Amend_010_Add_No._2.pdf

PDF 20 KB Posted

Attached to
Richland Federal Building Electrical Upgrade Federal contract opportunity
Solicitation number
GS-10P-14-LT-R-0047
Issued by
General Services Administration Public Buildings Service Region 10

About this file

Amendment 010 (SF30)

View the file

Other files for this federal contract opportunity

Other files attached to Richland Federal Building Electrical Upgrade, newest first.
File Type Posted
Addendum_No._2.pdf PDF
Exhibit_1_R2_Pricing_Schedule_DB_Richland_FB_Elec.xlsx XLSX spreadsheet
Atch4R3_WA_30_7.24.2015.pdf PDF
Amend_009_35__Design_Addendum_01.pdf PDF
Atch4R2_WD_WA30_07.10.15_DB_Richland_FB_Elec.pdf PDF
PANEL_SCHEDULE_CHART_Q A.xlsx XLSX spreadsheet
Atch1d_Addendum_01_to_35__design.pdf PDF
Amend_008.pdf PDF
Pre-proposal_Conf_slides.pdf PDF
Amend_008_Q A.pdf PDF
Pre-proposal_Conf_Attendees.pdf PDF
Exhibit_6_-_SBU_Form.docx DOCX document
Amend_007_SBU.pdf PDF
Amend_006_RFP_35__Design.pdf PDF
Atch_4_R1_WD_WA30_6.12.15_DB_Richland_FB_Elec.pdf PDF
CoverPage_ _1442_DB_Richland_FB_Elec.pdf PDF
Exhibit_1_R1_Pricing_Schedule_DB_Richland_FB_Elec.xlsx XLSX spreadsheet
The_Agreement_R1__DB_Richland_FB_Elec.pdf PDF
The_Solicitation_R1_DB_Richland_FB_Elec.pdf PDF
Amend_005_RFP_Status_Update.pdf PDF
Amend_004_RFP_Closing_Date_Suspended.pdf PDF
Amend_003_RFP_Closing_Date_Extension.pdf PDF
Amendment_002.pdf PDF
Amend_001_Pre-Proposal_Conf.pdf PDF
Atch_4_WD_WA30_9.19.14_DB_Richland_FB_Elec.pdf PDF
Exhibit_5_SF_24-98_DB_Richald_FB_Elec.pdf PDF
Atch_1_SOW_DB_Richland_FB_Elec.pdf PDF
The_Agreement__DB_Richland_FB_Elec.pdf PDF
Reps.Certs_DB_Richald_FB_Elec.pdf PDF
Exhibit_4_-_Security__DB_Richland_FB_Elec.zip ZIP file
The_Solicitation_DB_Richland_FB_Elec.pdf PDF
Exhibit_3_Performance_Evaluation_Form_DB_Richland_FB_Elec.docx DOCX document
Exhibit_1_Pricing_Schedule_DB_Richland_FB_Elec.xlsx XLSX spreadsheet
Atch_3_Historic_Preservation_DB_Richland_FB_Elec.pdf PDF
Atch_2_Div_1_DB_Richland_FB_Elec.pdf PDF
Atch_1a_PDS__DB_Richland_FB_Elec.pdf PDF
Exhibit_2_Resume_Format_DB_Richland_FB_Elec.docx DOCX document
CoverPage_ _1442__DB_Richland_FB_Elec.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States of America

(Signature of Contracting Officer)

16C. Date Signed

(Signature of person authorized to sign)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. Contract ID Code Page of Pages

1 2

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable)

010 07/30/2015 10PCP-14-0066

6. Issued By Code 10PCQ 7. Administered By (If other than Item 6) Code

GSA PBS Region 10, Regional Office Same as block 6

Design & Construction Division

400 15th Street SW

Auburn, WA 98001-6599

8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.

GS-10P-14-LT-R-0047

9B. Date (See Item 11)

Oct 17, 2014 10A. Modification of Contract/Order No.

10B. Date (See Item 13)

Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended X is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-

MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT

IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor x is not, is required to sign this document and return 3 copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Design Build Richland FB Electrical Upgrade

A. The purpose of this Amendment is to (1)issue Addendum No. 2 to 35% design documents, (2) Revise Exhibit 1, Pricing Schedule and (3) Incoproate a revised Wage Determination.

SF30 Continuation of Block Narrative Page 2 of 2

B. Addenum No. 2 to 35% design dated 7/30/2015 is hereby incorporated and reflects the design changes resulting from the panel schedule questions and answers released under Amendment 9. Offerors are instructed to replace only those sheets affected by the change (pages that contain the same number).

C. Exhibit 1R1_Pricing Schedule is deleted in its entirety and replaced with the attached Exhibit 1R2_Pricing Schedule. This pricing schedule corrects the period of performane range on the Total Evaluated Price Worksheet to account for the full period of performance identified in ‘The Agreement”, paragraph I.C which equals a total of 810 calendar days (750 calendar days for Substantial Completion and 60 calendar days for Contract Completion).

D. A Revised Wage Determination is incorporated. Atch4R2_WD WA30_7.10.15 is replaced in its entirety with Atch4R3_WD WA30_7.24.15.

E. There is no change in the closing date and time (2:00pm local time / Aug 4, 2015).