QAs 3 May 2010.pdf

PDF 38 KB Posted

Attached to
Amendment 03 Pending modification Tactical Combat Casualty Care
Solicitation number
H92222-10-R-0018
Issued by

About this file

2nd Set of Q As H92222-10-R-0018 TCCC

View the file

Other files

File Type Posted
TCCC Award Synopsis.pdf PDF
Attach 04 CDRL.pdf PDF
Amendment 03.pdf PDF
Attach 03 MIN MAX QTY.pdf PDF
Attach 02 TCCC SOO.pdf PDF
Attach 05 Performance_Matrix.xls XLS spreadsheet
TCCC AMEND 02 21May2010.pdf PDF
TCCC AMEND 01 20 May 2010.pdf PDF
Q A's 14 May 2010.pdf PDF
Q A's as of 30 Apr 2010.doc DOC document
CDRL Attch 04.pdf PDF
MIN MAX QTY Attch 03.pdf PDF
SOO Attch 02.pdf PDF
Solicitation TCCC.doc DOC document
P Spec Attch 01.pdf PDF
Performance Matrix Attch 05.xlsx XLSX spreadsheet
MIN MAX QTY Attch 03.pdf PDF
CDRL Attch 04.pdf PDF
Draft Solicitation 100407.pdf PDF
SOO Attch 02.pdf PDF
Performance Spec Attch 01.pdf PDF
Performance Matrix Attch 05.xlsx XLSX spreadsheet
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

May 3, 2010

Questions & Answers H92222-10-R-0018

TCCC

48. Do you want the contractor to supply both the Combat Operator Trauma Kit and the Combat Medic Trauma Kit identified in the Performance Specification Annex, or are we to assume that you will be combining our kits with the Combat Operator Trauma Kit and the Combat Medic Trauma Kit that SOF currently receives from existing vendors? If you would like the contractor to supply these kits, to which module would you like them added?

No. The government will look to the sustainment module to provide items to replenish a depleted operator or medic kit in the field. The requirement is for the integrator to provide the specific items identified for like item replacement.

49. Regarding the Performance Specification 4.1.5.2.8, please confirm that you would like a non-folding knife.

Confirmed, non folding knife is requested.

50. In order to prepare an adequate response to USG requirements, will USG provide extension of time to respond to RFP H92222-10-R-0018?

At this time, the Program does not anticipate extending the proposal due date.

51. Would the Government consider removing the “discussion regarding the items in paragraphs

2.1.1.1 thru 2.1.1.4” from the SOW requirement and have the contractor address the paragraphs separately under Factor 1: Technical Proposal?

Granted. Remove “discussion”

52. 4.1.4.2.3 “The T-1 Module shall have the capability to monitor casualty vital signs to include blood pressure (T), oxygen saturation (T) cardiac output (T)…….”

Please clarify the capability to monitor “cardiac output” are there thresholds and/or objectives for the duration of continuous operation for:

A1.1 Monitor A1.2 Pump I.V.

A1.2 Defibrillator A1.4 Fluid Warming Device A1.5 Ventilator A1.6 Oxygen Generator

With regards to the thresholds and/or objectives for the duration of continuous operation for:

A1.1 Monitor A1.2 Pump I.V.

A1.4 Fluid Warming Device A1.5 Ventilator

May 3, 2010

Threshold: 4 hours Objective: 8 hours

A1.2 Defibrillator:

Threshold: 4 hours and 30 discharges Objective: 8 hours and 60 discharges

A1.6 Oxygen Generator (should be Oxygen Concentrator):

Threshold: 30 minutes Objective: 1 Hr

53. There are conflicting statements within the performance matrix and performance specifications which document takes precedence in the event of conflict? For example:

4.1.5.2 Sustainment module performance specification calls for 24 hour sustainment whereas performance matrix calls for 4 hours. Please advise.

Reference page 4 of 23 in the Performance Specification. 2.3 Order of precedence; The P-spec takes precedence in all events.

54. Will Government accept PDF V. 5 and up submissions in lieu of Microsoft format?

No, it may or will cause software issues.

55. Should we list every single item in each module? Some items are not functional in and of themselves, such as straps, buckles, snaps ect. As an example: CMC Triangle Rigging Plate, Steel- Cost is $1.93

Yes. The government requests all items be listed and priced individually to aid in accountability and replenishment / refurbishment cost evaluations.

56. Can we format the heading cells for diagonal text? I have attached a sample.

Diagonal text is acceptable.