Asbestos_Reinspection_Survey_Report_Gus_J_Solomon_Cthse.pdf
PDF 5 MB Posted
- Attached to
- Design Build Contract for Fire Alarm System Replacement, Solomon US Courthouse (SOLCRT), Portland, Oregon
- Solicitation number
- GS-10P-13-LT-C-0015
About this file
Asbestos Reinspection Survey Report Gus J Solomon Cthse
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS REINSPECTION SURVEY REPORT
GENERAL SERVICES ADMINISTRATION
GUS J. SOLOMON US COURTHOUSE AND
FEDERAL BUILDING
OR0023ZZ
PORTLAND, OREGON
February 26, 2007
Prepared for:
Mr. Ron Smith
GSA
400 15th Street SW Auburn, WA 98001
Prepared by:
EHS – International, Inc.
13228 NE 20th Street, Suite 100 Bellevue, WA 98005
(425) 455–2959
Solomon US Courthouse and Federal Bldg, Portland 1 EHSI Project 9143-23 OR0023ZZ February 26, 2007
ASBESTOS REINSPECTION
GENERAL SERVICES ADMINISTRATION
GUS J. SOLOMON US COURTHOUSE AND FEDERAL BUILDING (OR0023ZZ)
PORTLAND, OREGON
BACKGROUND
EHS International, Inc. (EHSI), a hazardous materials consulting firm, under contract to the General Services Administration (GSA) was tasked by GSA to conduct a hazardous materials reinspection and confirmation sampling in accessible areas at the Gus J.
Solomon US Courthouse and Federal Building, located at 620 SW Main Street, Suite 706, Portland, Oregon.
EXECUTIVE SUMMARY OF FINDINGS
The following suspect materials were assumed to be asbestos containing or sampled and identified as either asbestos-containing materials (ACM) or non-ACM in the subject areas of the building:
Asbestos-containing Materials (ACM) Sampled Non-Asbestos Materials Thermal system insulation (TSI) on piping Vinyl floor tile (VFT) Thermal system insulation (TSI) debris Tectum wall and ceiling panels Vinyl asbestos tile (VAT) Suspended acoustic ceiling tiles (SACT) Sheet vinyl (SV) with ACM backing Plaster Flooring mastic associated with VAT, VFT and SV Poured flooring
Ductwork insulation Mechanical isolation cloth Stainless steel sink undercoating Tar in attic walkway Acoustical ceiling tile (ACT) and associated ACM mastic Cove base and associated mastic
Mastic associated with non-ACM Tectum wall and ceiling panels Built-up roofing
Assumed ACM Fire doors
DAMAGED MATERIAL
Damaged ACM TSI was noted in the basement, second and fourth through seventh floors. Refer to drawings DM-1 to DM-6 (attached) for approximate locations of the damaged ACM material. Refer to attachment A; Damage Material Physical Assessment Sheets, for information and cost estimates.
Solomon US Courthouse and Federal Bldg, Portland 2 EHSI Project 9143-23
REINSPECTION
EHSI accomplished an asbestos materials reinspection of the subject building on February 2, 2007. The intent of the reinspection is to specifically identify, quantify, determine the current condition, assign homogenous sample area numbers (HSA#), and develop an engineer’s cost estimate for removal/disposal of ACM.
EHSI was tasked to use applicable Federal, State, and local guidelines in the accomplishment of its reinspection. EHSI was further tasked to provide a written report for the areas reinspected including identification of all suspect materials and a determination of whether suspect material was ACM.
A spreadsheet listing all of the reinspection data is included in Appendix A.
REINSPECTION FINDINGS
Asbestos-Containing Materials
EHSI reviewed GSA electronic data files for a previous PBS Environmental asbestos inspection conducted in 1994 and interviewed maintenance crew at the Gus J. Solomon US Courthouse and Federal Building. The design drawings from the 1994 survey showed TSI on pipe fittings and pipe runs, debris in pipe chases, VAT, SV, mastics associated with floor tiles and sheet vinyl flooring, ductwork insulation, ACT and associated mastic, ACM mastic associated with non-ACM tectum wall and ceiling tiles and built-up roofing as sampled and confirmed asbestos-containing materials. Additional samples taken as part of previous surveys confirmed that the following materials were not ACM: vinyl floor tile, tectum wall and ceiling panels, suspended acoustic ceiling tiles, plaster, poured flooring, mechanical isolation cloth, tar in attic walkway, and cove base and associated mastic.
Information on past renovation work was collected from on sight maintenance crew:
Abatement of VAT and ACM mastics from the fourth floor was conducted in October of 2006. Affected rooms included 414, 415, 417, 423 and 445.
The first floor GSA offices underwent an extensive renovation in 2000.
All floors, with the exception of the third and penthouse level, have undergone remodeling since the 1994 survey. These remodels included extensive relocation of wall systems.
Five (5) bulk samples of suspect ACM were collected as part of this reinspection. Limited destructive inspection was conducted to identify hidden and/or concealed materials;
however, demolition of concrete walls or floor slabs for access and inspection was beyond the scope of this reinspection. Summaries of asbestos sampling information including sample number, sample location, material description and analytical results are included in Table 1 below.
Solomon US Courthouse and Federal Bldg, Portland 3 EHSI Project 9143-23
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
GUS J. SOLOMON US COURTHOUSE AND FEDERAL BUILDING
SAMPLE
NUMBER
9143-23
SAMPLE
LOCATION
MATERIAL
DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
230, by doorway to room 232
Layer 1: Clear adhesive Layer 2: 9” tan VAT Layer 3: Black mastic
L1: ND
L2: ND
L3: 3%
N/A N/A
Chrysotile 02 214 Black sink undercoating 2% Chrysotile
03 214, storage Layer 1: 9” gray VAT Layer 2: Black mastic Layer 3: Leveling compound
L1: 2% L2: 2%
L3: ND
Chrysotile Chrysotile
N/A
04 214 Layer 1: 9” light gray VFT Layer 2: Black mastic
L1: ND
L2: 3%
N/A Chrysotile
801, on air handling units and floor
White debris ND N/A
KEY: N/A= not applicable, ND = none detected, VAT = vinyl asbestos tile, VFT = vinyl floor tile.
ACM identified in this survey should not be disturbed unless handled by personnel who are properly trained and certified in asbestos work. Any survey, regardless of how extensive, can miss concealed materials. Demolition and/or renovation activities by contractors may expose concealed suspect ACM. Contingency plans should include stopping work and identification of concealed suspect ACM, evacuation of the area, and sampling by a certified AHERA inspector. Concealed suspect material may include, but is not limited to:
non-fiberglass pipe insulation; spray-applied coatings; cementitious board; asphalt or paper vapor barriers; and mastics.
LIMITATIONS
During reinspection, not all rooms were accessible due to tenant restrictions. This reinspection was limited to the chemicals and materials identified herein. No effort was made to identify hazardous materials in soil, water, or air, other than those listed herein.
Limited destructive inspection (e.g., cutting holes in floors, walls, and ceilings) of the building materials to identify, sample, quantify and determine the condition of concealed suspect building materials was not accomplished for this reinspection. Any reinspection, regardless of how extensive, can miss concealed materials. Contractors should be aware of the potential that demolition activities may expose concealed suspect ACM and should have preplanned contingencies for handling these materials when discovered during demolition work. Any concealed, suspect ACM material that was not sampled or that was assumed to be ACM by this reinspection report when encountered must be assumed to be ACM and treated as such until sampled by a certified AHERA Building Inspector and analyzed by a certified laboratory.
Solomon US Courthouse and Federal Bldg, Portland 4 EHSI Project 9143-23
STANDARD OF CARE
The recommendations and conclusions contained in this report represent the professional opinions of EHSI. These opinions are derived in accordance with Federal, State and local environmental and health and safety laws and regulations. This reinspection was accomplished in accordance with applicable Federal, State, and local regulations and industry standards in effect at the time. Other than this, no other warranty is implied or intended.
