Exhibit_4_Performance_Evaluation_Factors_-_Commercial_Client.docx

DOCX document 48 KB Posted

Attached to
911 Federal Building Elevator Design Modernization Federal contract opportunity
Solicitation number
GS-10P-16-LT-R-9000
Issued by
General Services Administration Public Buildings Service Region 10

About this file

Exhibit 4 Performance Evaluation Factors - Commercial Client

View the file

Other files for this federal contract opportunity

Other files attached to 911 Federal Building Elevator Design Modernization, newest first.
File Type Posted
0_-_SF30_for_GS10P16LTR9000.pdf PDF
1_-_AMENDMENT_A006.docx DOCX document
2_-_GS10P16LTR9000_A006_Q A_24_May_2016.docx DOCX document
3_-_GS10P16LTR9000_A005_Q A_19_May_2016.docx DOCX document
2_-_GS-10P-16-LT-R-9000_DB_SOLICITATION_19_May_2016_(A005).docx DOCX document
Exhibit_5_911_Portland_Elevator_DB_SOW_19_MAY_2016_(A005).docx DOCX document
0_-_SF30_for_GS10P16LTR9000-1.pdf PDF
1_-_AMENDMENT_A005.docx DOCX document
Exhibit_1_Price_Services_Schedule_Amd_04_05_18_16.docx DOCX document
1_-_AMENDMENT_A004.docx DOCX document
0_-_SF30_for_GS10P16LTR9000.pdf PDF
2_-_GS10P16LTR9000_A003_Q A_17_May_2016_(Final).docx DOCX document
Freight_Elevator_Capacity_Label_-_A003.pdf PDF
1_-_AMENDMENT_A003_(Final).docx DOCX document
0_-_SF30_for_GS10P16LTR9000.pdf PDF
Passenger_Elevator_Capacity_Label-A003.pdf PDF
Exhibit_5_911_Portland_Elevator_DB_SOW_17_MAY_2016_(Final).docx DOCX document
Exhibit_7_-_Contruction_Wage_Determination_OR160029_04_22_2016_(Mod_4).pdf PDF
0_-_SF30_for_GS10P16LTR9000.pdf PDF
1_-_AMENDMENT_A002_-_Wording_(Rev_1).docx DOCX document
Exhibit_10_Elevator_Pit_Visit_-_911_(Rev_1)_(2).docx DOCX document
Site_Visit_Attendee_List_GS10P16LTR9000_Attended.docx DOCX document
GS10P16LTR9000_A001.pdf PDF
Exhibit_5_911_Portland_Elevator_DB_SOW_4.21.16.docx DOCX document
2_-_GS-10P-16-LT-R-9000_DB_SOLICITATION_(4.15.16).docx DOCX document
1-GS-10P-16-LT-R-9000_Cover_Page SF1442.docx DOCX document
0_-_GS-10P-16-LT-R-9000_DB_AGREEMENT_(4.15.16).docx DOCX document
911_DWGS.zip-10.zip ZIP file
911_DWGS.zip-9.zip ZIP file
911_DWGS.zip-7.zip ZIP file
911_DWGS.zip-6.zip ZIP file
911_DWGS.zip-4.zip ZIP file
911_DWGS.zip-3.zip ZIP file
911_DWGS.zip-2.zip ZIP file
911_DWGS.zip-1.zip ZIP file
911_CAD.zip ZIP file
Exhibit_9_Pre-Proposal_Conference_-_911.docx DOCX document
Exhibit_8a_2001_Asbestos_Survey_Report.pdf PDF
Exhibit_6_HSPD-12_Documents.pdf PDF
Exhibit_5_911_Portland_Elevator_Design_Build_SOW.docx DOCX document
Division_1.pdf PDF
Exhibit_6a_R10_OMA_HSPD12_FY16.pptx PPTX presentation
Exhibit_8b_2004.08_Portland_911_Final_Facility_Condition_Assessment_Report.pdf PDF
Exhibit_7_Construction_Wage_Determination_OR160029_04_1_2016.pdf PDF
Exhibit_7A_Representations_and_Certifications_2016.docx DOCX document
Exhibit_3_Sample_Key_Personnel_Resume_Format.docx DOCX document
Exhibit_1_Price_Services_Schedule.docx DOCX document
Exhibit_2_Project_Experience_Form.docx DOCX document
BLG_10.OR0033.pdf PDF
Exhibit_0_Read_Me_First_-_SBU_Document.docx DOCX document
Show all 50

911 Federal Building Elevator Design Modernization has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PBS PAST PERFORMANCE QUESTIONNAIRE

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. CONTRACTOR INFORMATION

Firm Name:

Address:

Phone Number:
DUNs Number:

Contact Name:

Email Address:
Contact Phone Number:

2. GENERAL WORK INFORMATION

Work performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Please explain):

Percent (%) of project work performed:

If a subcontractor, who was the prime (Name/Phone #):

3. CONTRACT INFORMATION

Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: |_| Firm Fixed Price |_| Cost Reimbursement |_| Other (Please explain)

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Original Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Schedule Change:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. PROJECT DESCRIPTION

Complexity of Work: |_|High |_| Med |_| Routine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

NOTE: PBS requests that the client complete this Questionnaire and submit it directly back to the offeror. The offeror will submit this completed Questionnaire to PBS with their proposal, and may duplicate this Questionnaire for future submission on PBS solicitations. Clients are highly encouraged to submit Questionnaires directly to the offeror. However, Questionnaires may be submitted directly to PBS. Please contact the offeror for PBS POC information. The Government reserves the right to verify any and all information on this form.

Use the following adjective ratings and definitions in your evaluation of the Contractor’s performance.

RATING
DEFINITION
NOTE
(E) Exceptional
Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good
Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory
Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

CLIENT INFORMATION

Client Information:

Name:

Title:

Phone Number:

Email Address:

Describe the client’s role in the project:

Date Questionnaire was completed (mm/dd/yy):

Client’s Signature:

Instructions: Please select the adjective rating and the Yes/No reply that best reflects your evaluation of the contractor’s performance.

1. QUALITY:
E VG S M U N
(a) Quality of technical data/report preparation efforts.
|_| |_| |_| |_| |_| |_|
(b) Ability to meet quality standards specified for technical performance.
|_| |_| |_| |_| |_| |_|
(c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.
|_| |_| |_| |_| |_| |_|
(d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance).
|_| |_| |_| |_| |_| |_|
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
E VG S M U N
(a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below.)
|_| |_| |_| |_| |_| |_|
(b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract.
|_| |_| |_| |_| |_| |_|
3. CUSTOMER SATISFACTION:
E VG S M U N
(a) To what extent were the end users satisfied with the project?
|_| |_| |_| |_| |_| |_|
(b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication).
|_| |_| |_| |_| |_| |_|
(c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
|_| |_| |_| |_| |_| |_|
(d) Overall customer satisfaction.
|_| |_| |_| |_| |_| |_|
4. MANAGEMENT/ PERSONNEL/LABOR
E VG S M U N
(a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
|_| |_| |_| |_| |_| |_|
(b) Ability to hire, apply, and retain a qualified workforce to this effort.
|_| |_| |_| |_| |_| |_|
(c) Government Property Control.
|_| |_| |_| |_| |_| |_|
(d) Knowledge/expertise demonstrated by contractor personnel.
|_| |_| |_| |_| |_| |_|
(e) Utilization of Small Business concerns.
|_| |_| |_| |_| |_| |_|
(f) Ability to simultaneously manage multiple projects with multiple disciplines.
|_| |_| |_| |_| |_| |_|
(g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes.
|_| |_| |_| |_| |_| |_|
(h) Effectiveness of overall management (including ability to effectively lead, manage and control the program).
|_| |_| |_| |_| |_| |_|
5. COST/FINANCIAL MANAGEMENT
E VG S M U N
(a) Ability to meet the terms and conditions within the contractually agreed price(s)?
|_| |_| |_| |_| |_| |_|
(b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client.
|_| |_| |_| |_| |_| |_|
(c) If this is/was a Government cost type contract, or a CMc/CMc at Risk Contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns).
|_| |_| |_| |_| |_| |_|
(d) Is the Contractor’s accounting system adequate for management and tracking of costs? (If no, please explain in comment section below.)
|_| Yes |_| No
(e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? (Indicate if show cause or cure notices were issued, or any default action in comment section below.)
|_| Yes |_| No
(f) Have there been any indications that the contractor has had any financial problems? (If yes, please explain in the comment section below.)
|_| Yes |_| No
6. SAFETY/SECURITY
E VG S M U N
(a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.).
|_| |_| |_| |_| |_| |_|
(b) Contractor complied with all security requirements for the project and personnel security requirements.
|_| |_| |_| |_| |_| |_|

7. SUSTAINABILITY

Were sustainability methods, processes, or materials incorporated into the project? (If yes, please explain in the comments section below.)
|_| Yes |_| No
8. GENERAL
E VG S M U N
(a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
|_| |_| |_| |_| |_| |_|
(b) Compliance with contractual terms/provisions (If there were specific issues, please explain in the comments sections below.)
|_| |_| |_| |_| |_| |_|
(c) Would you hire or work with this firm again? (If no, please explain in the comments section below.)
|_| Yes |_| No
(d) In summary, provide an overall rating for the work performed by this contractor.
|_| |_| |_| |_| |_| |_|

COMMENTS SECTION

Please provide additional information below, and attach additional pages if necessary.

Please provide responses to the above questions (if applicable) and/or additional remarks. Also please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

File details come from the government source that posted it. Updated .