00300-3_Schedule_of_Values__1-8-25_revised__1-24-25_revised__1-31-25.pdf
PDF 126 KB Posted
- Attached to
- Golden Gem Utility Improvements
- Solicitation number
- ITB 25-PW-002
- Issued by
- Lake County, Florida
About this file
This document is a Schedule of Unit Prices for the City of Umatilla's N/S Golden Gem Utility Improvements project located in Florida. The comprehensive schedule outlines detailed unit pricing for a utility infrastructure project that includes general construction activities, roadway improvements, water infrastructure work, and sewer system installations. The project encompasses multiple categories of work, including mobilization, NPDES permit compliance, construction layout and as-built surveys, traffic maintenance, demolition, sodding, asphalt and concrete work, and various water and sewer line components such as PVC watermains, directional boring, gate valves, pipe transitions, and pressure testing.
The unit pricing document stipulates that the prices represent the exact net amount per unit to be paid by the Contractor for additions or increases, or refunded by the Owner for decreases. No additional adjustments will be allowed for overhead, profit, insurance, or other direct or indirect expenses. The bidder is responsible for performing necessary tests and calculations to determine required quantities. The schedule provides a detailed breakdown of items with units of measurement including lump sum (LS), linear feet (LF), square yards (SY), and each (EA), allowing for precise cost estimation and potential scope modifications. The document includes a 110% Payment & Performance Bond provision and provides a framework for comprehensive pricing of the utility improvements project.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item # Description Quantity Unit Unit Price Amount
GENERAL
1 Mobilization LS 2 NPDES Permit & Compliance LS 3 Construction Layout Survey LS 4 As-built Survey LS 5 Testing LS 6 Maintenance of Traffic LS 7 Silt Fence LF 8 Demo Asphalt & Driveway LS 9 Sod SY
10 Concrete Driveway SY
SUB-TOTAL
ROADWAY
11 2" SP 9.5 Asphalt SY 12 8" Limerock SY 13 12" Stabilized Subgrade SY 14 Thermo Stop Bar LS
SUB-TOTAL
WATER
15 10" PVC Watermain LF
16 10" DIP LF
17 12" HDPE Directional Bore LF 18 10" PVC to 12" HDPE Transition EA 19 Temporary Jumper EA 20 10" 45° Bend EA 21 10" x 4" Tee 22 10" x 10" Tee EA 23 8" Wet Tap w/ Tapping Sleeve & Valve EA
24 12" x 10" Wet Tap w/ Tapping Sleeve & Valve EA
25 8" x 10" Reducer EA 26 4" Gate Valve EA 27 8" Gate Valve EA 28 10" Gate Valve EA 29 4" Plug EA 30 Thrust Restraints EA 31 Bactees LS 32 Pressure Test LS
SUB-TOTAL
3. The Unit Prices shall represent the exact net amount per unit to be paid by the Contractor (in the case of additions or increases) or to be refunded by the Owner (in the case of decrease). No additional adjustments will be allowed for overhead, profit, insurance, or to other direct or indirect expenses of the Contractor or Subcontractors, and no additional adjustments will be allowed.
City of Umatilla N/S Golden Gem Utility Improvements
Schedule of Unit Prices
1. It shall be the responsibility of the BIDDER to perform whatever tests and/or calculations as are necessary to determine quantities required for the performance of the work described herein.
2. Should certain additional work be required, or should the quantities submitted by the Contractor of certain classes of work be increased or decreased from those required by the Contract Documents, by authorization of the Owner, the unit prices contained in the following Schedule of Unit Prices shall, at the option of the Owner, be the basis of payment to the Contractor credit to the Owner, for such increase or decrease in the work.
SEWER
33 6" PVC Force Main LF
34 Tie Into Existing 6" Force Main (Requires City Coordination) LS
35 6" Plug Valve EA 36 6" x 6" Tee EA 37 6" Flushing Port EA 38 6" Plug EA 39 Thrust Restraints EA 40 Pressure Test LS
Subtotal 110% Payment & Performance Bond Total Price
TOTAL BASE BID PRICE for the contract sum (Sum of items 1-40 and Bond)
(In Words) (In Figures)
NS Golden Gem Utility Improveme
File details come from the government source that posted it. Updated .