QA Round 3 1-19.doc

DOC document 56 KB Posted

Attached to
Answer Questions
Solicitation number
HQ0034-12-R-0006
Issued by

About this file

Questions and Answers

View the file

Other files

File Type Posted
ISSC AMEND 3.doc DOC document
ISSC AMEND 1.doc DOC document
ISSC AMEND 2.doc DOC document
Final QUESTION 2ND ROUND PT2.doc DOC document
Proposed Amend1-ISSC1-10-12 .doc DOC document
Revised Attachment_5_Price_List_and_Scope_of_Work(1).xls XLS spreadsheet
RFP HQ0034-12-R-0006 23 Dec 2011.docx DOCX document
QA Round 2 12-15.doc DOC document
Industry Day sign in sheet.pdf PDF
Industry Day Participants 11-25.doc DOC document
Attachment 1 Spare Inventory.pdf PDF
HQ0034-12-R-0006 ISSC 23 NOV 11.docx DOCX document
Attachment 11 DD-254 ISSC 4-5-11.pdf PDF
Attachment 4 Monthly Repair Calls.doc DOC document
Q A Round 1.doc DOC document
Attachment 9 March 2011 Incidents.pdf PDF
Attachment 2 Final PWS PFPA Formatted 11-23-11.doc DOC document
Attachment 12-CDRL's.pdf PDF
Attachment 5 Price List and Scope of Work.xls XLS spreadsheet
Attachment 13 6 Job Samples for CLIN 0002.pdf PDF
Attachment 8 Industry Day.pdf PDF
Attachment 10 June 2011 Incidents.pdf PDF
Attachment 6 Past Performance Questionnaire —
Attachment 3 SB Participation Report.xls XLS spreadsheet
Attachment 7 NDA.doc DOC document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO: HQ0034-12-R-0006

QUESTIONS AND ANSWER

19 January 2012

1. The file name of the Amendment 0001 released on January 12 includes the word “proposed,” (Proposed Amend1-ISSC1-10-12.doc) and there is a large “DRAFT” watermark on page 1 of the amendment.

Question: Is the Amendment 0001 released on January 12 in fact the final version of the amendment or should vendors anticipate the release of an Amendment 0001 document marked “final”?

ANSWER: Yes final, the “DRAFT” watermark has been removed.

2. In all of the written documentation, it is indicated that the points of contact are Denise McKissick and Dhavid Cayanan, however the email address provided for Mr. Cayanan is returned undeliverable.

Question: FBO.gov lists Mr. Cayanan’s name and email as Dhavidson. Can vendors correctly assume that Dhavidson is the correct spelling?

ANSWER: dhavidson.cayanan@whs.mil

3. Following questions are in reference to Attachment 5 pricing excel

a. Regarding text: Item I.1.30 (Main Entry-Expedited): Install one AMAG alarm control panel: (1) DCU board (2) I/O Board, (1) 4-amp power supply, (1) AMAG exterior reader, (1) AMAG interior reader, (1) alarm status indicator, (1) electric strike, (1) request to exit sensor, (1) Infrared motion sensor, and (1) balanced magnetic switch. Complete in 30 days.

Question: Does Pentagon want 2 DCU (2 door controller) board or 4 DCU (4 DCU controller) board for pricing Item I.1.30?

ANSWER: We are requesting the use of the M2150 AMAG 4DCU with the Homeland Security Addition. This will allow for 4 card reader.

b. Question: For Item I.5.30 to I.6.60- There are no door contacts, no request to exit and no locks. Are these devices existing or provided by others?

ANSWER: Due to the fact that the contractor will be providing the electric strike, it can be assumed; the existing lock will be used and is operational in I.5.30. There should be a request to exit sensor, an Infrared motion sensor and a balanced magnetic switch.

I.6.60 should have an electrified mortise lock, an Infrared motion sensor and a balanced magnetic switch.

c. Question: Are the AMAG boards listed in the Revised Attachment 5 being added to existing enclosure?

i. If yes, should vendor also include the board MN-CAB-fix for the enclosure?

ANSWER: Yes, the Symmetry CAB4 enclosure kit should be provided as well.

ii. If no, who is to provide the new enclosure? What is the manufacturer, or requirement of the enclosure?

d. Question: Should vendor price a power supply board only, or power supply with enclosure and battery?

