CDRL Attch 04.pdf
PDF 187 KB Posted
- Solicitation number
- H92222-10-R-0018
- Issued by
-
United States Special Operations Command
About this file
CDRL's
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TCCC Award Synopsis.pdf | ||
| Attach 04 CDRL.pdf | ||
| Amendment 03.pdf | ||
| Attach 03 MIN MAX QTY.pdf | ||
| Attach 02 TCCC SOO.pdf | ||
| Attach 05 Performance_Matrix.xls | XLS spreadsheet | |
| TCCC AMEND 02 21May2010.pdf | ||
| TCCC AMEND 01 20 May 2010.pdf | ||
| Q A's 14 May 2010.pdf | ||
| QAs 3 May 2010.pdf | ||
| Q A's as of 30 Apr 2010.doc | DOC document | |
| CDRL Attch 04.pdf | ||
| MIN MAX QTY Attch 03.pdf | ||
| SOO Attch 02.pdf | ||
| Solicitation TCCC.doc | DOC document | |
| P Spec Attch 01.pdf | ||
| Performance Matrix Attch 05.xlsx | XLSX spreadsheet | |
| MIN MAX QTY Attch 03.pdf | ||
| Draft Solicitation 100407.pdf | ||
| SOO Attch 02.pdf | ||
| Performance Spec Attch 01.pdf | ||
| Performance Matrix Attch 05.xlsx | XLSX spreadsheet |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302.
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0001-0005, 0008, 1001-1018, 1021, 2001-2018, 3001-3018, 4001-4018
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER Safety .
D. SYSTEM/ITEM
SOF COMBAT CASUALTY CARE
E. CONTRACT/PR. NO.
H92222-10-R-0018
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Safety Studies Report
3. SUBTITLE
Material Safety Data Sheets (MSDS)
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-81065
5. CONTRACT REFERENCE
IAW Statement of Objectives
6. REQUIRING OFFICE
USSOCOM
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
See block 16 14. DISTRIBUTION
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
See block 16 a. ADDRESSEE
b. COPIES
Draft Final
Reg Repr
16. REMARKS
In lieu of format required by the DID, the Contractor shall provide a summary listing of all items containing hazardous materials or requiring special handling instructions. This summary shall have all related Material Safety Data Sheets included as an appendix. In addition, the MSDS shall be delivered with each item containing hazardous material or requiring special handling instructions. The MSDS will provide workers and emergency personnel with procedures for handling or working with that substance in a safe manner, and includes information such as physical data (melting point, boiling point, flash point, etc.), toxicity, health effects, first aid, reactivity, storage, disposal, protective equipment, and spill handling procedures.
Block 9: DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government Agencies and direst supporting contractors. Other requests for this document shall be referred to
COMMAND SURGEON, USSOCOM, MACDILL AIR FORCE BASE, TAMPA FL.
Block 12/13: First submission with delivery of PDM’s, subsequent deliveries with each procurement order
Block 14.a: Natick Soldier Center
PM-SOF-SSES RM D017
Kansas St, Natick MA 01760 Attn: Scott Williams, APM-TCCC
Electronic submissions may be addressed to scott.m.williams1@us.army.mil
Natick Soldier Center
15. TOTAL
See
BLK
16b
See
BLK
16b
See
BLK
16b
G. PREPARED BY
Scott Williams, APM
H. DATE
I. APPROVED BY
Tom Mills, PM
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages http://en.wikipedia.org/wiki/Melting_point� http://en.wikipedia.org/wiki/Boiling_point� http://en.wikipedia.org/wiki/Flash_point� http://en.wikipedia.org/wiki/Toxicity� http://en.wikipedia.org/wiki/Health_effects� http://en.wikipedia.org/wiki/First_aid� http://en.wikipedia.org/wiki/Reactivity� mailto:scott.m.williams1@us.army.mil�
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302.
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0007, 1021, 2020, 3020, 4020
TDP TM OTHER Configuration Management .
SOF COMBAT CASUATLY CARE
H2222-10-R-00018
A002
Training Materials
TCCC Training Guide - Student Guide
DI-ILSS-80872
DD
AS REQ
12. DATE OF FIRST SUBMISSION
See block 16 14. DISTRIBUTION
8. APP CODE
See block 16 a. ADDRESSEE
b. COPIES
Draft Final
Reg Repr
16. REMARKS
The Contractor shall provide a Student Training Guide to include safety, operation, and maintenance procedures for the CASEVAC Set. The content shall be suitable for application in a self-paced, self-directed format. The material shall contain sufficient instructions to guide students through all specified hands-on training without a need for instruction lectures and instructor interface. Existing manufacturer’s training and service manuals may be incorporated into the material insofar as they meet specified requirements. The Training Guide will be developed during the PDM training and evaluation phase of the contract.
Block 9: DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government Agencies and direst supporting contractors. Other requests for this document shall be referred to
COMMAND SURGEON, USSOCOM, MACDILL AIR FORCE BASE, TAMPA FL.
Block 12/13: First submission in rough draft format to be delivered with the initial PDM’s, in chapter format in 8.5 X 11, 3 ring binders to facilitate rapid change and updates. Subsequent deliveries will be 10 days prior to each of the 5 phases of the evaluation process.
Block 14.a: Natick Soldier Center
PM-SOF-SSES RM D017
Electronic submissions may be addressed to Scott.M.Williams1@us.army.mil
Block 15: Total qty not to exceed 10, 000
Government review and approval shall be within 30 days of contractor submission. Contractor revisions shall be within 2 weeks of Government review and approval. Final Government approval shall be within 20 days of delivery of final Training Materials.
See
BLK
16b
See
BLK
16b
See
BLK
BLK
16b
See
BLK
16b
See
BLK
mailto:Scott.M.Williams1@us.army.mil�
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302.
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0001, 1001, 2001, 3001, 4001
TDP TM OTHER .
A003
Commercial Drawings/Models and Associated Lists
Product Baseline Drawings and Inventory Diagrams
DI-SESS-81003D
DD
ONE/R
12. DATE OF FIRST SUBMISSION
See BLK 16 14. DISTRIBUTION
8. APP CODE
AS REQD a. ADDRESSEE
b. COPIES
Draft Final
Reg Repr
16. REMARKS
The Product Baseline Drawings and Inventory Diagrams required by this CDRL ‘WILL NOT’ be used by the Government for re-procurement purposes.
This deliverable is considered by the Government as “INFORMATION ONLY” and shall be reflective of the CASEVAC Set configuration delivered to the Government. Contractor drawing format shall apply in lieu of TDP Option Selection Worksheet. First submission of this CDRL shall reflect configuration of the First Article Test Set. The drawings or ‘tabletop’ will be used for inventory management at the user level to ensure kits are complete and available for reuse. Any changes made to the kit configuration after First Article Test Set delivery shall be submitted as updates to this CDRL. Any changes made after Production Sets are delivered shall follow the ECP Configuration Process and will require resubmission of this CDRL reflecting the approved changes and affected data.
Documentation shall be made available on CD-ROM with viewer software and 1 each hard copy provided to the addressee in Block 14. All computer media will be compatible with current government software.
COMMAND SURGEON, USSOCOM, MACDILL AIR FORCE BASE, TAMPA FL.
Block 12/13: First submission with delivery of PDM’s, subsequent deliveries with each procurement order
Block 14.a: Natick Soldier Center
PM-SOF-SSES RM D017
shall be within 20 days of delivery of final drawings/models and associated Lists.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302.
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0007, 1021, 2020, 3020, 4020
TDP TM OTHER Training .
SOF Combat Casualty Care
A004
Training Material
Safety, Operation, and Maintenance Training for the CASEVAC SET
DI-ILSS-80872
DD
ASREQ
12. DATE OF FIRST SUBMISSION
See block 16 14. DISTRIBUTION
8. APP CODE
See block 16 a. ADDRESSEE
b. COPIES
Draft Final
Reg Repr
16. REMARKS
The Contractor shall provide a Training Video on CD or DVD ROM, in lieu of hardcopy text specified in the DID, to include safety, operation, and maintenance procedures for the CASEVAC Set. The content shall be suitable for application in a self-paced, self-directed format. The material shall contain sufficient instructions to guide students through all specified hands-on training without a need for instruction lectures and instructor interface. Existing manufacturer’s training and service manuals may be incorporated into the material insofar as they meet specified requirements.
