QAs 3 May 2010.pdf
PDF 38 KB Posted
- Solicitation number
- H92222-10-R-0018
- Issued by
-
United States Special Operations Command
About this file
2nd Set of Q As H92222-10-R-0018 TCCC
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TCCC Award Synopsis.pdf | ||
| Attach 04 CDRL.pdf | ||
| Amendment 03.pdf | ||
| Attach 03 MIN MAX QTY.pdf | ||
| Attach 02 TCCC SOO.pdf | ||
| Attach 05 Performance_Matrix.xls | XLS spreadsheet | |
| TCCC AMEND 02 21May2010.pdf | ||
| TCCC AMEND 01 20 May 2010.pdf | ||
| Q A's 14 May 2010.pdf | ||
| Q A's as of 30 Apr 2010.doc | DOC document | |
| CDRL Attch 04.pdf | ||
| MIN MAX QTY Attch 03.pdf | ||
| SOO Attch 02.pdf | ||
| Solicitation TCCC.doc | DOC document | |
| P Spec Attch 01.pdf | ||
| Performance Matrix Attch 05.xlsx | XLSX spreadsheet | |
| MIN MAX QTY Attch 03.pdf | ||
| CDRL Attch 04.pdf | ||
| Draft Solicitation 100407.pdf | ||
| SOO Attch 02.pdf | ||
| Performance Spec Attch 01.pdf | ||
| Performance Matrix Attch 05.xlsx | XLSX spreadsheet |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
May 3, 2010
Questions & Answers H92222-10-R-0018
TCCC
48. Do you want the contractor to supply both the Combat Operator Trauma Kit and the Combat Medic Trauma Kit identified in the Performance Specification Annex, or are we to assume that you will be combining our kits with the Combat Operator Trauma Kit and the Combat Medic Trauma Kit that SOF currently receives from existing vendors? If you would like the contractor to supply these kits, to which module would you like them added?
No. The government will look to the sustainment module to provide items to replenish a depleted operator or medic kit in the field. The requirement is for the integrator to provide the specific items identified for like item replacement.
49. Regarding the Performance Specification 4.1.5.2.8, please confirm that you would like a non-folding knife.
Confirmed, non folding knife is requested.
50. In order to prepare an adequate response to USG requirements, will USG provide extension of time to respond to RFP H92222-10-R-0018?
At this time, the Program does not anticipate extending the proposal due date.
51. Would the Government consider removing the “discussion regarding the items in paragraphs
2.1.1.1 thru 2.1.1.4” from the SOW requirement and have the contractor address the paragraphs separately under Factor 1: Technical Proposal?
Granted. Remove “discussion”
52. 4.1.4.2.3 “The T-1 Module shall have the capability to monitor casualty vital signs to include blood pressure (T), oxygen saturation (T) cardiac output (T)…….”
Please clarify the capability to monitor “cardiac output” are there thresholds and/or objectives for the duration of continuous operation for:
A1.1 Monitor A1.2 Pump I.V.
A1.2 Defibrillator A1.4 Fluid Warming Device A1.5 Ventilator A1.6 Oxygen Generator
With regards to the thresholds and/or objectives for the duration of continuous operation for:
A1.1 Monitor A1.2 Pump I.V.
A1.4 Fluid Warming Device A1.5 Ventilator
May 3, 2010
Threshold: 4 hours Objective: 8 hours
A1.2 Defibrillator:
Threshold: 4 hours and 30 discharges Objective: 8 hours and 60 discharges
A1.6 Oxygen Generator (should be Oxygen Concentrator):
Threshold: 30 minutes Objective: 1 Hr
53. There are conflicting statements within the performance matrix and performance specifications which document takes precedence in the event of conflict? For example:
4.1.5.2 Sustainment module performance specification calls for 24 hour sustainment whereas performance matrix calls for 4 hours. Please advise.
Reference page 4 of 23 in the Performance Specification. 2.3 Order of precedence; The P-spec takes precedence in all events.
54. Will Government accept PDF V. 5 and up submissions in lieu of Microsoft format?
No, it may or will cause software issues.
55. Should we list every single item in each module? Some items are not functional in and of themselves, such as straps, buckles, snaps ect. As an example: CMC Triangle Rigging Plate, Steel- Cost is $1.93
Yes. The government requests all items be listed and priced individually to aid in accountability and replenishment / refurbishment cost evaluations.
56. Can we format the heading cells for diagonal text? I have attached a sample.
Diagonal text is acceptable.