06.11.3 DB RFP Phase 2- Exhibit 3 - Wage Determination.pdf
PDF 22 KB Posted
- Solicitation number
- GS-10P-09-LT-C-0112
About this file
FCS - Phase 2 RFP - Exhibit 3 Wage Determination
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: WA080051 09/25/2009 WA51
State: Washington
Construction Type: Building
County: King County in Washington.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date 0 07/03/2009 1 07/17/2009 2 07/24/2009 3 07/31/2009 4 08/14/2009 5 08/21/2009 6 09/25/2009
ASBE0007-002 01/01/2009
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 33.93 14.35
BRWA0001-011 06/01/2009
Rates Fringes
Bricklayers, Caulkers............$ 34.31 12.04
* CARP0770-020 06/01/2009
Rates Fringes
CARPENTER (Acoustical Installation)....................$ 35.55 13.08 CARPENTER (Including Formwork, Drywall Hanging, Cabinet Installation;
Insulator-Batt and Metal Stud Installation)....................$ 35.39 13.08
MILLWRIGHT.......................$ 36.39 13.08
PILEDRIVERMAN....................$ 35.59 13.08
(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL
CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS
Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities:
Seattle Olympia Bellingham Auburn Bremerton Anacortes Renton Shelton Yakima Aberdeen-Hoquiam Tacoma Wenatchee Ellensburg Everett Port Angeles Centralia Mount Vernon Sunnyside Chelan Pt. Townsend
12/8/2009http://www.wdol.gov/wdol/scafiles/davisbacon/WA51.dvb
Zone Pay:
0 -25 radius miles Free 26-35 radius miles $1.00/hour 36-45 radius miles $1.15/hour 46-55 radius miles $1.35/hour Over 55 radius miles $1.55/hour
(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT
AND PILEDRIVER ONLY)
Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center
Zone Pay:
0 -25 radius miles Free 26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour
ELEC0046-006 06/01/2009
Rates Fringes
ELECTRICIAN......................$ 40.81 3%+15.71
ELEC0046-007 01/29/2007
Rates Fringes
ELECTRICIAN (Alarm Installation Only)...............$ 23.30 7.85 ELECTRICIAN (Low Voltage Wiring Only).....................$ 23.30 7.85
ELEV0019-005 01/01/2009
Rates Fringes
ELEVATOR MECHANIC................$ 42.91 18.285+A+B
FOOTNOTE:
a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit.
b. Eight paid holidays: New Year's Day; Memorial Day;
Independence Day; Labor Day; Veteran's Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day
ENGI0302-019 06/01/2009
Rates Fringes
Power equipment operators:
Group 1A...................$ 35.79 15.15 Group 1AA..................$ 36.36 15.15 Group 1AAA.................$ 36.92 15.15 Group 1.....................$ 35.24 15.15 Group 2.....................$ 34.75 15.15 Group 3.....................$ 34.33 15.15 Group 4.....................$ 31.97 15.15
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1AAA - Cranes-over 300 tons, or 300 ft of boom (including jib with attachments)
GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments); Excavator/Trackhoe: Over 90 metric tons
GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Loaders-overhead, 8 yards and over; excavator/Trackhoe: over 50 metric tons to 90 metric tons
GROUP 1 - Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments); Excavator/Trackhoe: over 30 metric tons to 50 metric tons; Loader- overhead 6 yards to, but not including 8 yards; Dozer D-10; Screedman;
Scrapers: 45 yards and over; Grader/Blade
GROUP 2 - Cranes, 20 tons thru 44 tons with attachments;
Drilling machine; Excavator/Trackhoe: 15 to 30 metric tons;
Horizontal/directional drill operator; Loaders-overhead under 6 yards; Crane Oiler-100 Tons and Over; Compactor;
Scraper: under 45 tons
GROUP 3 - Cranes-thru 19 tons with attachments; Dozers-D-9 and under; Motor patrol grader-nonfinishing; Roller-Plant Mix; Crane Oiler under 100 tons; Excavator/Trackhoe: under 15 metric tons; Forklift: 3000 lbs and over with attachments; Service Oiler; Concrete Pump; Outside Hoist (Elevators and Manlifts); Pump Grout
GROUP 4 - Roller-other than plant mix; Forklift: under 3000 lbs with attachments; Bobcat; Rigger/Bellman
IRON0086-010 07/01/2009
Rates Fringes
IRONWORKER (Reinforcing, Structural and Ornamental).......$ 36.62 17.40
LABO0001-016 06/01/2009
ZONE 1:
Rates Fringes
Laborers:
GROUP 2.....................$ 24.86 9.07
GROUP 3.....................$ 30.96 9.07
GROUP 4.....................$ 31.70 9.07
GROUP 5.....................$ 32.21 9.07
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES):
ZONE 2 - $1.00
ZONE 3 - $1.30
BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT,
TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT.
