Exhibit_8a_2001_Asbestos_Survey_Report.pdf

PDF 2 MB Posted

Attached to
911 Federal Building Elevator Design Modernization Federal contract opportunity
Solicitation number
GS-10P-16-LT-R-9000
Issued by
General Services Administration Public Buildings Service Region 10

About this file

Exhibit 8a 2001 Asbestos Survey Report

View the file

Other files for this federal contract opportunity

Other files attached to 911 Federal Building Elevator Design Modernization, newest first.
File Type Posted
0_-_SF30_for_GS10P16LTR9000.pdf PDF
1_-_AMENDMENT_A006.docx DOCX document
2_-_GS10P16LTR9000_A006_Q A_24_May_2016.docx DOCX document
2_-_GS-10P-16-LT-R-9000_DB_SOLICITATION_19_May_2016_(A005).docx DOCX document
1_-_AMENDMENT_A005.docx DOCX document
Exhibit_5_911_Portland_Elevator_DB_SOW_19_MAY_2016_(A005).docx DOCX document
0_-_SF30_for_GS10P16LTR9000-1.pdf PDF
3_-_GS10P16LTR9000_A005_Q A_19_May_2016.docx DOCX document
1_-_AMENDMENT_A004.docx DOCX document
0_-_SF30_for_GS10P16LTR9000.pdf PDF
Exhibit_1_Price_Services_Schedule_Amd_04_05_18_16.docx DOCX document
Freight_Elevator_Capacity_Label_-_A003.pdf PDF
1_-_AMENDMENT_A003_(Final).docx DOCX document
0_-_SF30_for_GS10P16LTR9000.pdf PDF
Passenger_Elevator_Capacity_Label-A003.pdf PDF
Exhibit_5_911_Portland_Elevator_DB_SOW_17_MAY_2016_(Final).docx DOCX document
2_-_GS10P16LTR9000_A003_Q A_17_May_2016_(Final).docx DOCX document
0_-_SF30_for_GS10P16LTR9000.pdf PDF
1_-_AMENDMENT_A002_-_Wording_(Rev_1).docx DOCX document
Exhibit_10_Elevator_Pit_Visit_-_911_(Rev_1)_(2).docx DOCX document
Exhibit_7_-_Contruction_Wage_Determination_OR160029_04_22_2016_(Mod_4).pdf PDF
Site_Visit_Attendee_List_GS10P16LTR9000_Attended.docx DOCX document
GS10P16LTR9000_A001.pdf PDF
Exhibit_5_911_Portland_Elevator_DB_SOW_4.21.16.docx DOCX document
1-GS-10P-16-LT-R-9000_Cover_Page SF1442.docx DOCX document
0_-_GS-10P-16-LT-R-9000_DB_AGREEMENT_(4.15.16).docx DOCX document
2_-_GS-10P-16-LT-R-9000_DB_SOLICITATION_(4.15.16).docx DOCX document
911_DWGS.zip-10.zip ZIP file
911_DWGS.zip-9.zip ZIP file
911_DWGS.zip-7.zip ZIP file
911_DWGS.zip-6.zip ZIP file
911_DWGS.zip-5.zip ZIP file
911_DWGS.zip-4.zip ZIP file
911_DWGS.zip-3.zip ZIP file
911_DWGS.zip-2.zip ZIP file
911_DWGS.zip-1.zip ZIP file
911_CAD.zip ZIP file
Exhibit_5_911_Portland_Elevator_Design_Build_SOW.docx DOCX document
Division_1.pdf PDF
Exhibit_6a_R10_OMA_HSPD12_FY16.pptx PPTX presentation
Exhibit_8b_2004.08_Portland_911_Final_Facility_Condition_Assessment_Report.pdf PDF
Exhibit_3_Sample_Key_Personnel_Resume_Format.docx DOCX document
Exhibit_1_Price_Services_Schedule.docx DOCX document
Exhibit_2_Project_Experience_Form.docx DOCX document
BLG_10.OR0033.pdf PDF
Exhibit_0_Read_Me_First_-_SBU_Document.docx DOCX document
Exhibit_7_Construction_Wage_Determination_OR160029_04_1_2016.pdf PDF
Exhibit_7A_Representations_and_Certifications_2016.docx DOCX document
Exhibit_4_Performance_Evaluation_Factors_-_Commercial_Client.docx DOCX document
Exhibit_6_HSPD-12_Documents.pdf PDF
Show all 50