COMMAND SURGEON, USSOCOM, MACDILL AIR FORCE BASE, TAMPA FL.
Block 12/13: First submission with delivery of Production Models, subsequent deliveries with each procurement order in each Set or Kit. Videos will also be distributed to the components thru
SOFSA.
Block 14.a: Natick Soldier Center
PM-SOF-SSES RM D017
Block 15: Total qty not to exceed 10, 000 shall be within 20 days of delivery of final Training Material.
BLK
16b
See
BLK
16b
See
BLK
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302.
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0008, 1021
TDP TM OTHER Provisioned Items Order
SOF TACTICAL COMBAT CASUALTY CARE
A005
Provisioning Parts List
Spare equipment, parts and maintenance material
DI-ILSS-80134A
DD
ASREQ
12. DATE OF FIRST SUBMISSION
See BLK 16 14. DISTRIBUTION
8. APP CODE
A
11. AS OF DATE
Initial Proposal
13. DATE OF SUBSEQUENT
SUBMISSION
Annually a. ADDRESSEE
b. COPIES
Draft Final
Reg Repr
16. REMARKS
Provisioned Items Order (PIO, also known as spares) – Provisioning is the management process of determining and acquiring the range and quantity of support items necessary to operate and maintain an end item of materiel. The PIO CLIN is required to support the provisioning process and is assigned a predetermined not to exceed (NTE) dollar amount. The government may procure spares, repair parts, and support equipment via delivery orders with pricing to be determined at the time the requirement arises and an order is placed over the length of this contract. The total of all delivery orders issued under these CLINs shall not exceed the NTE amount specified in Section B for these CLINs.
Delivered in 8.5”X11” hardbound three ring binder and in digital format via CD-ROM in Government compatible software. All illustrations in the document shall be supplied in Tagged Information Format (TIF) and all data files used to develop the Manual shall be provided on the
CD-ROM.
and direct supporting contractors. Other requests for this document shall be referred to
COMMAND SURGEON, USSOCOM, MACDILL AIR FORCE BASE, TAMPA FL.
Block 12/13: First submission with delivery of PDM’s, subsequent deliveries with each procurement order and/or ECP change.
Block 14.a: Natick Soldier Center
PM-SOF-SSES RM D017
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302.
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
0008, 1021
A006
Recommended Spare Parts List for Spares Acquisition Integrated with Production (SAIP)
DI-ILSS-80293B
DD
ASREQ
12. DATE OF FIRST SUBMISSION
See Block 16 14. DISTRIBUTION
8. APP CODE
See Block 16 a. ADDRESSEE
b. COPIES
Draft Final
Reg Repr
16. REMARKS
The Contractor shall submit a complete list of all individually replaceable sub-components with the entire TCCC Set.
The list shall include, as a minimum, Contractor quantities for every type of spare part for the Set to include all consumable and expendable items, part number, OEM part number, NSN if assigned, nomenclature, quantity and estimated price.
The list must be kept updated with pricing and ECP driven part changes.
Block 9: DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government Agencies and direct supporting contractors. Other requests for this document shall be referred to
COMMAND SURGEON, USSOCOM, MACDILL AIR FORCE BASE, TAMPA FL.
BLK 12: The Contractor shall submit a SAIP concurrent with delivery of Product Demonstration Sets.
BLK 13: SAIP subsequent submission shall be 45 days following the scheduled delivery of Full Production Sets
Block 14.a: Natick Soldier Center
PM-SOF-SSES RM D017
The deliverable shall be submitted in Government compatible software, Microsoft Office, Adobe or a mutually agreed upon format. Mail one hard copy or email to Block 14 Addressee.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302.
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
1001-1018, 2001-2018, 3001-3018, 4001-4018
A007
Engineering Change Proposal (ECP) I, II
ECP
DI-CMAN-80639C
DD
AS GEN
12. DATE OF FIRST SUBMISSION
See block 16 14. DISTRIBUTION
8. APP CODE
See block 16 a. ADDRESSEE
b. COPIES
Draft Final
Reg Repr
16. REMARKS
The Contractor shall submit a Class II ECP for each proposed change that will NOT affect form, fit, function, or safety. Class II ECPs shall be provided in Contractor format. They shall be provided for Government concurrence in classification only and will not require Government approval, but will be used for configuration tracking.
