This document is a Questions and Answers (Q&A) file for the Targeted Requirement Execution (TREX) 3 Multiple Award Contract solicitation, containing administrative inquiries from potential contractors and corresponding government responses. The Q&A covers multiple topics including serial numbering requirements for sets, kits, and assemblies across different delivery orders, document access protocols, and page limit constraints for proposal submissions. Key responses include clarifications that set, kit, or assembly definitions will be detailed within individual delivery orders, confirmation that contractors must request restricted documents when amendments are issued, and a denial of requests to expand page limits for delivery order management proposals, with the government asserting that the current 5-page limit has been adequate for past solicitations.

View the file

Other files

File Type Posted
H92401-25-R-0002_Final_RFP_QNA_Round_6_23_Apr_25.pdf PDF
H92401-25-R-0002-0004 Amendment 4_21_Apr_25.pdf PDF
H92401-25-R-0002_Final_RFP_QNA_Round_5_21_Apr_25.pdf PDF
H92401-25-R-0002 CONFORMED SF33 thru Amendment 04_25_Apr_25.pdf PDF
H92401-25-R-0002-0003 Amendment 03_07_Apr_25.pdf PDF
H92401-25-R-0002 CONFORMED SF33 thru Amendment 03_07_Apr_25.pdf PDF
H92401-25-R-0002-0002 Amendment 02_31_MAR_25.pdf PDF
H92401-25-R-0002_Final_RFP_QNA_Round_3_07_Apr_25.pdf PDF
H92401-25-R-0002 CONFORMED SF33 thru Amendment 02_31_MAR_25.pdf PDF
H92401-25-R-0002_Final_RFP_QNA_Round_2_31_MAR_25.pdf PDF
H92401-25-R-0002-0001 Amendment 02_31_MAR_25.pdf PDF
H92401-25-R-0002 - SF33_14_Mar_25 FINAL.pdf PDF
H92401-25-R-0002_Final_RFP_QNA_Round_1_25_MAR_25.pdf PDF
H92401-25-R-0002-0001 Amendment 01_25_MAR_25.pdf PDF
H92401-25-R-0002-SF33-CONFORMED thru Amdt 01_25_MAR_25.pdf PDF
J-9_Q A Template_FINAL_7 Mar 25.xlsx XLSX spreadsheet
J-4 Warranty Source Of Repair_30 Jan 25.xlsx XLSX spreadsheet
Master QNA_draft RFP_14 Mar 25 (released version) .pdf PDF
H92401-25-R-0002 - Attachment Listing.pdf PDF
H92401-25-R-0002 - SF33_14_Mar_25 FINAL.pdf PDF
J-3 WarrantyTracking Information_30 Jan 25.xlsx XLSX spreadsheet
Exhibit A_TREX 3 CDRLS_13 Feb 25 FINAL.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM

SECTION

NUMBER

NAME OF SECTION

COMMENT

TYPE

(Select from drop down)

SOURCE

SELECTION

SENSITIVE OR

PROPRIETARY

INFORMATION

QUESTIONS / COMMENTS

(With justification of why considered source selection sensitive if applicable) Government Answer

Attachment 10b

DO 1 SOW Administrative No

1) It states in 7.2 "Set, Kit or Assembly Serial Numbers. Each Set, Kit or Assembly shall be assigned an overall serial number (S/N) derived from the end item component." Can the Government provide a definition for Set, Kit or Assembly please.

2) If Set, Kit or Assembly is something other than at the Delivery Order, can the Government provide the BoM breakout.

1) The definition of a Set, Kit or Assemby is detailed within a delivery order. The ELIN Price Matrix for each order provides detailed information as to what is included within each ELIN as a deliverable.

Addionally, as outlined in Section L.3 and L.4 System/Kit/Component, etc. vary by Delivery order.

2) NA as it is at the Delivery Order as this in a order SOW.

Attachment 11b

DO 2 SOW Administrative No

1) It states in 7.2 "Set, Kit or Assembly Serial Numbers. Each Set, Kit or Assembly shall be assigned an overall serial number (S/N) derived from the end item component." Can the Government provide a definition for Set, Kit or Assembly please.

2) If Set, Kit or Assembly is something other than at the Delivery Order, can the Government provide the BoM breakout.

See response to item #37

Attachment 12b

DO 3 SOW Administrative No

1) It states in 7.2 "Set, Kit or Assembly Serial Numbers. Each Set, Kit or Assembly shall be assigned an overall serial number (S/N) derived from the end item component." Can the Government provide a definition for Set, Kit or Assembly please.

2) If Set, Kit or Assembly is something other than at the Delivery Order, can the Government provide the BoM breakout.

See response to item #37

Attachment

12c DO 3 IPB Administrative

Is there an equivelent document for DO 1,2 and 4 the Government can provide?

No, not every order on TREX will include an Integrated Parts Breakdown (IPB).

Attachment 13b

DO 4 SOW Administrative No

1) It states in 7.2 "Set, Kit or Assembly Serial Numbers. Each Set, Kit or Assembly shall be assigned an overall serial number (S/N) derived from the end item component." Can the Government provide a definition for Set, Kit or Assembly please.

2) If Set, Kit or Assembly is something other than at the Delivery Order, can the Government provide the BoM breakout.

See response to item #37

J List of Documents, Exhibits and Other Attachments

Administrative No

Can the government confirm when an amendment drops, if a document is affected by the change, it is the responsibility of the potential prime to request the document from the government for both non-controlled and controlled (CUI).

Yes, it is the responsibility of the potential offerors to request any document that requires restricted access and thus not posted directly in sam.gov as outlined in each notice posting instructions with the applicable amendment.

L Instructions, Conditions and Notices to Bidders

Administrative No

Table 1 of L.0.12 on page 66 of the RFP provides a page limit of 5 pages for each delivery order. In order to adequately cover all of the ELIN items, CLIN structures and milestones (which will exceed dozens in total) required for our schedules, we are requesting permission to submit the proposed schedules for each of the four delivery orders of Volume 3: Factor 3 - Delivery Order Management as a separate attachment in either Microsoft Excel or Project formats. We are requesting no page limit for the proposed schedules. Additionally, since Factor 3 requires a structured approach for systems integration, procurement, logistics, shipping and delivery with significant details of each process, we are requesting a page count increase to seven pages for each of the four delivery orders.

No. The page count remains unchanged. It has been deemed adqueate for the past 2 TREX source selections and hundreds of post award DO competitions since 2015.