2nd_Questions_and_Answers_DTRA_BAA.docx
DOCX document 13 KB Posted
- Attached to
- DTRA BAA New Initiatives for Nuclear Detection Technologies Federal contract opportunity
- Solicitation number
- HDTRA1-18-S-0002
- Issued by
- Defense Threat Reduction Agency
About this file
This document contains questions and answers regarding the DTRA BAA HDTRA1-18-S-0002 solicitation. The solicitation seeks proposals for new nuclear detection technologies to fill capability needs for search, standoff detection, sensitive site exploitation, threat diagnostics and characterization, consequence management, contamination avoidance, and attribution. Technologies proposed must provide substantial improvements over current capabilities in areas such as size, weight, power consumption, cost, compatibility, and background mitigation. Acceptable technologies cannot be static portal monitors or fixed in place checkpoint systems. The principal investigator identified in phase I proposals does not need to be the final individual, as changes can be made later.
Additional questions and answers
View the file
Other files for this federal contract opportunity
Show all 50
DTRA BAA New Initiatives for Nuclear Detection Technologies has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2nd Round of Questions and Answers
DTRA BAA HDTRA1-18-S-0002
Question 1: DET-01 says “DTRA will not consider proposals for static portal monitors”. Does this mean “don’t propose detection systems that sit in one place” or does it mean “nothing that bolts to the ground, but a man-portable, relocatable system is fine”.
Answer 1: For the purposes of this requirement static is defined as fixed in place while a portal monitor refers to a system that is located at a checkpoint or point of entry for screening vehicles or personnel. DTRA will not consider systems designed for either of these applications.
Question 2: Requirements for the Quad Chart (in BAA Section 3.4.2.1) state that the header must be in Arial 28 point bold font; however, given the information that must be included in the heading (per BAA Section 3.5.1.1), this size font takes up a significant portion of the allotted 1 page. Will the Government allow Arial 18 point bold font for the Quad Chart header?
Answer 2: The requirement is correct.
Question 3: Per BAA Section 3.5.1.1, information that must be provided in the Quad Chart heading includes the Principal Investigator. If that individual is undetermined at the time of Phase I submission, will the Government accept “TBD” in that space?
Answer: 3: The phase I proposal submission should identify a Principle Investigator. It is understood that further planning may reflect changes in the Phase II proposal including the Principle Investigator.