Exhibit_8b_2004.08_Portland_911_Final_Facility_Condition_Assessment_Report.pdf
PDF 27 MB Posted
- Solicitation number
- GS-10P-16-LT-R-9000
About this file
Exhibit 8b 2004.08 Portland 911 Final Facility Condition Assessment Report
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Facility Condition Assessment:
Final Report
NORTHWEST/ARTIC REGION
OR0033PE-PORTLAND 911 FEDERAL BUILDING
911 NE 11TH AVENUE
Portland, OR
Submitted by:
VFA, Inc.
266 Summer St.
Boston, MA 02210-1112 800-693-3132 Contract Number: GS35F0118J August 2004
Acknowledgements
VFA, Inc. extends our appreciation to Roger Wright, John Merritt, John Jarosz and the Portland 911 Building. We wish to acknowledge the time and effort put forth by everyone who assisted with the Portland 911 Building.
Thank any individuals that offered guidance and assistance during the project and contributed to the success of the project.
The members of the project team went to great lengths to assure that the information they collected was accurate and concise, and of the utmost value to the GSA.
There are other members who undoubtedly participated in this project, though may not have been mentioned in this acknowledgement. To those, we express our appreciation for your help and input.
Report Disclaimer
VFA has produced this document under an agreement between VFA and GSA Property Development Br Procurement (10PDC) Contract Number GS35F0118J, Order Number P1003LT0023 dated September 24,2003. Other than to Client, VFA disclaims any obligation to any other person with respect to any material presented in this document and no person may rely upon this document without advance and express written consent from VFA and such person's written agreement to be bound by the limitations, qualifications, terms, conditions, and indemnities to VFA set forth in that agreement. VFA specifically states that its review of the property in question is subject to monetary restraints and scope limitations. Given those limitations and conditions, VFA has made what, in its opinion, is a reasonable investigation, limited to visual observations. Design analysis of systems including structural systems has not been performed. VFA has also relied upon interviews and documents with the understanding that independent verification of their factual content is beyond the scope of VFA's work.
The materials presented in this document are "to VFA's knowledge" where such phrase means to VFA's actual knowledge of the subject matter after such inquiry as VFA considered reasonable in light of the qualifications and limitations upon the scope of work.
Assumptions regarding the overall condition of the properties have been developed based upon inspection of "representative" areas of the facilities. As such, the development of schematic methods and associated costs for the correction of identified deficiencies is based upon the overview inspection and is also limited with respect to completeness.
Investigation for the presence of asbestos containing materials (ACM), PCB's, CFC's, radon and other environmentally hazardous materials is not part of this Agreement. In addition, a review and certification that the buildings have been designed to meet current seismic requirements is not part of this review.
t a b l e o f c o n t e n t s i
Section
Executive Summary
Assessment Methodology
Asset Renewal Management
• Asset Renewal Forecast
Funding Scenario Analysis
Requirement Cost Data Summary
• Asset List
• Crosstab of Requirements by System Group and Priority
• Crosstab of Requirements by Category and Priority
• Crosstab of Requirements by Category and System Group
• Summary and List of Requirements by Priority
• Summary and List of Requirements by Category
• Summary and List of Requirements by Building System
Asset Detailed Data
• Asset Description ......................................................................................... ..........A
• Requirement Description with Estimates........................................................ ..........B
• Photos ......................................................................................................... ..........C
Glossary
Appendix e x e c u t i v e s u m m a r y
Vanderweil Facility Advisors conducted a facilities condition assessment of the GSA
Northwest/Arctic Region Portland 911 Federal Building in April of 2004. The building, OR0033PE, was assessed by Jorge Silva (Architect), Narayan Sharma (Mechanical Engineer) and Romen Rodberg (Electrical Engineer).
The following facility assessment reporting demonstrates VFA’s method of facilities analysis and the proprietary software systems that support the analysis. The primary goal of the assessment is threefold:
1. to provide an analysis of the Portland 911 Federal Building for strategic planning and for establishing funding requirements;
2. to demonstrate the strategic and management value of facility analysis and condition assessments; and
3. to demonstrate the decision support capabilities of VFA.facility, VFA’s facility management software program.
The facilities analysis includes the following, all based on detailed on-site assessments of the
Portland 911 Federal Building performed by VFA’s specialized facilities assessment professionals:
• Current conditions analyses – existing facility requirements including deferred maintenance, deferred renewal, near-term anticipated renewal, recommended discretionary improvements, and code non-compliance issues.
• Anticipated capital renewal analyses – projections of ongoing degradation of facilities’ components and costs associated with the renewal or replacement of these components as they reach the end of their useful lives.
• Capital funding analyses – scenario comparisons showing various funding levels and the effect of each on the condition of the Portland 911 Federal Building; an optimal funding level is identified.
Current conditions analysis –
Summarizing VFA’s condition findings, the present condition of the Portland 911 Federal
Building as evidenced by a Requirements / Facility Condition Index (RI/FCI) of 0.48 indicates that the condition of the physical plant almost 10imes the optimal level of 0.05. Refer to the
Assessment Methodology and glossary for further discussion of RI / FCI. Further examination shows that a considerable proportion of the requirements, approximately 38% is associated with Structural Systems. An additional 21is associated with Electrical Systems, 18is associated with HVAC Systems, and 7 is associated with Interior Construction.
Analyzing the requirements data by category shows that about 83% of the total $23,558,537 backlog is attributed to “Integrity”. This is primarily due to upgrades to the structural systems and exterior windows for blast protection and seismic events. An additional 3% is attributed to "Functionality" 4% to “Security”, and 6% accounts for various Code related items such as
“Building Code Compliance, Accessibility and Life Safety”. Note that actions of requirements with priorities 1, 2, & 3 (which exclude long term requirements) represent almost 48% or a
RI/FCI of 0.23, which is more than 4 times the optimal level.
