GWD_FL20250119_HEAVY_01.03.2025.pdf
PDF 2 MB Posted
- Attached to
- Golden Gem Utility Improvements
- Solicitation number
- ITB 25-PW-002
- Issued by
- Lake County, Florida
About this file
This document is a General Decision Number FL20250119 issued by the U.S. Department of Labor's Wage and Hour Division for heavy construction projects in Lake County, Florida, specifically covering Kennedy Space Flight Center and Malbar Radar Site. The document provides prevailing wage rates for various construction job classifications effective January 3, 2025, and supersedes the previous general decision from January 24, 2019. It applies to contracts subject to the Davis-Bacon Act, with wage rates determined by union rates, survey rates, or state-adopted rates for different construction job classifications.
The wage determination includes detailed hourly rates for multiple job classifications such as Power Equipment Operators, Ironworkers, Laborers, Painters, Carpenters, Electricians, Truck Drivers, and Welders. The document specifies minimum wage requirements under Executive Orders 14026 and 13658, with contractors required to pay workers at least $17.75 per hour (or the applicable wage rate) for contracts entered into on or after January 30, 2022, and $13.30 per hour for contracts awarded between January 1, 2015, and January 29, 2022. The document also includes provisions for paid sick leave under Executive Order 13706 and outlines a comprehensive appeals process for wage determinations.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .