Addendum_No._2.pdf
PDF 3 MB Posted
- Attached to
- Richland Federal Building Electrical Upgrade Federal contract opportunity
- Solicitation number
- GS-10P-14-LT-R-0047
About this file
Addendum No. 2
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Architecture Planning Design LEED Consulting
115 NW First Ave, Suite 300 Portland, OR 97209 tel 503.280.8000 fax 503.224.5442
Oh planning+design, architecture ADDENDUM
Project Name: Richland Federal Building Addendum Number: 02
Electrical Upgrade
Project Address: Building No WA0063ZZ Date of Issuance: 07/30/15
825 Jadwin Avenue Richland, WA 99352
Owner: GSA General Services Administration OHP+D Project Number: 80030 Dawn Ashton 401 15th Street West Auburn, WA 98001
Contractor For: General Design-Build Bidding & Construction
Description: The purpose of this addendum is to respond to bidder questions related to a scope of work for this project. Spreadsheet of questions and responses are included at the end of addendum for reference.
1. Drawings, dated 06/11/15, which have been added to or modified are listed as follows:
a. Sheet G-001 COVER SHEET:
i. Drawing sheets being replaced are clouded for reference.
b. Sheet E-414 2ND FLOOR ENLARGED PLANS - FEDERAL BUILDING:
i. In plan 1, REVISE panel labeled ‘150A PANEL 2C’ to read ‘150A DISCONNECT’.
ii. In plan 1, REVISE panel labeled ‘PANEL 2D’ to read ‘DISCONNECT PANEL 2D’.
Remove keynote 1 from panel.
c. Sheet E-500 ELECTRICAL ONE-LINE DIAGRAM:
i. In General Notes, REPLACE note 2 to include additional panels ‘CAR HEATER OUTLET’, ‘FC’, ‘DP-1’, ‘DP-2’, ‘IG-3’, ‘1D-4’, and ‘8A’.
ii. In Sheet Notes, REPLACE note 5 in its entirety.
iii. Keynote 5 is clouded at each panel location to highlight modification to Sheet Note
5.
iv. DELETE panel SM and 100A breaker serving it from one-line diagram.
v. At panel 1D-5, ADD keynote 9.
d. Sheet E-501 ELECTRICAL ONE-LINE DIAGRAM:
i. In Sheet Notes, REPLACE keynote 4 in its entirety.
NAME BUILDING FLOOR ROOM
PRINT GRID
LINES
VOLTAGE SIZE
MIN# OF
POLES
MAIN CB FEED FROM FEEDS SUB-PANEL NOTES / COMMENTS INSITE GROUP INC. RESPONSE 7/22/2015
K-5 FED G 120/208 225 42 225 NOT ON DETAIL OR 1-LINE Panel to be replaced per General Note # 2 on sheet E-500.
DP FED G KITCHENETTE G2C 277/480 400 42 400 NOT ON DETAIL OR 1-LINE Panel to be replaced per General Note # 2 on sheet E-500.
IG-3 COURT E-177 K-24 NOT ON DETAIL OR 1-LINE Panel to be replaced per General Note # 8 on sheet E-500.
8A PENT ELEV 120/208 225 37 MLO NOT ON DETIAL Panel to be replaced per General Note # 8 on sheet E-500. Location of existing panel to be determined.
C-3 FED G E-G112 H-17 277/480 C-2 NONE NOT ON GSA PNL SCHEDULE Panel to be replaced per electrical plan note #1 on sheet E-412.
1A-5 FED 1 E-150 S-15 120/208 1A-2 NONE NOT ON GSA PNL SCHEDULE Existing panel is a newer panel that doesn't meet NEC working clearances. See Sheet Note #14 on sheet E-500.
1D-4 FED 1 E-165 H-17 120/208 100 47 100 NOT ON 1-LINE Panel to be replaced per General Note # 8 on sheet E-500.
1D-5 FED 1 E-165 H-17 120/208 1D-2 NONE NOT ON GSA PNL SCHEDULE Existing panel is a newer panel and does not need to be replaced. Panel to remain and be re-fed.
1D-6 FED 1 E-165 H-17 277/480 125 NOT ON GSA PNL SCHED OR 1-LINE Existing panel is a newer panel and does not need to be replaced. Panel to remain and be re-fed. Panel to be relocated per electrical plan note #7 on sheet E-413.
