended to clarify the requirement.
16. Section L2: Written Proposal Organization Instructions; Sub-section 7 has been amended to clarify and refine the requirement.
17. Section L3: Volume 1 - Contract Document Instructions; TAB C has been amended to clarify and refine the requirement.
18. Section L3: Volume 1 - Contract Document Instructions; TAB D has been amended to clarify and refine the requirement.
19. Section L3: Volume 1 - Contract Document Instructions; TAB E has been amended to clarify and refine the requirement.
20. Section L3: Volume 1 - Contract Document Instructions; TAB I has been amended to clarify and refine the requirement.
21. Section L4: Volume II - Gate Criteria Submission Instructions: FACTOR 1: GATE
CRITERIA, Sub-factor 1.2 High Availability and Failover (TAB B), Sub-section 1 has been amended to refine the requirement.
22. Section L4: Volume II - Gate Criteria Submission Instructions: FACTOR 1: GATE
CRITERIA, Sub-factor 1.2 High Availability and Failover (TAB B), Sub-section 2 has been amended to clarify and refine the requirement.
23. Section L4: Volume II - Gate Criteria Submission Instructions: FACTOR 1: GATE
CRITERIA, Sub-factor 1.2 High Availability and Failover (TAB B), Sub-section 3 has been amended to refine the requirement.
24. Section L4: Volume II - Gate Criteria Submission Instructions: FACTOR 1: GATE
CRITERIA, Sub-factor 1.3 Commerciality (TAB C) paragraph 2 has been amended to clarify the requirement.
25. Section L4: Volume II - Gate Criteria Submission Instructions: FACTOR 1: GATE
CRITERIA, Sub-factor 1.5 Automation (TAB E), Sub-section 3(a) and 3(b) have been amended to delete the word “account” and “accounts” and replace it with “workspace” and “workspaces.”
26. Section L4: Volume II - Gate Criteria Submission Instructions: FACTOR 1: GATE
CRITERIA, Sub-factor 1.5 Automation (TAB E), Sub-section 5 5(a) and 5(b) have been amended to delete the word “account” and replace it with “workspace.”
27. Section L4: Volume II - Gate Criteria Submission Instructions: FACTOR 1: GATE
CRITERIA, Sub-factor 1.6 Commercial Cloud Offering Marketplace (TAB F), Sub-section
2 has been amended to add “continuous,” to line 2654.
28. Section L4: Volume II - Gate Criteria Submission Instructions: FACTOR 1: GATE
CRITERIA, Sub-factor 1.6 Commercial Cloud Offering Marketplace (TAB F), Sub-section
2(c) has been amended to clarify and refine the requirement.
29. Section L4: Volume II - Gate Criteria Submission Instructions: FACTOR 1: GATE
CRITERIA, Sub-factor 1.7 Data (TAB G), Sub-section 2 has been amended to delete
“usage based” and replace it with “data” and delete the word “data” before the word migration.
30. Section L5: Volume III - Technical Criteria Submission Instructions; Factor 3 - Tactical
Edge (TAB C), Sub-section 2(a)(vii) has been amended to clarify the requirement.
31. Section L5: Volume III - Technical Criteria Submission Instructions; Factor 3 - Tactical
Edge (TAB C), Sub-section 3 has been amended to delete “(ii)” and replace it with “(i)” on line 2853.
32. Section L5: Volume III - Technical Criteria Submission Instructions; Factor 4 -
Information Security and Access Controls (TAB D), Sub-section 2(a) has been amended to delete the word “account” and “accounts” and replace it with “workspace” and
“workspaces”.
33. Section L5: Volume III - Technical Criteria Submission Instructions; Factor 5 -
Application and Data Hosting and Portability (TAB E), Sub-section 1(a) and 1(b) have been amended to delete the word “account” and “accounts” and replace it with
“workspace” and “workspaces”.
34. Section L5: Volume III - Technical Criteria Submission Instructions; Factor 5 -
Application and Data Hosting and Portability (TAB E), Sub-section 2(a) and 2(b) have been amended to delete the word “account” and “accounts” and replace it with
“workspace” and “workspaces”. Both Sub-sections have been amended to include
“Cloud” after the word “JEDI”.