The results of the current condition analyses are as follows, and are defined in greater detail in the following sections of this report:
Current Requirement/Action Cost and % of Replacement Cost (RI/FCI including Priorities 1 – 4)
Current Requirement/Action Cost without Priority 4 items (5 + years)
Portland 911 Federal Building CRV = $48,760,676
$23,558,537
RI/FCI (1-4) = 0.48
$11,022,452
RI/FCI (1-3) = 0.23
Building and other codes used -
The detailed on-site assessment of Portland 911 Federal Building, performed by VFA’s specialized facilities assessment professionals, included a review of all major building systems for Code compliance. The Codes used in the assessment process are as follows:
• PBS-P100, Facility Standards for the Public Buildings Service, revised March 2003
• GSA Security Criteria (October 8, 1977) Reference PBS-P100 Above
• Uniform Federal Accessibility Standards (UFAS), Federal Standard 795, April 1, 1988, & P.L. 90-
• Americans with Disability Act (ADA) - 1992
• 2003 International Building Code
• 2003 International Mechanical Code
• 2003 International Plumbing Code
• 2002 National Electric Code
• 2003 Life Safety Code (NFPA 101)
• ANSI A17.1 – 2000 Revision for Elevators
• Energy Policy Act of 1992
• ASHRAE 90.1R for Energy Conservation
• OSHA and EPA Regulations as Applicable
• Other NFPA Codes as referenced by the 2003 International Building Code
Cost correction factors –
Remedial cost estimates contained in section 6 have been estimated utilizing VFA.facility and
R.S. Means 2004 cost data. As part of each requirement/action, VFA has included a cost correction factor of 1.42 comprised as follows:
• 15% for Design and Management Fees
• 20% for Work in Occupied Spaces
• 7% for Work in a High Security Building
These cost correction factors were derived during working sessions with GSA NCR senior personnel.
Anticipated capital renewal analysis –
VFA estimates the average capital renewal requirements to be approximately $0.91 million per year without inflation (1.24 million per year with 2.5% inflation). It is important to note these values represent current dollar values averaged over a 20-year period. The profile of annual spending associated is non-linear and “spiky” as evidenced by the Facility Renewal
Forecast. Based on systems reaching the end of their expected lifecycles, capital expenditures remain flat until 2010 and 2011, where the first peaks occur. In 2014, 2016, 2020 and 2023 similar peaks occur, before a sharp drop in 2024.
The capital renewal forecasts represent only costs associated with anticipated systems requiring replacement as they reach the end of their useful lives. Current deferred maintenance backlog is not included in the above figure. However, the combination of both capital renewal needs and deferred maintenance is addressed in the funding scenario analyses.
Capital funding analyses –
As an example of our capability of producing multiple funding scenarios to model the effects of various levels of funding on the condition of the Portland 911 Federal Building, we have selected three typical models for the Portland 911 Federal Building as defined below.
Three options were modeled:
1. Typical funding modeled as annual funding at 1/2% of current replacement value;
2. Maintain the current condition level of requirement costs totaling about 48% of the current asset replacement value; and
3. Attain a more appropriate condition level, RI/FCI = 0.05 to be reached in ten years and maintained thereafter.
Applied Funding in Net Present Dollars over 20 years
Condition at Year 20 as Percent of the Asset Replacement Value
Backlog at End of Model Duration (in Net Present Dollars)
Option 1:
Level funding @ 1/2% Plant Value
$4,876,069 RI/FCI = 1.04 $50,830,284
Option 2:
Maintain Current
RI/FCI @ 48%
$28,557,850 RI/FCI = 0.48 $23,558,537
Option 3:
Attain desired condition level over 10 years.
$43,553,408
RI/FCI = 0.05 $2,438,033
Report structure The report contains the following sections, which illustrate the scope of work performed by
VFA and demonstrate the capabilities of VFA.facility:
Assessment Methodology
Describes the methods employed and defines the categorization and prioritization standards applied to identified requirements. Also defines Requirement Index (RI) and Facility Condition Index (FCI).
Asset Renewal Management
Asset systems reaching the end of their useful lives require replacement. An important feature of VFA.facility is the ability to predict the annual facility renewal funding required to maintain a portfolio of assets or any subset thereof. This section presents the methodology used in this analysis of the Portland 911 Federal Building.
Funding Scenario Analysis
The logic and methodology used during the analysis of the condition data is presented along with three funding scenarios that have been provided for illustrative purposes. The three scenarios represent different ends of the funding spectrum and their resultant effects on the asset over time.
Requirement Cost Data Summary
The assessment team identified and estimated current requirements with actions totaling
$23,558,537 for the Portland 911 Federal Building. In this section, the condition data is summarized in multiple formats, sorted by priority, category, and building system. Cross-tabular reports presenting requirements sorted by system and priority, category and priority and category and system are included at the end of the section.
Detailed Asset Information
For the Portland 911 Federal Building, the following reports are included:
Asset Description - VFA.facility provides an asset summary for the Portland 911
Federal Building, containing at summary of the RI/FCI and requirements.
Requirements Descriptions with Estimates - For full requirements detail, the individual asset report contain detailed descriptions of each requirement and of associated action methods. These detailed reports also indicate the action cost detail provided through the use of the program’s estimating module, VFA.estimator. These sections are sorted by priority and then cost.
Photographs - Photographs taken by the surveyor during the survey have been incorporated into the VFA.facility database. For the Portland 911 Federal Building, an overall photograph is included along with several other photos, which graphically represent overall condition or specific requirements
Glossary
Definitions and terms used throughout the report and within VFA.facility.
Appendix A
Backup and supporting data for the Portland 911 Federal Building.
END
a s s e s s m e n t m e t h o d o l o g y
Initial Project Setup The assessment team met with Portland 911 Federal Building representatives at the start of the project to establish criteria to be used to evaluate facilities. Discussions were conducted to identify particular problems previously encountered, corrective solutions used and their effectiveness, and anticipated future projects. Existing building requirements and sensible improvements were noted. These instructions and checklists are represented below.
Building Survey
The survey team consisting an architect, a mechanical engineer and an electrical engineer inspected the Portland 911 Federal Building . In conjunction with the building surveys, the team met with representatives of the Portland 911 Federal Building responsible for maintenance to get a more in depth viewpoint of problem areas.
The requirements were classified in several ways. In addition to detailed specific descriptions, each requirement was assigned a category, priority, and primary system association. This parallel differentiation allows for multiple queries of the database, facilitating analysis of the data. It is possible, for instance, to query the database for all
Priority 5 code requirements in the HVAC system or all Priority 1 and 2 building integrity issues in the exterior wall systems. The definitions of priorities, categories and systems used have been modified for the GSA
The criteria used to determine the priorities; categories and primary systems are as follows:
Priorities:
Priority One: Immediate / First Year
Items in this category require immediate action and include corrective measures to:
• Return a facility to normal operation
• Stop accelerated deterioration
• Replace items that have reached or exceeded their useful service life
• Correct Life Safety and or Code hazards
Priority Two: Within the next 1-2 Years
Items in this category require action in the next 1-2 years and include corrective measures to:
• Return a facility to normal operation
• Stop accelerated deterioration
• Replace items that will reach their useful service life within the next year
• Correct Life Safety and or Code hazards
Priority Three: Within the next 3-5 years
Items in this category, if not corrected expeditiously, will become critical in the next several years. Items in this category include corrective measures to:
• Stop intermittent interruptions
• Correct rapid deterioration
• Correct functionality or aesthetic issues that are not critical
• Correct potential safety hazards
Priority Four: In the Next 5 or more years
Items in this category include conditions requiring appropriate attention to preclude predictable deterioration or potential downtime and the associated damage or higher costs if deferred further.
