SOLCRT_DB_FA_GS-10P-13-LT-C-0013_AMD_02.docx

DOCX document 28 KB Posted

Attached to
Design Build Contract for Fire Alarm System Replacement, Solomon US Courthouse (SOLCRT), Portland, Oregon
Solicitation number
GS-10P-13-LT-C-0015
Issued by

About this file

SOLCRT DB FA GS-10P-13-LT-C-0013 AMD 02

View the file

Other files

File Type Posted
Exhibit_6_Davis_Bacon_WD_Multnomah_County_Portland_OR130029_07262013_OR29_Mod_10_AMD_02.pdf PDF
SOLCRT_Fire_Alarm_DB_SOLICITATION_-_AMD_02.docx DOCX document
Attendance_Sheet_-_SOLCRT_DB.doc DOC document
SOLCRT_RFI_-_AMD_02.docx DOCX document
SOLCRT_RFI_-_Amd_01.docx DOCX document
Exhibit_1_Price_ _Services_Schedule_-_Amd_01.docx DOCX document
Solomon_FA_DB_SOW_7.23.2013_-_Amd_01.docx DOCX document
SOLCRT_DB_FA_GS-10P-13-LT-C-0013_Amd_01.docx DOCX document
Exhibit_6_Davis_Bacon_WD_Multnomah_County_Portland_OR130029_07122013_OR29_Mod_9_Amd_01.pdf PDF
Exhibit_3_Sample_Key_Personnel_Resume_Format_-_FINAL.docx DOCX document
SOLCRT_Fire_Alarm_DB_SOLICITATION_-_FINAL.docx DOCX document
Elec_2.zip ZIP file
Arch_4.zip ZIP file
Elec_4.zip ZIP file
Exhibit_2_Project_Experience_Form_-_FINAL.docx DOCX document
Exhibit_6_Davis_Bacon_WD_Multnomah_County_Portland_OR130029_06072013__OR29.docx DOCX document
CoverPage_ _1442_-_Final.docx DOCX document
SOLOMON_Preservation_Plan_7-2-09.pdf PDF
Exhibit_7A_Contractor_Information_Worksheet.docx DOCX document
Arch_3.zip ZIP file
Asbestos_Reinspection_Survey_Report_Gus_J_Solomon_Cthse.pdf PDF
Exhibit_5_Solomon_Fire_Alarm_Replacement_SOW_-_Final.docx DOCX document
Solomon_Historical_Zones.pdf PDF
Arch_1.zip ZIP file
Exhibit_7B.Security_Clearance_Desk_Guide-External_Contractor.pdf PDF
Exhibit_1_Price_ _Services_Schedule_-_Final.docx DOCX document
Exhibit_7E.Optional_Form_OF306_Addendum.pdf PDF
Exhibit_4_Performance_Evaluation_Form_-_Commercial_Client.docx DOCX document
Solomon_ACM_Mgmt_Plan_2008.docm DOCM document
Gus_Solomon_Building_Class_A_Report.pdf PDF
Solomon_F.A._Division_1_Specs.docx DOCX document
Solomon_CH_HM_Spec_13280.pdf PDF
Elec_5.zip ZIP file
Exhibit_7C.Short_Term_Clearance_Instructions.docx DOCX document
Elec_1.zip ZIP file
GSA_Region_10_-_Fire_Alarm_Design _Installation_and_Testing_Policy_FY_13.docx DOCX document
Elec_3.zip ZIP file
Elec_6.zip ZIP file
SOLCRT_Fire_Alarm_DB_AGREEMENT_-_FINAL.docx DOCX document
Exhibit_7D.Optional_Form_OF306.pdf PDF
Arch_2.zip ZIP file
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MODIFICATION SCHEDULE

Item No.
Supplies/Services
Quantity
Unit
Unit Price
Amount
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. Contract ID Code
Page of Pages
1
2
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req. No.
5. Project No. (if applicable)
02
July 31, 2013

6. Issued By

7. Administered By (If other than Item 6)
Code
GSA PBS Design & Construction Division
See Block 6

400 15th St SW Auburn, WA 98001 Richard Risso, 253-931-7309

8. Name and Address of Contractor (No., Street, County, and Zip Code)
(X)
9A. Amendment of Solicitation No.
X
GS-10P-13-LT-C-0015

9B. Date (See Item 11)

June 19, 2013

10A. Modification of Contract/Order No.

10B. Date (See Item 13)

Code
Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers
is extended
X
is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning
1
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer

submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-

MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT

IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x)
A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor
x
is not,

is required to sign this document and return 3 copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FIRE ALARM SYSTEM REPLACEMENT

DESIGN-BUILD CONSTRUCTION PROJECT

SOLOMON FEDERAL COURTHOUSE,

PORTLAND, OREGON

See submitted questions and related responses.

The purpose of this amendment is as follows:

(1) Provide answers to questions submitted – See attachment SOLCRT RFI – AMD 02

(2) Provide updated SOLCRT DB Fire Alarm DB SOLICITATION – AMD 02

(3) Provide updated DBA Wage Determination – See Exhibit 6, Davis Bacon WD Mulnomah County Portland OR130029 07262013 Mod 10 – AMD 02

(4) Provide the attendance sheet from the site visit, dated 2 July 2013.

The time set for receipt of proposals remains unchanged: 14 August 2013 at 1:00 PM PST.

All other terms and conditions remain unchanged.

Attachments:

1. SOLCRT RFI – AMD 02

2. SOLCRT DB Fire Alarm DB SOLICITATION – AMD 02

3. Exhibit 6, Davis Bacon WD Mulnomah County Portland OR130029 07262013 Mod 10 – AMD 02

4. Site Visit Attendence Sheet, dated 2 July 2013

SF30 Continuation of Block Narrative
Page
2
of
2

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print)
16A. Name and title of Contracting Officer (Type or Print)
15B. Contractor/Offeror
15C. Date Signed
16B. United States of America

(Signature of Contracting Officer) 16C. Date Signed

_____________________________________________(Signature of person authorized to sign)

NSN 7540-01-152-8070
30-105

STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE

Prescribed by GSA FAR (48 CFR) 53.243

File details come from the government source that posted it. Updated .