H92401-25-R-0002-0004 Amendment 4_21_Apr_25.pdf
PDF 564 KB Posted
- Solicitation number
- H92401-25-R-0002_TREX_RFP
- Issued by
-
United States Special Operations Command
About this file
This document is a Standard Form 30 (SF-30) Amendment of Solicitation/Modification of Contract for the Targeted Requirement Execution (TREX) 3 Multiple Award Contract (MAC). The amendment, numbered 0004 and effective 21 April 2025, makes administrative changes to several attachments in the Request for Proposals (RFP), specifically updating Delivery Order 1 (DO1) documents including the Statement of Work (SOW) and Invitation to Offer (ITO) to reflect OEM testing and referencing updated dates. The amendment updates the attachment listing in Section J to show revised dates for RFP Attachments J-10a and J-10b, with most attachments dated between January and April 2025.
The modifications impact various sections and attachments, including updates to the Prime Contract Statement of Work, warranty tracking documents, OEM listings, and price matrices for four different delivery orders covering systems such as PM-RC sUMS, PM-TS TACLAN, PM-TCC HF-TTL, and PM-ISS JTWS. The contract remains a multiple award IDIQ with a maximum ceiling value of $2,390,000,000, solicited through full and open competition with potential reserved award for a small business offeror. The amendment maintains the existing contract structure while making minor administrative updates to supporting documentation.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to incorporate the follow ing administrative chages:
1. Update RFP Attachment J-10b, "DO1 SOW" paragraph 2.2 to reflect OEM testing like the other DO's.
2. Update RFP Attachment J-10a, "DO1 ITO" to reference the date of the revised DO1 SOW.
3. Update SF33, Section J, Attachment listing to reflect the new date of 21 Apr 25 for RFP Attachments J-10a and J-10b.
1. CONTRACT ID CODE PAGE OF PAGES
S 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Apr-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X H9240125R0002
X 9B. DATED (SEE ITEM 11)
14-Mar-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Apr-2025
CODE
HQ USSOCOM
SOF AT&L-KI
7701 TAMPA POINT BLVD
TAMPA FL 33621-5323
H92401 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
H9240125R0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
ATTACHMENT LISTING
Attachment # CLINs/Section Title Pages Date
J-1 Section C Prime Contract Statement of Work (SOW) 10 31-Mar-25 J-2 SOW DD Form 254 10 26-Feb-25 J-3 Section E Warranty Tracking N/A 30-Jan-25 J-4 Section E Warranty Source of Repair N/A 30-Jan-25 J-5 N/A Class Brand Name Justification with Attachment 1
(Redacted as appropriate) 18 3-Mar-25
J-6 Section H.3 and Section
L.0.3
OEM Listing (Reference H.3) (Prohibited Bidders/Primes)
3 14-Feb-25
Exhibit A SOW Contract Data Requirements List (CDRLs) 7 11-Feb-25
J-7 RESERVED
J-8 Section L.4.0 Price Matrix for Total Evaluated Price (TEP)
(Exhibits B-E) N/A 7-Apr-25
Tab 1 - TEP Tab 2 - DO 1 Price Exhibit B-PM-RC sUMS Tab 3 - DO 2 Price Exhibit C-PM-TS TACLAN Tab 4 - DO 3 Price Exhibit D-PM-TCC HF-TTL Tab 5 - DO 4 Price Exhibit E-PM- ISS JTWS Tab 6 - Errata Sheet
J-9 N/A Q&A Template N/A 7-Mar-25 J-10 Section L.3 Delivery Order 1 PM-RC sUMS J-10a Section L.3 DO 1 ITO- PM-RC sUMS 2 21-Apr-25 J-10b Section L.3 DO 1 SOW-PM-RC sUMS 3 21-Apr-25 J-11 Section L.3 Delivery Order 2 PM-TS TACLAN J-11a Section L.3 DO 2 ITO-PM-TS TACLAN 2 5-Mar-25 J-11b Section L.3 DO 2 SOW-PM-TS TACLAN 3 5-Mar-25 J-12 Section L.3 Delivery Order 3 PM-TCC HF-TTL J-12a Section L.3 DO 3 ITO-PM-TCC HF-TTL 2 31-Mar-25 J-12b Section L.3 DO 3 SOW-PM-TCC HF-TTL 3 31-Mar-25 J-12c Section L.3 DO 3 IPB-PM-TCC HF-TTL 34 various J-13 Section L.3 Delivery Order 4-PM- ISS JTWS J-13a Section L.3 DO 4 ITO-PM- ISS JTWS 2 7-Apr-25 J-13b Section L.3 DO 4 SOW-PM- ISS JTWS 3 14-Feb-25 TBD N/A Small Business Subcontracting Plan N/A N/A
(End of Summary of Changes)
H9240125R0002
File details come from the government source that posted it. Updated .