35. Section L5: Volume III - Technical Criteria Submission Instructions; Factor 5 -
Application and Data Hosting and Portability (TAB E), Sub-section 4 has been amended to delete “(c)” and replace it with “(e)”.
36. Section L8: Volume VI - Price Submission Instructions; Factor 9: Price, Sub-section 1 paragraph 2 has been amended to delete “conforming to ISO standards 32000-2”.
37. Section L8: Volume VI - Price Submission Instructions; Factor 9: Price, Sub-section 2 paragraph 2 has be amended to delete the last sentence.
38. Section L8: Volume VI - Price Submission Instructions; Factor 9: Price, Sub-section 2 paragraph 4 has be amended to delete the last sentence.
39. Section L8: Volume VI - Price Submission Instructions; Factor 9: Price, Sub-section 3 paragraph 1 has been amended to delete “conforming to ISO standards 32000-2” and to delete the last sentence.
40. Section L8: Volume VI - Price Submission Instructions; Factor 9: Price, Sub-section 3 paragraph 4 has been amended to clarify and refine the requirement.
41. Section M2: Evaluation Process; Under Phase Two of the evaluation process, Sub-section 2, has been amended to delete the work “and” before Volume V, and clarify and refine the requirement.
42. Section M3: Evaluation Factors; Sub-factor 1.2 - High Availability and Failover has been amended to clarify and refine the requirement.
43. Section M3: Evaluation Factors; Sub-factor 1.3 - Commerciality has been amended to clarify the requirement.
44. Section M3: Evaluation Factors; Factor 4 - Information Security and Access Controls, Sub-section 2(a) has been amended to delete the word “account” and “accounts” and replace it with “workspace” and “workspaces”.
45. Section M3: Evaluation Factors; Factor 4 - Information Security and Access Controls, Sub-section 2(e) has been amended to add the word “workspace”.
46. Section M3: Evaluation Factors; Factor 5 - Application and Data Hosting and Portability, Sub-section 2(a) and 2(b) have been amended to delete the word “account” and replace it with “workspace”.
47. Section M4: Technical Capability Performance Evaluation Ratings and Definitions; Sub-section 2 has been amended to add the word “Technical”.
48. Attachment L-1 Statement of Objectives 0001: Section 3 Performance Requirements, Sub-section 3.0 has been amended to delete “contract award” and replace it with “the conclusion of the post award kickoff event”.
49. Attachment L-1 Statement of Objectives 0001: Section 3 Performance Requirements, Sub-paragraph 3.1.2 has been amended to delete the word “account” and replace it with
“workspace.”
50. Attachment L-1 Statement of Objectives 0001: Section 3 Performance Requirements, Sub-paragraph 3.1.3 has been amended to delete the word “accounts” and replace it with “workspaces.”
51. Attachment L-1 Statement of Objectives 0001: Section 3 Performance Requirements, Sub-paragraph 3.2.2 has been amended to add “ultimately” to the paragraph.
52. Attachment L-1 Statement of Objectives 0001: Section 3 Performance Requirements, Sub-paragraphs 3.2.2.1 and 3.2.2.2 have been added to clarify and refine the requirement.
53. Attachment L-1 Statement of Objectives 0001: Section 3 Performance Requirements, Sub-section 3.7.1 and 3.7.3 has been amended to delete the word “account” and replace it with “workspace.”
54. Attachment L-1 Statement of Objectives 0001: Section 3 Performance Requirements, Sub-section 3.8 and Sub-paragraphs 3.8.1, 3.8.2 and 3.8.3 have been amended to delete the word “account” and “accounts” and replace it with “workspace” and
“workspaces”.
55. Attachment L-1 Statement of Objectives 0001: Section 3 Performance Requirements, Sub-paragraph 3.9.1.5 and 3.9.1.6 have been amended to delete the word “account” and replace it with “workspace.”
56. Attachment L-1 Statement of Objectives 0001: Section 3 Performance Requirements, Sub-paragraph 3.15.2 has been be refined and Sub-paragraph 3.15.2.1 and 3.15.2.2 have been added.