Requirement Categories
Parent categories, which group categories, are listed below in bold italics. You can apply a parent category or a child category to a requirement.
Code Compliance
• Accessibility: Conditions that violate the American Disabilities Act guidelines. (Examples:
Non-compliant building entrances, plumbing fixtures, and door hardware).
• Building Code: Conditions that violate Building codes (Examples: Any conditions that disregard building, electrical, mechanical, and plumbing codes.)
• Life Safety: Conditions that violate the NFPA 101 Life Safety Code (Example: Any conditions that endanger life in the event of fire, smoke, fumes or panic.)
Operations
• Energy: Conditions that adversely affect energy use (Examples: Single pane windows, pipe insulation).
• Maintenance: Components or systems that require routine maintenance. (Examples:
Recalibrate thermostats, clean ducts).
• Security: Conditions that compromise the protection of the asset or its occupants
(Examples: Broken locks, lack of lighting).
Functionality
• Mission: Components or systems that do not meet the standards of the organization
(Examples: Non-uniform paint and décor; equipment upgrades to ensure a facility is operational 24/7.)
• Modernization: Conditions that need to be made modern in appearance or function
(Example: Outdated furniture).
• Plant Adaptation: Components or systems that must change to fit a new or adapted use
(Example: Renovation or restoration of old space).
• Obsolescence: Components or systems that are or are becoming obsolete (Example:
Outdated equipment).
• Capacity: Problems with the system's ability to keep up with demand load (Examples:
Heating equipment that cannot adequately cover its intended area, overcrowding).
Integrity
• Appearance: Problems with the asset's appearance that are not functional in nature
(Examples: Peeling paint, worn carpet).
• Reliability: Components or systems that cannot be depended upon (Example: Equipment that functions correctly but sometimes is unpredictable).
• Beyond Rated Life: A component or system that had exceeded its rated life (Example: A
20-year warranted roof that is 30 years old).
Environmental
• Air/Water Quality: Conditions that affect the environmental quality of the water or air
Examples: Insufficient ventilation, lack of chemical treatment, no backflow protection).
• Asbestos: Visible observance of suspected Asbestos Containing Materials (ACMs).
• Lead: Visible observance of suspected lead-based paint.
• PCB: Visible observance of suspected PCB-containing materials in building equipment
(Example: Transformer).
Miscellaneous
• Other: Other deficient items not covered in all other categories (Examples: Space utilization, Occupational Health and Safety, and OSHA Facilities and Equipment).
Primary Systems (VFA’s Classifications)
Site
• Vehicular Pavement
• Sidewalks
• Landscaping
• Utilities
Structure
• Structure
Exterior Structure
• Exterior Walls
• Roof
• Windows and Exterior Doors
Interior Structure
• Wall Surfaces
• Ceilings
• Flooring
• Furnishings & Equipment
• Stairs
• Elevators
• Interior Doors
• Fire Separation Assemblies
HVAC
• Boilers/Furnaces
• Air Handling Units
• Circulation Pumps
• Cooling Towers
• Ductwork
• HVAC Piping
• Terminal Devices
• Ventilation Systems
• Temperature Control
Plumbing
• Domestic Water
• Sanitary Waste
• Plumbing Fixtures
• Fire Suppression Systems
Electrical
• Electrical Service
• Electrical Distribution
• Lighting
• Fire Alarm
• Emergency Lighting and Exit Signs
• Telecommunications
For each requirement, one or more proposed actions were established, and a recommended action identified. The corrective work was then estimated using 2004 R.S. Means Estimating
Data accessed directly by VFA.facility. For work not covered by R.S. Means, a lump sum figure was inserted and described in the text of the requirement.
Requirements Index / Facility Condition Index
VFA has automated a standard process for assessing the relative condition of assets, facilitating comparison both within and among institutions. For each asset, two condition indices are determined. The Requirements Index (RI) is the TOTAL sum of all requirements divided by the current replacement value. The Facility Condition Index (FCI) is the total value of a SUBSET of requirements, either based on category or priority, divided by the current replacement value. For the case of the GSA, the Requirements Index equals the Facility
Condition Index.
For example, if an asset with a replacement value of $1,000,000 has $100,000 of existing requirements, the RI and FCI is $100,000/$1,000,000 or 0.10. This principle can be expanded to cover groups of assets or an entire service center or region.
Condition Levels Condition FCI Range Very Good 0.00 to 0.05
Good 0.051 to 0.10
Fair 0.11 to 0.15
Poor 0.151 and above
FCI is a standard measure used throughout the country; it is recommended by both the
National Association of College Business Officers (NACUBO) and the Association of Higher
Education Facility Officers (APPA).
To determine the current replacement value of assets, VFA.facility uses cost templates developed for each different asset type. The cost templates include a square foot cost for each asset. The target overall replacement costs (total dollars/SF) are derived from the functional replacement values obtained from the GSA. Individual systems costs/SF are derived from industry standard costs such as Mean’s and the teams’ professional experience.
Each asset is assigned a cost template that reflects its use. The program multiplies the square foot cost with the gross area entered for each asset and determines the replacement cost of that asset. The program then aggregates all the assets to determine the total replacement value of the plant.
f a c i l i t y r e n e w a l m a n a g e m e n t
In addition to management of deficient conditions, VFA.facility provides budgeting and management tools for facility capital renewal forecasting. Whereas deferred maintenance is concerned with existing conditions, capital renewal forecasting is concerned with the continuous deterioration of assets. From an accounting perspective, this is the cause for asset depreciation. This section presents the findings of the capital renewal forecasting for the Portland 911 Federal Building.
Unlike the theoretical straight-line depreciation familiar to accountants, asset deterioration occurs at a wide variety of rates for various asset systems. As such, VFA has developed a methodology for predicting asset deterioration and associated capital renewal funding requirements based on systematic analyses of the asset components, estimating renewal costs at the end of each component’s useful life. In a typical assessment, each asset system is modeled with a value represented as its percent of the total replacement cost of the facility, a lifetime, a percentage of the system to be replaced at the end of its lifetime and a percent through its lifetime. The extent of detail shown represents VFA’s standard approach; however, this listing is intended to be flexible, adjusting to each client’s needs. Addition of more detail is not limited by the system.
