GRSM 14(3)121(1)ETC_BIP_STR 5460-060P.pdf

PDF 4 MB Posted

Attached to
Great Smoky Mountains National Park
Solicitation number
693C73-20-B-000021
Issued by

About this file

This solicitation is for rehabilitation of nine bridges located in the Great Smoky Mountains National Park in Tennessee. The work includes asphalt wearing course removal, scour protection around existing abutments and wingwalls, installation of new concrete deck, replacement of nail-laminated timber decking, cleaning and repointing of masonry joints, repaving of bridge approaches, rail repairs, and other miscellaneous work. The project will be split into multiple work schedules and contract options, with the total cost expected to be between $1,000,000 to $5,000,000. Construction must be completed by March 26, 2022. Sealed bids from certified Small Business Concerns will be accepted, with the bid due date and location specified on the SF1442 form in Block 13a of the solicitation.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE SUMMARY STRUCTURE NO. 5460-060P

RAMSEY CASCADES ROAD BRIDGE #1 INSPECTION DATE: 6/19/18

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL:

MAIN SPAN TYPE:

# OF BEAMS, MAIN SPAN: ..

DECK TYPE:

WEARING SURFACE:

ABUT. FOUNDATIONS:

PIER FOUNDATION(S):

ABUTMENT / PIER MAT'L: ...

PROJ./PLAN REF. NO:

NPS ROAD CLASS:

STRUCTURE HISTORY:

STEEL

STRINGER/MULTI-BEAM or GIRDER

WOOD OR TIMBER

NONE

SPREAD FTG ON BEARING MAT'L

UNKNOWN

MASONRY / CONCRETE

2C / 00000

2 - CONNECTOR ROAD

NO. OF MAIN SPANS:

NO. OF APPR. SPANS:

STRUCT. TOTAL LENGTH: ..

MAX. SPAN LENGTH:

DECK WIDTH:

CURB TO CURB WIDTH:

YEAR BUILT:

YEAR RECONSTRUCTED: ..

SKEW ANGLE:

FRACTURE CRITICAL:

93.3 FT (28.4 M)

63.3 FT (19.3 M)

13.0 FT (4.0 M)

11.8 FT (3.6 M)

N/A

20 °

YES

LOCATION

GREAT SMOKY MOUNTAINS NATIONAL PARK MILE POINT: ..................... 0.00 (KM PT 0.00)

STATE: ................................. TENNESSEE LOCATION: 0.01 MILES EAST FROM NPS ROUTE 102

(GREENBRIER ROAD).FACILITY CARRIED: ............ RAMSEY CASCADES ROAD

FEATURE INTERSECTED: .. PORTERS CREEK

STRUCTURE EVALUATION SUMMARY

This weathering steel beam bridge is in fair condition overall. The main problem is erosion and scour with undermining at the west abutment apron and along the channel embankments. Additional problems include abrasion and rutting of the deck timbers; soil accumulation on the bearing areas; and rutting and potholes at the approaches.

Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: B. BUMPERS, T. POWELL (VOLKERT, INC.)

CONDITION ASSESSMENT:

BRITT BUMPERS, P.E., FIELD TEAM LEADER

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 11/8/18

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5460-060P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

C226 PRIORITY OF IMPROVEMENT

ITEM

NO.

ROUTINE MAINTENANCE QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

60.3 REMOVE SOIL FROM BEARING AREAS. 1 LS

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST

ESTIMATES

REHAB. RECONSTR.

60.9, 61.2 PLACE ENGINEERED RIPRAP ALONG CHANNEL BANKS AND IN

FRONT OF WEST ABUTMENT.

1 LS

58.3 INSTALL TIMBER RUNNING PLANKS ALONG WHEEL PATHS. 1 LS

222.4,6 REPAIR RUTTING AND POTHOLES AT APPROACHES. 1 LS

CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL,

DESIGN, AND CONSTRUCTION ENGINEERING.

1 LS

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 5460-060P

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

N NOT APPLICABLE

9 EXCELLENT CONDITION

8 VERY GOOD CONDITION - no problems noted.

7 GOOD CONDITION - some minor problems.

6 SATISFACTORY CONDITION - structural elements show some minor deterioration.

5 FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

1 “IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

0 FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

58. DECK 6

1. DECK SLAB F

2. EXPANSION JOINTS N

3. WEARING SURFACE N

4. RIDEABILITY G

5. CURBS, SIDEWALKS, AND MEDIAN F

6. PARAPETS AND/OR RAILINGS F

7. DRAINS AND DRAINAGE F

8. UTILITIES N

9. DEFLECTION AND/OR VIBRATION G

10. OTHER N

59. SUPERSTRUCTURE 5

1. BEARING DEVICES

2. GIRDERS OR BEAMS

3. ARCH(ES) OR SLAB(S)

4. FLOOR BEAMS AND STRINGERS

5. TRUSSES

6. DIAPHRAGMS AND BRACING

7. PAINT

8. FASCIA(E)

9. DEFLECTION AND/OR VIBRATION

10. ALIGNMENT

11. OTHER

60. SUBSTRUCTURE

ABUTMENTS

1. BREASTWALLS OR COLUMNS

2. PILE BENTS

3. CAPS AND/OR BEARING SEATS

4. BACKWALLS AND/OR BULKHEADS

5. FOUNDATIONS

6. WINGWALLS

7. WEEP HOLES

8. EXPANSION JOINTS

9. EROSION AND/OR SCOUR

10. SETTLEMENT OR DEFLECTION

11. SLOPE PROTECTION

12. OTHER (CONCRETE APRON)

PIER(S)

13. WALLS AND/OR COLUMNS

14. PILE BENTS

15. CAPS AND/OR BEARING SEATS

16. FOUNDATIONS

17. EROSION AND/OR SCOUR

18. SETTLEMENT OR DEFLECTION

19. OTHER

F F N N N F N N G G N

G N F G G G G N F G N G

G N G N G G N

58.1

58.5,6

58.7

59.1,2,6

60.1

60.3

60.6

60.9

60.13

ITEM REFERENCE AND REMARKS

2" X 8" (NOMINAL) NAIL-LAMINATED TIMBER DECK. MINOR

ABRASION AND RUTTING OF DECK SURFACE; MODERATE AT LAST 5'

OF DECK, BOTH ENDS.

MODERATE SPLITTING, CHECKING, AND DECAY OF TIMBER CURBS

AND RAILINGS. MINOR TO MODERATE DECAY ON TOPS OF RAIL

POSTS. MINOR COLLISION DAMAGE TO EAST END OF SOUTH CURB

AND WEST END OF NORTH CURB AND BOTTOM RAIL.

MINOR TO MODERATE ACCUMULATION OF DEBRIS AND GRAVEL ON

DECK.

A588 WEATHERING STEEL. MINOR TO MODERATE FLAKING OF

PROTECTIVE COAT, PITTING, AND MINOR SECTION LOSS

THROUGHOUT BEARINGS, DIAPHRAGMS, AND BEAM WEBS AND

BOTTOM FLANGES; TYPICAL 0.875" THICKNESS OF BOTTOM FLANGE

REMAINING IN WEST SPAN; 0.75" IN EAST SPAN. UP TO 0.125"

TOTAL LOSS OF WEBS.

BEAM ENDS IN CONTACT AT PIER; NO ROOM FOR EXPANSION

REMAINING.

MINOR MAP CRACKING THROUGHOUT EAST ABUTMENT

BREASTWALL.

MODERATE SOIL ACCUMULATION ON ABUTMENT BEARINGS AND

SOUTH BEARING SEATS AT ABUTMENTS.

MINOR DETERIORATION OF MORTAR JOINTS WITH MODERATE

EFFLORESCENCE AT NORTHWEST AND SOUTHWEST WINGWALLS.

UP TO 2' UNDERMINING OF CONCRETE APRON AT WEST ABUTMENT.

MINOR DETERIORATION OF MORTAR JOINTS AT BASE OF PIER.

