This Quality Assurance Surveillance Plan outlines the monitoring of a contractor's performance under the Defense Research & Engineering Network 4 contract. Key personnel overseeing performance include the Program Manager, Contracting Officer, and Contracting Officer's Representative. Performance will be monitored using periodic inspection, 100% inspection, and random sampling. Standards address delivery timeliness and accuracy, latency, jitter, loss, trafficking compliance, provisioning, change requests, network database accuracy, problem resolution timeliness, outage duration, and availability. Incentives of up to -16% of fees may apply for delays, errors, or downtime exceeding thresholds.
This federal contract solicitation requests proposals for the Defense Research Engineering Network - DREN4 by January 27, 2020. Questions are due by December 16. Sensitive attachments related to pricing, statements of work, implementation plans, node locations, and non-disclosure agreements will be provided separately to US nationals upon request. The Defense Information Systems Agency is the issuing agency.
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
As of 17 January 2020
1. CONTRACT NUMBER & TITLE
Defense Research & Engineering Network 4 (DREN4) Contract
2. PURPOSE
This QASP provides a systematic method to conduct surveillance of the Contractor's performance for work performed under the stated contract. This QASP explains the following:
What will be monitored?
How monitoring will take place.
Who will conduct the monitoring?
How monitoring efforts and results will be documented.
This QASP does not detail how the Contractor accomplishes the work. Rather, the QASP is created with the premise that the Contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government's responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP recognizes that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. Updates will ensure that the QASP remains a valid, useful, and enforceable document in synchronization with the PWS as it may change.
3. ROLES AND RESPONSIBILITIES
The following personnel will oversee and coordinate surveillance activities.
a) Program/Project Manager (PM)
The PM provides program oversight and supports the COR's performance assessment activities.
b) Contracting Officer (KO)
The KO will ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO will also ensure that the Contractor receives impartial, fair, and equitable treatment under this contract and determine the final assessment of the Contractor's performance.
c) Contracting Officer's Representative (COR)
The COR is responsible for providing continuous technical oversight of the Contractor's performance.
The COR uses the QASP to guide the oversight/surveillance process. The COR will keep Quality
Assurance records that accurately document the Contractor's actual performance. The purpose of the Surveillance Plan is to monitor that the Contractor meets the performance standards contained in the contract. The COR will report early identification of performance problems to the KO. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the
Government's behalf.
4. METHODS OF SURVEILLANCE
This QASP guides monitoring performance as stated in the PWS primarily using Periodic Inspection. Some
Performance Surveillance will be performed also using the 100 Percent Inspection and Random Sampling methods.
5. PERFORMANCE STANDARDS
Task Performance
Standard
Acceptable Quality Level (AQL) Surveillance Method Incentives (+/-)
6.0.2 General
Guidance
Deliverable schedule and accuracy
Deliverables and all revisions and corrections to deliverables are on time, accurate, and error free.
Periodic Inspection:
Government review of
Deliverables for delivery time, accuracy, and errors.
-.5% of NOC MRC per incident of not meeting any of the delivery time, accuracy, and error requirements.
-.5% of NOC MRC for each additional 7 days past the delivery time requirement.
6.1.3.1
Latency
Latency
Formula
For all DREN Nodes, no more than 5 pairs exceed Latency
Formula requirements.
Periodic Inspection:
Government review of contractor developed
Latency Report.
See Node Credits (6.5.7.1.2 and 6.5.7.2.2)
6.1.3.2 Jitter Jitter
Measurement
Jitter between all pairs of DREN
Nodes is less than 1 milliseconds.
Random Sampling:
Government review of jitter as reported in the 6.5.9.1.3
Data Dashboard
See Node Credits (6.5.7.1.2 and 6.5.7.2.2)
6.1.3.3 Loss Loss
Measurement
Loss on all DREN paths is less than 0.01%.
Random Sampling:
Government review of loss as reported in the 6.5.9.1.3
Data Dashboard
See Node Credits (6.5.7.1.2 and 6.5.7.2.2)
6.4.8
Combating
Trafficking in
Persons
Compliance with FAR
52.222-50
The Contractor immediately reports issues to KO
Periodic Inspection:
Program Management
Review (PMR) infrequent compliance issues noted and annual inspection
None
6.5.1 Service
Provisioning
Service
Provisioning
Elements a) through f)
The Contractor delivers service as required from a Government issued TSO and within the timelines specified in Table 6.12
Required Provisioning Intervals for DITCO-issued service orders.