Component Lifetime
Component lifetimes represent the anticipated serviceable duration of each building component.
Lifetimes reflect the durability of the type of system present. For example, typical EPDM roofing has a standard lifetime of 20 years, while slate shingle roofing has a serviceable life of 50 to 100 years depending on the thickness and construction method used. As such, each component is analyzed and a life assigned. These figures are based on published standards as modified by VFA to reflect our professional experience. The lifetimes are further refined to reflect the owner’s experience and approach to preventative maintenance as well as expected or historic wear on the assets.
Percentage Replaced
At the time of renewal, many components are only partially renewed/replaced. For example, while a roof is generally totally replaced at the end of its life, elevators are not totally replaced, but have significant residual value. The shaft, piston, doors, etc. generally remain but the cab and electronics are replaced.
f a c i l i t y r e n e w a l m a n a g e m e n t
Percent Used
For each component, VFA professionals estimate the percent depletion relative to its lifetime. Field inspection results are used to determine the percent used, not simply the age of the component.
The following graph illustrates the results of the facilities renewal forecast process for the Portland 911
Federal Building . The annual costs associated with replacement of systems not currently deficient, but anticipated to fail in the future are mapped to the graph. The time frame used was 20 years;
additional analyses can be produced with other time frames.
The results of this analysis are used in combination with the data collected on current requirements to produce the financial models presented and described in the next section, Funding Scenario
Analyses.
Facility Renewal Forecast
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
Year
Fu nd in g
(i n
M ill io ns
Annual
Average
Moving Average(5yr)
Trend based
08/23/04Copyright © 1998-2004 VFA, Inc. All rights reserved. 1
Year Annual Average Moving Average(5yr) Trend based
2004 $0 $911,164 $0 $0
2005 $0 $933,943 $0 $80,730
2006 $0 $957,291 $0 $179,920
2007 $0 $981,224 $0 $284,018
2008 $0 $1,005,754 $271,929 $393,210
2009 $0 $1,030,898 $661,978 $507,683
2010 $1,428,478 $1,056,670 $678,527 $627,634
2011 $2,013,261 $1,083,087 $763,245 $753,265
2012 $0 $1,110,164 $1,371,057 $884,786
2013 $355,924 $1,137,918 $1,097,670 $1,022,412
2014 $3,092,676 $1,166,366 $1,525,411 $1,166,366
2015 $0 $1,195,525 $1,563,547 $1,316,879
2016 $4,380,642 $1,225,413 $1,712,750 $1,474,189
2017 $0 $1,256,049 $1,089,474 $1,638,541
2018 $981,143 $1,287,450 $1,943,430 $1,810,189
2019 $0 $1,319,636 $1,539,114 $1,989,396
2020 $4,342,859 $1,352,627 $2,179,273 $2,176,431
2021 $2,577,144 $1,386,443 $2,786,210 $2,371,575
2022 $3,160,705 $1,421,104 $2,980,928 $2,575,116
2023 $4,012,189 $1,456,631 $2,650,117 $2,787,351
2024 $656,970 $1,493,047 $2,696,726 $3,008,589
08/23/04Copyright © 1998-2004 VFA, Inc. All rights reserved. 2
Region Northwest/Arctic Region
Service_Center 911/511 PMT
Asset Portland 911 Federal Building
Systems All
Forecast Years 20
Inflation Rate 2.5%
Allocate renewal cost to single year
Yes
Facility Renewal Forecast
Forecast Parameters
08/23/04Copyright © 1998-2004 VFA, Inc. All rights reserved. 3 f a c i l i t y f u n d i n g s c e n a r i o
VFA.facility integrates both deferred maintenance and capital renewal projection findings into comprehensive facility funding analyses. Various strategies can be comparatively analyzed including various funding levels, various distributions of funding and testing of assumption parameters. Using this tool, optimal facility investment strategies can be identified.
Three investment scenarios for the Portland 911 Federal Building are included at the end of this section. These models are based on long range planning discussions and illustrate compelling plant needs. These models do not include debt service as a renewal investment. The audit treats the original capital expenditure as a renewal investment. Adding the debt service counts the single investment twice.
The model integrates the current condition information and the annual renewal projections to analyze various funding schemes. Asset replacement cost is annually adjusted by the inflation rate identified, in this case 2.5%. If the institution anticipates plant growth, this rate is reflected in both the replacement cost and the overall FCI, assuming that growth is via new construction with
FCI = 0. Anticipated new requirements are estimated as the further deterioration of current requirements not corrected, at the backlog deterioration rate identified as 2%, and the results of the renewal forecast. With these factors, various funding schemes can be analyzed and the effect on the asset condition estimated. All figures are adjusted for inflation over the duration of the analysis; the discount rate used for net present value calculations is the inflation rate as well.
Other discount rates can be used, to reflect the opportunity cost associated with a facility investment. The investment should be assumed to include major repair costs (other than those for custodial or routine zone maintenance needs) and any capital projects that substantially affect the condition of the plant, such as asset or partial asset renovations.
The graphs and tables that follow identify funding strategies and show the associated effects on asset condition, in terms of the RI/FCI (see section 2 and 7 for a discussion and definition of
RI/FCI.) The Summary of Funding Options presents key results such as change in plant value and RI/FCI at end of funding period for the three scenarios. For the graphical presentation, bars indicate annual dollars invested in the asset, as indicated on the left axis, and the lines indicate the effect of this funding on the RI/FCI, as indicated on the right axis. The spreadsheets have been projected over 20 years for clarity; further extensions of the model are possible. The following scenarios are presented for the Portland 911 Federal Building contained in this report:
Option One explores the effects of investing 1/2% of current replacement value
(CRV). The present condition of the assets is considered poor according to industry standards, with an overall RI/FCI of 0.48. Over 20 years the condition of the assets steadily deteriorates with the RI/FCI increasing to 1.04. Total aggregated net present value of the asset after funding is ($3,391,293), down from the initial $48,760,676. Total aggregated net present value of 20 years worth of deferred maintenance, at this funding level, has resulted in a backlog of work estimated at $50,830,284 - a significant increase from the current backlog of
$23,558,537.
Option Two explores the effects of setting funding levels to maintain the existing overall RI/FCI. In this scenario, the condition remains stable with an overall RI/FCI of 0.48. Total aggregated net present value of 20 years worth of deferred maintenance, at this level of funding, has resulted in a backlog that remains at
$23,558,537 given the assumed zero plant growth. The total aggregated net present value of a 20-year asset investment is $28,557,850. This Option is useful as a benchmark for setting goals to improve plant condition and value.