FIELD INSPECTION REPORT STRUCTURE NO. 5460-060P

ITEM REFERENCE AND REMARKS

61. CHANNEL 6

1. ALIGNMENT F

2. EROSION AND/OR SCOUR F

3. CHANNEL PROTECTION G

4. WATERWAY OBSTRUCTIONS G

5. OTHER N

6. ADEQUACY OF OPENING SUFF

7. NORMAL VELOCITY HIGH

8. AVERAGE CLEAR OPENING 7 FT.

9. STREAM BED COMPOSITION :

ROCK, SAND, STONES

222. APPROACHES 6

1. APPROACH SLABS

2. RELIEF JOINTS

3. APPROACH GUARDRAIL

4. SURFACING

5. EROSION

6. SETTLEMENT

7. SIGNS

8. ALIGNMENT

9. OTHER

N N N F G F G F N

223. RETAINING WALL N

1. WALL

2. WEEP HOLES

3. FOUNDATION

4. EROSION AND/OR SCOUR

5. SETTLEMENT OR DEFLECTION

6. OTHER

36. TRAFFIC AND SAFETY FEATURES

A. BRIDGE RAILINGS

B. TRANSITIONS

C. APPROACH GUARDRAILS

D. APPROACH GUARDRAIL ENDS

N N N

61.1 STREAM FLOWS AGAINST WEST ABUTMENT; NO FLOW IN EAST

SPAN.

61.2 VOID (2'-6" D) BELOW STACKED BOULDERS AT DOWNSTREAM END

OF WEST ABUTMENT CONCRETE APRON. EROSION AND 3'

UNDERMINING OF EMBANKMENT, 4' SOUTH OF SOUTHWEST

WINGWALL. MODERATE EROSION OF CHANNEL BANKS BEYOND

NORTHWEST AND SOUTHWEST WINGWALLS.

SEE BRIDGE FILE FOR SCOUR EVALUATION.

222.4,6 MODERATE RUTTING IN WHEEL PATHS AT BOTH APPROACHES WITH

POTHOLES UP TO 2" D. UP TO 1" OF SETTLEMENT AT BOTH

APPROACHES.

222.7 REFLECTIVE OBJECT MARKERS AT BOTH APPROACHES. TIMBER

POSTS WITH REFLECTORS AT WEST APPROACH. "NO TOWED

VEHICLES" SIGN AT WEST APPROACH.

222.8 T-INTERSECTION AT WEST APPROACH.

TRAFFIC SAFETY RATING CODES

N

Does not meet standards or a safety feature is required and none is provided.

Meets currently acceptable standards.

Not applicable or a safety feature is not required.

STRUCTURE LOAD RATING STRUCTURE NO. 5460-060P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 16 15 27 25

HS 25 23 41 37

TYPE 3 22 20 37 33

TYPE 3S2 32 29 53 48

TYPE 3-3 38 34 63 57

DESIGN LOADING: UNKNOWN

CAPACITY MEETS OR EXCEEDS DESIGN LOAD

X CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

X ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 10/10

LOAD RATING CONTROLLED BY: BEAM MOMENT CAPACITY

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-060P

STRUCTURE IDENTIFICATION

(201) PARK: GREAT SMOKY MOUNTAINS NATIONAL PARK

(202) STRUCTURE NAME: .......... RAMSEY CASCADES ROAD BRIDGE #1

(203) STRUCTURE KIND: ............1 - BRIDGE

(204) STRUCTURE NUMBER: ..... 5460-060P

(205) NPS REGION: .................... 4 - SOUTHEAST

(206) ROUTE CODE NUMBER: ... 113

(207) ROAD SECTION NO: ..........060P

(208) NPS ROAD CLASS: ............ 2 - CONNECTOR ROAD

(209) WITHIN NPS BNDRY?: .......YES

(210) OPERATING UNIT: ............. N. DIST.

(211) PROJECT NO(S): ................2C

(212) DRAWING NUMBERS:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY/PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR: ..

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORICAL DESIGNATION: ..

474 - TENNESSEE (TN)

155 - SEVIER

164001130

PORTERS CREEK

RAMSEY CASCADES ROAD

5460060P0000000

0.01 MILES EAST FROM NPS

99.99 FT (99.99 M)

0.00 (KM PT 0.00)

N/A

3 - FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

3 - STEEL

02 - STRINGER/MULTI-BEAM or GIRDER

63.3 FT (19.3 M)

93.3 FT (28.4 M)

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

0 - UNKNOWN

0 - UNKNOWN

8 - WOOD OR TIMBER

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 0 - NONE

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 0 - UNKNOWN (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 25.0 TONS (22.7 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 41.0 TONS (37.2 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 6/18 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... YES

INSP. EVERY: 24 MONTHS - LAST INSP. : 6/18 (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-060P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 35°42'27.50"

(17) LONGITUDE: ......................... 83°22'56.50"

(19) DETOUR LENGTH: ............... 0 MI (0 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 00

(42A) SERVICE ON: ..................... 1 - HIGHWAY

(42B) SERVICE UNDER: .............. 5 - WATERWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... 0

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M)

(56) LEFT: ......................... 0.0 FT (0.0 M)

(51) CURB TO CURB WIDTH:

(52) DECK WIDTH:

(32) APPR. ROADWAY WIDTH:

(213) APPR. PAVEMENT WIDTH:

LEFT SHOULDER:

RIGHT SHOULDER:

(33) BRIDGE MEDIAN:

(34) SKEW ANGLE:

(35) DECK FLARE?:

(47) TOTAL HORIZ. CLEARANCE:

(50) SIDEWALKS:

LEFT :

RIGHT :

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION:

MATERIAL:

DESIGN TYPE:

(215) BRIDGE RAIL HEIGHT:

(53) MIN. VRT. CLEAR. OVER DECK:

(54) MIN. VRT. UNDERCLEARANCE:

11.8 FT (3.6 M)

13.0 FT (4.0 M)

20.0 FT (6.1 M)

12.0 FT (3.7 M)

4.0 FT (1.2 M)

4.0 FT (1.2 M)

0 - NO MEDIAN

20 °

NO

11.8 FT (3.6 M)

0.0 FT (0.0 M)

0.0 FT (0.0 M)

1 - FULL HEIGHT (NO PARAPE

7 - TIMBER

1 - CONTINUOUS RAIL

3.50 FT (1.07 M)

99.99 FT (99.99 M)

0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ...........................N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

5 - Stable; scour within limits of

2 - REHAB/RECONSTRUCTION

C - MODERATE

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

https://83�22'56.50 https://35�42'27.50

APPENDIX STRUCTURE NO. 5460-060P

PHOTOGRAPHS STRUCTURE NO. 5460-060P

PHOTO #1 - LOOKING EAST TOWARD RAMSEY CASCADES

FLOW

PHOTO #2 - SOUTH (UPSTREAM) SIDE

PHOTO #3 - GENERAL TOP SIDE VIEW LOOKING EAST

PHOTO #4 - GENERAL UNDERSIDE VIEW OF WEST SPAN LOOKING

WEST

PHOTO #5 - TYPICAL ABRASION AND RUTTING OF DECK SURFACE AT

EAST END

PHOTO #6 - TYPICAL SPLITTING, CHECKING, AND DECAY OF TIMBER

CURBS, EAST END OF NORTH CURB SHOWN

PHOTO #7 - COLLISION DAMAGE TO WEST END OF NORTH CURB AND

BOTTOM RAIL

PHOTO #8 - TYPICAL RUTTING ALONG WHEEL PATHS AT BOTH

APPROACHES WITH POTHOLES, EAST APPROACH SHOWN

PHOTO #9 - TYPICAL DECAY IN TIMBER RAIL POST, NORTH POST IN

EAST SPAN SHOWN

PHOTO #10 - GENERAL VIEW OF WEST ABUTMENT

PHOTO #11 - DETERIORATION, RUSTING AND SECTION LOSS TO BEAM,

BEARING AND DIAPHRAGM, SOUTH BEAM AT WEST ABUTMENT SHOWN

PHOTO #12 - GENERAL VIEW OF WEST FACE OF PIER; NOTE TYPICAL

DETERIORATION OF MORTAR JOINTS AT PIER, WEST FACE OF PIER

SHOWN

PHOTO #13 - TYPICAL BEAM ENDS IN CONTACT AT PIER, NORTH SIDE

OF NORTH BEAM SHOWN

PHOTO #14 - TYPICAL DETERIORATION OF WEATHERING STEEL

BEAMS, NORTH SIDE OF NORTH BEAM IN WEST SPAN SHOWN

PHOTO #15 - GENERAL VIEW OF EAST ABUTMENT; NOTE MAP

CRACKING

PHOTO #16 - TYPICAL SOIL ACCUMULATION ON BEARINGS, SOUTH

BEARING AT EAST ABUTMENT SHOWN

PHOTO #17 - LOOKING UPSTREAM FROM DECK

PHOTO #18 - LOOKING DOWNSTREAM FROM DECK