APPENDICES
Appendix A provides the reinspection physical assessment of asbestos containing materials spreadsheet utilized during the reinspection. Appendix B provides the analytical reports and chain-of-custody forms for asbestos samples for the current reinspection. Appendix C contains sampling methodology. Appendix D contains AHERA Building Inspector certificates. Appendix E provides laboratory certification for asbestos analysis. Appendix F includes the sample location drawings. Appendix G includes the homogenous material drawings. Appendix H includes Damaged ACM material drawings.
AHERA CERTIFIED BUILDING INSPECTOR
The AHERA Certified Building Inspectors listed below reinspected the Portland Gus J.
Solomon US Courthouse and Federal Building, on February 2, 2007, in accordance with Federal, State, and local requirements.
Jim O’Malley EHS-International, Inc.
13228 NE 20th Street Suite 100 Bellevue, WA 98005 AHERA Building Inspector Certification #: 9199-03-02 Expiration Date: 01/25/08
Jeffrey L. Murray EHS-International, Inc.
13228 NE 20th Street Suite 100 Bellevue, WA 98005 AHERA Building Inspector Certification #: 9199-02-07 Expiration Date: 01/11/08
Lisa Kollasch EHS-International, Inc.
13228 NE 20th Street Suite 100 Bellevue, WA 98005 AHERA Building Inspector Certification #: 9040-02-03 Expiration Date: 1/12/08
APPENDIX A
PHYSICALASSESSMENT OF ACM SPREADSHEET
Building Name:
Building Number: Ptld Cts Prpty Mng Office
Address:
HOMOGENOUS
MATERIALS
DESCRIPTION HSA # ACM FLOOR ROOM LOCATION U
N
IT
S
M E A S U E R E D
Q U A N T
IT
Y
C O N D
IT
IO
N
D A M A G
P O T E N T
IA
L
D A M A G E T Y P E
O T H E R D A M A G E
R E C O M M E N D
R
S P O N S
A C T
IO
N
S A M P L E D
A S S U M E D
D A M A G E
F R
IA
B
IL
IT
Y
E S T
IM
A T
S T
F
M E D
IA
T
IO
N
VAT and ACM mastic on concrete 314 Yes
Basement, 1, 2, 4 & 5
B3, B41, South entry & Cell
Room (1st floor), Room North of
214 (2nd floor), 539A and SW
Storage (5th floor)
Floor Sq. Ft. 3,400 Good Low N/A N/A O&M Sampled None No $7,650
Non-ACM VFT and ACM mastic on concrete 314 Yes
Basement &
B4, B86, B88, 214, 237 and
NW hallway storage (2nd floor)
Floor Sq. Ft. 1,200 Good Low N/A N/A O&M Sampled None No $2,100
VAT and Non-ACM mastic on concrete, under carpet 314 Yes 4 419 Floor Sq. Ft. 600 Good Low N/A N/A O&M Sampled None No $900
VAT and Non-ACM mastic on concrete 314 Yes Basement B76 Floor Sq. Ft. 1,200 Good Low N/A N/A O&M Sampled None No $1,800
VAT and ACM mastic on concrete, under carpet 314 Yes 4
413, 435, 437-
444, 446, 447 and the North office area
Throughout Sq. Ft. 5,200 Good Low N/A N/A O&M Sampled None No $13,000
Gus J. Solomon US Crth & Fed Bldg
620 SW Main St, Suite 706
Re-Inspection Physical Assessments of Asbestos-Containing Materials
Order No:
OR0023ZZ
February 2, 2007Date:
Portland, Oregon 97205
Howard SchafferService Center:
Field Office: 503-326-5690
Propty Mg:
Phone:
HOMOGENOUS
MATERIALS
DESCRIPTION HSA # ACM FLOOR ROOM LOCATION U
N
IT
S
M E A S U E R
A N T
IT
Y
C O N D
IT
IO
N
D A M A
T E N T
IA
L
D A M A G E T Y P E
O T H E R D A M A G E
R E C O M M E N D
S P O N
T
IO
N
S A M P L E D
A S S U M E D
D A M A G E
F R
IA
B
IL
IT
Y
E S T
IM
A T
S T
M E D
IA
T
IO
N
Sheet vinyl flooring with
ACM backing and mastic 410 Yes 4 & 6
NW hallway bath
(4th floor) & NW and NE baths
(6th floor)
Floor Sq. Ft. 120 Good Low N/A N/A O&M Sampled None Yes $540
Non-ACM VFT and ACM mastic on concrete under carpet
314 Yes 2 & 6
201-204, 206-
208, 222, 223, 225-235, Library office, SE office
(2nd floor) and
618 storage room
Throughout Sq. Ft. 10,000 Good Low N/A N/A O&M Sampled None No $21,600
ACM TSI on straight pipe runs 385 Yes All Throughout Throughout Linear Ft. 4,500 Fair Moderate
See
DM
dwgs
N/A Repair Sampled Minor Yes $68,250
ACM TSI on pipe fittings 379 Yes All Throughout Throughout Each 1,500 Fair Moderate
See
DM
dwgs
N/A Repair Sampled Minor Yes $19,750
ACM 12" ACT with ACM mastic 194 Yes 5&6
522, room North of 522, SW hallway storage room (5th floor), 612, 613, 615, 618 and Staff kitchen (6th floor), 702, 702B, 703, 708A, 710, SW offices and the NE office area
Ceiling Sq. Ft. 5,300 Good Low N/A N/A O&M Sampled None No $14,600
ACM ductwork insulation 245 Yes Basement B61 Ceiling Linear Ft. 105 Fair Moderate
See
DM
dwgs
N/A Repair Sampled Minor Yes $1,575
DESCRIPTION HSA # ACM FLOOR ROOM LOCATION U
N
IT
S
M E A S U E R
A N T
IT
Y
C O N D
IT
IO
N
D A M A
T E N T
IA
L
D A M A G E T Y P E
O T H E R D A M A G E
R E C O M M E N D
S P O N
T
IO
N
S A M P L E D
A S S U M E D
D A M A G E
F R
IA
B
IL
IT
Y
E S T
IM
A T
S T
M E D
IA
T
IO
N
Stainless steel sink with
ACM undercoating 443 Yes 2 214
See HM drawings Each 1 Good Low N/A N/A O&M Sampled None No $100
ACM core fire doors 258 Yes Basement, 1-
Throughout
Basement & elevator doors on
1-7
See HM drawings Each 40 Good Low N/A N/A O&M Assumed None Yes $7,000
ACM mastic behind Tectum wall and ceiling acoustical panels
353 Yes 8 &
Penthouse
801 and
Penthouse elevator rooms
Walls/Ceiling Sq. Ft. 1,700 Good Low N/A N/A O&M Sampled None No $9,350
Built-up roofing 397 Yes Penthouse Mechanical room Roof Sq. Ft. 5,000 Good Low N/A N/A O&M Sampled None No $6,250
Covebase and mastic 6 No All All Floor Linear Ft. Good Low N/A N/A Sampled None
Plaster 392 No All All Walls/Ceiling Sq. Ft. Good Low N/A N/A Sampled None
Poured Flooring 367 No All All Throughout Sq. Ft. Good Low N/A N/A Sampled None
Mechanical isolation cloth 344 No Basement Throughout On ductwork Sq. Ft. Good Low N/A N/A Sampled None
Tar 367 No 8 Attic walkway Floor Sq. Ft. Good Low N/A N/A Sampled None
Terazzo Flooring 367 No All Throughout Floor Sq. Ft. Good Low N/A N/A Assumed None
DESCRIPTION HSA # ACM FLOOR ROOM LOCATION U
N
IT
S
M E A S U E R
A N T
IT
Y
C O N D
IT
IO
N
D A M A
T E N T
IA
L
D A M A G E T Y P E
O T H E R D A M A G E
R E C O M M E N D
S P O N
T
IO
N
S A M P L E D
A S S U M E D
D A M A G E
F R
IA
B
IL
IT
Y
E S T
IM
A T
S T
M E D
IA
T
IO
N
SACT 154 No B, 1-4, 6 & 7 Throughout Ceiling Sq. Ft. Good Low N/A N/A Sampled None
$174,465
$52,340
$69,786
$296,591
Abatement Cost Est. Subtotal
Abatement Design Cost
Abatement Construction Management Costs
Total Abatement Cost
Building Name: Gus J. Solomon US Cthse & Fed Bldg Building Number:
Address:
Portland, Oregon 97205
HSA # ACM FLOOR ROOM L
O C A T
IO
N
U N
IT
S
A C C E S S
IB
L E
385 Yes Basement, 2, 4, 5, 6, &
Throughout
See DM-1 to DM-6 drawings
Linear Ft.