911 Federal Building Elevator Design Modernization has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS

SURVEY REPORT

For

911 BUILDING

General Information 1.1 Inspection Summary 1.2 Photographs 2.1 Asbestos Survey Drawing ASB.1 Sample Inventories 3.1 Laboratory Data Not Numbered AHERA Certificates Not Numbered NVLAP Certificates Not Numbered

Prepared By

May 2001

PBS ENVIRONMENTAL

1220 SW Morrison St. #600

Portland, OR 97205

(503) 248-1939

PBS Project No. 15273.016

GENERAL INFORMATIONGeneral Services Administration

911 NE 11th Avenue

BUILDING DATA

911 Building

Portland, OR

CLIENT DATA

General Services Administration Project Services, 10PC Auburn, WA 98001-6599

• The type, location and approximate quantity of suspect asbestos-containing materials;

• Bulk sampling of selected suspect building materials;

• Laboratory analytical data of bulk materials sampled

SURVEY SCOPE

PBS endeavored to locate all the suspect asbestos-containing materials in the building; however, suspect asbestos-containing materials may be present concealed within wall, ceiling, or floor spaces. If suspect materials are uncovered during demolition activities that are not identified in this report, testing should be performed prior to impact.

PBS has conducted a physical inspection of the building, compiled this report consistent with the survey scope, and certifies that the information is correct and accurate within the standards of professional quality and contractual obligations.

PBS Engineering and Environmental has performed a general asbestos survey of accessible building areas in accordance with OSHA in 29 CFR 1910.1001 and compiled a report with the following information:

911 Building1.1 January 2004 PBS Project No: 15273.016

Rich DufresneRon Petti

IR-03-1084MPR-02-2680

DateSignature

Project Manager Prime Inspector

DateSignature

Accreditation #: Accreditation #:

PBS Engineering and Environmental

INSPECTION SUMMARYGeneral Services Administration

The following materials tested negative based on ASHARA sampling minimums and testing by NVLAP participating laboratories.

Although no asbestos was detected, it is possible that further sampling could indicate asbestos content. It may be prudent to test prior to impact through demolition, renovation, etc.

4/26/2001 Rich Dufrense 4/27/2001 Rich Dufresne

DATES SURVEYED BY ACTIVITY

Inspect and Sample Inspect and Sample

PBS Engineering and Environmental has investigated accessible areas inside of the building(s) to locate suspect asbestos-containing building materials (ACBM). Suspect materials may be present in concealed areas (e.g. behind walls and under carpet). The findings are listed below.

ASBESTOS MATERIALS

The following materials either tested positive, or, based on the experience of PBS field personnel, were not tested and should be considered asbestos-containing. Materials that had mixed results are considered positive. Materials not sampled may not contain asbestos and should be tested to verify asbestos content prior to impact through demolition, renovation, etc.

(+) Tested Positive, (M) Mixed Results, (P) Presumed Positive, (T) Previously Tested Positive.

Approx. Quantit

MATERIALS WHICH TESTED NEGATIVE FOR ASBESTOS

Type Material Location

Material Location

East and West Stairwell Landings, Mechanical rooms.

Floor Coating(+)

Microwave Equip.

Room, Sub-Basement Break Room, Closets, Electrical Rooms.

Vinyl Floor Tile(+)

3 EABasement Fan Room, Elevator Shaft

Hard Fittings/Fiberglass(P)

200 SFElevator Equipment Room

Electrical Mounting Boards(+)

1,000 SFBlack Coating on Exterior of Elevator Cars

Coating(+)

10 EAElevator Equipment Room, on Elevator Hoists

Brake Pads(+)

Lining Inside Elevator Doors

Fire Door Lining(+)

Gypsum and Plaster Walls and Ceilings Throughout Lay-in Ceiling Tile Throughout Sprayed Fibrous Fireproofing Basement levels Troweled-on Fireproofing Throughout

911 Building1. 2 January 2004 PBS Project No: 15273.016

Asbestos bulk samples obtained from these buildings were collected by an EPA AHERA accredited inspector and analyzed using Polarized Light Microscopy (PLM) with dispersion staining. The results of the analysis are presented in a separate section of this report. See the inspection summary for additional information.

Various types of Vinyl Floor Tile Storage Rooms, Basement Rooms

911 Building1. 3

FINDINGS

ASBESTOS SUMMARY

During the period from April 26, 2001 through May 15, 2001, PBS Environmental performed an asbestos-containing materials investigation of the 911 Building located at 911 NE 11th Avenue in Portland, Oregon.

Bulk samples of all accessible suspect asbestos-containing materials were collected by an EPA- AHERA accredited inspector and analyzed by an NVLAP certified laboratory using Polarized Light Microscopy (PLM). No destructive investigation was performed during this inspection.

PBS endeavored to locate and sample all accessible suspect asbestos materials. However, hidden or concealed suspect materials may exist. Materials may exist in areas of the building that were not investigated in the scope of this survey. If concealed suspect asbestos materials are discovered during renovation activities that are not identified in this report, destructive sampling should be performed prior to impacting.

The building reportedly underwent a major renovation during the mid-eighties. During the renovation, the majority of asbestos-containing materials were removed. PBS reviewed prior asbestos survey reports and asbestos abatement drawings to aid in completion of this survey.

Sample data from existing surveys that was used to complete this survey is not included in this report.

Floor coating located in the penthouse mechanical rooms and in the east and west stairwell landings tested positive for asbestos. The floor coating is in poor condition in the stairs. It is chipping and flaking from wear. The material is covered with a heavy coat of paint in the mechanical room areas.

Floor tile in various locations in the building tested positive for asbestos. Asbestos-containing floor tile is located in the penthouse microwave equipment room. The mastic in this room tested negative for asbestos; the T/E rooms on each floor under elevated cable floor; and in the break room on the sub-basement Mezzanine under carpet. Remnant, Red 9 inch floor tile presumed to be asbestos-containing was also identified inside the east and west electrical closets on each floor. All floor tile was observed non-friable and in good condition. It is possible that floor tile exists under the elevated cable floors in the office spaces of the building. The interstitial space under the cable floors was not inspected except where the floors were found exposed.

Hard fitting pipe insulation was identified in two remote locations in the building. The hard fittings are located in the freight elevator shaft at the eighth floor level and in a fan room in the basement. The pipe insulation was not sampled, but is presumed to be asbestos-containing.

Black electrical equipment mounting boards located in the elevator equipment room are asbestos-containing. The boards are inside the electrical cabinets, are ¼ to ¾ inch thick and are non-friable.

An asbestos-containing coating was identified on the exterior of the elevator cars. The coating

911 Building1. 4 material is a non-friable, tar-like material applied to the sheet metal as a sound dampener.

Brake pads on the elevator hoists in the penthouse elevator mechanical room tested positive for asbestos. The brake pads are non-friable and brake dust is present on the hoists.

The elevator doors are lined with an asbestos-containing insulation. The door linings are friable and are enclosed inside the steel doors.

Refer to the Asbestos Survey Drawing and Laboratory Data for additional information.

911 Building1. 5

911 BUILDING ASBESTOS SURVEY PHOTO DOCUMENTATION

PBS Project #15273.016

PHOTO 1: ASBESTOS-CONTAINING HARD FITTING ON FIBERGLASS

PIPE INSULATION

PHOTO 2: ASBESTOS-CONTAINING COATING ON CONCRETE IN STAIRWELLS

PHOTO 3: ASBESTOS-CONTAINING VINYL FLOOR TILE IN PENTHOUSE

MICROWAVE EQUIPMENT ROOM

PHOTO 4: ASBESTOS-CONTAINING VINYL FLOOR TILE LOCATED UNDER THE

ELEVATED CABLE FLOOR IN ELECTRICAL T/E ROOMS

PHOTO 5 ASBESTOS-CONTAINING REMNANT FLOOR TILE IN ELECTRICAL CLOSETS

PHOTO 6: ASBESTOS-CONTAINING VINYL FLOOR TILE UNDER CARPET

PHOTO 7: ASBESTOS-CONTAINING ELEVATOR BRAKE PADS ON ELEVATOR HOISTS

PHOTO 8: ASBESTOS CONTAINING ELECTRICAL MOUNTING BOARDS LOCATED

IN THE PENTHOUSE MECHANICAL ROOM

INVENTORY OF ASBESTOS SAMPLES

LEGEND ASBESTOS SAMPLE SYMBOLS

MAY 2001

AS-1

1 OF 1215273.016

ASBESTOS SURVEY

BU

IL

D

IN

G

PO

RT

LA

N D

, O

RE

G O

N

A

SB

E

ST

O S

SU

RV

E Y

P

LA

N

SCALE: 1/16" = 1'-0"