57. Attachment L-1 Statement of Objectives 0001: Section 3 Performance Requirements, Sub-paragraph 3.16.1 has been amended to delete the word “account” and replace it with “workspace.”
58. Attachment L-1 Statement of Objectives 0001: Section 3 Performance Requirements, Sub-section 3.17 has been amended to delete the word “accounts” and replace it with
“workspaces.”
59. Attachment L-1 Statement of Objectives 0001: Section 3 Performance Requirements, Sub-paragraph 3.18.2 has been amended to clarify and refine the requirement.
60. Attachment L-1 Statement of Objectives 0001: Section 3 Performance Requirements, Sub-paragraph 3.18.3 has been amended to delete the word “account” and replace it with “workspace.”
61. Attachment L-1 Statement of Objectives 0001: Section 3 Performance Requirements, Sub-paragraph 3.19.3 has been amended to refine the requirement.
62. Attachment L-1 Statement of Objectives 0001: Section 3 Performance Requirements, Sub-paragraph 3.19.12 has been added to the requirement.
63. Attachment L-1 Statement of Objectives 0001: Section 3 Performance Requirements, Sub-paragraph 3.25.3 has amended to delete the word “accounts” and replace it with
“workspaces.”
64. Attachment L-1 Statement of Objectives 0001: Section 5 Performance Metrics, Table
5.1*, row 22, column 3 has been amended to refine the requirement.
65. Attachment L-2 Price Scenario 1 Sample Unclassified Application Stack has paragraph 2 has been amended to clarify and refine the requirement.
66. Attachment L-2 Price Scenario 1 Sample Unclassified Application Stack has paragraph 6 has been amended to delete “15 GB” and replace it with “1 GB”.
67. Attachment L-2 Price Scenario 2 Sample Classified COTS deployment + Tactical Edge paragraph 1 has been amended to add “contain a single DNS zone and” on line 175.
68. Attachment L-2 Price Scenario 2 Sample Classified COTS deployment + Tactical Edge paragraph 3 has been amended to add “by the main CONUS ERP system” on line 188.
69. Attachment L-2 Price Scenario 2 Sample Classified COTS deployment + Tactical Edge
Sub-section b. Please price this scenario, Sub-paragraph (iii) has been amended to delete “April” and replace it with “June”.
70. Attachment L-2 Price Scenario 3 Sample Tactical Edge + Peered Query paragraph 2 has been amended to clarify and refine the requirement.
71. Attachment L-2 Price Scenario 3 Sample Tactical Edge + Peered Query Sub-section a.
Please price this scenario, Sub-paragraph (ii) has been refined and Sub-paragraph (iii)
“Please price separately all IaaS and PaaS offerings required to perform the advanced data analysis using cloud hosted, Offeror provided services across all of the accounts specified in the scenario.” has been deleted.
72. Attachment L-2 Price Scenario 4 Large Data Storage, Analysis, and Archiving; Sub-section (f) and (g) have been amended to delete “(c)” and replace it with “(e)”.
73. Attachment L-2 Price Scenario 5 Rapidly Deployed, Static Data Center paragraph 3(a) has been amended to delete “100PB” and replace it with “10 PB” and Sub-section a.
Please price this scenario and Sub-paragraph (i) and (ii) have been amended to delete
“10 FOB” and replace it with “4 FOB”.
74. Attachment J-8 Joint Enterprise Defense Infrastructure (JEDI) Cloud, JEDI Cloud
Definitions, Number 24. Direct fiber link has been added to the definitions.
75. Attachment J-8 Joint Enterprise Defense Infrastructure (JEDI) Cloud, JEDI Cloud
Definitions, Number 46. Points of Presence definition has been amended to clarify and refine the definition.
76. Attachment J-8 Joint Enterprise Defense Infrastructure (JEDI) Cloud, JEDI Cloud
Definitions, Number 66. Workspace has been added to the definitions.
77. Attachment J-10 Small Business Participation Document 0001 has been amended to fix a formatting change only.
Except as provided herein, all terms and conditions of HQ0034-18-R-0077, as heretofore changed, remains unchanged and in full force and effect.