Option Three explores the effects of reducing the overall RI/FCI to 0.05, which is considered good by industry standards. In this scenario, asset improvements are distributed over a multi-year period bringing the RI/FCI down to an efficient 0.05 in
10 years, and maintained at this level thereafter. This scenario implies continued use of the facility during renewal improvements. Total aggregated net present value of 20-year asset investment is $43,553,408. In this case, regular and adequate investment toward preventative maintenance has had dramatic results in reducing the backlog of work to be performed. Total aggregated net present value of 20 years worth of preventative maintenance has resulted in a backlog of work estimated at only $2,438,033. At the end of the 20-year period, this backlog can be envisioned as a balloon payment of $$2,438,033 coming due to fix the requirements. Combining $43,553,408 and the $$2,438,033 invested over 20 years yields roughly an annual investment of $2.3 million into the facilities necessary to bring the plant up to good condition. This option yields much greater benefits than
Option 2.
These options reflect only three of the many possible scenarios. Additional scenarios can be easily run on the data.
Starting Net Present Value FCI
Funding Option Backlog FCI Applied Funding
Ending Backlog
Total Funding Requirement
Deferred Maintenance Penalty
Ending
Pay as you go $23,558,537 0.4831 $42,692,968 $42,692,968 0
Funding to reduce FCI to 5% in 10 years
$23,558,537 0.4831 $43,553,408 $2,438,033 $45,991,441 $3,298,473 0.0500
0.5% of the current replacement value
$23,558,537 0.4831 $4,876,069 $50,830,284 $55,706,353 $13,013,385 1.0424
Funding to maintain Constant FCI
$23,558,537 0.4831 $28,557,850 $23,558,537 $52,116,387 $9,423,419 0.4831
Comparison Of Options
Funding/FCI Report
0.0000
0.1000
0.2000
0.3000
0.4000
0.5000
0.6000
0.7000
0.8000
0.9000
1.0000
0.0
0.6
1.2
1.8
2.4
3.0
3.6
4.2
4.8
5.4
6.0
Year
Fu nd in g
(i n
M ill io ns
FC
I
Funding-Maintain FCI FCI-Maintain FCI
Funding-0.5% of the Current Replacement Value FCI-0.5% of the Current Replacement Value
Funding-Target FCI-Funding to reduce FCI to 5% in 10 Years FCI-Target FCI-Funding to reduce FCI to 5% in 10 Years
Maintain FCI
Year Replacement Cost
Renewal Cost Backlog Deterioration
Total New Liability
New Backlog Total
Net Plant Value
Funding Funding Reserve
FCI
2004 $48,760,676 $0 $0 $23,558,537 $23,558,537 $25,202,139 $0 $0 0.4831
2005 $49,979,692 $0 $482,950 $482,950 $24,147,500 $25,832,192 $482,950 $0 0.4831
2006 $51,229,183 $0 $495,024 $495,024 $24,751,187 $26,477,996 $495,024 $0 0.4831
2007 $52,509,911 $0 $507,399 $507,399 $25,369,966 $27,139,945 $507,399 $0 0.4831
2008 $53,822,658 $0 $520,084 $520,084 $26,004,214 $27,818,443 $520,084 $0 0.4831
2009 $55,168,223 $0 $533,086 $533,086 $26,654,319 $28,513,904 $533,086 $0 0.4831
2010 $56,547,427 $1,428,478 $546,414 $1,974,892 $27,320,676 $29,226,751 $1,974,892 $0 0.4831
2011 $57,961,111 $2,013,261 $560,074 $2,573,335 $28,003,693 $29,957,419 $2,573,335 $0 0.4831
2012 $59,410,138 $0 $574,076 $574,076 $28,703,784 $30,706,353 $574,076 $0 0.4831
2013 $60,895,390 $355,924 $588,428 $944,351 $29,421,378 $31,474,012 $944,351 $0 0.4831
2014 $62,417,773 $3,092,676 $603,138 $3,695,815 $30,156,912 $32,260,861 $3,695,815 $0 0.4831
2015 $63,978,216 $0 $618,217 $618,217 $30,910,834 $33,067,382 $618,217 $0 0.4831
2016 $65,577,670 $4,380,642 $633,672 $5,014,314 $31,683,604 $33,894,066 $5,014,314 $0 0.4831
2017 $67,217,110 $0 $649,514 $649,514 $32,475,694 $34,741,416 $649,514 $0 0.4831
2018 $68,897,536 $981,143 $665,752 $1,646,894 $33,287,585 $35,609,951 $1,646,894 $0 0.4831
2019 $70,619,973 $0 $682,395 $682,395 $34,119,774 $36,500,199 $682,395 $0 0.4831
2020 $72,385,471 $4,342,859 $699,455 $5,042,315 $34,972,768 $37,412,703 $5,042,315 $0 0.4831
2021 $74,195,106 $2,577,144 $716,942 $3,294,086 $35,847,086 $38,348,020 $3,294,086 $0 0.4831
2022 $76,049,982 $3,160,705 $734,865 $3,895,570 $36,743,262 $39,306,719 $3,895,570 $0 0.4831
2023 $77,951,229 $4,012,189 $753,237 $4,765,425 $37,661,843 $40,289,386 $4,765,425 $0 0.4831
2024 $79,900,008 $656,970 $772,068 $1,429,038 $38,603,388 $41,296,620 $1,429,038 $0 0.4831
0.5% of the Current Replacement Value
Cost
Renewal Cost Backlog Deterioration
Total New Liability
New Backlog Total
Net Plant Value
Funding Funding Reserve
FCI
2004 $48,760,676 $0 $0 $23,558,537 $23,558,537 $25,202,139 $0 $0 0.4831
2005 $49,979,692 $0 $482,950 $482,950 $24,380,551 $25,599,140 $249,898 $0 0.4878
2006 $51,229,183 $0 $499,801 $499,801 $25,233,720 $25,995,463 $256,146 $0 0.4926
2007 $52,509,911 $0 $517,291 $517,291 $26,119,304 $26,390,607 $262,550 $0 0.4974
2008 $53,822,658 $0 $535,446 $535,446 $27,038,618 $26,784,039 $269,113 $0 0.5024
2009 $55,168,223 $0 $554,292 $554,292 $27,993,034 $27,175,189 $275,841 $0 0.5074
2010 $56,547,427 $1,428,478 $573,857 $2,002,335 $30,412,457 $26,134,970 $282,737 $0 0.5378