Periodic Inspection:
Government review of
Service Request
Provisioning Performance
Weekly Report and individual 6.5.13.2
Acceptance Test Reports.
New Node or upgrade timeline
NRC
Plus/Minus
On time No +/-
1-10 days late -2%
11-20 days late -4%
21-30 days late -8%
> 31 days late -16%
6.5.2 Change
Request
Provisioning
Change
Request
Provisioning
The Contractor provisions change requests on time and
100% accurate/error free.
100 Percent Inspection:
Government validation of change requests and review of Change Request
Provisioning Performance
Report.
-1% of NOC MRC per incident of not meeting 100% accurate and on time.
6.5.4
Contractor
Managed
Network
Database
Contractor
Managed
Network
Database
The Contractor maintains a
Network Database that is 100% accurate/error free.
All errors detected by the
Contractor, by the validation process or reported by the
Government are corrected within seven days.
Periodic Inspection:
Government review of
Validation report and
Random Sampling:
Spot checks of Network
Database.
-.5% of NOC MRC if greater than 5% errors are identified in the month.
6.5.6 Problem
Management
Problem
Resolution /
Management
The Contractor meets all requirements specified in this subtask on time and error free
Periodic Inspection:
Government review of
Problem Management
Reports
-1% of NOC Monthly Recurring fee for each incident that does not meet the required times.
In addition for DREN Nodes with the Rapid Response option:
-100% of DREN Nodes Rapid
Response Option fee when one or more incidents occur in a month on that DREN Node that does not meet the required times.
6.5.7.1 DREN
Node Outages
6.5.7.1.1
Node Outage
Time minimal Periodic Inspection:
Government review of
DREN Node and Network
Availability Report
Outage Node MRC
Plus/Minus
<15 minutes
0%
>=15 minutes
Credit calculated per 6.5.7.1.2
DREN Node MRC
Billing Credits
6.5.7.2
Network
Availability
ANA The Contractor maintains an
ANA of 99.9% or greater.
Periodic Inspection:
Government review of
Network Availability Report
Availability MRC Plus/Minus
>=99.9% 0%
<99.9% Credit calculated per
6.5.7.2.2 ANA
Total MRC
Billing Credits
6.5.10 OOB
Access
OOB Access
Function
The Contractor deploys and maintains an OOB Access capability, performs OOB Access
Testing weekly and repair failures within a week
Periodic Inspection:
Government review of OOB
Status Reports
None
6.5.14 DNS
Service
Accurate DNS
Resource
Records
The Contractor immediately updates records to reflect changes and continuously audits the DNS records and maintains 100% accuracy
Periodic Inspection:
Monthly report (6.4.1.8) of changes and auditing of
DNS records missing or inaccurate
70% to<90% -2% NOC MRC
<70% -10% NOC MRC
6. DOCUMENTING PERFORMANCE
The Government will use the Deliverables from the PWS in the following table as part of the documentation of
Contractor performance.
PWS
Task#
Deliverable
Number/Title
Format Due Date Distribution/Copies Frequency and
Remarks
6.1.3.5 1: DCN Placement
Current Map(s)
Contractor-
Determined Format
15 days after
Government request
Standard Distribution
(6.0.2)
Monthly through
CITP, Annually after
CITP, after any significant changes, and upon
Government Request
6.1.3.5 2: DCN Placement
Current Report
Contractor-
Determined Format
15 days after
Government request
Standard Distribution
(6.0.2)
Monthly through
CITP, Annually after
CITP, after any significant changes, and upon
Government Request
6.1.3.5 3: DCN Placement
Proposed Map(s)
Contractor-
Determined Format
15 days after
Government request
Standard Distribution
(6.0.2)
Monthly through
CITP, Annually after
CITP, after any significant changes, and upon
Government Request
6.1.3.5 4: DCN Placement
Proposed Report
Contractor-
Determined Format
15 days after
Government request
Standard Distribution
(6.0.2)
Monthly through
CITP, Annually after
CITP, after any significant changes, and upon
Government Request
6.1.3.6.1 5: Latency Report Contractor-
Determined Format
15th of each month Standard Distribution
(6.0.2)
Monthly
6.1.3.6.2 6: On Demand
Pairwise TCP Test
Report
Contractor-
Determined Format
15 days after
Government request
Standard Distribution
(6.0.2)
Upon Government
Request
6.1.3.6.3 7: On Demand
Aggregate TCP Test
Report
Contractor-
Determined Format
15 days after
Government request
Standard Distribution
(6.0.2)
Upon Government
Request
6.1.3.6.4 8: On Demand
Pairwise Throughput
Test Report
Contractor-
Determined Format
15 days after
Government request
Standard Distribution
(6.0.2)
Upon Government
Request
6.1.3.6.5 9: On Demand
Aggregate
Throughput Test
Report
Contractor-
Determined Format
15 days after
Government request
Standard Distribution
(6.0.2)
Upon Government
Request
6.3.1 10: RMF Artifacts Contractor-
Determined Format
Within 15 days after any change to the physical, logical, or flow aspects of the network or other security impacting changes eMASS filings; RADIX uploads; ACAS filings;
and other CSSP uploading and filing requirements
Every time there are significant changes
6.3.1.1 11: RMF IATT
Artifacts
Government provided templates to be provided after award
220 days after contract award eMASS filings; RADIX uploads; ACAS filings;
and other CSSP uploading and filing requirements
One Time
6.3.1.2 12: RMF ATO
Artifacts
Government provided templates to be provided after award
243 days after contract award eMASS filings; RADIX uploads; ACAS filings;
and other CSSP uploading and filing requirements
One Time
6.3.1.3 13: Control Review
Report
Contractor determined format
243 days after contract award eMASS filings; RADIX uploads; ACAS filings;
and other CSSP uploading and filing requirements
One Time
6.3.1.3 14: POA&M Status
Report
Contractor determined format
15th of each month Standard Distribution
(6.0.2) plus the DREN
ISSM
Monthly
6.3.1.3 15: Physical, Logical, and Flow Network
Diagrams
Contractor determined format
Within 15 days of every 180 day revalidation
Upload to the
Government
Documentation
Repository (draft and final) and to eMASS
(final)
Every 180 days
6.3.1.3 16: Resubmitted
RMF Artifacts
Contractor determined format
Within 15 days after any change to the physical, logical, or flow aspects of the network or other security impacting changes, and every
SCA-V assessment eMASS filings; RADIX uploads; ACAS filings;
and other CSSP uploading and filing requirements
Every time there are significant changes or a SCA-V assessment
6.3.2 17: CCB Change
Request
Contractor determined format
30 days prior to requested change date
Standard Distribution
(6.0.2)
As required
6.3.8 18: SDREN CAP
documentation
Government provided format after contract award
No more than 180 days after commencement of
Phase II of transition
Standard Distribution
(6.0.2)
One time, update as required
6.4.1.1 19: Program Task
Management Report
Contractor-
Determined Format
(includes presentation, minutes and associated materials)
15th of each month Standard Distribution
(6.0.2)
Monthly
6.4.1.3 20: Project
Management
Planning and Control
Report
Contractor
Determined Format
30 days after
Contract Award and seven days after any substantive changes occur
Standard Distribution
(6.0.2)
Any time there is a substantive change
6.4.1.5 21: Progress Report Contractor
Determined Format
(risk management, resources, task completion, technical support hours, significant activities, accomplishments)
15th of each month Standard Distribution
(6.0.2)
Monthly
6.4.1.6.1 22: TIM
Presentations
Government provided prior to
TIM
21 days prior to the
TIM
Standard Distribution
(6.0.2) and presented at the meeting
Annually
6.4.1.6.1 23: TIM Minutes Contractor
Determined Format
Seven days after the
TIM
Standard Distribution
(6.0.2)
Annually
6.4.1.8 24: PMR Report Contractor
Determined Format
(presentations, minutes, and associated materials)
15th of each month Standard Distribution
(6.0.2)
Monthly
6.4.1.9 25: Annual Planning and Design Review
Report
Contractor
Determined Format
(presentations, minutes, and associated materials)
Presentations 21 days prior to review meeting, minutes
Seven days after meeting
Standard Distribution
(6.0.2)
Annually
6.4.2 26: Network Status
Report
Contractor
Determined Format
(presentations, minutes, and associated materials)
15th of each month Standard Distribution
(6.0.2)
Monthly
6.4.3.1 27: TIP Contractor
Determined Format
14 days after
Government request or as needed for
Contractor initiated
Standard Distribution
(6.0.2)
As required
6.4.5 28: Accounting
Management Report
Contractor
Determined Format
15th of each month Standard Distribution
(6.0.2)
Monthly
6.4.7 29: SCRM Plan Contractor-
Determined Format no more than 25 pages
Draft: 30 days after award
Final: 30 days after receipt of
Government feedback
Update: five days after any change
Standard Distribution
(6.0.2)
One time, update as required
6.5.1 30: Service Request
Provisioning
Performance weekly report
Contractor-
Determined Format
Weekly by each
Thursday at 12:00, Eastern Time
Standard Distribution
(6.0.2)
Weekly
6.5.2 31: Change Request
Provisioning
Performance Report
Contractor-
Determined Format
15th of each month Standard Distribution
(6.0.2)
Monthly
6.5.4 32: Validation
Report
Contractor-
Determined Format
15th of each month Standard Distribution
(6.0.2)
Monthly
6.5.5 33: Response Metric
Report
Contractor-
Determined Format
15th of each month Standard Distribution
(6.0.2)
Monthly
6.5.5 34: Help Desk SOP Contractor-
Determined Format
Prior to IPC
Demonstration
Standard Distribution
(6.0.2)
Full document delivered completely once, changes reviewed with
Government after
6.5.6 35: Problem
Management Report
Contractor-
Determined Format
15th of each month Standard Distribution
(6.0.2)
Monthly
6.5.7.3 36: Network
Availability Report
Contractor-
Determined Format
15th of each month Standard Distribution
(6.0.2)
Monthly
6.5.8 37: Problem
Escalation Procedure
Contractor-
Determined Format
Prior to IPC
Demonstration
Standard Distribution
(6.0.2)
One time, changes reviewed annually
6.5.9.1.1 38: API
Documentation
Contractor
Determined Format
Beginning of IPC
Demonstration
Standard Distribution
(6.0.2)
One time, updated within 15 days of API changes
6.5.10 39: OOB Status
Report
Microsoft Office
Excel spreadsheet with Contractor determined layout
Weekly by each
Thursday at 12:00, Eastern Time
Standard Distribution
(6.0.2) weekly
6.5.11 40: Regression
Testing Plan
Contractor-
Determined Format
15 days after regression testing ticket opened
Standard Distribution
(6.0.2)
As required
6.5.11 41: Regression Test
Report
Contractor-
Determined Format
Seven days after regression testing is complete
Standard Distribution
As required
6.5.11 42: Change/upgrade
MOP
Contractor-
Determined Format
Seven days after regression testing is complete
Standard Distribution
(6.0.2)
As required
6.5.11 43: Upgrade
Schedule
Contractor-
Determined Format
Seven days after regression testing is complete
Standard Distribution
(6.0.2)
As required
6.5.12.1 44: DREN Node
Master Plan
DREN Node Master
Plan Template
Draft version 90 days after contract award;
final version 15 days after receiving comments and recommendations from the
Government
Standard Distribution
(6.0.2)
One time, and updated as necessary after
6.5.12.2 45: Individual DREN
Node As-Built Report
Contractor-
Determined Format
Seven days after
Government acceptance of a new or upgraded DREN
Node
Standard Distribution
(6.0.2)
As required
6.5.12.3 46: DREN Node Site
Survey Template
Contractor-
Determined Format
Draft: 21 days after contract award
Final: 21 days after
Government feedback on draft
Update: within seven days of any significant change
Standard Distribution
(6.0.2)
One time, update as required
6.5.12.4 47: DREN Node Site
Survey
Contractor-
Determined Format
30 + seven days after
DITCO issues service order for new/change
21 + seven days after
DITCO issues service order for termination
Standard Distribution
(6.0.2)
As required
6.5.12.5 48: DREN Node
Location
Modification Plan
Contractor-
Determined Format
14 days after delivery of DREN
Node Site Survey
Standard Distribution
(6.0.2)
As required
6.5.13.1 49: Acceptance Test
Plan
Contractor-
Determined Format
Prior to IPC
Demonstration
Standard Distribution
(6.0.2)
One time, update as required
6.5.13.2 50: Acceptance Test
Report
Contractor-
Determined Format
Seven days following satisfactory testing
Standard Distribution
(6.0.2)
As required
6.6.1.1.1 51: IPC Plan Contractor-
Determined Format
Draft version 60 days after contract award;
final version 80 days after contract award
Standard Distribution
(6.0.2)
One time
6.6.1.1.2 52: RTM Template provided by the Government following contract award
60 days after contract award
Standard Distribution
(6.0.2)
One time, annually, and as required
6.6.1.1.4 53: IPCDP Contractor-
Determined Format
Draft version 120 days after IPC Plan submission
Final version 140 days after final IPC
Plan submission
Standard Distribution
(6.0.2)
One time
6.6.1.1.6 54: IPCDR Contractor-
Determined Format
Seven days after completion of the IPC
Test and
Demonstration
Standard Distribution
(6.0.2)
One time
6.6.1.3 55: CITP Contractor-
Determined Format
200 days after contract award
Standard Distribution
(6.0.2)
One time, updated as required
6.6.3.1.1 56: Development of
Contract and
Network Phase-Out
Transition Plan
Contractor-
Determined Format
60 calendar days after award of follow-on DREN contract
Standard Distribution
One time
The Government will document the two types of performance:
a) Acceptable Performance
Positive Performance will be documented in the COR Report and significant positive performance also as a Contractor Performance Assessment Reporting System (CPARS) entry.
b) Unacceptable performance
Unacceptable Contractor performance will be identified from surveillance evaluations. When unacceptable performance occurs, the COR will inform the Contractor. The COR will document the form and content of the discussion and place it in the COR Report which will be reviewed by the KO.
When the COR/KO determines formal written communication is required, the COR will prepare a
Corrective Action Report (CAR). The CAR is forwarded to the KO for dissemination to the Contractor.
The Contractor shall acknowledge receipt of the CAR in writing. The CAR will specify if the Contractor is required to prepare a Corrective Action Plan (CAP) to document how the Contractor shall correct the unacceptable performance and avoid any recurrence. The CAR will also state how long after receipt the Contractor has to present this CAP to the KO and COR. The Government may withhold payment for services until corrective action is taken. The Government will review the Contractor's
CAP to determine acceptability. Upon Government acceptance of the corrected services the
Contractor will be permitted to invoice.
Any CAR may become a part of the supporting documentation for contract payment deductions, fee
(if any) deductions, CPARS entries, or other actions deemed necessary by the KO.
7. MANDATORY OR REGULATORY COMPLIANCE ITEMS
The Contractor shall provide initial proof of compliance with regulatory and compliance items contained in the contract. The COR and the KO will evaluate the initial submission and will conduct ad hoc reviews of the
Contractor's compliance throughout the remainder of the contract. The Contractor shall monitor compliance as required by FAR 52.222-50, Combating Trafficking in Persons, and report any issues to the KO.
8. ACCEPTABLE QUALITY LEVEL (AQL)
The AQLs for this contract are included in the table in 5. Performance Standards
9. EVALUATION METHOD
The COR will document receipt of all Deliverables as well as any verbal or electronic communications regarding performance on the contract including the times of delivery. The COR and as necessary the KO will review this information to perform evaluation of contract performance.
10. PERFORMANCE RATING
In evaluating the quality of Contractor's performance, the following performance ratings may be used (same as CPAR ratings).
Performance
Rating Criteria
Exceptional Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and Contractor actions were highly effective.
Very Good Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the Contractor were effective.
Satisfactory Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the Contractor were satisfactory.
Marginal Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor’s proposed actions were marginally effective or were not completely implemented.
Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the Contractor’s corrective actions appear to have been or were ineffective.
APPENDIX A. PERFORMANCE ASSESSMENT REPORT
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACT/TASK ORDER
NUMBER
2. CONTRACTOR 3. TYPE OF SERVICES
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
5. COR PHONE 6. SUSPENSE DATE
I. PERFORMANCE
7. DEFICIENCY (CHECK ALL BOXES THAT
APPLY)
NEW
REPEAT
NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM
REVIEWED
9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY
BOX WAS CHECKED)
10. DETAILED PERFORMANCE ASSESSMENT
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE CONCUR
NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION
DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON
FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. CONCUR NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS
APPENDIX B. CORRECTIVE ACTION REPORT
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY MAJOR MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
ACCEPTED REJECTED
12. CLOSE DATE
| 1. Contract Number & Title |
| 2. Purpose |
| 3. Roles and Responsibilities |
| 4. Methods of Surveillance |
| 5. Performance Standards |
| 6. Documenting Performance |
| 7. Mandatory or regulatory compliance items |
| 8. Acceptable Quality Level (AQL) |
| 9. Evaluation Method |
| 10. Performance Rating |
| Appendix A. Performance Assessment Report |
| Appendix B. Corrective Action Report |
File details come from the government source that posted it. Updated .