2C FED 2 E-214 H-17 150 NOT ON GSA PNL SCHED OR 1-LINE "150A PANEL 2C" shown on sheet E-414 is a disconnect serving panels "2C-1" and "2C-2". Disconnect does not need to be replaced.
2D FED 2 E-214 H-17 NOT ON GSA PNL SCHED OR 1-LINE "PANEL 2D" shown on sheet E-414 is a disconnect serving panels "2D-1" and "2D-2". Disconnect "PANEL 2D" does not need to be replaced.
3D FED 3 E-304 H-17 225 NOT ON GSA PNL SCHED OR 1-LINE "PANEL 3D" shown on sheet E-415 is a disconnect serving panels "3D-1" and "3D-2". Disconnect "PANEL 3D" does not need to be replaced.
SUB-PNL A 120/208 8 A NONE NOT ON GSA PNL SCHED OR DETAIL Panel to be replaced. Location of existing panel to be determined.
CTV-H&V 277/480 4C NONE NOT ON GSA PNL SCHED OR DETAIL Existing panel is a newer panel and does not need to be replaced. Panel to remain and be re-fed.
1H 277/480 DIST PNL #2 NONE NOT ON GSA PNL SCHED OR DETAIL Panel to be replaced. There is a 200 A breaker in Distribution Panel #2 serving the panel. Location of existing panel 1H to be determined.
SM 277/480 100 MAIN DIST #2 EAST NONE NOT ON GSA PNL SCHED OR DETAIL Panel has already been removed. Panel "SM" and 100 A breaker serving it have been removed from the one-line diagram shown on sheet E-500.
DP-1 COURT 1 E-177 K-24 120/208 100 37 MLO NOT ON 1-LINE Panel to be replaced per electrical plan note #1 on sheet E-402.
DP-2 COURT 1 E-177 K-24 120/208 100 30 MLO NOT ON 1-LINE Panel to be replaced per electrical plan note #1 on sheet E-402.
DP-3 COURT 1 E-177 K-24 120/208 100 30 MLO NOT ON 1-LINE Panel to be replaced per electrical plan note #1 on sheet E-402.
K1 FED G CORRIDOR G-5 K-11 120/208 400 42 MLO NOT ON 1-LINE Panel to be replaced per General Note # 2 on sheet E-500.
K2 FED G CORRIDOR G-5 K-11 120/208 400 42 MLO NOT ON 1-LINE Panel to be replaced per General Note # 2 on sheet E-500.
K3 FED G CORRIDOR G-5 K-11 120/208 400 42 MLO NOT ON 1-LINE Panel to be replaced per General Note # 2 on sheet E-500.
FC FED G W. TRANS VAULT D-17 277/480 600 42 MLO NOT ON 1-LINE Panel to be replaced per General Note # 8 on sheet E-500.
4E FED G E. TRANS VAULT D-16 NOT ON GSA PNL SCHED OR 1-LINE Panel to remain and be re-fed.
45 KVA TXF FED 1 E-165 H-17 NOT ON 1-LINE Existing transformer is a newer transformer and does not need to be replaced. Transformer to remain and be re-fed.
TENANT PNL FED 3 E-304 H-17 NOT ON GSA PNL SCHED OR 1-LINE Panel to remain and be re-fed.
CAR HEAT
OUTLET
PO 1 J-4 NOT ON GSA PNL SCHED OR 1-LINE Panel to be replaced per electrical plan note #1 on sheet E-422.
150KVA TXF PO PENT MECH ROOM PENT G-9 NOT ON 1-LINE Transformer to be replaced per electrical plan note #1 on sheet E-423.
9C PENT ELEV 120/208 225 37 MLO 7C NONE NOT ON DETAIL Panel to be replaced per General Note # 8 on sheet E-500. Location of existing panel to be determined.
3H 120/208 100 42 MLO 3G-1 NONE NOT ON DETAIL Panel to be replaced per General Note # 8 on sheet E-500. Location of existing panel to be determined.
TXF-7 MCC #10 1-P NOT ON DETAIL Transformer to be replaced per Sheet Note # 7 on sheet E-500. Location of existing panel to be determined.
E-1 FED G E-G112 277/480 225 65 MLO ATS E-2 NOT ON DETAIL Panel to be replaced per General Note # 8 on sheet E-500. Location of existing panel to be determined.
9D PENT ELEV 120/208 400 24 MLO 7D-1 NONE
NOT ON DETAIL - 1-LINE SHOWS AS 208v &
GSA SCHEDULE SHOWS 480V
Panel to be replaced per General Note # 8 on sheet E-500. Panel should be 120/208V per one-line diagram.
1I COURT G G42 277/480 225 42 MLO DIST PNL #1 NONE NOT ON DETAIL Panel to be replaced. Location of existing panel to be determined.
400A ELEV
PNL
PENT ELEV 277/480 400 24 MLO NOT ON DETAIL This a new panel. Final location to be determined.
TF-H8V FED 4 E-404 H-17
NOT ON 1-LINE - TENANT PNL , RECONNECT
ONLY
Tenant panel. Reconnect only.
jgilles Text Box
BIDDER QUESTIONS AND RESPONSES
GENERAL CONSTRUCTION NOTES
1. All work shall conform to the contract documents which include the owner/contractor agreement, the drawings and specifications and all addenda and modifications issued by the Contracting Officer and Construction Manager.
2. The Contractor shall review all documents and verify all dimensions and field conditions and shall confirm that work is buildable as shown. Any conflicts, discrepancies, or omissions, etc., within contract documents, drawings or between drawings and field conditions shall be immediately reported to the Contracting Officer and Construction Manager for clarification prior to the commencement of affected work.
3. All contract documents, including without limitation these general notes and the specifications shall apply not only to the General Contractor but to all subcontractors and suppliers on this project. The word 'contractor' shall hereafter apply equally and without exception to all subs and suppliers. All contractors are responsible for familiarizing themselves with both these notes and specifications.
4. No one drawing or specification section shall 'govern'. Contractor shall correlate work between drawings and specifications. Contractor shall also correlate work between drawings of different scales within each section. It is the explicit and specific responsibility of the contractor to examine the contract documents in their entirety, report all discrepancies encountered therein to the attention of the Contracting Officer and Construction Manager and await resolution before proceeding with any work affected by such discrepancies. Where the requirements of either the general notes or the specifications may be at variance with the general conditions, the more restrictive provision shall govern.
5. Contractor shall field verify all existing construction and related conditions prior to starting design, demolition or new construction.
6. General notes are an aid to the contractor in understanding the work and should not be construed as being complete in every detail. It is the explicit and specific responsibility of the contractor to visit the site, verify the existing conditions and familiarize himself thoroughly with the scope of work, and report all discrepancies between the drawings and the assumed or actual conditions to the attention of the Contracting Officer and Construction Manager.
7. Substitutions, revisions or changes must be submitted to the owner for review (in conformance with specified procedures) prior to purchase, fabrication or installation.
8. The Contractor shall maintain for the entire duration of the work all exits, exit lighting, fire protective devices and alarms in conformance with all applicable codes and ordinances.
9. Where interruption of the building's Life Safety System is required to perform the work as described in the construction documents, or to coordinate with owner's operations, the Contractor shall provide interim Life Safety measures to comply with, federal code and owner's requirements.
10. Protect the building, its systems, finishes and related and appurtenant items, so as not to cause damage derived from the work; comply with building rules and regulations.
11. Locate and verify existence and use of existing utilities. Take necessary measures to protect and preserve function and condition of any utilities to be repaired, replaced, or reused in new construction. Coordinate work with Owner.
12. 'Typical' or 'typ' shall mean that the condition is representative for similar conditions throughout unless otherwise noted. Details are usually keyed and noted 'typ' only once, when they first occur.
13. 'Similar' or 'Sim' means comparable characteristics for the conditions noted, verify dimensions and orientation on plans and elevations.
14. The contractor shall not be relieved of responsibility for deviations from requirements of the contract documents by the construction manager's review of shop drawings, product samples, or similar submittals unless the contractor has specifically informed the Construction Manager in writing of such deviation at the time of submittal and the Contracting Officer and Construction Manager has reviewed the specific deviation for the compliance with the intent of the contract documents. The Contractor shall not be relieved of responsibility for errors or omissions in shop drawing, product samples, or similar submittals by the Construction Manager's review thereof.
