About this file

Amendment 0006

View the file

Other files for this federal contract opportunity

Other files attached to Global Information Grid Services Management - Engineering, Transition and Implementation (GSM-ETI), newest first.
File Type Posted
Redacted_JA.pdf PDF
GSM-ETI QA FRFP- 28 June 2011.doc DOC document
Atch_3_-_ETI_Sample_Task_Order_v13q_06-23-2011 PMO-2 —
0005.doc DOC document
GSM-ETI QA FRFP 6-149- 13 Jun 2011.doc DOC document
Atch 3 - ETI Sample Task Order v13p 06-01-2011.doc DOC document
SF-30 - HC1028-10-R-2001 - Amendment 0004.doc DOC document
Atch 10 - Pricing Rate Tables.xls XLS spreadsheet
Atch 5 -GSM-ETI_Past_Performance_Information.DOC DOC document
Atch 15 - STO Supplemental Tech Data.doc DOC document
Atch 2 - GSM-ETI CDRLs 05-06-2011.doc DOC document
GSM-ETI QA FRFP 1-5.doc DOC document
Amend 0003.doc DOC document
Amend 0002.doc DOC document
GSM-ETI QA FRFP 1-5.doc DOC document
Amendment 0001.doc DOC document
SBA OHA.pdf PDF
Attachment 8 - GSM-ETI PP Questionnaire.doc DOC document
GSM-ETI QA FRFP 1-5 —
Attachment 5 - GSM-ETI Past Performance Information.DOC DOC document
Attachment 4 - GSM-ETI Task Order Guide.doc DOC document
Attachment 3 - GSM-ETI Sample Task Order.doc DOC document
Attachment 1 - DD254_GSM-ETI.doc DOC document
Attachment 5 - GSM-ETI Past Performance Information.DOC DOC document
Attachment 6 - GSM-ETI Subc_Teaming Partner Consent Letter.doc DOC document
Attachment 14 - Electronic Products List.doc DOC document
Attachment 2 - GSM-ETI CDRLs.doc DOC document
Attachment 4 - GSM-ETI Task Order Guide.doc DOC document
Attachment 10 - GSM-ETI Labor Category_Rate.xls XLS spreadsheet
Attachment 9 - PWS Template.doc DOC document
Attachment 7 - GSM-ETI Client Auth Letter.doc DOC document
GSM-ETI QA Matrix - APR 2011.doc DOC document
Attachment 8 - GSM-ETI PP Questionnaire.doc DOC document
HC1028-10-R-2001.doc DOC document
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION M - EVALUATION FACTORS FOR AWARD

The following have been modified:

M3.3 Factor 1: Technical/Management. Color/adjectival ratings for subfactors 1 through 3 will be provided at the subfactor level. All components/elements included in the individual subfactor are equal in importance and will be evaluated as having met the standard or does not meet the standard. Components/elements will not receive an individual color rating.

M3.3.1 Subfactor 1: Technical Solution. The offeror's proposed technical approach for delivering the GSM-ETI requirements (reference PWS paragraphs 5.2 through 5.5.3) will be evaluated on the degree to which the offeror’s response demonstrates technical ability, responsiveness, minimizes risk of specific solutions and demonstrates an understanding of the requirements using systematic processes and procedures, such as the Information Technology Infrastructure Language (ITIL) framework (or similar framework).

M3.3.2 Subfactor 2 – Sample Task Order (STO). The Government will evaluate the extent to which the offeror’s proposed phased technical approach for the Sample Task Order GSM-ETI #ES1 (Reference HC1028-10-R-2001 - Section J, Attachment 3) demonstrates the offeror’s application of PWS requirements 5.2 through 5.5.3 to the objectives and constraints of the Sample Task Order (as required by the scope paragraph 3a of the Sample Task Order), to include CDRLs called out in STO paragraphs 5.1e, 5.2c, 5.3c. 5.4d, and 5.5c.

The labor categories identified by the offeror will be analyzed to determine if personnel with the proper levels of expertise are assigned to the Sample Task Order and the hours necessary to complete the task will be compared to the Government‘s established estimate.

M3.3.3 Subfactor 3: Management Plan. The offeror’s proposed Management Plan will be evaluated to determine the degree to which the offeror’s proposed solution/approach demonstrates an appropriate methodology for creating and maintaining a performance-based environment for task order execution at multiple worldwide performance locations from the perspectives of corporate, contract and task order levels to include any management challenges unique to GSM-ETI to include the offeror’s plan to contain and reduce contract price/costs. The Government’s evaluation of the offeror’s Management Plan will include an analysis of the offeror’s Organizational Structure/Chart or methodology highlighting reporting hierarchy; to include teaming partners; the offeror’s Cost Management Process describing methodology to provide seamless and efficient processes for integrating and documenting, containing and reducing all costs associated with GSM-ETI effort as required by PWS Paragraphs 5.1, 5.1.1, 5.1.2 and 5.1.3; the offeror’s Change Management Plan highlighting change management processes and procedures to include any management changes reflecting the offeror’s ability grow and shrink its staff in response to changing work conditions; the offeror’s Security Process demonstrating compliance with GSM-ETI PWS Paragraph 4.2 - (Security Requirements and subparagraphs thereto); and the offeror’s processes identifying the offeror’s ability to respond on a worldwide basis to task order requirements to include the offeror’s capability to obtain appropriate permits, connections approvals, clearances, DoD Common Access Cards and other Government (DISA) badges, etc

(End of Summary of Changes)

File details come from the government source that posted it. Updated .