Attachment 18 QA from AMD004.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Spectrum Information System (SIS) Sustainment and Enhancement
Solicitation number
HC104725R0005
Issued by

About this file

This file is a Questions and Answers (Q&A) document for the Spectrum Information System (SIS) Sustainment and Enhancement solicitation (HC104725R0005) issued by the Defense Information Systems Agency (DISA). The Q&A addresses 19 vendor questions covering proposal submission requirements, page limitations, document formatting, facilities clearance, and technical details about the GEMSIS system. Key clarifications include: proposals for Parts A-F can be submitted in a single file with page limits, PDF submission is allowed, text boxes are not permitted, and past performance questionnaires are required but will not impact technical evaluation. The solicitation is a two-phase procurement with Phase One proposals due by 12:00 PM ET on 1 April 2025, and Phase Two proposals due by 12:00 PM ET on 5 May 2025. The requirement involves sustaining and enhancing the Global Electromagnetic Spectrum Information System (GEMSIS), supporting DoD spectrum operations across multiple network environments, with services including software architecture expansion, data storage improvements, and integration of additional data sets and analytics.

View the file

Other files

File Type Posted
AMD 007.pdf PDF
Attachment 18 QA from AMD007.xlsx XLSX spreadsheet
Attachment 18 QA from AMD006.xlsx XLSX spreadsheet
Solicitation -AMD006.pdf PDF
Attachment 9 - IDIQ Labor Rates Spreadsheet_Rev2.xlsx XLSX spreadsheet
HC104725R0005_AMD005.pdf PDF
HC104725R0005-AMD0004.pdf PDF
Attachment 9 - IDIQ Labor Rates Spreadsheet_Rev1.xlsx XLSX spreadsheet
Attachment 14 - TO 001 CLIN Pricing Worksheet Rev 1.xlsx XLSX spreadsheet
Attachment 18 QA from AMD03.xlsx XLSX spreadsheet
Solicitation-AMD003.pdf PDF
Solicitation-AMD002.pdf PDF
Solicitation-AMD001.pdf PDF
Solicitation-AMD001.pdf PDF
Attachment 3 - Past Performance Questionnaire (Update).docx DOCX document
Attachment 18 - QA from Original Solicitation.xlsx XLSX spreadsheet
Attachment 6 - Appendix 5 - Acronym List.xlsx XLSX spreadsheet
Attachment 2 - QA Template.xlsx XLSX spreadsheet
Attachment 1 - IDIQ - DD254.pdf PDF
Attachment 10 - IDIQ GFP Attachment.xlsx XLSX spreadsheet
Attachment 15 - TO 001 QASP.docx DOCX document
Attachment 17 - Mission-Essential Contractor Services.pdf PDF
Attachment 9 - IDIQ Labor Rates Spreadsheet.xlsx XLSX spreadsheet
Attachment 18 - Question and Answers from Draft RFP.xlsx XLSX spreadsheet
Attachment 14 - TO 001 CLIN Pricing Worksheet.xlsx XLSX spreadsheet
Attachment 11 - IDIQ QASP.docx DOCX document
Attachment 3 - Past Performance Questionaire.docx DOCX document
Attachment 5 - Appendix 4 - NDA for Contractor Personnel.pdf PDF
Attachment 12 - TO 001 PWS.docx DOCX document
Solicitation.pdf PDF
Attachment 8 - Appendix 7 SIS KPP.pdf PDF
Attachment 16 - Labor Category Description.xlsx XLSX spreadsheet
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Q&A INSTRUCTIONS: The purpose of these specific instructions is to expedite the process of answering questions. Please do not change the format of this document.
Complete the spreadsheet tab below named "Q&A" with all questions, comments, and recommendations about the RFP. Examples provided in the spreadsheet. **Please delete the examples before submitting your questions.

COLUMN A: Complete the "Page" column. This is the page number from the RFP located in the upper right hand corner of the page. Do not include the total page number. Enter only the page number where the topic begins.

COLUMN B: Complete the "Section/Paragraph" column with the applicable section and paragraph number (if applicable) of the RFP. For example: B2, C, or L5.1.2. For a section and paragraph number reference do not place a dot between the letter and the first number. Additional subparagraph references should be separated with a dot regardless of the format in the RFP, for example, L5.1.2.a. Do not including any other extraneous identifiers or other information other then instructed here. If the reference is to a CLIN, Clause, Appendix, or Attachment etc. the entry goes in the next column. At a minimum you will always insert at least the Section letter A through J in this column.

COLUMN C: Complete the "CLIN/Clause/Other" column. Insert the CLIN, Clause, Provision, Appendix, or Attachment number. For example: CLIN 0001, 52.217-8, Appendix A, or Attachment L3. Insert the section letter only in the Column B. This column will be completed only when there is not a more precise RFP reference number. NOTES: CLINs are in Section B. Most sections contain clauses so ensure you reference the correct section.

COLUMN D: Complete the Questions/Comments/Recommendations column. Start the question by referencing the topic. This may help the sort process. For example: Minimum Qualifications Checklist or Performance Area 10. Then insert the question or comment.

Issues must be submitted to the Contracting Officer and Contract Specialist listed in L2.1.1 (edit as necessary).

Q&A

Question NumberRFP PageRFP Section/ ParagraphCLIN/ Clause/Appendix/Attachment/OtherQuestions/Comments/RecommendationsGovernment Response
1N/AN/AAttachment+18+-+Question+and+Answers+from+Draft+RFP.xlsxIt appears that the intention of this file was to provide answers to vendor questions about the draft RFP. The spreadsheet on SAM.gov is an empty template and contains no Q&A. Can the Government please provide these Q&A, and defer the Phase 1 submission date to provide time to process them?There were no questions recceived during the draft RFP phase. Attachment 18 was not included in the final solicitation (Section J) and the attachment has been removed from SAM.gov.
2100L2.1Notional ScheduleWill the Government consider adding the opportunity for a Phase II round of Q&As?Please reference Section L4.0, Advisory Notification. Phase I and Phase II and both part of this solicitation and will not be posted separately. All questions regarding Phase II must be provided in Phase I and no additional Q&A's will be conducted after the 25th of March 2025.
3102L2.2.1Table 1.1Can Part A and Part B documents be submitted in PDF format, to prevent inadvertent editing?Yes.
4102L2.2.1Table 1.1Re. Part C Table of Contents, what items should this TOC cover? Are Parts A through F meant to be submitted in a single PDF file, where the TOC relates to all parts in this single file?The Table of Content (TOC) should cover Volume I, Parts A-F. The TOC refers to all parts. Parts A-F can be submitted in a single file. However, each part must adhere to the page limit specified in Section L2.2.1, Table 1.1 - Proposal Organization and L2.2.2-L2.2.8 and L2.3.
5102L2.2.1Table 1.1In Part D, what does the "Facilities Clearance" in the title refer to, given that proof of facility clearance is provided in Part E?Please reference Section L3.4.5.1 - L3.6.1 and Section M2.1.1.

For Volume I, Part D, the prime will indicate whether or not they have the appropriate facilities clearance to be determined to be acceptable (must indicate what facilities clearance they have). The facilities clearance levels for all subcontractors/independent consultants will also be listed in Part E (must indicate if it is INTERIM or FINAL). Reference Factor 1, subfactor 2 of Section M2.0, Evaluation Factors (Specifically M2.1.1).

For Volume I, Part E must include proof of facilities clearance (Facilities Verficiation Notification) for the prime and all sub-contractors and independent consultants proposed from the Defense Counterintelligence and Security Agency Facility Clearance branch.

For Volume I, Part F, the offeror must complete the DD254, blocks 6a-6c, 7a-7c (if subcontracting), and 8a/8a-c of the DD254 with appropriate information for their company in accordance with L3.6.1 and M2.1.1. A completed DD254 must be submitted for the prime and all subcontractors/independent consultants that are included in the proposal.

6103L2.2.2.Page LimitationsThe Government states that "page limitations shall not be circumvented by including inserted text boxes/pop-ups...". Can the Government please confirm that textboxes are allowed if they are not pop-ups?No, text boxes are not allowed. IAW L2.2.2, text boxes and pop-ups or internet links to additional information are not acceptable and inclusion of these components will not be considered part of the proposal.
7127M2.1N/APlease specify what "Component technologies of GEMSIS JSDR" refers to.Components technologies of GEMSIS JSDR include, but are not limited to, experience with similar COTS products as depicted in the Appendix 1 – CSCIs and Appendix 2 – System Architecture Diagrams in support of Access Control, Data Services, Analytics, and UI/UX; with an integrated content management platform, such as Alfresco Content Services; development and sustainment of custom JavaScript UIs; interface, display, and manipulation of disparate data sources, such as Background Environmental Information, Joint Equipment Tactical and Space database, intelligence data, Spectrum XXI, Electronic Warfare Planning and Management Tool, Spectrum Services Framework, Foreign Coordination spectrum supportability data, EMBM-J EMS data; development and sustainment of REST APIs to provide data in SFAF and JSON formats, and for the distribution of Electromagnetic Interference (EMI) reporting.
876N/AN/ARegarding DFARS 252.204-7012, is this clause applicable if all work is done at the Government's site?Yes, it is applicable even if all work is completed at the Government site as this requirement contains CUI. Covered Defense Information (CDI) refers to unclassified, controlled technical information or other information, as described in the Controlled Unclassified Information (CUI) Registry, that requires safeguarding or dissemination controls and is either marked/identified in a contract and provided by the DoD or collected, developed, received, transmitted, used, or stored by the contractor.
9101L2.1.13N/AThe directions ask that emails to be sent “encrypted”. Should the questions be sent through DoD SAFE? Or can they be submitted through email?Questions and comments are not considered source selection information. A consolidated and sanitized questions and comments attachment with answers and clarifications on the RFP will be shared to all offerors after the Q&C deadline as an RFP amendment.
10102, 104L2.2.1; L2.2.5N/ADocument Submission: Can the Government please clarify the volume submission format? Does the Government want Offerers to submit Part A, B, C, D, E, and F as standalone volume submissions adhering to section L2.2.5 "Labelling. Each volume of the proposal should be separately labeled to include the volume number, title, solicitation identification, and the offeror’s name" and the different document formats in Table 1.1. Or does the Government want Part A, B, C, D, E, and F submitted as a single file with section breaks, since they are all considered part of Volume I in Table 1.1.Parts A-F can be submitted in a single file. However, each part must adhere to the page limit specified in Section L2.2.1, Table 1.1 - Proposal Organization and L2.2.2-L2.2.8 and L2.3.
11102, 103, 105L2.2.1; L2.2.2; L3.1N/ADoes the cover page count within the Part A Cover Page/Exec summary count towards the 3 page limit?Yes.
12104L2.2.7N/ADoes the Glossary of Abbreviations and Acronyms count towards page count in each Volume requirement?No.
13107L.3.4.1, L.3.5.1N/ASince 3.5.1 is requesting proof of facility clearance, could the Government remove the facilities clearance requirement from 3.4.1?Section L3.4.1 requires offerors to provide relevant and recent (from the last three (3) years) experience that demonstrates that the offeror has relevant expertise in accordance with specifications defined in Section M, Evaluation Factors for Award. While Section L3.5.1 Offerors shall demonstrate they have a FINAL TS Facility Clearance from the Defense Counterintelligence and Security Agency at the time of proposal submission by providing their Facility Verification Notification. Section L.3.4.1 requires you to demonstrate the work you have completed while Section L3.5.1 requires you provide proof of your facility clearance. L3.4.1 and L3.5.1 tie into Section M, Factor 1, Subfactor 1 and 2. Facilities clearance requirement will not be removed as it is an important subfactor under Factor One of Phase One evaluations.
14109L.7N/ACould the Government provide the number of FTEs supporting the current effort?Approximately 17 FTEs for TO 001.
15103/113L2.2.1. L8.0, L8.1N/ATable 1.1- Proposal Organization for Phase Two Submission requires a Volume V Past Performance Questionnaire with a 3-page limit. The instructions for L8.0. Volume V - Past Performance/L8.1. General states "Submission of past performance is not required..." and "This Volume shall be included in the proposal with a completed Past Performance Questionnaire (Attachment 3)." There are no instructions on the number of Past Performance Questionnaires allowed to be submitted. Can the Government please provide clarification on submission of Past Performances (i.e. required/not required; max number of Past Performance Questionaires, etc.)?Section L8.1 has been amended via Amendment 0001. Past Performance Questionaires (PPQ) are required; however, past performance will be reviewed as part of a responsibility determination but will not impact the technical evaluation. Contractors shall submit no more than 3 recent PPQs for evaluation. Recent efforts are those which have been performed during any portion of the last 3 years, including those efforts currently being performed.
16116/117L7.1.7Attachment+12+-+TO+001+PWSAttachment+12+-+TO+001+PWS, Section 5 says: "Surge support over the life of the contract will not exceed 15% of the contractor’s total proposed cost/price for the base and all option periods", but the Solicitation section L7.1.7. says: "The Government is providing a percentage value to be used by all offerors when proposing surge: surge support will be equal to 45% of the Offeror’s total proposed cost/price for the five (5) year ordering period." Please provide clarification regarding the surge percentage and calculation.
L7.1.7 identifies two separate surge percentages. The ID/IQ contract’s surge percentage is 45%. The TO’s surge percentage is 15% (Attachment 14). To prevent further confusion, language on the ID/IQ surge has been removed from L7.1.7 in AMD04 as Attachment 9 is only a labor rate schedule.
17N/AN/AAttachment+14+-+TO+001+CLIN+Pricing+Attachment+14+-+TO+001+CLIN+Pricing+Worksheet calculates a surge of 15% per option period (except the transition out); however the formula provided in the template looks to be incorrect. In the CLIN Summary tab, the subtotal (row 23) does not include CLINS x008, x009, and x0010. Can we edit the formula or will you provide a new pricing template?Attachment 14, TO 001 CLIN Pricing Worksheet has been updated to correct the formula on the CLIN Summary Tab. Formulas for all other tabs in this spreadsheet can be customized to suit the offerors needs. However, all

solicitation requirements must be priced, figures correctly calculated, and prices presented in a clear and useful. To provide clarification, the 15% surge applies to the transition out CLIN, but not to the six-month extension amount.

18N/AN/AAttachment 9 - ID/IQ Labor Rates SpreadsheetIn Volume IV, Attachment 9, step 6 of the instructions say "6) Title Excel workbook as "Offeror'sName"_"EvaluationP2"_Attachment 11". Attachment 11 is the IDIQ QASP. Should we title the excel workbook as "Offeror's Name"_"EvaluationP2"_Attachment 9"?Yes, please title the the spreadsheet as: "Offeror's Name"_"EvaluationP2"_Attachment 9". Corrections have been made on the spreadsheet template for Attachment 9 and a revised attachment has been uploaded to SAM.gov.
19107-108/119L2.2.1 and L9.0N/A1. The Phase II instructions state "Proposals for Phase Two (Volumes II – V) are due NLT 12:00 PM ET 5 May 2025." Is Volume VI (Contract Documentation) also due on May 5, 2025 at 12:00PM ET?Yes. All of the Phase Two proposal, including Volume VI, must be provided by 5 May 2025 at 12:00 PM ET.