SUB-BASEMENT

ASBESTOS SAMPLE SYMBOLSLEGEND

MAY 2001

AS-2

2 OF 1215273.016

ASBESTOS SURVEY

BU

IL

D

IN

G

PO

RT

LA

N D

, O

RE

G O

N

A

SB

E

ST

O S

SU

RV

E Y

P

LA

N

SCALE: 1" = 40'

BASEMENT

MAY 2001

AS-3

3 OF 1215273.016

ASBESTOS SURVEY

BU

IL

D

IN

G

PO

RT

LA

N D

, O

RE

G O

N

A

SB

E

ST

O S

SU

RV

E Y

P

LA

N

SCALE: 1" = 40'

FIRST FLOOR

MAY 2001

AS-4

4 OF 1215273.016

ASBESTOS SURVEY

BU

IL

D

IN

G

PO

RT

LA

N D

, O

RE

G O

N

A

SB

E

ST

O S

SU

RV

E Y

P

LA

N

SCALE: 1" = 40'

SECOND FLOOR

MAY 2001

AS-5

5 OF 1215273.016

ASBESTOS SURVEY

BU

IL

D

IN

G

PO

RT

LA

N D

, O

RE

G O

N

A

SB

E

ST

O S

SU

RV

E Y

P

LA

N

SCALE: 1" = 40'

THIRD FLOOR

MAY 2001

AS-6

6 OF 1215273.016

ASBESTOS SURVEY

BU

IL

D

IN

G

PO

RT

LA

N D

, O

RE

G O

N

A

SB

E

ST

O S

SU

RV

E Y

P

LA

N

SCALE: 1" = 40'

FOURTH FLOOR

MAY 2001

AS-7

7 OF 1215273.016

ASBESTOS SURVEY

BU

IL

D

IN

G

PO

RT

LA

N D

, O

RE

G O

N

A

SB

E

ST

O S

SU

RV

E Y

P

LA

N

SCALE: 1" = 40'

FIFTH FLOOR

MAY 2001

AS-8

8 OF 1215273.016

ASBESTOS SURVEY

BU

IL

D

IN

G

PO

RT

LA

N D

, O

RE

G O

N

A

SB

E

ST

O S

SU

RV

E Y

P

LA

N

SCALE: 1" = 40'

SIXTH FLOOR

MAY 2001

AS-9

9 OF 1215273.016

ASBESTOS SURVEY

BU

IL

D

IN

G

PO

RT

LA

N D

, O

RE

G O

N

A

SB

E

ST

O S

SU

RV

E Y

P

LA

N

SCALE: 1" = 40'

SEVENTH FLOOR

MAY 2001

AS-10

10 OF 1215273.016

ASBESTOS SURVEY

BU

IL

D

IN

G

PO

RT

LA

N D

, O

RE

G O

N

A

SB

E

ST

O S

SU

RV

E Y

P

LA

N

SCALE: 1" = 40'

EIGHTH FLOOR

LEGEND

MAY 2001

AS-11

11 OF 1215273.016

ASBESTOS SURVEY

BU

IL

D

IN

G

PO

RT

LA

N D

, O

RE

G O

N

A

SB

E

ST

O S

SU

RV

E Y

P

LA

N

SCALE: 1/16" = 1'-0"

911 BUILDING

PENTHOUSE

PENTHOUSE AND

MEZZANINE

LEGEND

MAY 2001

AS-12

12 OF 1215273.016

ASBESTOS SURVEY

BU

IL

D

IN

G

PO

RT

LA

N D

, O

RE

G O

N

A

SB

E

ST

O S

SU

RV

E Y

P

LA

N

SCALE: 1/8" = 1'-0"

911 BUILDING

ELEVATOR CAB

DIAGRAM

BULK SAMPLE INVENTORY

Code Material Location Lab

General Services Administration

8th floor storage; 12" tan with black

NVL Labs, Inc.