15. It is the responsibility of the contractor to coordinate, request and forward to the Construction Manager for review shop drawing, product data, samples and similar submittals required by the contract documents with reasonable promptness and in such sequence as to cause no delay in the work or in the activities of the power or of separate contractors.
16. All open joints, penetrations and other openings in the building envelope resulting from the remodel and alterations shall be caulked, sealed, gasketed or weather stripped to limit air leakage.
17. All manufactured articles, material and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned as directed by the manufacturer unless herein specified to the contrary. In case of difference between the manufacturer's instruction and the contract documents, the Contractor shall notify the Contracting Officer and Construction Manager before proceeding.
18. All lines, symbols, notes, tones and other graphic devices contained in the contract documents carry specific or inferential meaning. Items indicated in these are a part of the scope of work and will be required by the owner and Contracting Officer and Construction Manager to be included in the scope of the contractor's work whether they have been included in the contractor's original bid or not. Any items which require further clarification by the Contracting Officer and Construction Manager for the specific benefit of the contractor shall be brought to the attention of the Contracting Officer for such clarification before commencement of any work.
19. The Contractor shall assume design liability and all responsibility for changes in the scope of work not brought to the attention of the Contracting Officer.
20. Dimensions are not adjustable without written approval from the Contracting Officer.
21. The contractor shall pay specific attention to all dimensioned or inferential plan and sectional special relationships, and shall verify all alignments before commencing work.
22. Dimensions marked 'verify' are to be checked for accuracy by the contractor as work proceeds, and all discrepancies are to be brought to the attention of the Contracting Officer and Construction Manager before proceeding.
23. Dimensions marked 'clear' or minimum are not adjustable without the authorization from the Contracting Officer. 'Align' means to accurately locate finished faces in same plane as indicated.
24. Contractor shall not scale the drawings, figured dimensions only are to be used for all aspects of the work. Large scale details take precedence over smaller scale drawings. All dimensions are to face of finish surface, U.N.O.
25. Contractor is responsible for all waste removal and site clean up during performance of and at completion of the work.
26. All features of the Work not fully shown shall be of the same type and character shown for similar conditions. In the event that additional work is required to complete the Work as intended or required by governing codes and safety regulations, yet omitted or not fully shown on the drawings, the contractor must still provide carpentry, mechanical, electrical and/or plumbing work as necessary for Certificate of Occupancy.
27. Spaces within scope of work some equipment replacement occurs in same location and code required clearances are difficult to maintain. In these instances, Contractor is to seek out improvements to the layout to increase safety. Contact Construction Manager for review of proposed layout.
PROJECT DESCRIPTION
These documents represent the scope of work for the GSA Richland Federal Building Electrical Upgrade project. The scope of work includes the following:
ARCHITECTURAL
• Maintain current fire ratings at all new and existing floor and wall penetrations within each room designated as scope of work
• Repair and re-paint walls where wall-mounted equipment is replaced or relocated
• Replace floor stops at electrical room doors to allow doors to open to 90 degree
CIVIL
• Surveying for existing service lines
• Replacement and repair of asphalt parking lot and striping at new feeder line
• New concrete pad and surrounding bollards to enclose exterior switchgear
ELECTRICAL
• Replacement of primary switchgear
• Replacement of original dry type transformers that are more than
20 years old
• Replacement of main distribution switchboards
• Replacement of all panelboards throughout the facility that are more than 20 years old
• Replace vertical and horizontal bus ducts
• Replace existing motor control centers
• Replace elevator distribution panelboard and install new automatic transfer switches
• Maintain existing emergency generator system
• Electrical metering and electrical risk mitigation panel are not meeting working clearance requirements.
• Metering is required at all existing feeders to connect to existing
Obvius Acquisuite Data Acquisition Server.
FIRE SUPPRESSION SYSTEMS
• Extend existing system from closet location into all electrical rooms, gear rooms, and vault rooms noted within scope of work.
FIRE DETECTION
• Extend existing system from closet location into gear and vault rooms noted within scope of work.
Asbestos-containing materials and lead containing paint and varnish may be present throughout the facility. It is the responsibility of the Contractor to identify and contain the hazardous area within the area of work. When hazardous materials are identified, Contractor to notify the Owner.
