Golden_Gem_Utility_Improvements_Summary_of_Addendum_1_Plan_Changes.pdf
PDF 45 KB Posted
- Attached to
- Golden Gem Utility Improvements
- Solicitation number
- ITB 25-PW-002
- Issued by
- Lake County, Florida
About this file
This document is an Addendum #1 Summary of Plan Changes for the Golden Gem Utility Improvements project in Florida, detailing specific modifications to the construction plans. The addendum outlines two key changes for plan sections C-200 and C-300: first, changing water mains (WM) under pavement to Ductile Iron Pipe (DIP), and second, for C-300, moving the location of the Temporary Jumper Connection. These modifications appear to be part of the broader project scope involving water and sewer line construction, pavement reconstruction, and general site restoration.
The plan changes suggest refinements to the utility infrastructure design, likely aimed at improving technical specifications, construction methodology, or addressing site-specific conditions discovered during initial planning. The use of Ductile Iron Pipe under pavement indicates a potential enhancement in pipe durability and performance, which could contribute to the long-term reliability of the utility infrastructure. The relocation of the Temporary Jumper Connection may represent an optimization of the construction sequence or site layout to improve project efficiency.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary of Addendum #1 Plan Changes
C-200 Change WM under pavement to DIP (Same as C-300)
C-300 Change WM under pavement to DIP Move location of Temporary Jumper Connection