Attachment_5_-_Wind_Tunnel_Master_Schedule.docx

DOCX document 17 KB Posted

Attached to
Static Line & Military Free Fall COI for ATC
Solicitation number
H92240-15-R-0002
Issued by

About this file

Attachment 5 - Wind Tunnel MS

View the file

Other files

File Type Posted
H92240-15-R-0002_Q A's.docx DOCX document
H92240-15-R-0002-0002.doc DOC document
Attachment_1_-_Performance_Work_Statement_Revised.docx DOCX document
H92240-15-R-0002_Q A's.docx DOCX document
Attachment_3_-_ELIN(s)_Pricing_Spreadsheet_Revised.xlsx XLSX spreadsheet
Attachment_11_-_QASP.doc DOC document
Attachment_6-_Past_Performance_Report_Form_Revised.doc DOC document
Attachment_9_-_Swing_Land_Trainer_Revised.docx DOCX document
Attachment_4_-_Government_Furnished_Equipment_(GFE)_Revised.docx DOCX document
Attachment_10_-_NPC_FY16_Course_Schedule.xlsx XLSX spreadsheet
Attachment_7_-_Past_Performance_Information_Form_Revised.doc DOC document
Amendment_0001.doc DOC document
Attachment_1_-_Performance_Work_Statement_Revised.docx DOCX document
H92240-15-R-0002.doc DOC document
Attachment_4_-_Government_Furnished_Equipment_(GFE)_22AUG15.docx DOCX document
Attachment_1_-_Performance_Work_Statement_22Aug15.docx DOCX document
Attachment_5_-_Wind_Tunnel_Safety_Brief.docx DOCX document
Attachment_8_-_SCA_Wage_Determination_2005-2057.PDF PDF
Attachment_5_-_Wind_Tunnel_Evolution_Brief_Sheet.docx DOCX document
Attachment_5_-_Wind_Tunnel_Body_Stability_Class.ppt PPT presentation
Attachment_2_-_NPC_SL_TRAINEE_GUIDE_(Mar15_Rev).pdf PDF
Attachment_7_-_Past_Performance_Information_Form.doc DOC document
Attachment_2_-_NPC_MFF_LESSON_PLAN_(JUN15_Rev).pdf PDF
Attachment_5_-_Wind_Tunnel_Objectives.docx DOCX document
Attachment_3_-_ELIN(s)_Pricing_Spreadsheet.xlsx XLSX spreadsheet
Draft_Solicitation.doc DOC document
Attachment_9_-_SL_Contract_items_(2).docx DOCX document
Attachment_2_-_NPC_MFF_TCCD_(Jan_2012).pdf PDF
Attachment_2_-_NPC_SL_TCCD_(JUN_2014).pdf PDF
Attachment_2_-_NPC_SL_LESSON_PLAN_(Mar15_Rev).pdf PDF
Attachment_6-_Past_Performance_Report_Form.doc DOC document
Attachment_2_-_NPC_MFF_TRAINEE_GUIDE_(JUN15_Rev).pdf PDF
Attachment_1_-_DRAFT_Performance_Work_Statement_(Industry_Day).docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Training Outline:

Day One

0845-0900 VWT Safety Brief 0900-0940 Group 1 Round 1

0940-1020 Group 2 Round 1
1020-1100 Group 3 Round 1

1100-1140 Group 1 Round 2

1140-1220 Group 2 Round 2
1220-1300 Group 3 Round 2

1300-1340 Group 1 Round 3

1340-1420 Group 2 Round 3
1420-1500 Group 3 Round 3

1500-1540 Group 1 Round 4

1540-1620 Group 2 Round 4
1620-1700 Group 3 Round 4

1700-TBD Debrief and Field day of VWT Facility

Day Two

0845-0900 VWT Safety Brief 0900-0940 Group 4 Round 1

0940-1020 Group 5 Round 1
1020-1100 Group 6 Round 1

1100-1140 Group 4 Round 2

1140-1220 Group 5 Round 2
1220-1300 Group 6 Round 2

1300-1340 Group 4 Round 3

1340-1420 Group 5 Round 3
1420-1500 Group 6 Round 3

1500-1540 Group 4 Round 4

1540-1620 Group 5 Round 4
1620-1700 Group 6 Round 4

1700-TBD Debrief and Field day of VWT Facility

Rounds

Round 1
Flight 1 – Introduction to Body Stability
Flight 2 – Body Position and Heading Control
Flight 3 – Left/Right Turns
Round 2
Flight 4 – Hover Control, Forward/Backward Movement
Flight 5 – Level Turns
Flight 6 – Free Flight
Round 3
Flight 7 – Skills Overview
Flight 8 – Burble Stability Drill
Flight 9 – Side Slides and Altimeter Checks
Round 4
Flight 10 – Pull Procedures
Flight 11 – Pull Procedures
Flight 12 – Free Flight

File details come from the government source that posted it. Updated .