GENERAL HAZARD COMMUNICATION NOTES
GENERAL FINISHES NOTES
1. All interior patching and repair shall occur in the interior repairs scope of work.
2. Visual requirements: Do not cut and patch construction exposed on the exterior or in occupied spaces in a manner that would, in the architect's opinion, reduce the building's aesthetic qualities. Do not cut and patch construction in a manner that would result in visual evidence of cutting and patching. Remove and replace construction cut and patched in a visually unsatisfactory manner.
3. Protection: Contractor shall protect all existing construction from damage resulting from or related to demolition, construction operations, and cutting and patching. Provide protection from adverse weather conditions for portions of the project that might be exposed during cutting and patching operations. Avoid cutting existing pipe, conduit, or ductwork serving the building but scheduled to be remodeled or relocated until provisions have been made to bypass them.
4. General: Employ skilled workmen to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time and complete without delay.
5. Contractor shall repair or replace any existing construction to remain that is damaged in the course of the work to its original condition.
6. Patching: Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing.
7. Where removing walls or partitions extends one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform color and appearance. Remove existing floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance.
8. Where patching occurs in a smooth painted surface, extend final paint coat over entire unbroken surface containing the patch after the area has received primer and second coat.
9. For specific requirements and instructions see all drawings and specifications.
CONTACT INFORMATION
OWNER
General Services Administration 400 15th Street West Auburn, WA 98001-6599
Contact: Shawn Duffee, GSA Design & Construction Email: shawn.duffee@gsa.gov Telephone: 206.931.7320 Fax: 206.931.7308
Contact: Dawn Ashton, Contracting Officer Email: dawn.ashton@gsa.gov Telephone: 253.931.7784
Contact: Art Hall, GSA Property Manager Email: arthur.hall@gsa.gov Telephone: 509.372.1121
ARCHITECT-OF-RECORD
Oh planning + design, architecture 115 NW First Avenue, Suite 300 Portland, OR 97209
Contact: Deb France, Principal Email: deb.france@ohpd.net Telephone: 503.280.8000 Fax: 503.224.5442
ELECTRICAL ENGINEER
InSite Group, Inc.
310 SW 4th Avenue, Suite 1120 Portland, OR 97204
Contact: Chris Wierman. P.E.
Email: chris@insitegroup.net Telephone: 503.222.2044 Fax: 503.222.5294
LOCATION PLAN
I-182
DOWNTOWN RICHLAND, WA
G E
O R
G E
W A
S H
IN
G
T O
N W
A Y
LEE
SWIFT
T H
A Y
E R
JA
D
W
IN
PROJECT
LOCATION
PROJECT DATA
BUILDING TYPE
Area 370,175 SF Floors 8 Construction Type Steel Frame
2-hour resistive
APPLICABLE CODES
Reference Codes:
Per GSA standards, all design and construction work shall comply with the 2014 Facility Standards for the Public Buildings Service (P100) and all standards and codes referenced therein. This includes, but is not limited to:
ICC: International Code Council family of codes, unless otherwise noted below
NPFA 101: Technical egress requirements of the National Fire Protection Life Safety Code in lieu of the International Building Code (IBC) egress requirements
NFPA: NFPA, National Electrical Code (NFPA 70) in lieu of the ICC Electrical Code
NFPA 70E: NFPA, Standard for Electrical Safety in the Workplace
IFC: Existing fire ratings shall be maintained to comply with the International Fire Code
GSA Region 10: Dry Sprinkler System Guidelines; Fire Alarm Design, Installation and Testing Policy; Wet Sprinkler System Guidelines
10 CFR 434: Department of Energy - Energy Code for New Federal Commercial and Multi-Family High Rise Residential Buildings.
All other nationally recognized standards recognized by the GSA in the P100
State and Local Building Codes:
Facilities on federal property are exempt from State and local building codes.
However, it is GSA’s policy to comply with State and local building codes to the maximum extent practicable
NOT FOR
CONSTRUCTION
CHECKED BY:
R E
V
IS
IO
N
S
DRAWING TITLE
DRAWING NO.
DRAWN:
PROJECT NO.
PROJECT DEV. STUDY
400 15TH STREET WEST
AUBURN, WA 98001
GENERAL SERVICES
ADMINISTRATION
GS-P-10-14-LT-R-0047
P R
O J E
C T
D R
A W
IN
G
FILE NAME
FLOOR NO.