2011 $57,961,111 $2,013,261 $623,455 $2,636,717 $33,519,679 $24,441,432 $289,806 $0 0.5783
2012 $59,410,138 $0 $687,153 $687,153 $34,747,773 $24,662,365 $297,051 $0 0.5849
2013 $60,895,390 $355,924 $712,329 $1,068,253 $36,380,243 $24,515,147 $304,477 $0 0.5974
2014 $62,417,773 $3,092,676 $745,795 $3,838,471 $40,816,130 $21,601,643 $312,089 $0 0.6539
2015 $63,978,216 $0 $836,731 $836,731 $42,353,372 $21,624,844 $319,891 $0 0.662
2016 $65,577,670 $4,380,642 $868,244 $5,248,886 $48,333,203 $17,244,467 $327,888 $0 0.737
2017 $67,217,110 $0 $990,831 $990,831 $50,196,277 $17,020,833 $336,086 $0 0.7468
2018 $68,897,536 $981,143 $1,029,024 $2,010,166 $53,116,861 $15,780,675 $344,488 $0 0.771
2019 $70,619,973 $0 $1,088,896 $1,088,896 $55,180,577 $15,439,396 $353,100 $0 0.7814
2020 $72,385,471 $4,342,859 $1,131,202 $5,474,061 $61,672,224 $10,713,246 $361,927 $0 0.852
2021 $74,195,106 $2,577,144 $1,264,281 $3,841,425 $66,684,478 $7,510,628 $370,976 $0 0.8988
2022 $76,049,982 $3,160,705 $1,367,032 $4,527,737 $72,499,075 $3,550,906 $380,250 $0 0.9533
2023 $77,951,229 $4,012,189 $1,486,231 $5,498,420 $79,420,214 $-1,468,984 $389,756 $0 1.0188
2024 $79,900,008 $656,970 $1,628,114 $2,285,084 $83,291,301 $-3,391,293 $399,500 $0 1.0424
08/23/04Copyright © 1998-2004 VFA, Inc. All rights reserved. 3
Target FCI-Funding to reduce FCI to 5% in 10 Years
Cost
Renewal Cost Backlog Deterioration
Total New Liability
New Backlog Total
Net Plant Value
Funding Funding Reserve
FCI
2004 $48,760,676 $0 $0 $23,558,537 $23,558,537 $25,202,139 $0 $0 0.4831
2005 $49,979,692 $0 $482,950 $482,950 $21,982,648 $27,997,043 $2,647,802 $0 0.4398
2006 $51,229,183 $0 $450,644 $450,644 $20,313,241 $30,915,942 $2,669,617 $0 0.3965
2007 $52,509,911 $0 $416,421 $416,421 $18,546,625 $33,963,286 $2,690,868 $0 0.3532
2008 $53,822,658 $0 $380,206 $380,206 $16,678,982 $37,143,676 $2,711,514 $0 0.3099
2009 $55,168,223 $0 $341,919 $341,919 $14,706,365 $40,461,858 $2,731,510 $0 0.2666
2010 $56,547,427 $1,428,478 $301,480 $1,729,959 $12,624,693 $43,922,734 $4,179,289 $0 0.2233
2011 $57,961,111 $2,013,261 $258,806 $2,272,068 $10,429,747 $47,531,365 $4,782,631 $0 0.1799
2012 $59,410,138 $0 $213,810 $213,810 $8,117,162 $51,292,975 $2,787,138 $0 0.1366
2013 $60,895,390 $355,924 $166,402 $522,326 $5,682,430 $55,212,960 $3,159,986 $0 0.0933
2014 $62,417,773 $3,092,676 $116,490 $3,209,166 $3,120,889 $59,296,885 $5,912,769 $0 0.05
2015 $63,978,216 $0 $63,978 $63,978 $3,198,911 $60,779,305 $63,978 $0 0.05
2016 $65,577,670 $4,380,642 $65,578 $4,446,220 $3,278,883 $62,298,786 $4,446,220 $0 0.05
2017 $67,217,110 $0 $67,217 $67,217 $3,360,856 $63,856,255 $67,217 $0 0.05
2018 $68,897,536 $981,143 $68,898 $1,050,040 $3,444,877 $65,452,659 $1,050,040 $0 0.05
2019 $70,619,973 $0 $70,620 $70,620 $3,530,999 $67,088,974 $70,620 $0 0.05
2020 $72,385,471 $4,342,859 $72,385 $4,415,245 $3,619,274 $68,766,197 $4,415,245 $0 0.05
2021 $74,195,106 $2,577,144 $74,195 $2,651,339 $3,709,755 $70,485,350 $2,651,339 $0 0.05
2022 $76,049,982 $3,160,705 $76,050 $3,236,755 $3,802,499 $72,247,482 $3,236,755 $0 0.05
2023 $77,951,229 $4,012,189 $77,951 $4,090,140 $3,897,561 $74,053,668 $4,090,140 $0 0.05
2024 $79,900,008 $656,970 $79,900 $736,870 $3,995,000 $75,905,008 $736,870 $0 0.05
08/23/04Copyright © 1998-2004 VFA, Inc. All rights reserved. 4
Region Northwest/Arctic Region
Service_Center 911/511 PMT
Asset Portland 911 Federal Building
Systems All
Priority All
Requirement Type All
Forecast Years 20
Inflation Rate 2.5%
Backlog Deteriorate Rate 2.0%
Renewal Option Annual
Allocate renewal cost to single year
Yes
FCI/RI Setting FCI
Funding/FCI Report
Forecast Parameters
08/23/04Copyright © 1998-2004 VFA, Inc. All rights reserved. 5
Page 1 of
REGION: Northwest/Arctic Region
SERVICE_CENTER: 911/511 PMT
Number Name Use Age Size Replacement Value
FCI Cost (in thousands)
FCI RI Cost (in thousands)
RI (RI-FCI) Cost (in thousands)
OR0033PEPortland 911 Federal Building
Business 51 301,905 SF $48,760,677 $23,559 0.48 $23,559 0.48 $0
911/511 PMT Totals : 301,905 $48,760,677 $23,559 0.48 $23,559 0.48 $0
Northwest/Arctic Region Totals : 301,905 $48,760,677 $23,559 0.48 $23,559 0.48 $0
Asset List Report by Asset Name
REGION:
Northwest/Arctic Region
SERVICE_CENTER:
911/511 PMT
ASSET NAME:
Portland 911 Federal Building
Category - Priority 1 - Immediate / First Year
2 - Within 1 to 2 Years 3 - Within 3 to 5 Years 4 - 5+ Years 5: Does Not Meet Current Codes/Standards
Unknown Total
Electrical System $224,097 $2,792,851 $1,907,527 $61,507 $0 $0 $4,985,982
Equipment $334 $0 $0 $9,900 $0 $0 $10,234
Exterior Enclosure $290 $339,580 $370,504 $1,592,913 $0 $0 $2,303,287
Fire Protecion $100,924 $0 $0 $4,094 $0 $0 $105,018
HVAC System $705,210 $1,617,391 $985,497 $911,296 $0 $0 $4,219,394
Interior Construction $71,528 $0 $2,188,962 $304,701 $0 $0 $2,565,191
Plumbing System $8,390 $30,231 $0 $282,541 $0 $0 $321,162
Selective Demolition $0 $0 $0 $0 $0 $0 $0
Site $0 $12,136 $0 $0 $0 $0 $12,136
Structure $0 $0 $0 $9,036,133 $0 $0 $9,036,133
Total $1,110,773 $4,792,189 $5,452,490 $12,203,085 $0 $0 $23,558,537
Crosstabs of Requirements by Priority and System Group / Asset Name
Page 2 of
1 - Immediate / First Year
2 - Within 1 to 2 Years
3 - Within 3 to 5 Years
4 - 5+ Years
5: Does Not Meet Current Codes/Standards
Unknown
Electric al System
Equipment
Exterior E nclosure
Fire Protecion
HVAC System
Interior C onstru ction
Plumbing System
Selective Demolitio n Site
Structure
2,250,000
4,500,000
6,750,000
9,000,000
11,250,000
System Group
C os t
Crosstabs of Requirements by Priority and System Group / Asset Name
Northwest/Arctic Region
SERVICE_CENTER:
911/511 PMT
ASSET NAME:
Portland 911 Federal Building
Category - Priority 1 - Immediate / First Year
2 - Within 1 to 2 Years 3 - Within 3 to 5 Years 4 - 5+ Years 5: Does Not Meet Current Codes/Standards
Unknown Total
Accessibility $39,809 $23,215 $0 $267,204 $0 $0 $330,228
Air and Water Quality $0 $323,149 $0 $162,832 $0 $0 $485,981
Asbestos $0 $0 $0 $21,987 $0 $0 $21,987
Building Code $196,426 $329,332 $21,173 $172,392 $0 $0 $719,323
Functionality $0 $69,523 $692,789 $52,142 $0 $0 $814,454
Integrity $215,384 $3,157,792 $4,738,528 $11,526,528 $0 $0 $19,638,232
Life Safety $659,154 $12,136 $0 $0 $0 $0 $671,290
Security $0 $877,042 $0 $0 $0 $0 $877,042
Total $1,110,773 $4,792,189 $5,452,490 $12,203,085 $0 $0 $23,558,537
Crosstabs of Requirements by Category and Priority / Asset Name
1 - Immediate / First Year
2 - Within 1 to 2 Years
3 - Within 3 to 5 Years
4 - 5+ Years
5: Does Not Meet Current Codes/Standards
Unknown
Accessib ility
Air a nd W ater Q uality
Asbesto s
Building Code
Functionality
Integrity
Life Safety
Security
2,500,000
5,000,000
7,500,000
10,000,000
12,500,000
Category
C os t
Crosstabs of Requirements by Category and Priority / Asset Name
Northwest/Arctic Region
SERVICE_CENTER:
911/511 PMT
ASSET NAME:
Portland 911 Federal Building
Category - System Group
Structure Exterior Enclosure
Interior Construction
Plumbing System
HVAC
System
Fire Protection
Electrical System
Equipment Furnishings Special Construction
Selective Demolition
Site Total
Accessibility $0 $13,814 $253,390 $31,605 $0 $0 $31,419 $0 $0 $0 $0 $0 $330,228
Building Code $0 $0 $100,852 $119,709 $0 $105,018 $383,844 $9,900 $0 $0 $0 $0 $719,323
Life Safety $0 $290 $0 $0 $645,595 $0 $12,935 $334 $0 $0 $0 $12,136 $671,290
Security $0 $0 $0 $0 $0 $0 $877,042 $0 $0 $0 $0 $0 $877,042
Air and Water Quality $0 $0 $0 $162,832 $323,149 $0 $0 $0 $0 $0 $0 $0 $485,981
Asbestos $0 $0 $21,987 $0 $0 $0 $0 $0 $0 $0 $0 $0 $21,987
Functionality $0 $0 $0 $0 $69,523 $0 $744,931 $0 $0 $0 $0 $0 $814,454
Integrity $9,036,133 $2,289,183 $2,188,962 $7,016 $3,181,127 $0 $2,935,811 $0 $0 $0 $0 $0 $19,638,232
Total $9,036,133 $2,303,287 $2,565,191 $321,162 $4,219,394 $105,018 $4,985,982 $10,234 $0 $0 $0 $12,136 $23,558,537
Crosstabs of Requirements by Category and System Group / Asset Name
Structure
Exterior Enclosure
Interior Construction
Plumbing System
HVAC System
Fire Protection
Electrical System
Equipment
Furnishings
Special Construction
Selective Demolition
Site
Accessib ility
Building Code
Life Safety
Security
Air a nd W ater Q uality
Asbesto s
Functionality
Integrity
2,250,000
4,500,000
6,750,000
9,000,000
11,250,000
Category
C os t
Crosstabs of Requirements by Category and System Group / Asset Name
SERVICE_CENTER: 911/511 PMT
Asset Name: Portland 911 Federal Building Asset Number: OR0033PE
Priority: 1 - Immediate / First Year
Requirement Name Category Prime System Action Date Finish Date Cost
Comm and Security: Heat Detector Missing in Elev Mach Room
Building Code Communications and Security 04/28/05 $959
Communication and Security: Fire Alarms Missing Where Req
Accessibility Communications and Security 04/28/05 $31,419
Cooling Gen Systems: Cooling Tower Parts Corroded
Integrity Cooling Generating Systems 04/05/05 $59,615
Distribution Systems: Relocate Air Intake Louvers
Life Safety Distribution Systems 04/30/05 $126,454
Distribution Systems: Smoke Proof Enclosure/Pressurization
Life Safety Distribution Systems 04/30/05 $519,141
Elevators and Lifts: Elevator Machine Guards Missing
Building Code Elevators and Lifts 04/28/05 $10,012
Em Light and Power Systems: Exit Signs Aged
Integrity Emergency Light and Power Systems
04/28/05 $155,769
Equipment: Obstructed Egress Life Safety Equipment 01/19/05 $334
Exterior Doors: Non-Compliant Locking Hardware
Life Safety Exterior Doors 05/06/05 $290
Interior Construction: Protect Fire Separation Assemblies
Building Code Interior Construction 01/19/05 $38,606
Interior Doors: Hardware Not Compliant
Building Code Interior Doors 01/19/05 $22,910
Lighting and Branch Wiring:
Emergency Power Outlets
Building Code Lighting and Branch Wiring 04/28/05 $14,153
Lighting and Branch Wiring:
Miscellany
Building Code Lighting and Branch Wiring 04/28/05 $8,862
Requirement List Report by Asset Name and Priority.
08/23/04Copyright © 1998-2004 VFA, Inc. All rights reserved. 6
Requirement Name Category Prime System Action Date Finish Date Cost
Lighting and Branch Wiring:
Outlets Non-GFCI
Life Safety Lighting and Branch Wiring 04/28/05 $12,935
Plumbing Fixtures: Lacks Insulation below Sinks.
Accessibility Plumbing Fixtures 04/28/05 $8,390
Sprinklers: Inadequate Stairwell Coverage
Building Code Sprinklers 04/29/05 $96,282
Sprinklers: Missing Sprinkler Guards
Building Code Sprinklers 04/28/05 $4,642
1 - Immediate / First Year Totals: $1,110,773
Priority: 2 - Within 1 to 2 Years
Requirement Name Category Prime System Action Date Finish Date Cost
Communication and Security: Fire Alarm System End of Life
Integrity Communications and Security 04/28/06 $558,654
Communication and Security:
Security System Obsolete
Security Communications and Security 04/28/06 $877,042
Communication and Security:
Telecom Improper Wiring
Building Code Communications and Security 04/28/06 $162,029
Distribution Systems: AHU 8 & 9
- Lacks Control
Integrity Distribution Systems 04/30/06 $1,070,708
Distribution Systems: Air System Unbalanced
Air and Water Quality Distribution Systems 04/30/06 $139,536
Distribution Systems: Dirty Returns
Air and Water Quality Distribution Systems 04/30/06 $183,613
Distribution Systems: EF-11 in Basement Unused
Integrity Distribution Systems 04/28/06 $6,010
Distribution Systems: HW Piping- Flex Rubber Connectors
Integrity Distribution Systems 04/30/06 $50,547
Distribution Systems: Inadequate HVAC at Elevator Room
Integrity Distribution Systems 04/30/06 $36,736
Requirement List Report
Page 3 of
Distribution Systems: Mezzanine Above Auditorium Cold
Integrity Distribution Systems 04/29/06 $14,782
Distribution Systems: Unlabeled Pipes
Integrity Distribution Systems 04/30/06 $45,936
Domestic Water Dist: Aged Penthouse Dom HW Heater
Integrity Domestic Water Distribution 04/28/06 $7,016
Elec Serve and Dist: Main Elec.
Switchboard Aged
Integrity Electrical Service and Distribution 04/28/06 $282,141
Elec Serve and Dist: Service and Dist - Secondary Swtchbrds Aged
Integrity Electrical Service and Distribution 04/28/06 $176,368
Electrical Service and Distribution:
Elevator Main Disconnect
Building Code Electrical Service and Distribution 04/27/06 $1,615
Exterior Walls: Damaged Marble Planters
Integrity Exterior Walls 05/04/06 $22,764
Exterior Walls: Deteriorated Marble Panels
Integrity Exterior Walls 05/04/06 $175,449
Exterior Windows: Deteriorated Weatherstripping
Integrity Exterior Windows 01/19/06 $141,367
Heat Generation Systems:
Efficiency Study
Functionality Heat Generating Systems 06/10/06 $69,523
Lighting and Branch Wiring:
Cable and Wiring Aged
Integrity Lighting and Branch Wiring 04/28/06 $569,314
Lighting and Branch Wiring:
Outlets Missing in Corridors
Building Code Lighting and Branch Wiring 04/27/06 $7,149
Other Elec. Systems: Lightning Protection Missing
Building Code Other Electrical Systems 04/28/06 $158,539
Pedestrian Paving: Deteriorated Brick Paving
Life Safety Pedestrian Paving 01/19/06 $12,136
Plumbing Fixtures: Drinking Fountains Replace
Accessibility Plumbing Fixtures 04/30/06 $23,215
2 - Within 1 to 2 Years Totals: $4,792,189
Requirement List Report
Page 4 of
Priority: 3 - Within 3 to 5 Years
Requirement Name Category Prime System Action Date Finish Date Cost
Ceiling Finishes: Aged Ceiling Tiles
Integrity Ceiling Finishes 01/19/07 $459,131
Communication and Security:
Clock System Obsolete
Functionality Communications and Security 04/28/07 $240,459
Communication and Security:
Public Address System Missing
Functionality Communications and Security 05/23/07 $452,330
Controls and Instrumentation:
Upgrade
Integrity Controls and Instrumentation 04/29/07 $985,497
Elec Serve and Dist: Aged Elevator Switchboard
Integrity Electrical Service and Distribution 04/28/07 $55,332
Electrical Service and Distribution:
Electrical Panels Aged
Integrity Electrical Service and Distribution 04/27/07 $410,730
Electrical Service and Distribution:
MCCs Aged
Integrity Electrical Service and Distribution 04/28/07 $264,464
Electrical Service and Distribution:
Transformers Aged
Integrity Electrical Service and Distribution 04/28/07 $237,581
Exterior Doors: Deteriorated Metal Doors
Integrity Exterior Doors 01/19/07 $11,235
Exterior Doors: Main Entrance Need Replacing
Integrity Exterior Doors 01/19/07 $88,082
Floor Finishes: Carpet Aged and Deteriorated
Integrity Floor Finishes 01/19/07 $1,701,571
Floor Finishes: Damaged Terrazzo Integrity Floor Finishes 01/19/07 $2,974
Lighting and Branch Wiring:
Missing Occupancy Sensors
Building Code Lighting and Branch Wiring 04/28/07 $21,173
Lighting and Branch Wiring:
Theatrical Fixtures Aged
Integrity Lighting and Branch Wiring 04/27/07 $225,458
Roofing: Aged and Damaged Membrane
Integrity Roofing 01/19/07 $271,187
Requirement List Report
Page 5 of
Superstructure: Deteriorated Garage Deck
Integrity Superstructure 01/19/07 $0
Wall Finishes: Marble Pointing Deteriorated
Integrity Wall Finishes 01/19/07 $25,286
3 - Within 3 to 5 Years Totals: $5,452,490
Priority: 4 - 5+ Years
Requirement Name Category Prime System Action Date Finish Date Cost
Boilers: End of Life Integrity Boilers 04/28/14 $498,066
Cooling Gen Systems: Aged Cooling Towers
Integr…