Amendment 03.pdf
PDF 247 KB Posted
- Solicitation number
- H92222-10-R-0018
- Issued by
-
United States Special Operations Command
About this file
TCCC Solicitation Amend 03 - also attachment SOO atch 2 Contract MIN/Max atch 03 CDRL atch 04 and Performance Matrix 05
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TCCC Award Synopsis.pdf | ||
| Attach 04 CDRL.pdf | ||
| Attach 03 MIN MAX QTY.pdf | ||
| Attach 02 TCCC SOO.pdf | ||
| Attach 05 Performance_Matrix.xls | XLS spreadsheet | |
| TCCC AMEND 02 21May2010.pdf | ||
| TCCC AMEND 01 20 May 2010.pdf | ||
| Q A's 14 May 2010.pdf | ||
| QAs 3 May 2010.pdf | ||
| Q A's as of 30 Apr 2010.doc | DOC document | |
| CDRL Attch 04.pdf | ||
| MIN MAX QTY Attch 03.pdf | ||
| SOO Attch 02.pdf | ||
| Solicitation TCCC.doc | DOC document | |
| P Spec Attch 01.pdf | ||
| Performance Matrix Attch 05.xlsx | XLSX spreadsheet | |
| MIN MAX QTY Attch 03.pdf | ||
| CDRL Attch 04.pdf | ||
| Draft Solicitation 100407.pdf | ||
| SOO Attch 02.pdf | ||
| Performance Spec Attch 01.pdf | ||
| Performance Matrix Attch 05.xlsx | XLSX spreadsheet |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Summary of Changes for items amended.
Updated attachments are Statement of Objectives atch 02, Contract MIN/MAX atch 03, CDRL atch 04, and Performance Matrix atch 05.
Please note that the RFP and amendments will take precedence over any answers to questions previously posted to this amendment on FedBizOps.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 57
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X H92222-10-R-0018
X 9B. DATED (SEE ITEM 11)
20-Apr-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-May-2010
CODE
HQ USSOCOM SORDAC-K
ATTN: LEATRICE FREDERICK
7701 TAMPA POINT BLVD
MACDILL AFB FL 33621
H92222 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
H92222-10-R-0018
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
No changes
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
SUMMARY OF CLINS
Pricing is hereby requested for a five (5) year Indefinite Delivery/Indefinite Quantity (IDIQ) contract for the Tactical Combat Casualty Care (TCCC) Casualty Evacuation (CASEVAC) Set. The Contract Line Items are numbered to represent each year within the two separate ordering periods. The first ordering period is for the Product Demonstration Model (PDM) Phase and the second ordering period is an option for the Production Phase.
For the production years of the contract (i.e. Contract Line Item Number (CLIN) 1001 = second ordering period Production year one, 2001 = second ordering period Production year two, 3001 = second ordering period Production year three, etc.). The maximum quantity for each item that may be purchased throughout the life of the contract is depicted in year one, specifically CLINs 1001 through 1023. The maximum quantity will be adjusted at the beginning of each year by taking the balance of what was actually purchased during the previous year and moving it to the current year thus reflecting a revised maximum quantity. For example: CLIN 1001 identifies a maximum quantity of 28. If seven (7) are ordered in ordering period two Production year one, CLIN 1001 will be adjusted to reflect the actual quantity of 7ordered in Production year one and CLIN 2001 will reflect the remaining quantity of 21.
The minimum quantity that shall be purchased at time of contract award is 3 CASEVAC Sets during the PDM Phase. No order is guaranteed above the stated minimum quantity.
CLIN 0001
FROM:
The CLIN extended description has changed from Tactical Combat Casualty Care (TCCC) Casualty Evacuation (CASEVAC) Set Product Demonstration Models (PDM's), IAW contractor's proposed Statement of Work (SOW), based on the Statement of Objectives (SOO), Contractor shall provide TCCC CASEVAC Set, which includes four component Kits: Casualty Extraction Kit, Casualty Mobility Kit, Casualty Transport Kit and Casualty Sustainment Kit. Period of performance from award date Not to exceed (NTE) August 2011
TO:
Tactical Combat Casualty Care (TCCC) Casualty Evacuation (CASEVAC) Set Product Demonstration Models (PDM's), IAW contractor's proposed Statement of Work (SOW), based on the Statement of Objectives (SOO), Contractor shall provide TCCC CASEVAC Set, which includes four component Kits: Casualty Extraction Kit, Casualty Mobility Kit, Casualty Transport Kit and Casualty Sustainment Kit. Ordering Period One from award date through PDM Phase 16 Aug 2011.
CLIN 0002
The CLIN description has changed from Casualty Extraction Kit Refurbishment .
The CLIN extended description has changed from Replenishment/Refurbishment: During testing and employment of the Casualty Evacuation Kit, much of the equipment will be consumed, fail or break during the testing events and will require replenishment prior to the next test phase. IAW the Statement of Objectives (SOO), the Government will return each Kit to the contractor for refurbishment and replacement of consumables, and replacement of failed/broken items. Costs for return of the Kit and delivery of replenished/refurbished Casualty Evacuation Kits is included in this CLIN.CLIN shall be utilized as needed for the duration of the contract base period.Period of performance from award date NTE August 2011
TO:
Replenishment / Replacement Replenishment / Replacement of consumables will be required after each test scenario is complete. These are items that are expended, exhausted, or damaged beyond repair during PDM testing. Items requiring replenishment shall be delivered NLT 12 hours after order
CLIN shall be utilized as needed for the duration of ordering period one.
CLIN 0003
FROM:
The CLIN description has changed from Casualty Mobility Kit Refurbishment The CLIN extended description has changed from Replenishment/Refurbishment: During testing of the Casualty Mobility Kit, much of the equipment will be consumed, fail or break during the testing events and will require replenishment prior to the next test phase. IAW the Statement of Objectives (SOO), the Government will return each Kit to the contractor for refurbishment and replacement of consumables, and replacement of failed/broken items. Costs for return of the Kit and delivery of replenished/refurbished Casualty Mobility Kits is included in this CLIN.CLIN shall be utilized as needed for the duration of the contract base period. Period of performance from award date NTE August 2011
TO:
Refurbishment.
During testing of the kit, some of the equipment may require refurbishment prior to the next test phase.
Refurbishment of equipment kit is expected after completion of test cycle (per location) as required. Delivery of the refurbished set is required 30 days after contractor receipt of Set. The contractor shall submit a Firm Fixed Price proposal within 5 working days after contractor receipt of Set detailing the effort and cost for the refurbishment.
The Government will negotiate a price for this effort each time refurbishment is required. Price for return of the refurbished kit is included in this CLIN. CLIN shall be utilized as needed for the duration of ordering period one.
Ordering Period One from award date through PDM Phase 16 Aug 2011.
CLIN 0004
The CLIN description has changed from Casualty Transport Kit Refurbishment
The CLIN extended description has changed from Replenishment/Refurbishment: During testing of the Casualty Transport Kit, much of the equipment will be consumed, fail or break during the testing events and will require replenishment prior to the next test phase. IAW the Statement of Objectives (SOO), the Government will return each Kit to the contractor for refurbishment and replacement of consumables, and replacement of failed/broken items. Costs for return of the Kit and delivery of replenished/refurbished Casualty Transport Kits is included in this CLIN.CLIN shall be utilized as needed for the duration of the contract base period. Period of performance from award date NTE August 2011
TO:
Field Representation (14 days) Field Representation will be required to provide 2-day-factory/training support assets on each site to deliver training and safety instructions to the testers prior to the execution of scenario based evaluations. This will be the classroom portion of the evaluation where the Operators get their first look at the equipment they will be employing over the next four days. Training will provide an overview of the entire Set and its capabilities followed by targeted training of new items and capabilities that the Operator/Medic may be unfamiliar with. Example: The Operators have never used an extrication cutting tool and will require hands on training prior to the evaluation. The Prime Integrator (PI) Field Representative shall be available to recover and rebuild/reconstitute their respective kit in preparation of the next evolution (See SOO para 3.1.3). Ordering Period One from award date through PDM Phase 16 Aug 2011.