PROJECT
TITLE
PROJECT
DESCRIPTION
GSA PM
SUBMISSION
SUB. DATE
ELECTRICAL
UPGRADE
BUILDING NO.
B U
IL
D
IN
G
NAME
OTHER
BUILDING NOs.
RICHLAND FEDERAL
BUILDING
STREET 825 JADWIN AVENUE
CITY/ST./ZIP RICHLAND WA 99352
WA0063ZZ
FACILITY CODE
PRIME A/E
C O
N T
R A
C T
O R
S
A/E CON. NO.
SUB A/E
CONS. CONT.
CONS. WORK RICHLAND WA 99352
OH PLANNING+DESIGN,
ARCHITECTURE
A/E TASK NO.
INSITE GROUP
CONST.CON.
MARK DATE DESCRIPTION
SENSITIVE BUT UNCLASSIFIED (SBU). PROPERTY OF THE UNITED STATES GOVERNMENT. FOR OFFICIAL USE ONLY.
Do not remove this notice. Properly destroy when no longer needed.
/3
/2
:0 :0
A
M
CM
JG
15-4744-0 / 80030
COVER SHEET
G-001
6/11/2015
R
IC
H L A
N D
F E
D E
R A
L B
U
IL
D
IN
G E
L E
C T
R
IC
A L
U P
G R
A D
E
B u ild in g N o W
A Z
Z J a d w in A v e n u e
R ic h la n d W
A
RICHLAND FEDERAL
BUILDING ELECTRICAL
UPGRADE
- GENERAL -
G-001 COVER SHEET
ELECTRICAL
ES-101 SITE PLAN
RICHLAND FEDERAL BUILDING - ELECTRICAL UPGRADE
PROJECT DEVELOPMENT STUDY
825 JADWIN AVENUE
RICHLAND, WA 99352
BUILDING NO. WA0063ZZ
E-101 GROUND FLOOR PLAN-COURTHOUSE
E-102 1st FLOOR PLAN - COURTHOUSE
E-104 3rd FLOOR PLAN - COURTHOUSE
E-111 GROUND FLOOR PLAN - FEDERAL BUILDING
E-112 1st FLOOR PLAN - FEDERAL BUILDING
E-113 2nd FLOOR PLAN - FEDERAL BUILDING
E-114 3rd FLOOR PLAN - FEDERAL BUILDING
E-115 4th FLOOR PLAN - FEDERAL BUILDING
E-116 5th FLOOR PLAN - FEDERAL BUILDING
E-117 6th FLOOR PLAN - FEDERAL BUILDING
E-118 7th FLOOR PLAN - FEDERAL BUILDING
E-122 1st FLOOR PLAN - POST OFFICE
E-401 GROUND FLOOR ENLARGED PLANS - COURTHOUSE
E-402 1st FLOOR ENLARGED PLANS - COUTHOUSE
E-404 3rd FLOOR ENLARGED PLANS - COURTHOUSE
E-411 GROUND FLOOR ENLARGED PLANS - FEDERAL BUILDING
E-412 GROUND FLOOR ENLARGED PLANS - FEDERAL BUILDING
E-413 1st FLOOR ENLARGED PLANS - FEDERAL BUILDING
E-414 2nd FLOOR ENLARGED PLANS - FEDERAL BUILDING
E-415 3rd FLOOR ENLARGED PLANS - FEDERAL BUILDING
E-416 4th FLOOR ENLARGED PLANS - FEDERAL BUILDING
E-417 5th FLOOR ENLARGED PLANS - FEDERAL BUILDING
E-418 6th FLOOR ENLARGED PLANS - FEDERAL BUILDING
E-419 7th FLOOR ENLARGED PLANS - FEDERAL BUILDING
E-422 1st FLOOR ENLARGED PLANS - POST OFFICE
E-423 MEHANICAL PENTHOUSE ENLARGED PLAN - POST OFFICE
E-500 ELECTRICAL ONE-LINE DIAGRAM
E-501 ELECTRICAL ONE-LINE DIAGRAM
E-502 ELECTRICAL ONE-LINE DIAGRAM
1 05/04/2015 Revised PDS
2 05/15/2015 35% Design Development
3 06/11/2015 35% Design Development
4 07/21/2015 Addendum #1
5 07/30/2015 Addendum #2