Solicitation TCCC.doc
DOC document 981 KB Posted
- Solicitation number
- H92222-10-R-0018
- Issued by
-
United States Special Operations Command
About this file
Solicitation TCCC
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TCCC Award Synopsis.pdf | ||
| Attach 04 CDRL.pdf | ||
| Amendment 03.pdf | ||
| Attach 03 MIN MAX QTY.pdf | ||
| Attach 02 TCCC SOO.pdf | ||
| Attach 05 Performance_Matrix.xls | XLS spreadsheet | |
| TCCC AMEND 02 21May2010.pdf | ||
| TCCC AMEND 01 20 May 2010.pdf | ||
| Q A's 14 May 2010.pdf | ||
| QAs 3 May 2010.pdf | ||
| Q A's as of 30 Apr 2010.doc | DOC document | |
| CDRL Attch 04.pdf | ||
| MIN MAX QTY Attch 03.pdf | ||
| SOO Attch 02.pdf | ||
| P Spec Attch 01.pdf | ||
| Performance Matrix Attch 05.xlsx | XLSX spreadsheet | |
| MIN MAX QTY Attch 03.pdf | ||
| CDRL Attch 04.pdf | ||
| Draft Solicitation 100407.pdf | ||
| SOO Attch 02.pdf | ||
| Performance Spec Attch 01.pdf | ||
| Performance Matrix Attch 05.xlsx | XLSX spreadsheet |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY OF CLINS
Pricing is hereby requested for a five (5) year Indefinite Delivery/Indefinite Quantity (IDIQ) contract for the Tactical Combat Casualty Care (TCCC) Casualty Evacuation (CASEVAC) Set. The Contract Line Items are numbered to represent each ordering period of the contract (i.e. Contract Line Item Number (CLIN) 1001 = first ordering period, 2001 = second ordering, 3001 = third ordering period, etc.). The maximum quantity for each item that may be purchased throughout the life of the contract is depicted in year one, specifically CLINs 1001 through 1023. The maximum quantity will be adjusted at the beginning of each year by taking the balance of what was actually purchased during the previous year and moving it to the current year thus reflecting a revised maximum quantity. For example: CLIN 1001 identifies a maximum quantity of 28. If seven (7) are ordered in ordering period one, CLIN 1001 will be adjusted to reflect the actual quantity of 7ordered in ordering period one and CLIN 2001 will reflect a maximum quantity of 21.
The minimum quantity that shall be purchased at time of contract award is 3 CASEVAC Sets. No order is guaranteed above the stated minimum quantity.
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 3 |
| Each |
TCCC CASEVAC PDM's
FFP
Tactical Combat Casualty Care (TCCC) Casualty Evacuation (CASEVAC) Set Product Demonstration Models (PDM's), IAW contractor's proposed Statement of Work (SOW), based on the Statement of Objectives (SOO), Contractor shall provide TCCC CASEVAC Set, which includes four component Kits: Casualty Extraction Kit, Casualty Mobility Kit, Casualty Transport Kit and Casualty Sustainment Kit.
Period of performance from award date Not to exceed (NTE) August 2011
FOB: Destination
MAX
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 3 |
| Each |
Casualty Extraction Kit Refurbishment
Replenishment/Refurbishment: During testing and employment of the Casualty Evacuation Kit, much of the equipment will be consumed, fail or break during the testing events and will require replenishment prior to the next test phase. IAW the Statement of Objectives (SOO), the Government will return each Kit to the contractor for refurbishment and replacement of consumables, and replacement of failed/broken items. Costs for return of the Kit and delivery of replenished/refurbished Casualty Evacuation Kits is included in this CLIN.
CLIN shall be utilized as needed for the duration of the contract base period.
Period of performance from award date NTE August 2011
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 3 |
| Each |
Casualty Mobility Kit Refurbishment
Replenishment/Refurbishment: During testing of the Casualty Mobility Kit, much of the equipment will be consumed, fail or break during the testing events and will require replenishment prior to the next test phase. IAW the Statement of Objectives (SOO), the Government will return each Kit to the contractor for refurbishment and replacement of consumables, and replacement of failed/broken items. Costs for return of the Kit and delivery of replenished/refurbished Casualty Mobility Kits is included in this CLIN.
CLIN shall be utilized as needed for the duration of the contract base period.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 3 |
| Each |
Casualty Transport Kit Refurbishment
Replenishment/Refurbishment: During testing of the Casualty Transport Kit, much of the equipment will be consumed, fail or break during the testing events and will require replenishment prior to the next test phase. IAW the Statement of Objectives (SOO), the Government will return each Kit to the contractor for refurbishment and replacement of consumables, and replacement of failed/broken items. Costs for return of the Kit and delivery of replenished/refurbished Casualty Transport Kits is included in this CLIN.
CLIN shall be utilized as needed for the duration of the contract base period.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 3 |
| Each |
Casualty Sustainment Kit Refurbishment
Replenishment/Refurbishment: During testing of the Casualty Sustainment Kit, much of the equipment will be consumed, fail or break during the testing events and will require replenishment prior to the next test phase. IAW the Statement of Objectives (SOO), the Government will return each Kit to the contractor for refurbishment and replacement of consumables, and replacement of failed/broken items. Costs for return of the Kit and delivery of replenished/refurbished Casualty Sustainment Kits is included in this CLIN.
CLIN shall be utilized as needed for the duration of the contract base period.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 4 |
| Days |
| $960.00 |
| $3,840.00 |
Field Representation
IAW the contractor's proposed SOW in response to the SOO, the contractor will provide qualified field representation for initial kit instruction and training, calibration of equipment, field assessment and related guidance.
The Field Representation CLIN is assigned a predetermined NTE dollar amount.
MAX
$3,840.00
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Lot |
| $90,000.00 |
| $90,000.00 |
Travel
COST
All travel shall be conducted in accordance with the Joint Travel Regulation (JTR). The Travel CLIN is assigned a predetermined NTE dollar amount.
MAX COST
$90,000.00
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Job |
| $100,000.00 |
| $100,000.00 |
ECP
Engineering Change Proposal's may be executed any time within the performance period after Government review and approval.
The ECP CLIN is assigned a predetermined NTE dollar amount.
MAX
$100,000.00
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
NSP
Technical Data
Contract Data Requirements List (CDRLs), DD Form 1423
CDRLs A001-A009 are not separately priced (NSP)
MAX
NSP
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 28 |
| Each |
| OPTION |
| TCCC CASEVAC |
FFP
Contractor shall provide Tactical Combat Casualty Care (TCCC) Casualty Evacuation (CASEVAC) Set, IAW the Statement of Work (SOW) and Performance Specification, which includes four component Kits: Casualty Extraction Kit, Casualty Mobility Kit, Casualty Transport Kit and Casualty Sustainment Kit.
Ordering Period One 12 Months
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 84 |
| Each |
| OPTION |
| Casualty Extraction Kit |
FFP
Contractor shall provide the Casualty Evacuation Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes three modules: Casualty Extraction Module 1 (E-1), Casualty Extraction Module 2 (E-2), and Casualty Extraction Module 3 (E-3).
Ordering Period One 12 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 436 |
| Each |
| OPTION |
| Casualty Extraction Module 1 (E-1) |
FFP
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-1), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 436 |
| Each |
| OPTION |
| Casualty Extraction Module 2 (E-2) |
FFP
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-2), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 436 |
| Each |
| OPTION |
| Casualty Extraction Module 3 (E-3) |
FFP
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-3), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 267 |
| Each |
| OPTION |
| Casualty Mobility Kit |
FFP
Contractor shall provide the Casualty Mobility Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes two modules: Casualty Mobility Module 1 (M-1), and Casualty Mobility Module 2 (M-2).
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,262 |
| Each |
| OPTION |
| Casualty Mobility Module 1 (M-1) |
FFP
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Mobility Module (M-1), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,262 |
| Each |
| OPTION |
| Casualty Mobility Module 2 (M-2) |
FFP
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Mobility Module (M-2), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
| OPTION |
| Casualty Transport Kit |
FFP
Contractor shall provide the Casualty Transport Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes six Modules: Casualty Transport Module 1 (T-1), Casualty Transport Module 2 (T-2), Casualty Transport Module 3 (T-3), Casualty Transport Module 4 (T-4), Casualty Transport Module 5 (T-5), and Casualty Transport Module 6 (T-6).
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 81 |
| Each |
| OPTION |
| Casualty Transport Module 1 (T-1) |
FFP
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-1), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 81 |
| Each |
| OPTION |
| Casualty Transport Module 2 (T-2) |
FFP
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-2), IAW the Statement of Work (SOW) and Performance Specification.
Ordering Period One12 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 81 |
| Each |
| OPTION |
| Casualty Transport Module 3 (T-3) |
FFP
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-3), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 81 |
| Each |
| OPTION |
| Casualty Transport Module 4 (T-4) |
FFP
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-4), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 81 |
| Each |
| OPTION |
| Casualty Transport Module 5 (T-5) |
FFP
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-5), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 81 |
| Each |
| OPTION |
| Casualty Transport Module 6 (T-6) |
FFP
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-6), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 47 |
| Each |
| OPTION |
| Casualty Sustainment Kit |
FFP
Contractor shall provide the Casualty Sustainment Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes two Modules: Casualty Sustainment Module 1 (S-1), and Casualty Sustainment Module 2 (S-2).
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 182 |
| Each |
| OPTION |
| Casualty Sustainment Module 1 (S-1) |
FFP
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Sustainment Module (S-1), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 182 |
| Each |
| OPTION |
| Casualty Sustainment Module 2 (S-2) |
FFP
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Sustainment Module (S-2), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| Lot |
| $80,000.00 |
| OPTION |
| Field Representation |
FFP
IAW the SOW, the contractor will provide qualified field representation for kit instruction and training, calibration of equipment, field assessment and related guidance. The Field Representation CLIN is assigned a predetermined NTE dollar amount.
Maximum amount is for the life of the contract
$80,000.00
MAX
$80,000.00
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Lot |
| $45,000.00 |
| $45,000.00 |
| OPTION |
| Travel |
COST
All travel shall be conducted in accordance with the Joint Travel Regulation (JTR). The Travel CLIN is assigned a predetermined not to exceed (NTE) dollar amount for the life of the contract.
Maximum amount is for the life of the contract
MAX
$45,000.00
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Lot |
| $1,000,000.00 |
| $1,000,000.00 |
| OPTION |
| ECP |
FFP
Engineering Change Proposal's may be executed any time within the performance period after Government review and approval.
The ECP CLIN is assigned a predetermined NTE dollar amount.
Maximum amount is for the life of the contract
MAX
$1,000,000.00
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Lot |
| $5,900,000.00 |
| $5,900,000.00 |
| OPTION |
| Provisioned Items Order |
FFP
The government may procure spare parts via delivery orders with pre-negotiated pricing. The PIO CLIN is assigned a predetermined NTE dollar amount.
Maximum amount is for the life of the contract
MAX
$5,900,000.00
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
NSP
| OPTION |
| Technical Data |
Contract Data Requirements List (CDRLs), DD Form 1423
CDRLs A001 – A009 are not separately priced (NSP)
MAX
NSP
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
TCCC CASEVAC
Contractor shall provide Tactical Combat Casualty Care (TCCC) Casualty Evacuation (CASEVAC) Set, IAW the Statement of Work (SOW) and Performance Specification, which includes four component Kits: Casualty Extraction Kit, Casualty Mobility Kit, Casualty Transport Kit and Casualty Sustainment Kit.
