2_-_GS10P16LTR9000_A003_Q A_17_May_2016_(Final).docx

DOCX document 30 KB Posted

Attached to
911 Federal Building Elevator Design Modernization
Solicitation number
GS-10P-16-LT-R-9000
Issued by

About this file

Amendment 003 Q A Responses

View the file

Other files

File Type Posted
2_-_GS10P16LTR9000_A006_Q A_24_May_2016.docx DOCX document
1_-_AMENDMENT_A006.docx DOCX document
0_-_SF30_for_GS10P16LTR9000.pdf PDF
2_-_GS-10P-16-LT-R-9000_DB_SOLICITATION_19_May_2016_(A005).docx DOCX document
3_-_GS10P16LTR9000_A005_Q A_19_May_2016.docx DOCX document
Exhibit_5_911_Portland_Elevator_DB_SOW_19_MAY_2016_(A005).docx DOCX document
0_-_SF30_for_GS10P16LTR9000-1.pdf PDF
1_-_AMENDMENT_A005.docx DOCX document
Exhibit_1_Price_Services_Schedule_Amd_04_05_18_16.docx DOCX document
1_-_AMENDMENT_A004.docx DOCX document
0_-_SF30_for_GS10P16LTR9000.pdf PDF
Freight_Elevator_Capacity_Label_-_A003.pdf PDF
0_-_SF30_for_GS10P16LTR9000.pdf PDF
1_-_AMENDMENT_A003_(Final).docx DOCX document
Passenger_Elevator_Capacity_Label-A003.pdf PDF
Exhibit_5_911_Portland_Elevator_DB_SOW_17_MAY_2016_(Final).docx DOCX document
Exhibit_10_Elevator_Pit_Visit_-_911_(Rev_1)_(2).docx DOCX document
0_-_SF30_for_GS10P16LTR9000.pdf PDF
Exhibit_7_-_Contruction_Wage_Determination_OR160029_04_22_2016_(Mod_4).pdf PDF
1_-_AMENDMENT_A002_-_Wording_(Rev_1).docx DOCX document
Exhibit_5_911_Portland_Elevator_DB_SOW_4.21.16.docx DOCX document
Site_Visit_Attendee_List_GS10P16LTR9000_Attended.docx DOCX document
GS10P16LTR9000_A001.pdf PDF
0_-_GS-10P-16-LT-R-9000_DB_AGREEMENT_(4.15.16).docx DOCX document
1-GS-10P-16-LT-R-9000_Cover_Page SF1442.docx DOCX document
2_-_GS-10P-16-LT-R-9000_DB_SOLICITATION_(4.15.16).docx DOCX document
911_DWGS.zip-10.zip ZIP file
911_DWGS.zip-9.zip ZIP file
911_DWGS.zip-7.zip ZIP file
911_DWGS.zip-6.zip ZIP file
911_DWGS.zip-5.zip ZIP file
911_DWGS.zip-4.zip ZIP file
911_DWGS.zip-3.zip ZIP file
911_DWGS.zip-2.zip ZIP file
911_DWGS.zip-1.zip ZIP file
911_CAD.zip ZIP file
Exhibit_9_Pre-Proposal_Conference_-_911.docx DOCX document
Exhibit_7A_Representations_and_Certifications_2016.docx DOCX document
Exhibit_5_911_Portland_Elevator_Design_Build_SOW.docx DOCX document
Division_1.pdf PDF
Exhibit_8a_2001_Asbestos_Survey_Report.pdf PDF
Exhibit_4_Performance_Evaluation_Factors_-_Commercial_Client.docx DOCX document
Exhibit_6a_R10_OMA_HSPD12_FY16.pptx PPTX presentation
Exhibit_8b_2004.08_Portland_911_Final_Facility_Condition_Assessment_Report.pdf PDF
Exhibit_6_HSPD-12_Documents.pdf PDF
Exhibit_7_Construction_Wage_Determination_OR160029_04_1_2016.pdf PDF
Exhibit_0_Read_Me_First_-_SBU_Document.docx DOCX document
BLG_10.OR0033.pdf PDF
Exhibit_3_Sample_Key_Personnel_Resume_Format.docx DOCX document
Exhibit_2_Project_Experience_Form.docx DOCX document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL SERVICES ADMINISTRATION

Public Buildings Service – Northwest/Arctic Region 10 Construction Acquisition Division (10PQC)

QUESTIONS AND ANSWERS

Solicitation Number: GS10-P-16-LT-R-9000 Title of Project: 911 Federal Building Design Build Elevator Modernization Date: 17 May 2016 Amendment 003

The following questions were received through 13 May 2016.

Q5. Under item 2 “Scope of Services”, it specifies that new Safeties and Car Frame are required. Are these items required for both the Passenger and Service car? The reason I ask is because under item 2.1 (passenger elevators) it does not request new Safeties and Car Frame. However, under 2.2 (freight elevator) it does call out for new Safeties and Car Frame.

A5. Installation of new safeties and car frames is optional and is not a contract requirement for both passenger and freight elevators; however, the awarded contractor will be responsible to warrant all re-used existing equipment same as new and will be part of acceptance testing. Item 2 in the SOW is revised accordingly.

Q6. Under item 2.1 3rd sentence is says that the elevators are 300 FPM and 3000# capacity. They are actually 400 FPM and 3500# capacity (see photo of data tag from the car top).

A6. Noted and corrected. The Statement of Work has been updated to reflect the current conditions. See page 10, Section 2.1 Passenger Elevators and page 11 2.2 Freight Elevators for changes.

Q7. Under item 2.1 the seventh sentence calls out for Destination Dispatch System. Is the for Destination Dispatch System part of the base bid and would you like a Conventions System (Stander up/down hall buttons) as an alternate?

A7. Destination Dispatch is prescribed in the SOW as the required system. GSA does not wish to see any alternatives presented.

Q8. Under item 2.2 (Freight Elevator), the second sentence calls out for a Gearless Elevator. The existing system is a Geared Elevator and is a better candidate for a 7000# capacity elevator. Would you like an alternate price for a Geared Elevators?

A8. Corrected, removed gearless as a requirement. Proposal submission can be either geared or gearless. Statement of Work page 11, Section 2.2 has been updated to show correction.