Exhibit_6_Davis_Bacon_WD_Multnomah_County_Portland_OR130029_06072013__OR29.docx

DOCX document 19 KB Posted

Attached to
Design Build Contract for Fire Alarm System Replacement, Solomon US Courthouse (SOLCRT), Portland, Oregon
Solicitation number
GS-10P-13-LT-C-0015
Issued by

About this file

Exhibit 6 Davis Bacon WD Multnomah County Portland OR130029 06072013 OR29

View the file

Other files

File Type Posted
Exhibit_6_Davis_Bacon_WD_Multnomah_County_Portland_OR130029_07262013_OR29_Mod_10_AMD_02.pdf PDF
SOLCRT_Fire_Alarm_DB_SOLICITATION_-_AMD_02.docx DOCX document
Attendance_Sheet_-_SOLCRT_DB.doc DOC document
SOLCRT_RFI_-_AMD_02.docx DOCX document
SOLCRT_DB_FA_GS-10P-13-LT-C-0013_AMD_02.docx DOCX document
SOLCRT_RFI_-_Amd_01.docx DOCX document
Exhibit_1_Price_ _Services_Schedule_-_Amd_01.docx DOCX document
Solomon_FA_DB_SOW_7.23.2013_-_Amd_01.docx DOCX document
SOLCRT_DB_FA_GS-10P-13-LT-C-0013_Amd_01.docx DOCX document
Exhibit_6_Davis_Bacon_WD_Multnomah_County_Portland_OR130029_07122013_OR29_Mod_9_Amd_01.pdf PDF
Exhibit_3_Sample_Key_Personnel_Resume_Format_-_FINAL.docx DOCX document
SOLCRT_Fire_Alarm_DB_SOLICITATION_-_FINAL.docx DOCX document
Elec_2.zip ZIP file
Arch_4.zip ZIP file
Elec_4.zip ZIP file
Exhibit_2_Project_Experience_Form_-_FINAL.docx DOCX document
CoverPage_ _1442_-_Final.docx DOCX document
SOLOMON_Preservation_Plan_7-2-09.pdf PDF
Exhibit_7A_Contractor_Information_Worksheet.docx DOCX document
Arch_3.zip ZIP file
Asbestos_Reinspection_Survey_Report_Gus_J_Solomon_Cthse.pdf PDF
Exhibit_5_Solomon_Fire_Alarm_Replacement_SOW_-_Final.docx DOCX document
Solomon_Historical_Zones.pdf PDF
Arch_1.zip ZIP file
Exhibit_7B.Security_Clearance_Desk_Guide-External_Contractor.pdf PDF
Exhibit_1_Price_ _Services_Schedule_-_Final.docx DOCX document
Exhibit_7E.Optional_Form_OF306_Addendum.pdf PDF
Exhibit_4_Performance_Evaluation_Form_-_Commercial_Client.docx DOCX document
Solomon_ACM_Mgmt_Plan_2008.docm DOCM document
Gus_Solomon_Building_Class_A_Report.pdf PDF
Solomon_F.A._Division_1_Specs.docx DOCX document
Solomon_CH_HM_Spec_13280.pdf PDF
Elec_5.zip ZIP file
Exhibit_7C.Short_Term_Clearance_Instructions.docx DOCX document
Elec_1.zip ZIP file
GSA_Region_10_-_Fire_Alarm_Design _Installation_and_Testing_Policy_FY_13.docx DOCX document
Elec_3.zip ZIP file
Elec_6.zip ZIP file
SOLCRT_Fire_Alarm_DB_AGREEMENT_-_FINAL.docx DOCX document
Exhibit_7D.Optional_Form_OF306.pdf PDF
Arch_2.zip ZIP file
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: OR130029 06/07/2013 OR29

Superseded General Decision Number: OR20120029

State: Oregon

Construction Type: Building

County: Multnomah County in Oregon.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date 0 01/04/2013 1 01/11/2013 2 01/18/2013 3 01/25/2013 4 02/08/2013 5 03/08/2013 6 04/12/2013 7 04/19/2013 8 06/07/2013

BROR0001-014 06/01/2012

Rates Fringes

BRICK FINISHER...................$ 21.86 10.84

BRICKLAYER.......................$ 32.75 15.80

TILE FINISHER....................$ 21.86 10.19

TILE SETTER......................$ 29.19 13.27

CARP0001-025 06/01/2012

Rates Fringes

Carpenters:

Hardwood floors and batt insulation..................$ 32.76 14.44 Including metal stud installation, from work and scaffold building.......$ 32.61 14.44

CARP9001-003 06/01/2012

Rates Fringes

Acoustical Ceiling Installer & Drywall Hanger.................$ 32.90 14.15

LATHER...........................$ 31.02 16.03

ELEC0048-018 01/01/2013

Rates Fringes

ELECTRICIAN......................$ 38.05 18.44

ELEC0048-020 01/01/2013

Rates Fringes

ELECTRICIAN

Computer Installation, telephone installation, HVAC temperature control installation, Electrical low voltage wiring installer and sound technician only.............$ 22.50 13.83 Electrical installer alarms......................$ 28.75 14.96

ENGI0701-022 01/01/2013

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 37.63 13.55

GROUP 1A....................$ 39.51 13.55

GROUP 1B....................$ 41.39 13.55

GROUP 2.....................$ 35.97 13.55

GROUP 3.....................$ 34.96 13.55

GROUP 4.....................$ 34.00 13.55

GROUP 5.....................$ 32.88 13.55

GROUP 6.....................$ 29.84 13.55

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments

GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom;

GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over

GROUP 2: CRANE: Cableway Operator, 25 tons and over;

HYDRAULIC CRANE: Hydraulic crane operator 90 tons through 199 tons (without luffing or tower attachment);

TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; HYDRAULIC CRANE:

Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment); Rubber tired scraper with tandom scrapers, multi-engineTrenching Machine-Wheel Operator; Excavator over 130,000 lbs; Loader 120,000 lbs and above; BLADE: Auto Grader; Blade Operator-Robotic

GROUP 3: HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment);

LATTICE BOOM CRANES: Lattice Boom Crane-50 through 89 tons (and less than 150 feet boom); Rubber Tired Scraper: with tandom scrapers; self loading, paddle wheel, auger type, finish and/or 2 or more units; Excavator over 80,000 lbs through 130,000; Loader 60,000 lbs and less than 120,000 lbs.

GROUP 4: CRANE: Hydraulic Crane Operator, under 50 tons;

LATTICE BOOM CRANE OPERATOR: Lattice Boom Crane Operator, under 50 tons; TRACKHOE/EXCAVATOR-ROBOTIC: up to and including 20,0000 lbs. with any or all attachments;

Excavator Operator over 20,000 lbs through 80,000 lbs.;

BLADE: Blade Operator; Tractor operator with boom attachment; DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator over 20,000 lbs pullback; CRANE: Chicago boom and similar types; Boom type lifting device, 5 ton capacity or less; HYDRAULIC HOES:

Robotic Hydraulic backhoe operator, track and wheel type up to and including 20,0000 lbs. with any or all attachments;

Asphalt Paver; Screed Operator; Rubber-Tired Scraper, single engine, single scraper; Compactor-Self Propelled;

Trenching Machine, digging capacity over 3 ft Depth;

Excavator over 20,000 lbs through 80,000 lbs; Loaders 25,000 lbs and less than 60,000 lbs

GROUP 5: TRACKHOE/EXCAVATOR-HYDRAULIC: up to and including 20,000 lbs.; Boom truck operator; DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator less than 20,000 lbs pullback; HYDRAULIC HOES: Hydraulic Backhoe Operator, wheel type (Ford, John Deere, Case type);

Hydraulic Backhoe Operator track type up to and including 20,000 lbs.; Concrete Pumper; Concrete Paver: Compactor;

Loaders, rubber tired type , less than 25,00 lbs; Forklift over 5 ton, Man Lift/Outside Elevator

GROUP 6: LOADERS: (less than 1 cu yd.); Roller (Non-Asphalt); Oiler; Bobcat/Skid Loader; Grade Checker;

Crane oiler; Drill Assistant; Forklift

IRON0029-011 01/01/2012

Rates Fringes

IRONWORKER (Ornamental, Reinforcing, and Structural).....$ 33.87 20.12

LABO0001-030 06/01/2011

Rates Fringes

Laborers: (Mason Tender-Cement/Concrete)..........$ 25.19 12.35

LABO0001-031 06/01/2011

Rates Fringes

Laborers: (Mason Tender-Brick)...$ 25.19 12.35

LABO0001-032 06/01/2011

Rates Fringes

Laborers: (Mason Tender-Stone)...$ 25.19 12.35

LABO0003-011 06/01/2010

Rates Fringes

Laborers:

GROUP 1.....................$ 25.25 12.07

GROUP 2.....................$ 25.91 12.07

GROUP 3.....................$ 26.38 12.07

GROUP 4.....................$ 26.80 12.07

LABORER CLASSIFICATIONS

GROUP 1: Form-Stripping; Demolition, General Laborer

GROUP 2: Power Tool Operator

GROUP 3: Vibrating Plate

GROUP 4: Pipelayer

PAIN0055-025 07/01/2009

Rates Fringes

PAINTER

BRUSH, ROLLER AND SPRAY.....$ 19.59 7.24

PAIN0055-026 08/13/2012

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 32.22 12.40

PAIN0740-002 01/01/2013

Rates Fringes

GLAZIER..........................$ 35.80 13.89

PAIN1236-007 01/01/2013

Rates Fringes

FLOOR LAYER: Vinyl Flooring.....$ 27.28 11.62

PLAS0082-004 06/01/2011

Rates Fringes

PLASTERER

Including Stucco............$ 25.08 11.32

PLAS0555-006 06/01/2012

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 29.98 17.76

PLUM0290-009 04/01/2013

Rates Fringes

PIPEFITTER

Including HVAC Pipe Installation................$ 39.71 22.10

PLUM0290-010 04/01/2013

Rates Fringes

PLUMBER..........................$ 39.71 22.10

ROOF0049-004 07/01/2012

Rates Fringes

ROOFER

Excluding Metal Roof........$ 28.03 9.55

SFOR0669-002 01/01/2013

Rates Fringes

SPRINKLER FITTER

Fire Sprinklers.............$ 32.43 19.75

SHEE0016-015 07/01/2011

Rates Fringes

Sheet Metal Worker Including HVAC Duct Installation................$ 35.32 16.10

SUOR2009-027 11/09/2009

Rates Fringes

ELECTRICIAN (Low Voltage Wiring for Alarms)...............$ 27.97 6.41

LABORER: Asphalt Raker..........$ 20.94 7.05

LABORER: Landscape..............$ 12.38 0.00

MILLWRIGHT.......................$ 18.45 3.54

TRUCK DRIVER: Water Truck.......$ 18.11 5.05

TEAM0037-008 06/01/2012

Rates Fringes

Truck drivers:

GROUP 1.....................$ 26.90 13.25

GROUP 2.....................$ 27.02 13.25

GROUP 3.....................$ 27.15 13.25

GROUP 4.....................$ 27.41 13.25

GROUP 5.....................$ 27.63 13.25

GROUP 6.....................$ 27.79 13.25

GROUP 7.....................$ 27.99 13.25

TRUCK DRIVERS CLASSIFICATIONS

GROUP 1: Dump trucks, side, end and bottom dumps: up to and including 10 cu. yds.

GROUP 2: Dump trcuks/articulated dumps 6 cu to 10 cu.;

GROUP 3: Dump trucks, side, end and bottom dumps: over 10

cu. yds. and including 30 cu. yds., includes articulated dump trucks

GROUP 4: Dump trucks, side, end and bottom dumps: over 30 cu.

yds. and including 50 cu. yds. and includes articulated dump trucks

GROUP 5: Dump trucks, side, end and bottom dumps: over 50

cu. yds. and including 60 cu. yds. and includes articulated dump trucks

GROUP 6: Dump trucks, side, end and bottom dumps: over 60

cu. yds. and including 80 cu. yds. and includes articulated dump trucks

GROUP 7: Dump trucks, side, end and bottom dumps: over 80

cu. yds. and including 100 cu. yds., includes articulated dump trucks

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

File details come from the government source that posted it. Updated .