CLIN 0005
The contract type has changed from FFP The CLIN description has changed from Casualty Sustainment Kit Refurbishment The CLIN extended description has changed from Replenishment/Refurbishment: During testing of the Casualty Sustainment Kit, much of the equipment will be consumed, fail or break during the testing events and will require replenishment prior to the next test phase. IAW the Statement of Objectives (SOO), the Government will return each Kit to the contractor for refurbishment and replacement of consumables, and replacement of failed/broken items. Costs for return of the Kit and delivery of replenished/refurbished Casualty Sustainment Kits is included in this CLIN.CLIN shall be utilized as needed for the duration of the contract base period.Period of performance from award date NTE August 2011
TO:
Travel
COST
All travel shall be conducted IAW 5652.231-9001 Allowable Travel Costs. Ordering Period One from award date through PDM Phase 16 Aug 2011.
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0005 1 LOT
Travel
COST
Travel in support of SOO paragraph 3.1.2 and 3.1.3. All travel shall be conducted IAW 5652.231-9001 Allowable Travel Costs.
Ordering Period One from award date through PDM Phase 16 Aug 2011.
FOB: Destination
MAX COST
CLIN 0006
The CLIN description has changed from Field Representation The CLIN extended description has changed from IAW the contractor's proposed SOW in response to the SOO, the contractor will provide qualified field representation for initial kit instruction and training, calibration of equipment, field assesment and related guidance.The Field Representation CLIN is assigned a predetermined NTE dollar amount. Period of performance from award date NTE August 2011
TO:
Engineering Change Proposal (ECP).
All spiral development during the PDM phase of the evaluation will be thru the ECP process and must be approved by the Program Manager and authorized by the contracting officer. The Contracting Officer will modify the contract accordingly. During the evaluation phase better tools or items are identified and added to the kit following Engineering Change Proposal guidelines.
The ECP CLIN is assigned a predetermined NTE dollar amount. Ordering Period One from award date through PDM Phase 16 Aug 2011.
CLIN 0007
The CLIN description has changed from Travel The CLIN extended description has changed from All travel shall be conducted in accordance with the Joint Travel Regulation (JTR). The Travel CLIN is assigned a predetermined NTE dollar amount. Period of performance from award date NTE August 2011
Techincal Data.
Contract Data Requirements List (CDRLs), DD Form 1423CDRLs A001-A010 are Not Separately Priced (NSP).
The costs are included in the CLINs delineated in block A on the DD Form 1423. Ordering Period One from award date through PDM Phase 16 Aug 2011.
ITEM NO SUPPLIES/SERVICES NSP
Techincal Data
Contract Data Requirements List (CDRLs), DD Form 1423
CDRLs A001-A010 are are Not Separately Priced (NSP). The cost are included in the CLINs above. NSP
Ordering Period One from award date through PDM Phase 16 Aug 2010.
NSP
CLIN 0008
The CLIN description has changed from Engineering Change Proposal (ECP)
THIS CLIN HAS BEEN DELETED.
CLIN 0009
The CLIN description has changed from Techincal Data
CLIN 1001
The CLIN extended description has changed from Contractor shall provide Tactical Combat Casualty Care (TCCC) Casualty Evacuation (CASEVAC) Set, IAW the Statement of Work (SOW) and Performance Specification, which includes four component Kits: Casualty Extraction Kit, Casualty Mobility Kit, Casualty Transport Kit and Casualty Sustainment Kit.Ordering Period One 12 Months
Contractor shall provide Tactical Combat Casualty Care (TCCC) Casualty Evacuation (CASEVAC) Set, IAW the Statement of Work (SOW) and Performance Specification, which includes four component Kits: Casualty Extraction Kit, Casualty Mobility Kit, Casualty Transport Kit and Casualty Sustainment Kit. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year One 12 Months.
CLIN 1002
FROM:
The CLIN extended description has changed from Contractor shall provide the Casualty Evacuation Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes three modules: Casualty Extraction Module 1 (E-1), Casualty Extraction Module 2 (E-2), and Casualty Extraction Module 3 (E-3).Ordering Period One 12 Months
TO:
Contractor shall provide the Casualty Evacuation Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes three modules: Casualty Extraction Module 1 (E-1), Casualty Extraction Module 2 (E-2), and Casualty Extraction Module 3 (E-3). Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year One 12 Months.
CLIN 1003
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-1), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period One 12 Months
TO:
Casualty Evacuation Module (E-1), IAW the Statement of Work (SOW) and Performance Specification.
Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year One 12 Months.
CLIN 1004
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-2), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period One 12 Months
Casualty Evacuation Module (E-2), IAW the Statement of Work (SOW) and Performance Specification.
Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year One 12 Months.
CLIN 1005
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-3), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period One 12 Months
TO:
Casualty Evacuation Module (E-3), IAW the Statement of Work (SOW) and Performance Specification.
Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year One 12 Months.
CLIN 1006
The CLIN extended description has changed from Contractor shall provide the Casualty Mobility Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes two modules: Casualty Mobility Module 1 (M-1), and Casualty Mobility Module 2 (M-2).Ordering Period One 12 Months
TO:
Contractor shall provide the Casualty Mobility Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes two modules: Casualty Mobility Module 1 (M-1), and Casualty Mobility Module 2 (M-2). Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year One 12 Months.
CLIN 1007
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Mobility Module (M-1), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period One 12 Months
TO:
Casualty Mobility Module (M-1), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year One 12 Months.
CLIN 1008
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Mobility Module (M-2), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period One 12 Months
TO:
Casualty Mobility Module (M-2), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their
CLIN 1009
The CLIN extended description has changed from Contractor shall provide the Casualty Transport Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes six Modules: Casualty Transport Module 1 (T-1), Casualty Transport Module 2 (T-2), Casualty Transport Module 3 (T-3), Casualty Transport Module 4 (T- 4), Casualty Transport Module 5 (T-5), and Casualty Transport Module 6 (T-6).Ordering Period One 12 Months
TO:
Contractor shall provide the Casualty Transport Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes six Modules: Casualty Transport Module 1 (T-1), Casualty Transport Module 2 (T-2), Casualty Transport Module 3 (T-3), Casualty Transport Module 4 (T-4), Casualty Transport Module 5 (T-5), and Casualty Transport Module 6 (T-6). Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year One 12 Months.
CLIN 1010
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-1), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period One 12 Months
TO:
Casualty Transport Module (T-1), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their
CLIN 1011
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-2), IAW the Statement of Work (SOW) and Performance Specification. Ordering Period One 12 Months
TO:
Casualty Transport Module (T-2), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their
CLIN 1012
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-3), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period One 12 Months
TO:
Casualty Transport Module (T-3), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year One 12 Months.
CLIN 1013
FROM:
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-4), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period One 12 Months
TO:
Casualty Transport Module (T-4), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their
CLIN 1014
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-5), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period One 12 Months
TO:
Casualty Transport Module (T-5), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their
CLIN 1015
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-6), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period One 12 Months
TO:
Casualty Transport Module (T-6), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their
CLIN 1016
The CLIN extended description has changed from Contractor shall provide the Casualty Sustainment Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes two Modules: Casualty Sustainment Module 1 (S-1), and Casualty Sustainment Module 2 (S-2).Ordering Period One 12 Months
TO:
Contractor shall provide the Casualty Sustainment Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes two Modules: Casualty Sustainment Module 1 (S-1), and Casualty Sustainment Module 2 (S-2). Contractors will be invited to submit a revised proposal based on the PDM Phase results;
Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year One 12 Months.
CLIN 1017
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Sustainment Module (S-1), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period One 12 Months
TO:
Casualty Sustainment Module (S-1), IAW the Statement of Work (SOW) and Performance Specification.
Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year One 12 Months.
CLIN 1018
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Sustainment Module (S-2), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period One 12 Months
TO:
Casualty Sustainment Module (S-2), IAW the Statement of Work (SOW) and Performance Specification.
Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year One 12 Months.
CLIN 1019
Field Representation
FFP
IAW the SOW, the contractor will provide qualified field representation for kit instruction and training, calibration of equipment, field assessment and related guidance. The Field Representation CLIN is assigned a predetermined NTE dollar amount.
TO:
Travel
COST
All travel shall be conducted IAW 5652.231-9001 Allowable Travel Costs (2005). The Travel CLIN is assigned a $45,000.00 predetermined not to exceed (NTE) dollar amount for the Second Ordering Period, the Production Phase.
Ordering Period Two; All Production Years.
CLIN 1020
Travel
COST
All travel shall be conducted in accordance with the Joint Travel Regulation (JTR). The Travel CLIN is assigned a predetermined not to exceed (NTE) dollar amount for the life of the contract.
TO:
Engineering Change Proposal (ECP)
FFP
All spiral development will be thru the ECP process and must be approved by the Program Manager and authorized by the contracting officer. The Contracting Officer will modify the contract accordingly. The ECP CLIN is assigned a $1,000,000 predetermined NTE dollar amount for the Second Ordering Period, the Production Phase. Ordering Period Two; All Production Years.
CLIN 1021
ECP
FFP
Engineering Change Proposal's may be executed any time within the performance period after Government review and approval.
The ECP CLIN is assigned a predetermined NTE dollar amount
TO:
Provisioned Item Order (PIO)
FFP
The government may procure spare parts via delivery orders with pre-negotiated pricing. The PIO CLIN is assigned a $5,900,000 predetermined NTE dollar amount. Maximum amount is for the Second ordering period, the Production Phase. Offeror’s proposed price list will be included as attachment 06 with current and out year pricing. Ordering Period Two; All Production Years.
CLIN 1022
Provisioned Items Order
FFP
The government may procure spare parts via delivery orders with pre-negotiated pricing. The PIO CLIN is assigned a predetermined NTE dollar amount.
TO:
Technical Data
Contract Data Requirements List (CDRLs), DD Form 1423CDRLs A001 – A010 are NSP. The cost assoicated with the CDRLS should be included in the pricing of Production CLINS as delineated in block A on the DD Form 1423.
This CLIN Ordering Period Two; All Production Years.
CLIN 1023
Technical Data
Contract Data Requirements List (CDRLs), DD Form 1423 CDRLs A001 – A009 are not separately priced (NSP)
TO:
New Equipment Training (NET)
FFP
The Prime Integrator (PI) will be responsible for providing factory training to a government representative on all equipment requiring depot level maintenance. The PI will be equipped will all unique tools required to conduct maintenance and calibration. The PI will conduct annual training for the technician(s). Training is expected to be held at SOFSA. The duration is expected to be for 1 day, 8 hours.
UNIT UNIT PRICE MAX AMOUNT
1023 1 Each OPTION New Equipment Training (NET)
FFP
The Prime Integrator (PI) will be responsible for providing factory training to a government representative on all equipment requiring depot level maintenance. The PI will be equipped will all unique tools required to conduct maintenance and calibration. The PI will conduct annual training for the technician(s). Training is expected to be held at SOFSA. The duration is expected to be for 1 day, 8 hours.
Ordering Period Two: Production Year One 12 Months
CLIN 2001
The CLIN extended description has changed from Contractor shall provide Tactical Combat Casualty Care (TCCC) Casualty Evacuation (CASEVAC) Set, IAW the Statement of Work (SOW) and Performance Specification, which includes four component Kits: Casualty Extraction Kit, Casualty Mobility Kit, Casualty Transport Kit and Casualty Sustainment Kit.Ordering Period Two 12 Months.
Contractor shall provide Tactical Combat Casualty Care (TCCC) Casualty Evacuation (CASEVAC) Set, IAW the Statement of Work (SOW) and Performance Specification, which includes four component Kits: Casualty Extraction Kit, Casualty Mobility Kit, Casualty Transport Kit and Casualty Sustainment Kit. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Two, 12 Months.
CLIN 2002
The CLIN extended description has changed from Contractor shall provide the Casualty Evacuation Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes three modules: Casualty Extraction Module 1 (E-1), Casualty Extraction Module 2 (E-2), and Casualty Extraction Module 3 (E-3).Ordering Period Two 12 Months.
Contractor shall provide the Casualty Evacuation Kit, IAW the Statement of Work (SOW) and Performance
Specification, which includes three modules: Casualty Extraction Module 1 (E-1), Casualty Extraction Module 2 (E-2), and Casualty Extraction Module 3 (E-3). Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Two, 12 Months.
CLIN 2003
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-1), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period Two 12 Months.
TO:
Casualty Evacuation Module (E-1), IAW the Statement of Work (SOW) and Performance Specification.
Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Two, 12 Months.
CLIN 2004
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-2), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period Two 12 Months.
TO:
Casualty Evacuation Module (E-2), IAW the Statement of Work (SOW) and Performance Specification.
Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Two, 12 Months.
CLIN 2005
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-3), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period Two 12 Months.
TO:
Casualty Evacuation Module (E-3), IAW the Statement of Work (SOW) and Performance Specification.
Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Two, 12 Months.
CLIN 2006
The CLIN extended description has changed from Contractor shall provide the Casualty Mobility Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes two modules: Casualty Mobility Module 1 (M-1), and Casualty Mobility Module 2 (M-2).Ordering Period Two 12 Months.
TO:
Contractor shall provide the Casualty Mobility Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes two modules: Casualty Mobility Module 1 (M-1), and Casualty Mobility Module 2 (M-2). Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Two, 12
CLIN 2007
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Mobility Module (M-1), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period Two 12 Months.
TO:
Casualty Mobility Module (M-1), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Two, 12 Months.
CLIN 2008
FROM:
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Mobility Module (M-2), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period Two 12 Months.
TO:
Casualty Mobility Module (M-2), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Two, 12 Months.
CLIN 2009
FROM:
The CLIN extended description has changed from Contractor shall provide the Casualty Transport Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes six Modules: Casualty Transport Module 1 (T-1), Casualty Transport Module 2 (T-2), Casualty Transport Module 3 (T-3), Casualty Transport Module 4 (T- 4), Casualty Transport Module 5 (T-5), and Casualty Transport Module 6 (T-6).Ordering Period Two 12 Months.
Contractor shall provide the Casualty Transport Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes six Modules: Casualty Transport Module 1 (T-1), Casualty Transport Module 2 (T-2), Casualty Transport Module 3 (T-3), Casualty Transport Module 4 (T-4), Casualty Transport Module 5 (T-5), and Casualty Transport Module 6 (T-6). Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two:
Production Year Two, 12 Months.
CLIN 2010
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-1), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period Two 12 Months.
TO:
Casualty Transport Module (T-1), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Two, 12 Months.
CLIN 2011
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-2), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period Two 12 Months.
TO:
Casualty Transport Module (T-2), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their
CLIN 2012
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-3), IAW the Statement of Work (SOW) and
Performance Specification.Ordering Period Two 12 Months.
Casualty Transport Module (T-3), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their
CLIN 2013
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-4), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period Two 12 Months.
TO:
Casualty Transport Module (T-4), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their
CLIN 2014
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-5), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period Two 12 Months.
TO:
Casualty Transport Module (T-5), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their
CLIN 2015
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-6), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period Two 12 Months.
Casualty Transport Module (T-6), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their
CLIN 2016
The CLIN extended description has changed from Contractor shall provide the Casualty Sustainment Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes two modules: Casualty Sustainment Module 1 (S-1),and Casualty Sustainment Module 2 (S-2).Ordering Period Two 12 Months.
TO:
Contractor shall provide the Casualty Sustainment Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes two modules: Casualty Sustainment Module 1 (S-1),and Casualty Sustainment Module 2 (S-2). Contractors will be invited to submit a revised proposal based on the PDM Phase results;
Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Two, 12 Months.
CLIN 2017
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Sustainment Module (S-1), IAW the Statement of Work (SOW) and Performance Specification. Ordering Period Two 12 Months.
TO:
Casualty Sustainment Module (S-1), IAW the Statement of Work (SOW) and Performance Specification.
Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Two, 12 Months.
CLIN 2018
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Sustainment Module (S-2), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period Two 12 Months.
TO:
Casualty Sustainment Module (S-2), IAW the Statement of Work (SOW) and Performance Specification.
Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Two, 12 Months.
CLIN 2019
UNIT UNIT PRICE MAX AMOUNT
2019 1 Each New Equipment Training (NET)
FFP
The Prime Integrator (PI) will be responsible for providing factory training to a government representative on all equipment requiring depot level maintenance. The PI will be equipped will all unique tools required to conduct maintenance and calibration. The PI will conduct annual training for the technician(s). Training is expected to be held at SOFSA. The duration is expected to be for 1 day, 8 hours.
Ordering Period Two: Production Year Two 12 Months
CLIN 2020
The CLIN description has changed from Travel
CLIN 2021
The CLIN description has changed from Engineering Change Proposal (ECP)
CLIN 2022
The CLIN description has changed from Provisioned Items Order (PIO)
TO:
THIS CLIN HAS BEEN DELETED.