TOWNSEND, PT. ANGELES, AND BREMERTON
ZONE 1 - Projects within 25 radius miles of the respective city hall
ZONE 2 - More than 25 but less than 45 radius miles from the respective city hall ZONE 3 - More than 45 radius miles from the respective city hall
LABORERS CLASSIFICATIONS
GROUP 2: Flagman
GROUP 3: General Laborer; Mason Tender-Cement/Concrete;
Chipping Gun (under 30 lbs.); Form Stripping; Roof Tearoff
GROUP 4: Chipping Gun (over 30 lbs.); Concrete Saw Operator;
Grade Checker; Gunite; Pipe Layer; Vibrating Plate
GROUP 5: Mason Tender-Brick
PAIN0005-029 07/01/2008
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 32.61 14.43
PAIN0005-030 06/01/2008
Rates Fringes
Painters:
Parking Lot and Highway Striping Only...............$ 26.50 11.40
* PAIN0005-031 03/01/2009
Rates Fringes
PAINTER (Including Brush, Roller, Spray and Prep Work).....$ 20.82 7.44
* PAIN0188-005 09/01/2009
Rates Fringes
GLAZIER..........................$ 36.00 12.50
PAIN1238-002 07/01/2009
Rates Fringes
SOFT FLOOR LAYER (Including Vinyl and Carpet)................$ 27.06 11.90
PLAS0077-001 07/01/2008
Rates Fringes
PLASTERER........................$ 32.50 12.33
PLAS0528-004 06/01/2009
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 35.75 13.40
PLUM0032-009 06/01/2009
Rates Fringes
PIPEFITTER.......................$ 45.00 19.41
PLUMBER (Including HVAC Pipe Installation)....................$ 45.00 19.41
REFRIGERATION MECHANIC...........$ 41.88 18.28
ROOF0054-008 06/01/2009
Rates Fringes
ROOFER (Excluding Metal Roofs)...$ 28.62 11.43
* SFWA0699-006 04/01/2009
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 33.25 16.55
SHEE0066-024 06/01/2007
Rates Fringes
Sheet Metal Worker (Including HVAC Duct Work and Installation of HVAC Systems)....$ 34.24 17.63
SUWA2009-024 05/22/2009
Rates Fringes
LABORER: Driller................$ 17.17 5.36
LABORER: Irrigation.............$ 11.58 0.00
LABORER: Landscape..............$ 9.73 0.00
LABORER: Overhead Door Installation.....................$ 22.31 3.44
OPERATOR: Backhoe...............$ 29.95 7.20
OPERATOR: Mechanic..............$ 24.33 4.33
ROOFER: Metal Roof Only.........$ 24.30 4.05
TILE SETTER......................$ 18.72 3.35
TRUCK DRIVER: Dump Truck........$ 27.43 0.00
* TEAM0174-005 06/01/2009
Rates Fringes
Truck drivers:
ZONE A:
GROUP 2:...................$ 31.03 14.60
ZONE B (25-45 miles from center of listed cities*): Add $.70 per hour to Zone A rates.
ZONE C (over 45 miles from centr of listed cities*): Add $1.00 per hour to Zone A rates.
*Zone pay will be calculated from the city center of the following listed cities:
BELLINGHAM CENTRALIA RAYMOND OLYMPIA
EVERETT SHELTON ANACORTES BELLEVUE
SEATTLE PORT ANGELES MT. VERNON KENT
TACOMA PORT TOWNSEND ABERDEEN BREMERTON
TRUCK DRIVERS CLASSIFICATIONS
GROUP 2 - Semi-Trailer Truck
HAZMAT PROJECTS
Anyone working on a HAZMAT job, where HAZMAT certification is required, shall be compensated as a premium, in addition to the classification working in as follows:
LEVEL C: +$.25 per hour - This level uses an air purifying respirator or additional protective clothing.
LEVEL B: +$.50 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit."
LEVEL A: +$.75 per hour - This level utilizes a fully-encapsulated suit with a self-contained breathing apparatus or a supplied air line.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .