Amend_008_Q A.pdf

PDF 40 KB Posted

Attached to
Richland Federal Building Electrical Upgrade Federal contract opportunity
Solicitation number
GS-10P-14-LT-R-0047
Issued by
General Services Administration Public Buildings Service Region 10

About this file

Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Richland Federal Building Electrical Upgrade, newest first.
File Type Posted
Addendum_No._2.pdf PDF
Amend_010_Add_No._2.pdf PDF
Exhibit_1_R2_Pricing_Schedule_DB_Richland_FB_Elec.xlsx XLSX spreadsheet
Atch4R3_WA_30_7.24.2015.pdf PDF
Amend_009_35__Design_Addendum_01.pdf PDF
Atch4R2_WD_WA30_07.10.15_DB_Richland_FB_Elec.pdf PDF
PANEL_SCHEDULE_CHART_Q A.xlsx XLSX spreadsheet
Atch1d_Addendum_01_to_35__design.pdf PDF
Amend_008.pdf PDF
Pre-proposal_Conf_slides.pdf PDF
Pre-proposal_Conf_Attendees.pdf PDF
Exhibit_6_-_SBU_Form.docx DOCX document
Amend_007_SBU.pdf PDF
Amend_006_RFP_35__Design.pdf PDF
Exhibit_1_R1_Pricing_Schedule_DB_Richland_FB_Elec.xlsx XLSX spreadsheet
The_Agreement_R1__DB_Richland_FB_Elec.pdf PDF
The_Solicitation_R1_DB_Richland_FB_Elec.pdf PDF
Atch_4_R1_WD_WA30_6.12.15_DB_Richland_FB_Elec.pdf PDF
CoverPage_ _1442_DB_Richland_FB_Elec.pdf PDF
Amend_005_RFP_Status_Update.pdf PDF
Amend_004_RFP_Closing_Date_Suspended.pdf PDF
Amend_003_RFP_Closing_Date_Extension.pdf PDF
Amendment_002.pdf PDF
Amend_001_Pre-Proposal_Conf.pdf PDF
Atch_4_WD_WA30_9.19.14_DB_Richland_FB_Elec.pdf PDF
Exhibit_5_SF_24-98_DB_Richald_FB_Elec.pdf PDF
Exhibit_3_Performance_Evaluation_Form_DB_Richland_FB_Elec.docx DOCX document
Exhibit_1_Pricing_Schedule_DB_Richland_FB_Elec.xlsx XLSX spreadsheet
Atch_3_Historic_Preservation_DB_Richland_FB_Elec.pdf PDF
Atch_2_Div_1_DB_Richland_FB_Elec.pdf PDF
Atch_1a_PDS__DB_Richland_FB_Elec.pdf PDF
Atch_1_SOW_DB_Richland_FB_Elec.pdf PDF
The_Agreement__DB_Richland_FB_Elec.pdf PDF
Reps.Certs_DB_Richald_FB_Elec.pdf PDF
Exhibit_4_-_Security__DB_Richland_FB_Elec.zip ZIP file
The_Solicitation_DB_Richland_FB_Elec.pdf PDF
Exhibit_2_Resume_Format_DB_Richland_FB_Elec.docx DOCX document
CoverPage_ _1442__DB_Richland_FB_Elec.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP GS-10P-14-LT-R-0047

Amendment 008 DB Richland Federal Building Electrical Switchgear Upgrade

Questions and Answers

Q1: Originally URS had the new east SWBD #2 directly east of the existing to be removed. Now the engineer shows it in the same place as the existing to be removed. Being that we are still required to relocate the low duct, is there a reason why the location was changed? This will cause an extremely long outage to the east half of the building.

A1: The location was changed due to spatial constraints. The idea is to have the power switched to the

West as this is being installed. This is described in the PDS/35%. It is a DB, and this is a preferred suggestion, but the responsibility of the final solution lies with the design builder.

Q2: Do we need a right of way permit for the vault work? If so, please name which entity will provide it so we can determine associated costs?

A2: GSA is checking to see if a right of way permit is required. Upon confirmation this will be clarified in the next Amendment.

Q3: Can we re-use and add to some of the existing bus ducts? If yes, does it have to be same manufacturer?

A3: The intent of the project is to renew the electrical system, and the insulation in the existing bus duct is 50 years old. Bus duct may not be retained.

Q4: Is the information contained in the initial project solicitation, dated 10/17/2014, and amendments 1-4 pertinent to this proposal, or are we to limit our proposal to the information contained in the new solicitation, dated 06/12/2015, and amendments 5 and above? Please detail what information from the initial project solicitation and scope that we are to factor into this proposal.

A4: Amendment 6 is an update to the original solicitation including attachments and exhibits.

Amendment 6 clarifies the changes which include some documents that were replaced in their entirety and some that remain the same (ie Resume template).

Q5: Will electronic Microsoft Word files of the bridging document specifications be provided to the successful design team after project award which can be used as the basis of design and further developed/completed during the 100 day design phase?

A5: Yes. Electronic files will be provided.

Q6: Will electronic CAD drawing files of the bridging documents be provided to the successful design team after project award which can be used as the basis of design and further developed/completed during the 100 day design phase?

A6: CAD files are available and will be provided.

Q7: Amendments posted on Fed Biz op does not match. Amendment 8 calls out for #7. I understand that

8 is actually 7. For bidding purposes and confusion can this be addressed in the next Amendment

A7: When acknowledging Amendments on the SF1442, offerors shall list the number based on the SF30

Forms issued. The fbo.gov system automatically numbered the secure package Amendment 7 when it was uploaded. The secure package is actually a part of Amendment 6.