Ordering Period Two12 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Extraction Kit
Contractor shall provide the Casualty Evacuation Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes three modules: Casualty Extraction Module 1 (E-1), Casualty Extraction Module 2 (E-2), and Casualty Extraction Module 3 (E-3).
Ordering Period Two 12 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Extraction Module 1 (E-1)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-1), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Extraction Module 2 (E-2)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-2), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Extraction Module 3 (E-3)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-3), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Mobility Kit
Contractor shall provide the Casualty Mobility Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes two modules: Casualty Mobility Module 1 (M-1), and Casualty Mobility Module 2 (M-2).
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Mobility Module 1 (M-1)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Mobility Module (M-1), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Mobility Module 2 (M-2)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Mobility Module (M-2), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Kit
Contractor shall provide the Casualty Transport Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes six Modules: Casualty Transport Module 1 (T-1), Casualty Transport Module 2 (T-2), Casualty Transport Module 3 (T-3), Casualty Transport Module 4 (T-4), Casualty Transport Module 5 (T-5), and Casualty Transport Module 6 (T-6).
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Module 1 (T-1)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-1), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Module 2 (T-2)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-2), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Module 3 (T-3)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-3), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Module 4 (T-4)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-4), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Module 5 (T-5)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-5), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Module 6 (T-6)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-6), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Sustainment Kit
Contractor shall provide the Casualty Sustainment Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes two modules: Casualty Sustainment Module 1 (S-1), and Casualty Sustainment Module 2 (S-2).
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Sustainment Module 1 (S-1)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Sustainment Module (S-1), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Sustainment Module 2 (S-2)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Sustainment Module (S-2), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Lot |
Field Representation
IAW the SOW, the contractor will provide qualified field representation for kit instruction and training, calibration of equipment, field assessment and related guidance. The Field Representation CLIN is assigned a predetermined NTE dollar amount.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Lot |
Travel
All travel shall be conducted in accordance with the Joint Travel Regulation (JTR). The Travel CLIN is assigned a predetermined NTE dollar amount for the life of the contract.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Job |
ECP
Engineering Change Proposal's may be executed any time within the performance period after Government review and approval.
The ECP CLIN is assigned a predetermined NTE dollar amount.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Lot |
Provisioned Items Order (PIO)
The government may procure spare parts via delivery orders with pre-negotiated pricing. The PIO CLIN is assigned a predetermined NTE dollar amount.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
NSP
Technical Data
CDRLs A001 – A009 are not separately priced (NSP)
MAX
NSP
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
TCCC CASEVAC
Contractor shall provide Tactical Combat Casualty Care (TCCC) Casualty Evacuation (CASEVAC) Set, IAW the Statement of Work (SOW) and Performance Specification, which includes four component Kits: Casualty Extraction Kit, Casualty Mobility Kit, Casualty Transport Kit and Casualty Sustainment Kit.
Ordering Period Three 12 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Extraction Kit
Contractor shall provide the Casualty Evacuation Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes three modules: Casualty Extraction Module 1 (E-1), Casualty Extraction Module 2 (E-2), and Casualty Extraction Module 3 (E-3).
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Extraction Module 1 (E-1)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-1), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Extraction Module 2 (E-2)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-2), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Extraction Module 3 (E-3)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-3), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Mobility Kit
Contractor shall provide the Casualty Mobility Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes two modules: Casualty Mobility Module 1 (M-1), and Casualty Mobility Module 2 (M-2).
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Mobility Module 1 (M-1)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Mobility Module (M-1), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Mobility Module 2 (M-2)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Mobility Module (M-2), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Kit
Contractor shall provide the Casualty Transport Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes six Modules: Casualty Transport Module 1 (T-1), Casualty Transport Module 2 (T-2), Casualty Transport Module 3 (T-3), Casualty Transport Module 4 (T-4), Casualty Transport Module 5 (T-5), and Casualty Transport Module 6 (T-6).
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Module 1 (T-1)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-1), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Module 2 (T-2)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-2), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Module 3 (T-3)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-3), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Module 4 (T-4)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-4), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Module 5 (T-5)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-5), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Module 6 (T-6)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-6), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Sustainment Kit
Contractor shall provide the Casualty Sustainment Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes two Modules: Casualty Sustainment Module 1 (S-1), and Casualty Sustainment Module 2 (S-2).
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Sustainment Module 1 (S-1)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Sustainment Module (S-1), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Sustainment Module 2 (S-2)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Sustainment Module (S-2), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Lot |
Field Representation
IAW the SOW, the contractor will provide qualified field representation for kit instruction and training, calibration of equipment, field assessment and related guidance. The Field Representation CLIN is assigned a predetermined NTE dollar amount.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Lot |
Travel
All travel shall be conducted in accordance with the Joint Travel Regulation (JTR). The Travel CLIN is assigned a predetermined NTE dollar amount for the life of the contract.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Job |
ECP
Engineering Change Proposal's may be executed any time within the performance period after Government review and approval.
The ECP CLIN is assigned a predetermined NTE dollar amount.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Lot |
Provisioned Items Order
The government may procure spare parts via delivery orders with pre-negotiated pricing. The PIO CLIN is assigned a predetermined NTE dollar amount.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
NSP
Technical Data
CDRLs A001 – A009 are not separately priced (NSP)
MAX
NSP
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
TCCC CASEVAC
Contractor shall provide Tactical Combat Casualty Care (TCCC) Casualty Evacuation (CASEVAC) Set, IAW the Statement of Work (SOW) and Performance Specification, which includes four component Kits: Casualty Extraction Kit, Casualty Mobility Kit, Casualty Transport Kit and Casualty Sustainment Kit.
Ordering Period Four 12 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Extraction Kit
Contractor shall provide the Casualty Evacuation Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes three modules: Casualty Extraction Module 1 (E-1), Casualty Extraction Module 2 (E-2), and Casualty Extraction Module 3 (E-3).
Ordering Period Four
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Extraction Module 1 (E-1)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-1), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Extraction Module 2 (E-2)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-2), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Extraction Module 3 (E-3)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-3), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Mobility Kit
Contractor shall provide the Casualty Mobility Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes two modules: Casualty Mobility Module 1 (M-1), and Casualty Mobility Module 2 (M-2).
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Mobility Module 1 (M-1)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Mobility Module (M-1), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Mobility Module 2 (M-2)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Mobility Module (M-2), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Kit
Contractor shall provide the Casualty Transport Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes six Modules: Casualty Transport Module 1 (T-1), Casualty Transport Module 2 (T-2), Casualty Transport Module 3 (T-3), Casualty Transport Module 4 (T-4), Casualty Transport Module 5 (T-5), and Casualty Transport Module 6 (T-6).
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Module 1 (T-1)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-1), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Module 2 (T-2)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-2), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Module 3 (T-3)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-3), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Module 4 (T-4)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-4), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Module 5 (T-5)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-5), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Transport Module 6 (T-6)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-6), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Sustainment Kit
Contractor shall provide the Casualty Sustainment Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes two Modules: Casualty Sustainment Module 1 (S-1), and Casualty Sustainment Module 2 (S-2).
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Sustainment Module 1 (S-1)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Sustainment Module (S-1), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
Casualty Sustainment Module 2 (S-2)
Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Sustainment Module (S-2), IAW the Statement of Work (SOW) and Performance Specification.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Lot |
Field Representation
IAW the SOW, the contractor will provide qualified field representation for kit instruction and training, calibration of equipment, field assessment and related guidance. The Field Representation CLIN is assigned a predetermined NTE dollar amount.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Lot |
Travel
All travel shall be conducted in accordance with the Joint Travel Regulation (JTR). The Travel CLIN is assigned a predetermined NTE dollar amount for the life of the contract.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Job |
ECP
Engineering Change Proposal's may be executed any time within the performance period after Government review and approval.
The ECP CLIN is assigned a predetermined NTE dollar amount.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Lot |
Provisioned Items Order
The government may procure spare parts via delivery orders with pre-negotiated pricing. The PIO CLIN is assigned a predetermined NTE dollar amount.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
NSP
Technical Data
Contract Data Requirements List (CDRLs), DD Form 1423
CDRLs A001 – A009 are not separately priced (NSP)
MAX
NSP
Section D - Packaging and Marking
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
See Attachment 03
CLAUSES INCORPORATED BY FULL TEXT
252.211-7003 ITEM IDENTIFICATION AND VALUATION (AUG 2008)
(a) Definitions. As used in this clause'
Automatic identification device means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.
Concatenated unique item identifier means--
(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or
(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.
Data qualifier means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.
DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at http://www.acq.osd.mil/dpap/pdi/uid/iuid_equivalents.html.
DoD unique item identification means a system of marking items delivered to DoD with unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items. For items that are serialized within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier and a unique serial number. For items that are serialized within the part, lot, or batch number within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier; the original part, lot, or batch number; and the serial number.
Enterprise means the entity (e.g., a manufacturer or vendor) responsible for assigning unique item identifiers to items.
Enterprise identifier means a code that is uniquely assigned to an enterprise by an issuing agency.
Government's unit acquisition cost means--
(1) For fixed-price type line, sub line, or exhibit line items, the unit price identified in the contract at the time of delivery;
(2) For cost-type or undefinitized line, sub line, or exhibit line items, the Contractor's estimated fully burdened unit cost to the Government at the time of delivery; and
(3) For items produced under a time-and-materials contract, the Contractor's estimated fully burdened unit cost to the Government at the time of delivery.
Issuing agency means an organization responsible for assigning a non-repeatable identifier to an enterprise (i.e., Dun & Bradstreet's Data Universal Numbering System (DUNS) Number, GS1 Company Prefix, or Defense Logistics Information System (DLIS) Commercial and Government Entity (CAGE) Code).
Issuing agency code means a code that designates the registration (or controlling) authority for the enterprise identifier.
Item means a single hardware article or a single unit formed by a grouping of subassemblies, components, or constituent parts.
Lot or batch number means an identifying number assigned by the enterprise to a designated group of items, usually referred to as either a lot or a batch, all of which were manufactured under identical conditions.
Machine-readable means an automatic identification technology media, such as bar codes, contact memory buttons, radio frequency identification, or optical memory cards.
Original part number means a combination of numbers or letters assigned by the enterprise at item creation to a class of items with the same form, fit, function, and interface.
Parent item means the item assembly, intermediate component, or subassembly that has an embedded item with a unique item identifier or DoD recognized unique identification equivalent.
Serial number within the enterprise identifier means a combination of numbers, letters, or symbols assigned by the enterprise to an item that provides for the differentiation of that item from any other like and unlike item and is never used again within the enterprise.
Serial number within the part, lot, or batch number means a combination of numbers or letters assigned by the enterprise to an item that provides for the differentiation of that item from any other like item within a part, lot, or batch number assignment.
Serialization within the enterprise identifier means each item produced is assigned a serial number that is unique among all the tangible items produced by the enterprise and is never used again. The enterprise is responsible for ensuring unique serialization within the enterprise identifier.
Serialization within the part, lot, or batch number means each item of a particular part, lot, or batch number is assigned a unique serial number within that part, lot, or batch number assignment. The enterprise is responsible for ensuring unique serialization within the part, lot, or batch number within the enterprise identifier.
Unique item identifier means a set of data elements marked on items that is globally unique and unambiguous. The term includes a concatenated unique item identifier or a DoD recognized unique identification equivalent.
Unique item identifier type means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at http://www.acq.osd.mil/dpap/pdi/uid/uii_types.html.
(b) The Contractor shall deliver all items under a contract line, sub line, or exhibit line item.
(c) Unique item identifier.
(1) The Contractor shall provide a unique item identifier for the following:
(i) All delivered items for which the Government's unit acquisition cost is $5,000 or more.
(ii) The following items for which the Government's unit acquisition cost is less than $5,000:
See MARKING, LABELING, AND PACKAGING REQUIREMENTS
Contract line, sub line, or exhibit line item No. Item description
(iii) Subassemblies, components, and parts embedded within delivered items as specified in Attachment Number ----.
(2) The unique item identifier and the component data elements of the DoD unique item identification shall not change over the life of the item.
(3) Data syntax and semantics of unique item identifiers. The Contractor shall ensure that--
(i) The encoded data elements (except issuing agency code) of the unique item identifier are marked on the item using one of the following three types of data qualifiers, as determined by the Contractor:
(A) Application Identifiers (AIs) (Format Indicator 05 of ISO/IEC International Standard 15434), in accordance with ISO/IEC International Standard 15418, Information Technology--EAN/UCC Application Identifiers and Fact Data Identifiers and Maintenance and ANSI MH 10.8.2 Data Identifier and Application Identifier Standard.
(B) Data Identifiers (DIs) (Format Indicator 06 of ISO/IEC International Standard 15434), in accordance with ISO/IEC International Standard 15418, Information Technology--EAN/UCC Application Identifiers and Fact Data Identifiers and Maintenance and ANSI MH 10.8.2 Data Identifier and Application Identifier Standard.
(C) Text Element Identifiers (TEIs) (Format Indicator 12 of ISO/IEC International Standard 15434), in accordance with the Air Transport Association Common Support Data Dictionary; and
(ii) The encoded data elements of the unique item identifier conform to the transfer structure, syntax, and coding of messages and data formats specified for Format Indicators 05, 06, and 12 in ISO/IEC International Standard 15434, Information Technology--Transfer Syntax for High Capacity Automatic Data Capture Media.
(4) Unique item identifier.
(i) The Contractor shall--
(A) Determine whether to--
(1) Serialize within the enterprise identifier;
(2) Serialize within the part, lot, or batch number; or
(3) Use a DoD recognized unique identification equivalent; and
(B) Place the data elements of the unique item identifier (enterprise identifier; serial number; DoD recognized unique identification equivalent; and for serialization within the part, lot, or batch number only: original part, lot, or batch number) on items requiring marking by paragraph (c)(1) of this clause, based on the criteria provided in the version of MIL-STD-130, Identification Marking of U.S. Military Property, cited in the contract Schedule.
(ii) The issuing agency code--
(A) Shall not be placed on the item; and
(B) Shall be derived from the data qualifier for the enterprise identifier.
(d) For each item that requires unique item identification under paragraph (c)(1)(i) or (ii) of this clause, in addition to the information provided as part of the Material Inspection and Receiving Report specified elsewhere in this contract, the Contractor shall report at the time of delivery, either as part of, or associated with, the Material Inspection and Receiving Report, the following information:
(1) Unique item identifier.
(2) Unique item identifier type.
(3) Issuing agency code (if concatenated unique item identifier is used).
(4) Enterprise identifier (if concatenated unique item identifier is used).
(5) Original part number (if there is serialization within the original part number).
(6) Lot or batch number (if there is serialization within the lot or batch number).
(7) Current part number (optional and only if not the same as the original part number).
(8) Current part number effective date (optional and only if current part number is used).
(9) Serial number (if concatenated unique item identifier is used).
(10) Government's unit acquisition cost.
(11) Unit of measure.
(e) For embedded subassemblies, components, and parts that require DoD unique item identification under paragraph (c)(1)(iii) of this clause, the Contractor shall report as part of, or associated with, the Material Inspection and Receiving Report specified elsewhere in this contract, the following information:
(1) Unique item identifier of the parent item under paragraph (c)(1) of this clause that contains the embedded subassembly, component, or part.
(2) Unique item identifier of the embedded subassembly, component, or part.
(3) Unique item identifier type.**
(4) Issuing agency code (if concatenated unique item identifier is used).**
(5) Enterprise identifier (if concatenated unique item identifier is used).**
(6) Original part number (if there is serialization within the original part number).**
(7) Lot or batch number (if there is serialization within the lot or batch number).**
(8) Current part number (optional and only if not the same as the original part number).**
(9) Current part number effective date (optional and only if current part number is used).**
(10) Serial number (if concatenated unique item identifier is used).**
(11) Description.
** Once per item.
(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause in accordance with the data submission procedures at http://www.acq.osd.mil/dpap/pdi/uid/data_ submission_information.html.
(g) Subcontracts. If the Contractor acquires by subcontract, any item(s) for which unique item identification is required in accordance with paragraph (c)(1) of this clause, the Contractor shall include this clause, including this paragraph (g), in the applicable subcontract(s).
(End of clause)
5652.246-9000 Marking of Warranted Items (1998)
Each item covered by a warranty shall be stamped or marked with the contract number, item description, and ship to address. Items shall also include markings that state (i) the existence and substance of the warranty, (ii) the warranty duration, and (iii) who to notify if supplies are found to be defective. Where this is impractical, written notice shall be attached to or furnished with the warranted item.
(end of clause)
5652.247-9000 Packaging & Marking - F.O.B. Destination (1998)
The shipping, address, contract number, device number, and any other "MARK FOR" information shall be clearly marked on the outside of all packages shipped under this contract. Information shall be easily identified without opening the package. This information shall also be included on the inside of all packages.
(end of clause)
IUID INSTRUCTIONS
MARKING, LABELING, AND PACKAGING REQUIREMENTS
FOR
TACTICAL COMBAT CASUALTY CARE (TCCC) ITEMS
1.0 Marking
1.1 General marking: In addition to any special markings called out by the contract, all unit packages, intermediate packs, and exterior shipping containers shall be marked in accordance with MIL-STD-129P, Change 4, dated 19 September 2007 (Standard Practice for Military Marking). The contractor is responsible for application of the special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, shelf-life markings and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. Unless otherwise specified, shipments shall have the address markings applied to the identification marked side of the exterior shipping container. The following shall be marked “FROM: name and address of consignor and TO: name and address of the consignee”.
2.0 Military Shipment Labels (MSLs): The MSLs may be created using commercially available program. These commercial programs can generate a MIL-STD-129 and Defense Transportation Regulation compliant MSLs package labels. Insure that the “ship to” and “mark for” in-the-clear delivery address is complete including: consignee’s name, organization, department name, office, building, room, street address, city, state, country code, and DODAAC.
3.0 Hazardous Materials
Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
4.0 Packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:
__ International Civil Aviation Organization (ICAO) Technical Instructions for the Safe Transport of Dangerous Goods by Air
__ International Maritime Dangerous Goods Code (IMDG)
__ Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
__ Joint Service Regulation AFJMAN24-204/TM38-250/NAVSUPPUB 505/MCO P4030.19/DLAM 4145.23 (for military air shipments)
5.0 Product Material Safety Data Sheets (MSDS): The MSDS is required to be included with every unit pack and intermediate container and shall be included with the packing list inside a waterproof sealed pouch attached to the outside of the package.
6.0 Packaging
6.1 Packing slip requirements: The vendor must use a COMBO report that is generated from Wide Area Work Flow (WAWF) for all complete sets, modules, and individually shipped items delivered to Special Operations Forces Supply Activity (SOFSA). Each package shipped into SOFSA is required to include two copies of the COMBO report; one attached inside a waterproof sealed pouch to the exterior and the other inserted into the package.
7.0 Complete CASEVAC Set requirements: Complete CASEVAC sets delivered to Special Operations Forces Supply (SOFSA) must be packaged inside one stackable container that is moveable by a forklift or pallet jack. The prime integrator is required to provide a diagram inserted into each module containing photographs of each item included in that module plus an itemized list for that module. The itemized list must be separated into two categories.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .