This document provides details for a federal contract solicitation to rehabilitate bridges in the Great Smoky Mountains National Park. The solicitation was issued by the Department of Transportation Federal Highway Administration for sealed bids from certified Small Business Concerns only. The project consists of rehabilitation work on 9 bridges located in Tennessee, including asphalt removal, scour protection, new concrete deck installation, nail-laminated timber deck replacement, masonry repointing, approach repaving, and rail repairs. The work will be split into multiple schedules with a total estimated cost between $1-5 million. Construction must be completed by March 26, 2022. Bids are due on a date specified in the solicitation document available as of June 17, 2020 on the System for Award Management website. In addition to registration on SAM for payment processing, annual representations and certifications must be completed online. Questions regarding the solicitation should be directed to the specified email address.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 5460-047P
ELKMONT ROAD BRIDGE AT LITTLE RIVER INSPECTION DATE: 6/20/18
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... STEEL NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... ARCH - DECK NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 115.0 FT (35.1 M)
DECK TYPE: ......................... NOT APPLICABLE MAX. SPAN LENGTH: .......... 25.0 FT (7.6 M)
WEARING SURFACE: .......... NOT APPLICABLE DECK WIDTH: ...................... 21.5 FT (6.6 M)
ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 18.0 FT (5.5 M)
PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE / MASONRY YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 3B15 / 1368 SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 3 - SPECIAL PURPOSE FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 2012-BRIDGE AND APPROACHES REPAVED.
LOCATION
GREAT SMOKY MOUNTAINS NATIONAL PARK MILE POINT: ..................... 0.54 (KM PT 0.87)
STATE: ................................. TENNESSEE LOCATION: 0.1 MILES NORTH FROM NPS ROUTE
133.FACILITY CARRIED: ............ ELKMONT ROAD
FEATURE INTERSECTED: .. LITTLE RIVER
STRUCTURE EVALUATION SUMMARY
This four-span corrugated steel plate arch bridge is in fair condition. The main problems include scour along the north abutment with 15" of the footing exposed; scour along the north and center piers; deterioration of the abutment and pier wall masonry mortar joints with several washed out; and drift accumulation in the upstream channel. Other problems include deterioration of the bituminous coating with rusting, some areas with section loss, of the steel arch plates at the pier interfaces; erosion at the northwest and southwest approach parapet ends; and tree growth west of south pier.
Corrective action should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: J. PARRISH, P. SWANN (VOLKERT, INC.)
CONDITION ASSESSMENT:
JESSE PARRISH, E.I., FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 11/8/18
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5460-047P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
C226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
222.7 INSTALL REFLECTIVE OBJECT MARKERS AT APPROACH PARAPET ENDS. 4 EA
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
60.9 REPAIR SCOUR ALONG ABUTMENTS AND PIERS WITH ENGINEERED
RIPRAP.
1 LS
58.6, 59.8, 60.1,6,13,1
5, 222.3
REPOINT MASONRY MORTAR JOINTS AS NECESSARY. 1 LS
59.3 CLEAN EXPOSED STEEL ARCH PLATES AND RECOAT WITH
BITUMINOUS COATING.
1 LS
61.4 REMOVE DRIFT IN UPSTREAM CHANNEL. REMOVE TREE WEST OF
SOUTH PIER.
1 LS
222.5,6 STABILIZE EROSION OF APPROACH EMBANKMENTS. 1 LS
CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL,
DESIGN, AND CONSTRUCTION ENGINEERING.
1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5460-047P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
OTHER
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
FOUNDATIONS
CAPS AND/OR BEARING SEATS
PILE BENTS
WALLS AND/OR COLUMNS
PIER(S)
OTHER
SLOPE PROTECTION
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
EXPANSION JOINTS
WEEP HOLES
WINGWALLS
FOUNDATIONS
BACKWALLS AND/OR BULKHEADS
CAPS AND/OR BEARING SEATS
PILE BENTS
BREASTWALLS OR COLUMNS
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
N
N N F N N N N F G
N G
F N G N G F N N F G N
N(VEGETATION)
F N F N F G
F(VEGETATION)
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
12.
13.
14.
15.
16.
17.
18.
19.
58.6, 222.3 MINOR TO MODERATE DETERIORATION OF PARAPET MASONRY
MORTAR JOINTS; MINOR VEGETATION GROWTH IN JOINTS. MINOR
SEPARATION OF END BLOCK AT NORTHEAST CORNER.
59.3,8 SUPERSTRUCTURE CONSISTS OF GALVANIZED STEEL ARCH
PLATES WITH BITUMINOUS COATING.
MODERATE TO SEVERE DETERIORATION OF BITUMINOUS COATING
EXPOSING GALVANIZED STEEL ARCH PLATES; MINOR TO
MODERATE CRACKING AND DETERIORATION ELSEWHERE.
MINOR TO MODERATE RUSTING OF STEEL ARCH PLATES AT
INTERFACE WITH PIERS. HEAVY RUSTING AND MINOR SECTION
LOSS FROM STEEL ARCH PLATES AT CENTER PIER INTERFACE ON
SOUTH FACE. MODERATE EFFLORESCENCE ON STEEL ARCH PLATE
ABOVE SOUTH ABUTMENT PIER WALL; MINOR ELSEWHERE AND
RANDOMLY LOCATED.
HEAVY EFFLORESCENCE ON FASCIA RING STONE MORTAR JOINTS.
MINOR DETERIORATION OF MORTAR JOINTS WITH
EFFLORESCENCE AT BOTH SPANDREL WALLS; ISOLATED AREAS OF
MINOR VEGETATION GROWTH.
60.1,6 MODERATE DETERIORATION OF ABUTMENT BREASTWALL AND
WINGWALL MASONRY MORTAR JOINTS WITH MINOR TO MODERATE
EFFLORESCENCE; ISOLATED AREAS OF HEAVY EFFLORESCENCE
ON BREASTWALLS. SEVERAL MORTAR JOINTS WASHED OUT AT
WATERLINE.
60.5,9 MINOR TO MODERATE SCOUR ALONG FACE OF NORTH ABUTMENT
WITH UP TO 15" OF FOOTING EXPOSED FOR FULL LENGTH.
60.12,19 MINOR VEGETATION GROWTH ON WINGWALLS. LARGE TREE
GROWTH ENCROACHING WEST SIDE OF SOUTH PIER.
60.13,15 MODERATE TO SEVERE DETERIORATION OF PIER MASONRY
MORTAR JOINTS WITH MINOR TO MODERATE EFFLORESCENCE;
SEVERAL MORTAR JOINTS WASHED OUT AT WATERLINE.
SOUTH PIER STONE DISLODGED AT EAST END.
G G N F G N
N
N
N
N
FIELD INSPECTION REPORT STRUCTURE NO. 5460-047P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL 5
G G N P N
HIGH
SUFF
13 FT.
ROCK, SAND, STONES
222. APPROACHES 5
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER
N N F G F G N G N
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
N N N
60.17 MODERATE SCOUR ALONG SOUTH FACE OF CENTER PIER; MINOR
AT BOTH SIDES OF NORTH PIER. MODERATE AGGRADATION
PRESENT ALONG NORTH FACE OF NORTH AND CENTER PIERS.
61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.
61.4 LARGE DRIFT ACCUMULATION AT UPSTREAM SIDE OF SPANS #2
THROUGH #4; MINOR UPSTREAM OF SOUTH PIER.
222.4,5 MINOR EROSION ON WEST SIDE OF SOUTH APPROACH
EMBANKMENT, WITH APPROACH PARAPET END UNDERMINED UP
TO 10".
MODERATE AREA OF EROSION, UP TO 13" DROP-OFF, AT WEST
SHOULDER OF NORTH APPROACH; APPROACH PAVEMENT
UNDERMINED UP TO 7".
222.7 REFLECTIVE OBJECT MARKERS NOT PROVIDED AT APPROACH
PARAPET ENDS.
36 BRIDGE AND APPROACH PARAPET HEIGHT OF 2'-0", AT SOME
LOCATIONS, DOES NOT MEET CURRENT SAFETY GUIDELINES OF
2'-3" FOR TRAFFIC BARRIERS.
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE LOAD RATING STRUCTURE NO. 5460-047P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 24 22 41 37
HS 44 40 73 66
TYPE 3 30 27 51 46
TYPE 3S2 44 40 73 66
TYPE 3-3 49 44 82 74
DESIGN LOADING: UNKNOWN
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
X ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 5/16
LOAD RATING CONTROLLED BY: COVER OVER STRUCTURE
REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-047P
STRUCTURE IDENTIFICATION
(201) PARK: GREAT SMOKY MOUNTAINS NATIONAL PARK
(202) STRUCTURE NAME: .......... ELKMONT ROAD BRIDGE AT LITTLE RIVE
(203) STRUCTURE KIND: ............1 - BRIDGE
(204) STRUCTURE NUMBER: ..... 5460-047P
(205) NPS REGION: .................... 4 - SOUTHEAST
(206) ROUTE CODE NUMBER: ... 18
(207) ROAD SECTION NO: ..........047P
(208) NPS ROAD CLASS: ............ 3 - SPECIAL PURPOSE
(209) WITHIN NPS BNDRY?: .......YES
(210) OPERATING UNIT: ............. N. DIST.
(211) PROJECT NO(S): ................3B15
(212) DRAWING NUMBERS:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY/PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR: ..
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORICAL DESIGNATION: ..
474 - TENNESSEE (TN)
155 - SEVIER
164000180
LITTLE RIVER
ELKMONT ROAD
5460047P0000000
0.1 MILES NORTH FROM NPS
99.99 FT (99.99 M)
0.54 (KM PT 0.87)
N/A
3 - FREE ROAD
3 - POSSIBLY ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
3 - STEEL
11 - ARCH - DECK
25.0 FT (7.6 M)
115.0 FT (35.1 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
N - NOT APPLICABLE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. N - NOT APPLICABLE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 0 - UNKNOWN (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 44.0 TONS (39.9 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 73.0 TONS (66.2 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/18 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-047P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 35°39'17.40"
(17) LONGITUDE: ......................... 83°34'50.50"
(19) DETOUR LENGTH: ............... 0 MI (0 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 5 - WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
18.0 FT (5.5 M)
21.5 FT (6.6 M)
29.0 FT (8.8 M)
19.0 FT (5.8 M)
5.0 FT (1.5 M)
5.0 FT (1.5 M)
0 - NO MEDIAN
0 °
NO
18.0 FT (5.5 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
3 - PARAPET ONLY
9 - OTHER
1 - CONTINUOUS RAIL
2.00 FT (0.61 M)
99.99 FT (99.99 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK: ................................. N
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 0NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
4 - Stable; action required to pro
2 - REHAB/RECONSTRUCTION
C - MODERATE
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2012-BRIDGE AND APPROACHES REPAVED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
https://83�34'50.50 https://35�39'17.40
APPENDIX STRUCTURE NO. 5460-047P
PHOTOGRAPHS STRUCTURE NO. 5460-047P
FLOW
PHOTO #1 - LOOKING NORTH TOWARD ELKMONT CAMPGROUND
PHOTO #2 - WEST (DOWNSTREAM) SIDE; NOTE TYPICAL
EFFLORESCENCE ON MASONRY FASCIA
PHOTO #3 - GENERAL TOP SIDE VIEW LOOKING SOUTH
PHOTO #4 - GENERAL UNDERSIDE VIEW OF SPAN #4 LOOKING
NORTHWEST
PHOTO #5 - TYPICAL DETERIORATION OF PARAPET MASONRY MORTAR
JOINTS, EAST PARAPET SHOWN; NOTE VEGETATION GROWTH
PHOTO #6 - EROSION ALONG WEST SHOULDER OF NORTH APPROACH;
NOTE APPROACH PAVEMENT UNDERMINING
PHOTO #7 - GENERAL VIEW OF SOUTH ABUTMENT; NOTE
EFFLORESCENCE
PHOTO #8 - SOUTH PIER STONE DISLODGED AT EAST END; NOTE
DRIFT ACCUMULATION
PHOTO #9 - TREE GROWTH ENCROACHING WEST SIDE OF SOUTH
PIER
PHOTO #10 - RUSTING AND SECTION LOSS OF ARCH STEEL PLATES AT
SOUTH FACE OF CENTER PIER INTERFACE
PHOTO #11 - TYPICAL RUSTING OF ARCH STEEL PLATES AT PIER
INTERFACES, SOUTH FACE OF NORTH PIER SHOWN; NOTE TYPICAL
DETERIORATION OF MASONRY MORTAR JOINTS
PHOTO #12 - TYPICAL SCOUR ALONG PIERS, SOUTH FACE OF NORTH
PIER SHOWN
PHOTO #13 - SCOUR AT NORTH ABUTMENT; NOTE EXPOSED FOOTING
PHOTO #14 - TYPICAL AGGRADATION ALONG PIERS, NORTH PIER IN
SPAN #4 SHOWN
PHOTO #15 - GENERAL VIEW OF NORTH ABUTMENT; NOTE TYPICAL
DETERIORATION OF BITUMINOUS COATING EXPOSING GALVANIZED
STEEL
PHOTO #16 - DRIFT ACCUMULATION UPSTREAM OF SPANS #2
THROUGH #4
PHOTO #17 - LOOKING UPSTREAM THROUGH SPAN #2
PHOTO #18 - LOOKING DOWNSTREAM THROUGH SPAN #1