15273.016-0001 Vinyl Floor Tile (1) No Asbestos Detected (Brown vinyl tile) Analysis:

8th floor, computer room; 2' x 4' ceiling tile, random fissure, pin perf.

NVL Labs, Inc.

15273.016-0002 Lay-in Ceiling Tile No Asbestos Detected (Grey fibrous material w/paint)

Analysis:

8th floor, west office; 2' x 4' ceiling tile, random fissure, pin perf.

15273.016-0003 Lay-in Ceiling Tile No Asbestos Detected (Grey fibrous material

15273.016-0004 Lay-in Ceiling Tile No Asbestos Detected (Grey fibrous material

15273.016-0005 Lay-in Ceiling Tile No Asbestos Detected (Grey fibrous material

Floor coating in stair well

15273.016-0006 Coating 2% Chrysotile (Gray/tan brittle material) Analysis:

7th floor, west office; 2' x 4' ceiling tile, random fissure, pin perf.

15273.016-0007 Lay-in Ceiling Tile No Asbestos Detected (Grey fibrous material

2.1January 2004 911 Building

PBS Project No: 15273.016

Code Material Location Lab

General Services Administration

7th floor, center office; 2' x 4' ceiling tile, random fissure, pin perf.

NVL Labs, Inc.

15273.016-0008 Lay-in Ceiling Tile No Asbestos Detected (Grey fibrous material

7th floor above ceiling; Troweled-on fireproofing

15273.016-0009 Troweled-on Fireproofing No Asbestos Detected (White brittle material) Analysis:

East stairs; Floor coating in stair well

15273.016-0010 Coating 2% Chrysotile (Tan/gray brittle material) Analysis:

6th floor, library; 2' x 4' ceiling tile, random fissure, pin perf.

15273.016-0011 Lay-in Ceiling Tile No Asbestos Detected (Grey fibrous material

6th floor, west office; 2' x 4' ceiling tile, random fissure, pin perf.

15273.016-0012 Lay-in Ceiling Tile No Asbestos Detected (Grey fibrous material

6th floor, west telephone closet; Troweled-on fireproofing

15273.016-0013 Troweled-on Fireproofing No Asbestos Detected (Tan brittle material

6th floor, west telephone closet; Old plaster above ceiling

15273.016-0014 Wall and Ceiling Plaster No Asbestos Detected (Tan brittle material

2.2January 2004

Code Material Location Lab

General Services Administration

West stairs, 6th floor; Floor coating in stair well

NVL Labs, Inc.

15273.016-0015 Coating 2% Chrysotile (Tan/gray brittle material) Analysis:

5th floor, west office; 2' x 4' ceiling tile, random fissure, pin perf.

15273.016-0016 Lay-in Ceiling Tile No Asbestos Detected (Gray fibrous material

4th floor, west office; 2' x 4' ceiling tile, random fissure, pin perf.

15273.016-0017 Lay-in Ceiling Tile No Asbestos Detected (Gray fibrous material

4th floor, east office; 2' x 4' ceiling tile, random fissure, pin perf.

15273.016-0018 Lay-in Ceiling Tile No Asbestos Detected (Gray fibrous material

West stairs, level 3; Ceiling plaster

15273.016-0019 Wall and Ceiling Plaster No Asbestos Detected (White sandy brittle material)

3rd floor, east office; Debris inside radiator

15273.016-0020 Troweled-on Fireproofing No Asbestos Detected (Tan brittle material) Analysis:

Room 241; 2' x 4' ceiling tile, random fissure, pin perf.

15273.016-0021 Lay-in Ceiling Tile No Asbestos Detected (Gray fibrous material

2.3January 2004

Code Material Location Lab

General Services Administration

1st floor lobby; 2' x 4' ceiling tile, random fissure, pin perf.

NVL Labs, Inc.

15273.016-0022 Lay-in Ceiling Tile No Asbestos Detected (Gray fibrous material

1st floor lobby; 2' x 4' ceiling tile, random fissure, pin perf.

15273.016-0023 Lay-in Ceiling Tile No Asbestos Detected (Gray fibrous material

1st floor corridor, near C.U.; 2' x 4' ceiling tile, randome fissure, pin perf.

15273.016-0024 Lay-in Ceiling Tile No Asbestos Detected (Gray fibrous material

1st floor storage; 2' x 4' ceiling tile, random fissure, pin perf.

15273.016-0025 Lay-in Ceiling Tile No Asbestos Detected (Gray fibrous material

1st floor snack bar; 2' x 4' ceiling tile, random fissure, pin perf.

15273.016-0026 Lay-in Ceiling Tile No Asbestos Detected (Gray fibrous material

Auditorium; 12" white floor tile

15273.016-0027 Vinyl Floor Tile No Asbestos Detected (Off-white vinyl tile) Analysis:

Basement parking; Sprayed-on fireproofing

15273.016-0028 Troweled-on Fireproofing No Asbestos Detected (Tan brittle material

2.4January 2004

Code Material Location Lab

General Services Administration

Basement parking; Sprayed-on fireproofing

NVL Labs, Inc.

15273.016-0029 Troweled-on Fireproofing No Asbestos Detected (Tan brittle material

15273.016-0030 Troweled-on Fireproofing No Asbestos Detected (Tan brittle material

15273.016-0031 Troweled-on Fireproofing No Asbestos Detected (Tan brittle material

15273.016-0032 Troweled-on Fireproofing No Asbestos Detected (Tan brittle material

Basement storage area; Troweled-on fireproofing

15273.016-0033 Troweled-on Fireproofing No Asbestos Detected (White brittle material

15273.016-0034 Troweled-on Fireproofing No Asbestos Detected (White brittle material

15273.016-0035 Troweled-on Fireproofing No Asbestos Detected (White brittle material

2.5January 2004

Code Material Location Lab

General Services Administration

Sub-basement, stairs; Wall plaster

NVL Labs, Inc.

15273.016-0036 Wall and Ceiling Plaster No Asbestos Detected (White sandy brittle material)

SBM, break room; Floor tile under carpet

15273.016-0037 Vinyl Floor Tile 5% Chrysotile (Brown vinyl tile) Analysis:

7% Chrysotile (Black mastic)

Basement mail room; 12" white floor tile

NVL Labs, Inc.

15273.016-0038 Vinyl Floor Tile No Asbestos Detected (White vinyl tile) Analysis:

Basement Boiler Room; Troweled-on fireproofing

15273.016-0039 Troweled-on Fireproofing No Asbestos Detected (White brittle material

15273.016-0040 Troweled-on Fireproofing No Asbestos Detected (White brittle material

15273.016-0041 Troweled-on Fireproofing No Asbestos Detected (White brittle material

15273.016-0042 Troweled-on Fireproofing No Asbestos Detected (White brittle material

2.6January 2004

Code Material Location Lab

General Services Administration

Basement storage area; Remnant ceiling tile mastic dots

NVL Labs, Inc.

15273.016-0043 Mastic No Asbestos Detected (Gray fibrous material) Analysis:

No Asbestos Detected (Brown mastic)

Basement storage area; Remnant ceiling tile mastic dots

NVL Labs, Inc.

15273.016-0044 Mastic No Asbestos Detected (Gray fibrous material) Analysis:

No Asbestos Detected (Brown mastic)

2.7January 2004 911 Building

04/06/200204/06/2001

ASBESTOS INSPECTOR REFRESHER

HAS SUCCESSFULLY COMPLETED THE TRAINING COURSE

Course Date: Expiration Date:

Certificate: IR-01-1084

THIS IS TO CERTIFY THAT

for

Portland, ORCourse Location:

For verification of the authenticity of this certificate contact: PBS Environmental 4412 SW Corbett Avenue, Portland, OR 97239

(503) 248-1939

Dave Stover, Director of Training

RICH A. DUFRESNE

In accordance with TSCA Title II, Part 763, Subpart E, Appendix C of 40 CFR

AHERA is the Asbestos Hazard Emergency Response Act enacting Title II of Toxic Substance Control Act (TSCA)

File details come from the government source that posted it. Updated .