The Contractor shall provide Type I ECPs for Government review and approval. The Government will review the ECP for technical merit and impact. Final approval/disapproval of the Type I ECPs will be granted by the Government Contracting Officer in writing.
Block 9: DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government Agencies and direst supporting contractors. Other requests for this document shall be referred to
COMMAND SURGEON, USSOCOM, MACDILL AIR FORCE BASE, TAMPA FL.
Block 12/13: BLK 12: Class I ECPs shall be submitted in time to allow 30 days for Government approval process.
Block 14.a: Natick Soldier Center
PM-SOF-SSES RM D017
See
BLK
16b
See
BLK
16b
See
BLK
BLK
16b
See
BLK
16b
See
BLK
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302.
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TDP TM OTHER .
A008
Production Test Report
Air Worthiness Report
DI-NDTI-80492
DD
AS REQD
12. DATE OF FIRST SUBMISSION
See BLK 16 14. DISTRIBUTION
8. APP CODE
See BLK 16 a. ADDRESSEE
b. COPIES
Draft Final
Reg Repr
16. REMARKS
The Contractor shall submit Air Worthiness documentation for all electronic components and carry on equipment that may impact or applies to airworthiness IAW Army Regulation 70-62. This regulation may be found online.
COMMAND SURGEON, USSOCOM, MACDILL AIR FORCE BASE, TAMPA FL.
BLKs 12 and 13: The report/certificate shall be submitted with the initial Solicitation response. If an item is new and has not been certified it is the responsibility of the Contractor to have the item certified prior to final production award. A certificate will also be required with each item submitted in the ECP process if that item previously required an Airworthiness certificate.
Block 14.a: Natick Soldier Center
PM-SOF-SSES RM D017
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302.
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TDP TM OTHER .
A009
Status Report
Monthly contract status report
DI-MGMT-80368A / DI-MGMT-80227
DD
MONTHLY
12. DATE OF FIRST SUBMISSION
See Block 16 14. DISTRIBUTION
8. APP CODE
See Block 16 a. ADDRESSEE
b. COPIES
Draft Final
Reg Repr
Blocks 10, 12, 13: Initial submission shall be made within 15 days of the end of the first full month of performance under this order. Subsequent submissions shall be made by the 15th
The Report shall contain the following:
day of each month thereafter.
1.0 Summary: The summary shall include a brief statement of the overall project status, covering accomplished technical activities and development, objectives of efforts, summary results of efforts, identification of major problems/deficiencies with impact and recommended solutions.
2.0 Body of Report: The body shall contain the following:
a. A statement as to whether the program is on task/schedule. If not, provide details of why and the planned effort to get on task/schedule.
b. Effort expended on each task to date, a brief description of work performed during the reporting period.
c. Key dates in any testing or development work with significant results.
d. A narrative of outstanding problems existing as of the previous status report and their resolution status.
e. New problem areas encountered or anticipated, their effect on the overall work effort/project and steps being taken to remedy problem situations.
f. Significant results of conferences, trips or directives for the Contracting Officers Representative.
g. Any other information which may cause significant changes in the program schedule.
3.0 Itemized man-hours and costs. Itemized man-hour and cost expenditure incurred for the reporting period by category and task, total contractual expenditures and funds remaining as of the reporting date.
4.0 Contract deliveries status. The status of each deliverable end items, including data deliverables, as required by the contract. Provide item and contract identification, shipping/transmittal data, acceptance status, and schedule due date information.
5.0 ECP Status. Include a summary of ECP’s, including identification of proposed ECP’s, Approved ECP’s and implemented ECP’s.
Block 9: DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government Agencies and direst supporting contractors. Other requests for this document shall be referred to COMMAND SURGEON, USSOCOM, MACDILL AIR FORCE BASE, TAMPA FL.
Block 14.a: Natick Soldier Center
PM-SOF-SSES RM D017
File details come from the government source that posted it. Updated .