CLIN 2023
FROM:
The CLIN description has changed from Techincal Data
CLIN 3001
The CLIN extended description has changed from Contractor shall provide Tactical Combat Casualty Care (TCCC) Casualty Evacuation (CASEVAC) Set, IAW the Statement of Work (SOW) and Performance Specification, which includes four component Kits: Casualty Extraction Kit, Casualty Mobility Kit, Casualty Transport Kit and Casualty Sustainment Kit.Ordering Period Three 12 Months
Contractor shall provide Tactical Combat Casualty Care (TCCC) Casualty Evacuation (CASEVAC) Set, IAW the Statement of Work (SOW) and Performance Specification, which includes four component Kits: Casualty Extraction Kit, Casualty Mobility Kit, Casualty Transport Kit and Casualty Sustainment Kit. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Three, 12 Months.
CLIN 3002
The CLIN extended description has changed from Contractor shall provide the Casualty Evacuation Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes three modules: Casualty Extraction Module 1 (E-1), Casualty Extraction Module 2 (E-2), and Casualty Extraction Module 3 (E-3).Ordering Period Three 12 Months
TO:
Contractor shall provide the Casualty Evacuation Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes three modules: Casualty Extraction Module 1 (E-1), Casualty Extraction Module 2 (E-2), and Casualty Extraction Module 3 (E-3). Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering
Period Two: Production Year Three, 12 Months.
CLIN 3003
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-1), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period Three 12 Months
TO:
Casualty Evacuation Module (E-1), IAW the Statement of Work (SOW) and Performance Specification.
Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Three, 12 Months.
CLIN 3004
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-2), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period Three 12 Months
TO:
Casualty Evacuation Module (E-2), IAW the Statement of Work (SOW) and Performance Specification.
Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Three, 12 Months.
CLIN 3005
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Evacuation Module (E-3), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period Three 12 Months
TO:
Casualty Evacuation Module (E-3), IAW the Statement of Work (SOW) and Performance Specification.
Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Three, 12 Months.
CLIN 3006
The CLIN extended description has changed from Contractor shall provide the Casualty Mobility Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes two modules: Casualty Mobility Module 1 (M-1), and Casualty Mobility Module 2 (M-2).Ordering Period Three 12 Months
TO:
Contractor shall provide the Casualty Mobility Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes two modules: Casualty Mobility Module 1 (M-1), and Casualty Mobility Module 2 (M-2). Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Three, 12
CLIN 3007
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Mobility Module (M-1), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period Three 12 Months
TO:
Casualty Mobility Module (M-1), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Three, 12 Months.
CLIN 3008
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Mobility Module (M-2), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period Three 12 Months
TO:
Casualty Mobility Module (M-2), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Three, 12 Months.
CLIN 3009
The CLIN extended description has changed from Contractor shall provide the Casualty Transport Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes six Modules: Casualty Transport Module 1 (T-1), Casualty Transport Module 2 (T-2), Casualty Transport Module 3 (T-3), Casualty Transport Module 4 (T- 4), Casualty Transport Module 5 (T-5), and Casualty Transport Module 6 (T-6).Ordering Period Three 12 Months
TO:
Contractor shall provide the Casualty Transport Kit, IAW the Statement of Work (SOW) and Performance Specification, which includes six Modules: Casualty Transport Module 1 (T-1), Casualty Transport Module 2 (T-2), Casualty Transport Module 3 (T-3), Casualty Transport Module 4 (T-4), Casualty Transport Module 5 (T-5), and Casualty Transport Module 6 (T-6). Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two:
Production Year Three, 12 Months.
CLIN 3010
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-1), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period Three 12 Months
TO:
Casualty Transport Module (T-1), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Three, 12 Months.
CLIN 3011
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-2), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period Three 12 Months
TO:
Casualty Transport Module (T-2), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Three, 12 Months.
CLIN 3012
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-3), IAW the Statement of Work (SOW) and
Performance Specification.Ordering Period Three 12 Months
Casualty Transport Module (T-3), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Three, 12 Months.
CLIN 3013
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-4), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period Three 12 Months
TO:
Casualty Transport Module (T-4), IAW the Statement of Work (SOW) and Performance Specification. Contractors will be invited to submit a revised proposal based on the PDM Phase results; Contractors shall convert their proposed NTE prices to firm fixed prices (FFP). Ordering Period Two: Production Year Three, 12 Months.
CLIN 3014
The CLIN extended description has changed from Refurbishment/Replacement: Contractor shall refurbish and replace consumables within the Casualty Transport Module (T-5), IAW the Statement of Work (SOW) and Performance Specification.Ordering Period Three 12 Months
Casualty Transport Module (T-5), IAW the Statement of Work (SOW) and Performance Specification.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .