H92401-25-R-0002_Final_RFP_QNA_Round_6_23_Apr_25.pdf

PDF 305 KB Posted

Attached to
Targeted Requirement EXecution (TREX) 3 Multiple Award Contract(s) (MAC) Follow-On Request for Proposals (RFP)
Solicitation number
H92401-25-R-0002_TREX_RFP
Issued by

About this file

This document is a Questions and Answers (Q&A) file for Solicitation Number H92401-25-R-0002, related to the Targeted Requirement EXecution (TREX) 3 Multiple Award Contract. The file contains three specific Q&A items addressing technical attachments for the solicitation. The questions cover warranty tracking information, warranty repair source lists, and pricing matrix requirements. The government provides direct responses to each query, specifying precise submission requirements for Attachment 3 (Warranty Tracking Info), Attachment 4 (Warranty Repair Source List), and Attachment 8 (Price Matrix). For most attachments, the government mandates submission using specific required formats at the time of proposal submission, with some minor variations in exact timing and documentation requirements.

View the file

Other files

File Type Posted
H92401-25-R-0002-0004 Amendment 4_21_Apr_25.pdf PDF
H92401-25-R-0002_Final_RFP_QNA_Round_5_21_Apr_25.pdf PDF
H92401-25-R-0002 CONFORMED SF33 thru Amendment 04_25_Apr_25.pdf PDF
H92401-25-R-0002_Final_RFP_QNA_Round_4_14_Apr_25.pdf PDF
H92401-25-R-0002-0003 Amendment 03_07_Apr_25.pdf PDF
H92401-25-R-0002 CONFORMED SF33 thru Amendment 03_07_Apr_25.pdf PDF
H92401-25-R-0002-0002 Amendment 02_31_MAR_25.pdf PDF
H92401-25-R-0002_Final_RFP_QNA_Round_3_07_Apr_25.pdf PDF
H92401-25-R-0002 CONFORMED SF33 thru Amendment 02_31_MAR_25.pdf PDF
H92401-25-R-0002_Final_RFP_QNA_Round_2_31_MAR_25.pdf PDF
H92401-25-R-0002-0001 Amendment 02_31_MAR_25.pdf PDF
H92401-25-R-0002 - SF33_14_Mar_25 FINAL.pdf PDF
H92401-25-R-0002_Final_RFP_QNA_Round_1_25_MAR_25.pdf PDF
H92401-25-R-0002-0001 Amendment 01_25_MAR_25.pdf PDF
H92401-25-R-0002-SF33-CONFORMED thru Amdt 01_25_MAR_25.pdf PDF
J-9_Q A Template_FINAL_7 Mar 25.xlsx XLSX spreadsheet
J-4 Warranty Source Of Repair_30 Jan 25.xlsx XLSX spreadsheet
Master QNA_draft RFP_14 Mar 25 (released version) .pdf PDF
H92401-25-R-0002 - Attachment Listing.pdf PDF
H92401-25-R-0002 - SF33_14_Mar_25 FINAL.pdf PDF
J-3 WarrantyTracking Information_30 Jan 25.xlsx XLSX spreadsheet
Exhibit A_TREX 3 CDRLS_13 Feb 25 FINAL.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM

SECTION

NUMBER

NAME OF

SECTION

COMMENT TYPE

(Select from drop down)

SOURCE

SELECTION

SENSITIVE OR

PROPRIETARY

INFORMATION

QUESTIONS / COMMENTS

(With justification of why considered source selection sensitive if applicable) Government Answer

48 Attachment 3 Warranty Tracking Info Substantive No

Warranty information for this attachment cannot be fully provided prior to order. Can we submit warranty information in our own format for the proposal and fill the required paperwork out post contract when serial numbers and order numbers are available?

No. As outlined in each DO (Factor 3, Subfactors 1-4) ITO This attachment is required at the time of proposal submission IAW 52.246-19 and 252.246-7006.

Additionally, other formats are not authorized.

49 Attachment 4 Warranty Repair Source List

Substantive No

Warranty information for this attachment cannot be fully provided prior to order. Can we submit warranty information in our own format for the proposal and fill the required paperwork out post contract when serial numbers and order numbers are available?

As outlined in each DO (Factor 3, Subfactors 1-4) SOW para 4.0. This attachment is not required at the time of proposal submission, but rather within 2 business days after DO award using the Basic IDIQ Attachment 4 format only.

50 Attachment 8 Price Matrix Critical No

For our proposed CLIN structure, should our additional CLINs be added through a modification of the Government's pricing spreadsheet or should we submit our additional clins in our own format?

No. IAW Section L.4.1 offerors shall not re-format, remove, change, or alter the cells in Attachment 8. The proposed CLIN structure is required as part of the Volume 3, Factor 3 proposals for each Subfactor IAW Section L.3.1.1.

H92401-25-R-0002_Final_RFP_QNA_Round_6_23_Apr_25

File details come from the government source that posted it. Updated .