Yes
379 Yes Basement, 2, 4, 5, 6, &
Throughout
See DM-1 to DM-6 drawings
Each Yes
245 Yes Basement B61 at Ceiling
See DM-1 drawing
Linear Ft.
Yes
*$12,835
Yes $300
$7,550
Sampled Medium
$3,020
$2,265
*Exclusive of Mobilization Cost.
Date:
Service Center:
Field Office:
Total Abatement Cost
Abatement Construction Management Costs
HOMOGENOUS
MATERIALS DESCRIPTION
ACM ductwork insulation
ACM TSI on pipe runs and debris
Abatement Cost Est.
Subtotal
Portland Cts Prpty Mgmt Office
Re-Inspection Physical Assessments of Damaged Materials
Propty Mngr:
Phone:
Order No:
OR0023ZZ
620 SW Main St., Suite 706
Howard Schaffer
Abatement Design Cost
E S T
IM
A T E D C O
T
R E M E D
IA
T
IO
N
F R
IA
B
IL
IT
Y
S A M P L E D
A S S U M E D
R E C O M M E N D
S P O N
T
IO
N
E S T
IM
A T
A N T
IT
Y
M A G E D A C M
D
IS
T U R B A N
T E N T
IA
L
20 Repair
Repair
(503) 326-5690
February 2, 2007
Yes $5,000
ACM TSI on pipe fittings and debris
150 Repair Sampled Low Yes $2,250
250 Sampled Low
APPENDIX B
ANALYTICAL REPORTS AND CHAIN OF CUSTODY FORMS FOR
ASBESTOS SAMPLES
APPENDIX C
SAMPLING METHODOLOGY
SAMPLING METHODOLOGY
Asbestos-Containing Materials
The EHSI field inspectors were an asbestos Building Inspector, certified under the requirements of the United States Environmental Protection Agency (EPA) Asbestos Hazard Emergency Response Act (AHERA) regulation 40 CFR 763, Subpart E. Sampling was consistent with the requirements of AHERA, as well as meeting the requirements of State and local regulatory agencies. Samples were collected and analytical data obtained for suspect ACM identified in the facility. The number of bulk samples collected and their locations were based on the AHERA regulation and the guidelines provided by the EPA Document 560/5-85-030a, October 1985, Asbestos in Buildings: Simplified Sampling Scheme For Friable Surfacing Materials. Once collected, bulk samples were sealed to eliminate the possibility of contamination. “Chain-of-custody” tracking was followed to maintain sample integrity during handling and data reporting at EHSI and the analytical laboratory. As specified in 40 CFR Chapter 1 (1-1-87 edition) Part 763, Subpart F, Appendix A, each sample was analyzed using polarized light microscopy (PLM) dispersion staining techniques, in accordance with U.S. EPA Method 600/R-93/116.
Samples were analyzed for asbestos content by NVL Laboratories, Inc. (NVL), Seattle, Washington, a National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory. Only materials containing more than 1% total asbestos were classified as “asbestos-containing” based on EPA, State, and local regulations.
APPENDIX D
AHERA BUILDING INSPECTOR CERTIFICATES
APPENDIX E
LABORATORY CERTIFICATION FOR ASBESTOS ANALYSIS
APPENDIX F
SAMPLE LOCATION DRAWINGS
APPENDIX G
HOMOGENOUS MATERIAL DRAWINGS
APPENDIX H
DAMAGED ACM MATERIAL DRAWINGS
File details come from the government source that posted it. Updated .