ANSWER: Power supply with enclosure and battery.

i. Question: If vendor is to provide Power Supply board only, who is to provide the enclosure and batteries?

e. Question: Should the vendor provide ACM 8 relay boards and Power distribution module PD8 for the power supplies, or will this be an additional item to be provided at a later time and billed separately?

ANSWER: Yes, if required to operate the system.

f. Question: Is the vendor to include the cable as per the description or footage provided in Attachment 13?

ANSWER: For attachment 5, the vendor is to provide all cable necessary. Distances will vary depending on location.

g. Question: Some of the doors include both in and out card readers with request to exit. Is this accurate; is the vendor to provide both readers and the request to exit sensors?

ANSWER: Yes, the interior card reader could be necessary to deactivate the alarm system. The request to exit sensor is to shunt the alarm for egress.

h. Question: Are the access panels installed in head-end/security closet or above the doors?

ANSWER: Above the doors when possible.

i. Question: For labor content, should the vendor account for CAD drawings to be included with the line item prices? Yes

ANSWER:

4. Follow-up Question to 2nd Round, Question #1 & ANSWER: This offeror considers the Government’s answer to this question to be inadequate: “No. Although commercial in nature, the services are considered non-commercial and FAR 15 applies.”

Please provide a detailed explanation/analysis based upon the FAR definition of a “commercial item” that adequately justifies the Government’s “non-commercial” determination.

In the absence of a more reasonable explanation/analysis, this offeror believes the Government may be opening itself up to a potential protest.

ANSWER: The Government has reviewed FAR 2.101, FAR 12.203, FAR 13.5, FAR 15, DFARS Parts 212 and 215 to determine if the supplies and services being procured are commercial or non-commercial items. All of the supplies and services being purchased under the ISSC solicitation are commercial items. The solicitation will be amended to add FAR 52.212 and DFARS 252.212 clauses and delete the appropriate clauses from the solicitation as outlined below:

52.203-6
Restrictions On Subcontractor Sales To The Government
SEP 2006
52.203-13
Contractor Code of Business Ethics and Conduct
APR 2010
52.203-15
Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009
JUN 2010
52.204-10
Reporting Executive Compensation and First-Tier Subcontract Awards
JUL 2010
52.204-11
American Recovery and Reinvestment Act--Reporting Requirements
JUL 2010
52.209-6
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
DEC 2010
52.209-9
Updates of Publicly Available Information Regarding Responsibility Matters
JAN 2011
52.209-10
Prohibition on Contracting With Inverted Domestic Corporations
MAY 2011
52.219-8
Utilization of Small Business Concerns
JAN 2011
52.219-9 Alt II
Small Business Subcontracting Plan (JAN 2011) Alternate II
OCT 2001
52.219-16
Liquidated Damages-Subcontracting Plan
JAN 1999
52.222-19
Child Labor -- Cooperation with Authorities and Remedies
JUL 2010
52.222-21
Prohibition Of Segregated Facilities
FEB 1999
52.222-26
Equal Opportunity
MAR 2007
52.222-35
Equal Opportunity for Veterans
SEP 2010
52.222-36
Affirmative Action For Workers With Disabilities
OCT 2010
52.222-37
Employment Reports on Veterans
SEP 2010
52.222-40
Notification of Employee Rights Under the National Labor Relations Act
DEC 2010
52.222-54
Employment Eligibility Verification
JAN 2009
52.232-33
Payment by Electronic Funds Transfer--Central Contractor Registration
OCT 2003
52.233-3
Protest After Award
AUG 1996
52.243-1
Changes--Fixed Price
AUG 1987
252.211-7003
Item Identification and Valuation
JUN 2011
52.204-3
Taxpayer Identification
OCT 1998

5. Follow-up Question to 2nd Round, Question #3 & ANSWER: If there are no known “unique items at this time”, then will the Government consider removing the DFARS 252.211-7003, Item Identification and Valuation? The requirement could be negotiated into a specific future task order, if required.

ANSWER: DFAR 252.211-7003 will be deleted.

6. Question regarding the SB Subcontracting goal. Individual Small Business Subcontracting Plans usually allow the statement of SB Subcontracting goals as a percentage of the value subcontracted. Does the Government really mean 25% of “contract value”, including both labor and equipment?

ANSWER: Yes, the contractor subcontracting goal should reflect 25% of the value of the contract for SB subcontractors.

7. Vendor requests that in the event that the responses to the January 17 Q&A items take more than a couple of days to release, that the government entertain a request for an extension to the due date of 7 or more calendar days from the last Q&A release.

ANSWER: No extension anticipated.